HomeMy WebLinkAbout2020-124CCNA2018 WORK ORDER 14
BULK CHEMICAL TANK REPLACEMENT
AT HOBART REVERSE OSMOSIS WATER TREATMENT PLANT
This Amendment #1 to Work Order Number 14 is entered into as of this 7 t-11 day of Jules, 2020,
pursuant to that certain Continuing Consulting Engineering Services Agreement for Professional Services entered
into as of this 17`h day of April, 2018 (collectively referred to as the "Agreement"), by and between INDIAN
RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and Kimley-Horn and
Associates, Inc., ("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The
professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B
(Fee Schedule), attached to this Work Order and made a part hereof by this reference. The Consultant
will perform the professional services within the timeframe more particularly set forth in Exhibit C
(Time Schedule), attached to this Work Order and made a part hereof by this reference all in
accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of
the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement
and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as
if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of tlll y"? -first
..
Ove_ .... 1 �.
written above. .�'� .• °
CONSULTANT:'" ^,) BOARD OF COUNTY COMR71SS10(1��(
Kimley-Horp-�hd�s34ciate,�, Inc. OF INDIAN RIVER COUN
A—/
By: A— �4`-- — By:
.E. ( ( SuVn Adams, Chairman
Print Name:
Title: Principal BCC Approved Date: July 7, 2020
Attest: Jeffrey R. Smith, Clerk of Court and Comptroller
By:
Deputy Clerk „
Approved:
Jason E/. Br*n, County Administrator
Approved as to form and legal sufficiency:
Dylan T. Reingold, County Attorney
EXHIBIT #1
Amendment #1 to Work Order Number 14
Bulk Chemical Tank Replacement
At Hobart Reverse Osmosis Water Treatment Plant
PROJECT UNDERSTANDING
Kimley-Horn (Consultant) recently prepared bid documents for replacement of the bulk
sulfuric acid and caustic tanks at the Hobart Reverse Osmosis Water Treatment Plant
(ROWTP). The project has been permitted through FDEP and IRCU intends to advertise
the project soon for bidding.
Originally, the two projects were scoped under separate work orders. It was believed that
IRCU could change order the proposed tank replacement project under a separate
ongoing construction project, and the Consultant's additional involvement in construction
would have been limited to shop drawing review. This procedure is no longer desirable
and the County desires to advertise the tank replacement project as a standalone
construction contract. As such, IRCU has requested that Kimley-Horn prepare a work
order to provide additional construction phase services for this project in addition to the
Work Orders that have been previously authorized. The following presents description
for the additional services to be provided.
SCOPE OF SERVICES
Task 1— Bid and Construction Phase Services
In general, Consultant will provide construction phase services for this project, consisting
of; shop drawing review, coordination and phasing meeting attendance, responding to
questions from Contractors, payment application review, change order review, review of
operation and maintenance documents review, record drawing review, based on
information provided by contractors.
Consultant will attend one (1) pre-bid and one (1) pre -construction meeting.
Consultant will review the submitted bids and provide a bid review letter that summarizes
the bid and identifies the lowest, most responsive, most responsible bidder.
Shop drawing submittals will be reviewed for conformance with the design plans and
specifications. Shop drawings will be submitted directly to Consultant. It is anticipated
that approximately 4 shop drawings will be reviewed. Consultant will review the
submittals and furnish review comments to the IRCU for acceptance. Upon completion
of IRCU's review, Consultant will furnish complete review comments to Contractor.
C.%Usm%karm.welter\AppData\Loca]\Microsoft\Windows\[NetCache\Content.Outlook\9SCOM40G\20200630 - Hobart Chem Tank
Scope.docx Page I of 4
Consultant will provide coordination of project status meetings and observation of
construction for the duration of the project. Consultant will also review pay requests and
provide recommendations for payment to IRCU for the progress of the work. Consultant
will attend up to 2 progress meetings.
