HomeMy WebLinkAbout2020-059ATTACHMENT A
WORK ORDER NO. 3
ARCHITECTURAL/ENGINEERING PROPOSAL 2019-44.1.2
NORTH COUNTY LIBRARY ADDITION
DONADIO & ASSOCIATES, ARCHITECTS, P.A.
This Work Order Number 3 is entered into this 7 day of April, 2020, pursuant to that certain
Continuing Consulting Architectural Services Agreement, dated November 13, 2018, (collectively
referred to as the "Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the
State of Florida ("COUNTY") and DONADIO & ASSOCIATES, ARCHITECTS, P.A. ("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The
professional services will be performed by the Consultant for the fee schedule set forth in Exhibit 1.
Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with
the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in
each individual Work Order as if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first..••""""
written above.
CONSULT T: BOARD OF COUNTY COMMI�
Dona o & c itects, P.A. OF IAN RIV CO
B
y 11Pn
usan . Adams, Chairman
Approved Date: April 7. 2020
ATTEST: Jeffery R. Smith, Clerk of Court
and Comptroller
By: / \ N(
Deputy Clerk
Approved: "
Jason E. Brown Co
ty Administrator
Approved as to form and legal sufficiency:
Ian T. Reingold, County Attorney
ATTACHMENT A — EXHIBIT 1
J
D O N A D 1 0
& Associates, Architects, P.A.
March 16, 2020
Beth Powell
Asst. Director - Parks & Conservation Resources
5500 7711 Street
Vero Beach, FL 32967
RE: ARCHITECTURAL/ ENGINEERING PROPOSAL
FOR NORTH COUNTY LIBRARY ADDITION
1001 COUNTY ROAD #512, SEBASTIAN, FLORIDA
ARCHITECT'S PROJECT NO. 2019 - 44.1.2
Dear Ms. Powell,
Within the content of this letter is a Proposal for Architectural/Engineering Services for the Design of a new
single story 2,800sq. ft. Library Addition and Two (2) new Small Conference Rooms at the North County
Library located at 1001 County Road #512, Sebastian, Florida.
SCOPE OF WORK
Design of a new single story 2,800sq. ft. Library Addition to be for Multi -Purpose use and Two (2) new Small
Conference Rooms constructed with material similar to the existing Library; consisting of masonry bearing walls
with bar joist and metal deck roof structure, low slope roof membrane system and interior Architectural, HVAC,
Plumbing and Electrical systems and finishes to match that of the existing Library.
Services shall be provided by Donadio and Associates Architect, P.A. pursuant to our Continuing Consultants
Engineering Services Agreement for Professional Services with Indian River County dated November 13„ 2018. The
Scope of Work to be provided shall be as follows:
Architectural - Preparation of Construction Documents to include the following:
• Preparation of architectural construction documents consisting of floor plans, elevations, roof plans
and details, life safety plan, code review, schedules, general/construction, details, notes and
specifications.
• Coordination with MEP, Structural, Civil Engineering and Cost Estimating Consultants.
• Preparation of Schematic, Design Development, Construction Documents and Permit Revision
Documents.
• Preparation of all documents for site plan approval and building permit submittal.
• Make application to the City of Sebastian for site plan approval and building permit approval.
• Responses to site plan approval and building permit review comments.
• Attend all preconstruction /design meeting as required.
• Constructidi Administration Services shall be included. In addition provide scheduled site
observations, review of Contractor's requests for information and/or clarifications, shop
drawing reviews, review of change order and decisions on any claims or disputes, punch -list
walk-thru with contractor and County'to determine general conformity with approved plans and
specifications.
609 17ph Street Vero Beach, Florida 32960 Phone 772 794 2929 Fax 772 562 8600
Email - anthony@donadio-arch.com License No. AA0002238
ARCHITECTURAL/ ENGINEERING PROPOSAL
FOR NORTH COUNTY LIBRARY ADDITION
March 16, 2020
Page 2
Structural Engineering — Preparation of Construction Documents to include the following:
• Coordination with Donadio & Associates, Architects, P.A.
