Loading...
HomeMy WebLinkAbout2020-058AMENDMENT 1 TO WORK ORDER 2018006-4 SECTOR 3 BEACH AND DUNE NOURISHMENT PROJECT (IRC -1925) PROFESSIONAL ENGINEERING AND BIOLOGICAL SUPPORT SERVICES This Amendment 1 to Work Order Number 2018006-4 is entered into as of this 7 day of April , 2020 by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and APTIM Environmental & Infrastructure, LLC ("Consultant"). 1. The COUNTY has selected the Consultant to perform the professional services set forth in existing Work Order Number 2018006-4, Effective Date January 9, 2018. 2. The COUNTY and the Consultant desire to amend this Work Order as set forth on Exhibit 1 attached to this Amendment and made part hereof by this reference. The professional services will be performed by the Consultant for the fee schedule set forth in Exhibit 1, and within the timeframe outlined in above -referenced Work Order, all in accordance with the terms and provisions set forth in the Work Order. 3. From and after the Effective Date of this Amendment, the above -referenced Work Order is amended as set forth in this Amendment. IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the date first written above. CONSULTANT: APTIM ENVIRONMENTAL & INFRASTRUCTURE, LLC Print Name: Name: Beau C. Suthard, PG Title: Program Director BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY By: ams, Chairman BCC Approved Date: April 7, 2020 . y��011M/Ss•. oJ`'. /O^✓��s .�•• � „i; � ••fie`°, Attest: Jeffrey R. Smith, Clerk of Court and Comptroller By: / Deputy Clerk Approved: X��C V County Administrator Approved as to form and legal sufficiency: Wi liam K. DeBraal, Deputy County Attorney )>1k APTIM March 24, 2020 Exhibit 1 James Ennis Assistant Public Works Director Indian River County Public Works 1801 27th Street Vero Beach, FL 32960 Subject: Indian River County, FL Sector 3 — 2018006 — Work Order #4 — Amendment 1 Pre -Construction Biological Monitoring Dear James: Aptim Environmental & Infrastructure, LLC 2481 NW Boca Raton Blvd. Boca Raton, FL 33431 Tel: +1 561 391 8102 Fax: +1 561 391 9116 www.aptim.com Exhibit 1 This proposal outlines an amended scope of work for Aptim Environmental & Infrastructure, LLC (APTIM) to provide professional services to Indian River County (the County) in support of pre -construction biological monitoring efforts required for the Indian River County Sector 3 Beach and Dune Renourishment Project. The Biological Monitoring Plan developed for the Sector 3 project during permitting will require pre- and post - construction biological monitoring adjacent to the project area to monitor for potential secondary impacts to nearshore natural hardbottom. This task addresses the scope of work to complete the pre -construction biological monitoring, and is based on early coordination with the Florida Department of Environmental Protection (FDEP) and the FDEP Standard Operating Procedures (SOP) for Nearshore Monitoring of Beach Nourishment Projects (FDEP, 2016). The pre -construction biological monitoring proposed herein includes hardbottom edge mapping and establishment and monitoring of permanent crossshore transects. If additional or expanded tasks are identified by the regulatory agencies during the permitting process, APTIM will notify the County, and a mutually agreeable change order or additional Work Order will be executed. This amendment to the scope of work has resulted from the Requests for Additional Information (RAI) and permitting process during which the Biological Monitoring Plan was revised to include the installation and monitoring of thirty-eight (38) permanent transects. The costs to install eight (8) additional transects is provided herein. The costs associated with this work order were developed following the provisions of the Professional Services Agreement between Indian River County and APTIM, dated January 9, 2018, to provide engineering and biological support services for the Sector 3 (Wabasso Beach) Beach and Dune Renourishment Project (RFQ#2018006). Scope of Work • Installing and Monitoring Permanent Transects: Eight (8) additional (Thirty-eight (38) in total) permanent transects will be established along the length of project influence, which includes 1000 feet north (updrift) and 3000 feet south (downdrift). This includes twenty-four (24) biological monitoring transects and fourteen (14) sediment -only transects located in areas where the ETOF comes closest to the hardbottom. All transects will run perpendicular to the shoreline and extend from the landward Proj. #1002002913 ', APTIM Sector 3 — 2018006 — WO#4: Pre -Con Bio Monitoring March 24, 2020 Page 2 of 4 Exhibit 1 hardbottom edge