Loading...
HomeMy WebLinkAbout2020-113EIndian River County Emergency Services 4225 43" Avenue Vero Beach, Florida 32960 Telephone: (772) 226-3900 FAX: 772-567-9323 Project: P25 Radio Project Emergency Services WORK ORDER NO. 5 FOR THE COUNTYWIDE P25 MICROWAVE RADIO SYSTEM MIGRATION PROJECT WITH Communications International, Inc. This Work Order No. 5 to the Countywide P25 Radio System Migration Project dated May 26, 2020 is for the Radio System Contractor (Communications International) to perform work necessary to provide P25 Radio Communications Network Enhancements to the Indian River County (County) Radio System. Work Order No. 5 is as follows: SECTION I — PROJECT LIMITS This Work Order No. 5 includes tasks and services for Communications International to perform in connection with the radio system upgrade. SECTION II - SCOPE OF SERVICES As agreed upon between Communications International and County, that Communications International shall provide all engineering, design, supply necessary materials, and labor to: Expand L3 Harris P25 System from 5 Channels per Site to 10 Channels per Site; Supply Mastr V Spare Equipment; Replace the existing In building Bi -Directional amplifiers with P25 Phase 2 units at 9 existing county BDA locations; Remove the old 800 MHz Radio System Antennas, EDACS System Equipment and DC Power Systems at each of the Sites; Reconfigure the 800 MHz Mutual Aid System and interface to the P25 System as described in price quote dated 04- 15-2020. Milestones and pricing associated herein are attached to this Work Order No. 5 as Exhibit A and incorporated by reference herein. SECTION III — TIME FOR COMPLETION & DELIVERABLE&WORK PRODUCT Communications International shall provide the County.- The ounty:The services compieted by Communications International and delivered to the county within 365 days from notice to commence. SECTION IV — COMPENSATION The County agrees to pay, and Communications International agrees to accept, for the above- described services rendered as identified in Sections I, II, and III of this Work Order No. 5 for a total amount of $1,582,579.51 Any additional services not described hereon shall be pre -approved by the County. All invoicing shall include itemized costs and materials expended to complete the work. IN WITNESS WHEREOF the parties hereto have executed these presents this 9th day of June, 2020. OWNER: BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORI :r.co,i�:2;;� Approved by BCC T„nag, 9ngn ATTEST: Jeffrey R. Smith, Comptroller and Clerk of Circuit Court Lf �J� / 1 f _ � i Deputy' /Clerk Approved as to Form and Legal Sufficiency: unty Administrator DESIGN/BUILDER: Communications International (Signature) Melissa Osmolski, Project Manager Witnessed by: (Signature) (Printed name) EXHIBIT "A" Milestone Payment Schedule Milestone 1 Costumer Design Review Acceptance $111,092.40 Milestone 2 Cl receipt of L3Harris Equipment & $784,260.12 Install Materials Milestone 3 Cl receipt of Spare Equipment $70,151.79 Milestone 4 Cl Receipt of the PSAP's Backup Radio $92,394.10 Milestone 5 Supply & Install PSAP Backup Radios $37,410.60 & Antenna Systems Supply & Replace BDA's @ 9 County Locations IRC Jail 5 BDA Units Milestone 6 IRCSO Dispatch $73,604.75 IRCES Building IRC Court House Sebastian Hospital ER Milestone 7 Tower Crew Services to Remove Old $43,718.40 EDACS 800 Mhz Antenna System Milestone 8 Removal of 800 Mhz EDACS System & $51,918.75 Old DC Power Systems at each Site Milestone 9 Reconfiguration of the 800 Mhz Mutual $51,420.00 Aid System Installation, Engineering, Project Management and Transport of Old Milestone 10 Equipment to County Warehouse. Transport DC Power Systems to an $266,638.60 Approved Disposal Vendor TOTAL INVOICING: $1,582,579.51