• Design and prepare the Structural Documents for permit submittal and construction to include Foundation
Plans, Floor Plans, Roof Framing Plan, Sections, Details, Schedules and Specifications in short format on
the plans.
• Preparation of Schematic, Design Development, Construction Documents and Permit Revision
Documents.
• Preparation of all documents for building permits submittal.
• Responses to building permit review comments.
• Attendance at Pre-Construction/Design Meetings.
• Complete Construction Administration Services shall be included In addition provide scheduled
site observations, review of Contractor's requests for information and/or clarifications, shop
drawing reviews, review of change order and decisions on any claims or disputes, punch -list
walk-thru with contractor and County to determine general conformity with approved plans and
specifications.
Mechanical/Electrical/ Engineering — Preparation of Construction Documents to include the following:
• Coordination with Donadio & Associates, Architects, P.A.
• Design criteria for heating, ventilation and air conditioning (HVAC), electrical and plumbing
• Construction documents and specifications for HVAC, electrical and plumbing, which include but
are not limited to: floor plans, schedules, electrical and plumbing risers, electrical panels, reflected
ceiling plans and details, along with Fire Sprinkler System Performance Specification.
• Preparation of Schematic, Design Development, Construction Documents and Permit Revision
Documents.
• Florida Energy Calculations.
• Preparations of all documents for building permit submittal.
• Responses to building permit review comments.
• Attendance at Pre-Construction/Design Meetings.
• Complete Construction Administration Services shall be included In addition provide scheduled
site observations, review of Contractor's requests for information and/or clarifications, shop
drawing reviews, review of change order and decisions on any claims or disputes, punch -list
walk-thru with contractor and County to determine'general conformity with approved plans and
specifications.
Civil Engineering — Preparation of Construction Documents to include the following:
• Coordination with Donadio & Associates, Architects, P.A.
• Project coordination with the following regulatory agencies:
o City of Sebastian (COS)
o Indian River County (IRC)
o St. John's River Water Management District (SJRWMD)
Project coordination and review of the required boundary, project specific topographic and tree survey as
provided by t h e C o u my . It is also understood that the necessary hard copies (signed and sealed) will
be provided by the County as needed to support the permit agencies application submissions.
Coordination with project Architect for Base plan coordination on project building area and addition.
D O N A D I O
& Associates, Architects, P.A.
ARCHITECTURAL/ ENGINEERING PROPOSAL
FOR NORTH COUNTY LIBRARY ADDITION
March 16, 2020
Page 3
• Attendance to (3) project team meetings with project architect and / or County during
• Development of Traffic Statement for project (to be noted on Site Plan). Does not include
study.
• Preliminary meeting (Pre -Application Conference) with the COS Planning Department.
• Coordination with SJRWMD for stormwater permitting.
• Design of the minor paving and drainage systems to incorporate the new additions.
• Development of the on-site drainage calculation reflecting on-site modeling only. Base
not include re -modeling of the Sebastian Lakes PUD Master Stormwater system. Ho
this level of drainage analysis be required, the fee for this additional scope has
below in Additional Services
Design.
formal traffic
contract does
vever, should
een provided
• Preparation of the site construction drawings.
• Preparation of a code compliant landscape plan to incorporate in -fill landscaping as required for
the specific additions.
• Preparation of the following permit applications:
o City of Sebastian (COS) Pre -Application Conference
o COS PUD Major Site Plan Modification
o COS Land Clearing
o COS Tree Removal
o IRC Concurrency
o IRC Fire Review
o SJRWMD Letter Exemption
• Attendance at the COS Planning & Zoning Commission meeting.
• Attendance at the COS City Council meeting.
Construction Administration & Certifications to be provided by the County.
Architectural/Engineering Basic Services and Additional Services Fees shall be broken down as stated below.
The Basic Services Fees shall include Basic Services for Architectural, Structural, Mechanical, Electrical and
Plumbing Services.
I. BASIC SERVICES:
Architectural Services.................................................................$ 36,450.00
Structural Engineering................................................................$ 4,275.00
MEP Engineering......................................................................$ 2,850.00
Fire Sprinkler Performance Specification ............................................$ 1,375.00
TOTAL $44,950.00
Reimbursable Expenses...............................................................$15,000.00
Additional Services Fees shall include Additional Services for Civil Engineering, Cost Consulting Services,
Geotechnical Testing and Report and Site Lighting and Photometrics.