to a distance of 50 meters seaward. Stainless steel rods will be used to permanently mark the transects to facilitate repeatability for post -construction monitoring. Following transect establishment, a biological survey will be conducted to document the pre -construction condition of the hardbottom using the following methods: • Quadrat Assessments: Up to nine (9) 0.5-m2 quadrats sampled along each transect to quantify the benthic community. • Sediment Measurements: Collected using line -intercept and 1-m interval sediment depth measurements. • Video/Photo Documentation: Collected for the length of each transect. It is anticipated that an additional three (3) days (up to 20 days total) of field operations is required to delineate the hardbottom edge, install permanent transects and monitor the transects. The collected pre -construction data will be compiled and incorporated into an interactive GIS database and the quadrat data will be entered into an Access database. Data entry, reduction, archiving, and analysis time is included in the cost estimate to address the data management and reporting requirements for the field operations. Deliverable Raw data will be provided to FDEP and the County including a PDF of the scanned datasheets, excel spreadsheets with quadrat data, interval sediment depth measurements and line -intercept data, shapefiles of the hardbottom edge survey, video/photo documentation. Additionally, APTIM will provide a map of the project area and adjacent hardbottom resources with the hardbottom edge delineation and monitoring transects overlaid onto the most recent aerial photography (in digital format). A report is not proposed for the pre -construction monitoring survey. APTIM will also provide information or assistance to County staff, as needed or requested. Schedule The pre -construction monitoring event will take place, upon receipt of a written notice to proceed, during the summer (May — September) prior to project construction. Raw data from field operations will be submitted to the County and FDEP within 45 days of completion of the survey. Cost The lump sum cost for this amendment is $26,840.30. Summary The total lump sum cost to perform the proposed work described herein for Sector 3 — 2018006 — Work Order #4 is $26,840.30. The following page includes a summary of the costs and labor hours of each Task. Thank you for the opportunity to serve Indian River County. As always, please do not hesitate to call if you have any questions. Sincerely, Christopher Paul, P.E. Project Manager I Coastal Engineer Aptim Environmental & Infrastructure, LLC. cc: Quintin Bergman, IRC Eric Charest, IRC Stacy Buck, CPE zed Corporate Signature Beau C. Suthard P.G. Printed Name Program Director Title Proj. #1002002913 WO N L O t O N c v t O N X t W i O � co c O V N a` G F— r 40Q A J LL c T R � d 0 0 O N L U v O N N > (h O L c co U R =a c o m c E E y m a y 3 7 N m O M p M N C W Co R O 0 t0 N N Aa Vi EA to kA to 4fq fA O O = O N M N M —y CO to N > O (» v� (» (s (» ua E» to O O N Lr) l4 M M w t r CR C 69, (191 61)' 6� O M d N N O O C 'It .3 a w (» (» (» va w to o 0 O M M U Q) v 01 a LO Lf) O C.) ({) (A (fl 61 U) 63 w {q O O O p O O c0 R J U) (A EA EA Ef3 ff3 fA fH c O U O) O c y N O E c c 0 0 Z U N a .0 H M O II fn O O_ m � O `m E N M V LO (O I- O Z y U) N N co W U) R R R R R R R F- N H J LL c T R � d 0 0 O N L U v O N N > (h O L c co U R =a c o m c E E y m a y 3 7 N m tP O 9-4 O N O � N � 'E s O ^ X t W V O @ [a C: O U 2 CL UI 0 O 0 O 0 O 0 co 0 O OO O M O co O CO N M T In O N V Lo M N co O V (O N O U N N @ O H 64 fA (A ff3 f9 La fH H) f9 f9 w fA fR fH fH u fA ff) f9 fA w fA ff3 fA fA ul f9 w fR 64 fA w fA N M (OD N O � co @ O J S O O O O O O C O p O O O n O O c O Cl) M O O O ((J CO O O N O� co O U D C N N Lo V' .-- co N N O O c c- U O O U � N ~ d U@ ff9 di ffi 69 fA Gq Vi fA fA fA w w o 6%,61169 uf, w fA w fA to w ffi fA vA fA fA fA fA E9 fH Ei3 M m O cD o O O N M D U m 7 ) � J = - 0 0 00 0 0 0 0 p 0 0 0 0 0 0 0 o 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m Z5 @ 0 (D 0 O 0, m (O 0 (D N o O 0 M 0 (D V (O M L) T O N (D M u) Q7 N r O tD O4') M (A 0 p 0 V fD O N O 0 (b 0- N I� 0 (D 9 Q' N M r @ -� Y)w w o U)fA 6A 64 ffl fn (r) o bG fA fH w U-1 fH ffl 69 w u)ui fA fA w f9 cr. m a cu O a E cL N H N N--_ N C O O O i6 @ @ N C N N m C d7 C N C N C@ N N O O In U .0 m fll rn .- N - O O O C N O .C. C C C O a@ O C L L U C O O O C-- _@ O (` w0 N C ` N U C O lJJ @> W W W O (6 F- m m N N in U N N@ N U N O @ Q U N `07 O U N N 0 N N O O` N N O G C N 0 0 0 C O O@ 0 0 U7 N Q C LLL,uL X o 0 UUUUUd2(nU(n��d(3(D(D(nUCDmco0 0 0 0 0 2, 3 3 N (� (4 (1) (D N N Q - 0 0 fU O (nw2O @ o 2 O H UI