HomeMy WebLinkAbout2020-095ACONTINUING ARCHITECTURAL SERVICES AMENDMENT 1 TO WORK ORDER 1
JONES PIER CONSERVATION AREA HISTORIC RESIDENCE
ARCHITECTURAL/STRUCTURAL ENGINEERING
This Amendment #-1—to Work Order Number #1 is entered into as of this lVday of A�r�fi, 2020, pursuant to that
certain Continuing Architectural Services Agreement for Professional Services entered into as of the 13th day of
November, 2018 (collectively referred to as the "Agreement"), by and between INDIAN RIVER COUNTY, a
political subdivision of the State of Florida ("COUNTY") and Donadio & Associates, Architects, P.A.
("Consultant").
1. The COUNTY has selected the Consultant to perform the professional services set forth in existing Work Order
Number 1, Effective Date August 13, 2019.
2. The COUNTY and the Consultant desire to amend this Work Order as set forth on Exhibit A (Scope of Work)
attached to this Amendment and made part hereof by this reference. The professional services will be
performed by the Consultant for the fee schedule set forth in Exhibit g (Fee Schedule), and within the timeframe
more particularly set forth in Exhibit C (Time Schedule), all in accordance with the terms and provisions set forth
in the Agreement.
3. From and after the Effective Date of this Amendment, the above -referenced Work Order is amended as set
forth in this Amendment. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order
shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be
incorporated in each individual Work Order as if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first written above.
CONSU T: BOARD OF COUNTY COMMISSIONERS
OF INDIA7COUN
By: By:
Jaso E. own, County Administrator
Print Name: �/� �• 7.����;�-�
Title: Approved Date: 1� d—(,�
Approved as to form and legal sufficiency:
Dylan T. Reingold, County Attorney
ATTACHMENT
Exhibit A
DD
DONADIO
& Associates, Architects, P.A.
Project Name: IRC Jones Pier Historic Residence DAA Job: 2018-23.003.1.2
Client: Indian River County Parks & Conservation Resources Date: April 14, 2020
Contact:
Beth Powell
Asst. Director - Parks & Conservation Resources From: Anthony J. Donadio
DESCRIPTION OF WORK:
• CONSTRUCTION DOCUMENT PHASE
o Architectural Site Plan Changes and Front Elevation Rendering — $675.00
■ Provide a Front Elevation Rendering
■ Revised Architectural Site Plan Sheet A2.10 to eliminate the handicap ramp and details,
along with changing the front steps from wood risers with handrails to concrete risers
without handrails.
o Structural Engineering Changes — $525.00
■ Revised Sheets S1.10 2, S1.20 and 53.11 to eliminate the handicap ramp and details, along
with changing the front steps from wood risers with handrails to concrete risers without
handrails.
■ Add lattice detail to structural drawing detail Sheet S 4 of 5
Architectural/Eneineering Additional Services Amount:
Construction Document Phase - $1,200.00
Reimbursables - $100.00
Approved by:
(Authorized to sign on behalf of client)
Please print name:
Date:
Delivery: As Requested by Owner
Standard Hourly Fees
$65.00/hour Clerical
$85.00/hour Office Manager
$100.00/hour CADD Tech I
$135.00/hour CADD Manager
$135.00 Project Manager
$175.00/hour S e n i o r Project Manager
$200.00/hour Principal
2001 91 Avenue, Suite 308 Vero Beach, Florida 32960 Phone 772 794 2929 Fax 772 562 8600
Email - anthony@donadio-arch.com License No. AA0002238
EXHIBIT A
Exhibit B
MAN-HOUR ESTIMATE FOR PROPOSED PROFESSIONAL SERVICES
Project Name:
IRC Jones Pier Historic Residence
DAA Project No.:
2018.23.003.1.2
Date:
4/22/2020
PRINCIPAL SR. PROJECT ENGINEER
MANAGER
CADTECH.1
ENG./CAD ENG.TECH ADMIN.
TECH. ASSISTANT
TASK/DESCRIPITION
$175.00 $150.00 $125.00
$100.00
$75.00 $60.00 $55.00
TOTAL
I. SCHEMATIC DESIGN
- -- _--- ----
- ----
Architecture - Elevations
1.00
4.00
$575.00
Structure
MEP
--_. ----
$0.00
$0.00
Cost Estimate
$0.00
Technology
-- - - -_.---
--
$0.00
Life Cycle
Civil Preliminary Design
_
$0.00
$0.00
Sub -total Task I DD
$575.00
1. DESIGN DEVELOPMENT
Architecture
$0.00
Structure
$0.00
MEP
$0.00
Cost Estimate
$0.00
Technology
$0.00
Life Cycle
$0.00
Civil Design/Permitting
$0.00
Sub -total Task I DD
$0.00
II. CONSTRUCTION DOCUMENTS
Architecture -Site Plan Revsion
1.00
_
$100.00
Structure - Revisions
LOO
2.00
2.00
$525.00
MEP
$0.00
Cost Estimate
$0.00
Technology
$0.00
Civil Final Design
$O.OD
Sub -total Task II CD
$625.00
111. BIDDING
Architecture
$0.00
Structure
$0.00
MEP
$000
Technology
$O.OD
Civil
$0.00
Sub -total Task Ill Bidding
$0.00
IV. CONSTRUCTION ADMINISTRATION
Architecture
$0.00
Structure
$0.00
MEP
$0.00
Technology
$0.00
Civil Construction Services
$0.00
Civil Certification
$0.00
Sub -total Task IV CA
$0.00
TOTAL BASE FEES
$1.200.00
Existing Condition survey
Design Development
$0.00
Construction Documents
$0.00
Construction Administration
$0.00
Sub -total survey
$0.00
Reimbursable Expense
$100.00
$100.00
TOTAL FEES FOR ALL SERVICES
$1,300.00
EXHIBIT B