II. ADDITIONAL SERVICES:
A. Civil Engineering:
1. On -Site Civil Design/Permitting: .............................................. $ 17,500.00
2. Sebastian Lakes PUD Master Stormwater Tract Drainage Modeling ....$ 4,500.00
(only if required)
B. Construction Cost Consulting Services:
1. 100% Schematic Design Construction Budget .............................. $ 2,175.00
2. 50% Construction Documents Construction Budget .......................$ 1,475.00
C. Geotechnical Testing....................................................................$ 1,825.00
D. Site Lighting and Photometrics.........................................................................$ 1,045.00 (only if required)
D O N A D I O
& Associates, Architects, P.A.
ARCHITECTURAL✓ ENGINEERING PROPOSAL
FOR NORTH COUNTY LIBRARY ADDITION
March 16, 2020
Page 4
This proposal is based upon the provision of the following Scope of Services:
SCHEMATIC DESIGN PHASE
The Architect shall assist the County in establishing the program and ascertain the requirements of the project
and shall arrive at a mutual understanding of such requirements with the County. Based on this understanding
the Architect shall prepare Schematic Design Documents consisting of drawings and outline specifications
DESIGN DEVELOPMENT PHASE
Based on the approved Schematic Design Documents and any adjustments authorized by the County in the
program schedule or construction budget, the Architect shall prepare, for approval by the County, Design
Development Documents consisting of drawings and other documents to fix and describe the size and
character of the project as to Architectural, Structural, Mechanical and Electrical systems, materials and such
other elements as may be appropriate.
CONSTRUCTION DOCUMENTS PHASE
Based on the approved Design Development Documents and any further adjustments in the scope or quality of
the project or in the construction budget authorized by the County, the Architect shall prepare, for approval by
the County, Construction Documents consisting of Drawings and Specifications setting forth in detail the
requirements for the construction of the Project.
BIDDING AND NEGOTIATION PHASE
The County's Contractor shall procure Bids for the Construction of the Project and the Architect shall assist
the Contractor in the clarification of any Bid Requests for Information during the Bidding process.
CONSTRUCTION ADMINISTRATION PHASE
OF THE CONSTRUCTION CONTRACT
The Architect's responsibility to provide Basic Services for the Construction Phase under this Agreement
commences with the award of the contract for construction and terminates at the issuance to the County of the
final Certificate for Payment or 60 days after the date of Substantial Completion of the Work, whichever
comes first.
The Architect shall provide periodic Site Observations, Review of Contractor's Applications for Payment,
Contractors request for information and/or clarifications, Shop Drawing Reviews, Review of Change Order
and decisions on any claims or disputes, Punch -List Walk-Thru with Client and Contractor to determine
general conformity with approved plans and specifications.
PAYMENT SCHEDULE
A. The fee is based upon our understanding of the stated goals and upon completion of services
described above. The Fee Payment Schedule shall be as follows:
Schematic Design Phase 15%
Design Development Phase 20%
Construction Document Phase 40%
Bidding 5%
Construction Administration 20%
TOTAL 100%
D O N A D I O
& Associates, Architects, P.A.
ARCHITECTURAL/ ENGINEERING PROPOSAL
FOR NORTH COUNTY LIBRARY ADDITION
March 16, 2020
Page 5
Reimbursable expenses are in addition to compensation for Basic Services and
include expenses incurred by the Architect, in the interest of the project. Such expenses
include, but are not necessarily limited to the cost of reproduction of drawing and
specifications, including progress sets, postage, long-distance communication and
facsimiles, photographs, travel and mileage, and the following permit application fees:
o City of Sebastian (COS) Pre -Application Conference
o COS PUD Major Site Plan Modification
o COS Land Clearing
o COS Tree Removal
o IRC Concurrency
o IRC Fire Review
o SJRWMD Letter Exemption
o City of Sebastian Building Department Plan Review Fee.
o IRC Fire Plans Review FEE
Reimbursable expenses will be billed at actual cost. Estimated Cost of Reimbursable Expenses is a
maximum not to exceed amount of Fifteen Thousand Dollars ($15,000.00).