Consultant will provide up to four (4) site visits during construction and installation of
temporary and proposed equipment at periods appropriate to the stages of construction to
observe the progress to observe if in general, the work is proceeding in accordance with
the Contract specifications. Consultant's duties will consist of witnessing installation,
testing and startup of the temporary storage/feed setup and the proposed (permanent) bulk
chemical tanks.
Consultant will provide reviews of Requests for Additional Information from the
Contractor. No more than two (2) RFIs are anticipated as part of this project.
Consultant will provide reviews of change orders submitted by the contractor. No more
than two (2) change orders are anticipated as part of this project.
Once each new tank is constructed, tested and ready to be placed into service, Consultant
will prepare request for clearance to place component into operation. It is assumed that
the tanks will be constructed sequentially, so two (2) requests to FDEP will be required —
one (1) partial request after the first tank is constructed, and one (1) final request after the
second tank is constructed.
Consultant will prepare a "punch list" for the items that need to be completed for final
closeout of the project. Consultant will provide two (2) site visits with the contractor to
review the status of the completion of these punch -list items. Consultant will prepare and
submit certificate of substantial and final completion.
TIME SCHEDULE
Services for Task 1 are dependent on the Contractor and construction contract duration,
which is not anticipated to exceed 6 months.
FEE SCHEDULE
We will provide these services in accordance with our Continuing Consulting
Engineering Services Agreement for Professional Services dated April 17th, 2018, by and
between INDIAN RIVER COUNTY, a political subdivision of the State of Florida
("COUNTY") and Kimley-Horn and Associates, Inc., ("Consultant").
The Consultant will provide professional services for a lump sum fee as follows:
C:\Users\karren.walter\AppData\Locai\Microsoft\Windows\MetCache\Content.Outlook\9SCOM400\20200630 - Hobart Chem Tank
Scope.docx Page 2 of
Task No. Task Task Fee
Task 1 Bid & Construction Phase Services $10,349
TOTAL LUMP SUM FEE $ 10,349
ADDITIONAL SERVICES
The following services are not included in the Scope of Services for this project, but may
be required depending on circumstances that may arise during the execution of this
project. Additional services include, but may not be limited to the following:
• Construction phase services not described herein
• Additional meetings
• Record drawings in .dwg format
• Additional site visits
C:\Users\karren.walter\AppData\Local\Microsoft\Windows\iNetCache\Content.Outlook\9SCOM40G\20200630 - Hobart Chem Tank
Scope.docx Page 3 of 4
ESTIMATE FOR ENGINEERING SERVICES
PROJECT: Hobart Caustic Tank Replacemerd CPS
CLIENT: Indian River County_Unlities
ESTIMATOR: NB
SHEET 1 OF
'FILE NO.
.DATE: 6/30/2020
DESCRIPTION:
Hobart ROWiP Bulk Chemical Tank Replacement
PRINC
DIRECT LABOR
SEN REG
PROF PROF
MAN-HOURS
DES/ CLK EXP
P2 P1 SUB
EXP
SUB
Dir Exp
4.6%
LINE
TOTAL
NO. TASK
1 Construction Phase Services
Bid Review
0.5
4
_ _ $33
$751
Shop Drawing Review
0.5
_
4
$33
$751
Prebid Meeting
0.5
4
$33
$751
Preconstruction Meeting
Payment AlicationReview x6
0.5
0.5
4
6
2
$33
$56
$751
$1265
ChanRe Order Review x2
0.5
4
$33
$751
Site Visit x4
0.5
6
1 $47
$1,0641
Pro essMeeti x2
0.5
6
$47
$1064
RFls x4
0.5
4
$33
$751
FDEP Request for Clearance
0.5
4
21
$42
$951
Punch List Substantial&Final
0.5
6
$47
$1064
Certificate of Substantial and Final Conipletion
0.5
2
$19
$437
$0
TOTAL HOURS
6
0 54
0 4 01
0 $455
S10,349
LABOR ($/HOUR)!
235
225 150
105 96 25
$0
$0
SUBTOTAL:
1410
0 8100
ol 394 ol
o $9,894