HomeMy WebLinkAbout2020-157Aendment Number 5 to MBV
W�lrer#5�for Kroegel Homestead Conservation
Area (FTC No.: 02-58-FF2) - Construction
Inspections and Certifications
AMENDMENT NUMBER 5 TO WORK ORDER NUMBER 5
Indian River County Conservation / Public Access for Kroegel Homestead, Sebastian -
(PTC No.: 02-58-FF2)
This Amendment 5 to Work Order Number 5 is entered into as of this i3tb day of August—,
2020 pursuant to that certain Continuing Consulting Engineering Services Agreement for Professional Services
entered into as of this 17' day of April, 2018 (collectively referred to as the "Agreement"), by and between
INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and MBV Engineering,
Inc. ("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The
professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B
(Fee Schedule), attached to this Work Order and made a part hereof by this reference. The Consultant
will perform the professional services within the timeframe more particularly set forth in Exhibit C
(Time Schedule), attached to this Work Order and made a part hereof by this reference all in
accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of the
Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and
the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if
fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first
written above.
CONSULTANT:
MBV Engineering, Inc.
By: By:
Title: Vice President
BOARD OF COUNTY COMMISSIONERS
OF INDIAN RIVER C ''oa!�......
y G �,fF9s
.per "°°saw
Adams, Chairman
.2 •o
August 18, 2020 • yRi;� '�p����.•
BCC Approved Date:
Attest: Jeffrey Smith, Clerk of Court and Comptroller
By: v V
De uty Clerk
Approved:
Approved as to form and legal sufficiency:
Jason t,B wn, County Administrator
n T. Reingold, County Attorney
EXHIBIT A - SCOPE OF WORK
It is our understanding that the COUNTY intends to add services to its original scope for the Kroegel
Homestead project located in Sebastian, Florida, for the inclusion of construction inspections and
certifications.
Construction Services
Construction inspection and project certification services shall include:
1. Attendance of a pre -construction meeting for EOR and inspector
2. Shop drawing review of civil site components
3. One (1) inspection during subbase construction
4. One (1) inspection for pavilion pad formboards
S. One (1) inspection for sidewalk formboards
6. Two (2) site visits for water service inspection and testing
7. Two (2) site visits for sewer service inspection and testing
8. Two (2) site visits for drainage infrastructure inspections
9. One (1) site visit for punch -list for County certification
10. One (1) site visit for final County inspection walkthrough
11. Two (2) additional site visits as required — will not be billed if not used
12. Review of test reports and as-builts provided by others
13. Coordination as necessary with County, County representative and Site Contractor during
construction
14. Certification by EOR to County and Florida Dept. of Environmental Protection
NOTE: Above inspections or site visits are based on a 2.5 -hour time period.
Site Plan Modification
We understand the County wishes to modify the approved site plan to phase the project for
construction of the bathroom building in a Phase 2. These services shall include:
1. Preparation of a phased site plan.
2. Preparation and submittal of the Indian River County Administrative Approval application.
3. Address and submit one (1) round of comments regarding the AA submittal.
DELIVERABLES
The Consultant shall provide the COUNTY with the following:
• One (1) hard set and one (1) pdf copy of approved civil construction plans, signed and sealed, for
bidding purposes
• Two (2) hard copies of plans for pre -construction meeting, signed and sealed
EXHIBIT B - FEE SCHEDULE
The COUNTY agrees to pay and the Consultant agrees to accept for services rendered, pursuant to this
Agreement, fees inclusive of expenses in accordance with the following:
Task
Fee
Construction Services
HNTE $ 10,000
Site Plan Modification
$ 1,800
Work Authorization Total
$ 11,800
ADDITIONAL SERVICES
When required by the COUNTY or the Contract Documents, where circumstances exist beyond the
Consultant's control, Consultant shall provide or obtain from others, as circumstances required, those
additional services not listed as part of the Work Order, the Consultant shall notify the COUNTY
promptly prior to commencing said Additional Services, and if agreed upon, will be paid for by County
in accordance with the Master Agreement, Professionals and vendor intended to provide additional
services shall first be approved by the COUNTY, in writing, by the COUNTY's Project Manager.
The COUNTY has selected the Consultant to perform the professional services set forth on this Work
Order. The professional services will be performed by the Consultant for the fee schedule set forth in
this Work Order. The Consultant will perform the professional services within the timeframe more
particularly set forth in this Work Order in accordance with the terms and provisions set forth in the
Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall
conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be
incorporated in each individual Work Order as if fully set forth herein.
EXHIBIT C - SCHEDULE
Not Applicable.
EXHIBIT A - SCOPE OF WORK
This Work Order is to "Zero Out" (Close) the original Hallstrom House work authorization as stated
under the original Work Order #5, approved on May 9, 2017. This Work Order is being closed down
and replaced with proposed new Work Order #18 Hallstrom House (FTC No.:01-055-FF1). This
Amendment 6 represents the services that were completed for a portion of the Design Services section
under the original Work Order. For complete scope of the new Work Order, please refer to proposed
Work Order #18.
1. Design Services under original Work Order Completed to Date
a. Construction Plans
• Development of Preliminary Site Plan Exhibit 1
• Development of Preliminary Site Plan Exhibit 2
b. Construction Cost Estimate
• Cost Estimate No. 1 for Grant Applications Coordination
C. County Reviews
• Review with County to receive comments and revise plan
2. Deliverable provide to Date under original Work Order
a. Electronic copies of Preliminary Site Plan Exhibit 1 & Exhibit 2
b. Electronic copy of Cost Estimate No. 1
EXHIBIT B - FEE SCHEDULE
The below represents the original Fee Schedule for Hallstrom House as approved under the original
Work Order #5.
Task
Fee
Design Services
$ 7,500
Permitting Services
$ 6,500
Bidding Services
$ 800
Work Authorization Total
$14,800
The below represents the Remaining Fee Balance less fees already paid.
TASK
Contract
Value
%
Complete
Earned To
Date
Previous Amount
Paid
Fee Balance
CIVIL DESIGN PLANS
$7,500.00
80.00%
$6,000.00
$2,250.00
$3,750.00
PERMITTING SERVICES
$6,500.00
0.00% 1
$0.00
$0.00
$0.00
BIDDING SERVICES
$800.00
0.00%
$0.00
$0.00
$0.00
Subtotal 1
$14,800.00
$6,000.00
$2,250.00
$3,750.00