B. Progress billings will be made monthly based upon the percentage of completion of each phase of the project
as of the date of the invoice. Payment is due upon receipt of the invoice. Invoices not paid within thirty (30)
days of invoice date will be subject to a finance charge of one and one-half percent (1.5%) per month.
C. Should the scope of the project change substantially, the fee will be altered accordingly, based upon County
approval. Such work will be billed at the hourly rates specified below, for the time involved. No additional
work will be initiated without County written authorization.
D. Donadio & Associates, Architects, P.A. Standard Hourly Billing Rates are as follows:
Principal
$200.00
Senior Project Manager
$175.00
Project Manager
$135.00
CADD Manager
$135.00
CADD Technician I
$100.00
CADD Technician II
$ 90.00
CADD Technician III
$ 85.00
Office Manager
$ 85.00
Administrative Assistant
$ 65.00
Receptionist
$ 60.00
Technical Support
$ 55.00
MEP Engineering Standard Hourly Billing Rates are as follows:
$75.00 / Hr. - Clerical
$85.00 / Hr. - CADD
$95.00 / Hr. - Designer
$110.00 / Hr. — Engineering / Field Technician
$125.00 / Hr. — Project Manager
$225.00 / Hr. — Principals
D O N A D I O
& Associates, Architects, P.A.
ARCHITECTURAL/ ENGINEERING PROPOSAL
FOR NORTH COUNTY LIBRARY ADDITION
March 16, 2020
Page 6
Civil Engineering Standard Hourly Billing Rates are as follows:
Principal
$200 Per Hour
Expert Witness
$300 Per Hour
Sr. Engineer II
$175 Per Hour
Sr. Engineer I
$150 Per Hour
Jr. Engineer
$130 Per Hour
Sr. Technician
$115 Per Hour
Jr. Technician
$ 90 Per Hour
Inspector
$115 Per Hour
Administrative II
$ 80 Per Hour
Administrative I
$ 60 Per Hour
E. If the project is abandoned or terminated before completion, County will be invoiced for the services
performed, together with the reimbursable expenses incurred, as of the date of termination.
F. Should any questions arise regarding an invoice or any portion thereof, this office should be contacted
immediately. Payment for the amount in question may be withheld. However, timely payment of the balance
is required.
G. Payment for services performed is in no way based upon the receipt of regulatory approvals or project
financing.
H. This Proposal is valid for 30 days from the date shown hereon and represents the entire understanding
between Parties with respect to the referenced Project and may only be modified in writing.
GENERAL
A. Illustrative renderings or models are not part of the Basic Services.
B. Landscape and Irrigation Design and Drawings, Material Testing, Re -modeling of the Sebastian
Lakes PUD Master Stormwater System, Design of off-site Roadway and Utility improvements,
Construction Administration & Certifications to be provided by the County, Emergency Generator
Design And Drawings, Environmental Surveys, Topographical Surveys to be provided by County, As -
Built Drawings, Re -Zoning, Full Time on Site Representation, Site Plan Application Fees, Building
Permit Application Fees, and any other Application Fees for Agency approvals are not part of the
Basic Services.
C. All drawings, specifications and other documents prepared for this project are for use solely with this
project and unless otherwise provided Donadio & Associates, Architects, P.A. are the author and
County and retain all lawful copyrights to such documents.
D O N A D I O
& Associates, Architects, P.A.
ARCHITECTURAL/ ENGINEERING PROPOSAL
FOR NORTH COUNTY LIBRARY ADDITION
March 16, 2020
Page 7
This Proposal letter outlines our Architectural/Engineering Scope of Services.
Should this arrangement be acceptable to you, please sign and return one (1) copy to our Office
If you have any questions or wish to discuss this proposal, please feel free to contact our Office.
Thank you for this opportunity to work with you on this very exciting project.
Very truly yours,
Anthony J. Donadio, A.I.A., NCARB
President
D O N A D I O
& Associates, Architects, P.A.