HomeMy WebLinkAbout2020-157CMadmimt D -11 V Work Order #18 for Hallstrom
Farmstead Conservation Area - (FTC No.:01-055-FF 1)
NT91-1114 e1014: 3
Hallstrom House (FTC No.:01-055-FF1)
This Work Order Number 18 is entered into as of this 18 day of August , 2020 pursuant to that certain
Continuing Consulting Engineering Services Agreement for Professional Services entered into as of this 17' day
of April, 2018 (collectively referred to as the "Agreement"), by and between INDIAN RIVER COUNTY, a
political subdivision of the State of Florida ("COUNTY") and MBV Engineering, Inc. ("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The
professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B
(Fee Schedule), attached to this Work Order and made a part hereof by this reference. The Consultant
will perform the professional services within the timeframe more particularly set forth in Exhibit C
(Time Schedule), attached to this Work Order and made a part hereof by this reference all in
accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of
the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement
and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as
if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first
written above.
CONSULTANT: BOARD OF COUNTY COMMISS19 RS
��atiiMrss .
MBV Engineering, Inc. OF INDIAN RIVER COU ;.��y •.• �o,�•.,
By: T By: _ ✓` '
Susa dams, Chairman
Title: Vice President
BCC Approved Date: August 18, 2020
Attest: Jeffrey R. Smith, Clerk of Court and Comptroller
By:
Ul/ l�Vd�l
De ty Clerk
Approved:
Jason . Br wn, County dministrator
Approved as to form and legal sufficiency:
an T. Reingold, County Attorney
EXHIBIT A - SCOPE OF WORK
It is our understanding that the COUNTY intends to construct various site improvements on the parcel
of land located directly north of the historic Hallstrom House building located at 1723 Old Dixie Highway
in Vero Beach, FL. We understand the site will consist of the following:
• A stabilized entry / exist drive and parking area (shell or asphalt millings)
• (1) 320 SF Restroom building
• (1) 900 SF Outdoor Classroom Pavilion
• (1) 600 SF Outdoor Pavilion
• Potable and Fire Water services (assumes one Fire Hydrant will be required)
• 1,500 LF Off -Site Sewer service line extension and directional bore to connect to the
existing utility line located to the south of the property*
• (1) private, fiberglass lift station
• Drainage infrastructure (anticipates dry pond, piping, and inlets) to support the
proposed site improvements stormwater runoff and permit criteria
• Public Walking trail
Pursuant to coordination with County, it has been requested that the Architectural design services for
the proposed restroom facility be included in the Consultants contract and is described in further detail
below. Furthermore, it is understood that all existing conditions survey data (Boundary, Tree,
Topography), including off-site route survey information for the sewer line extension, shall be provided
by others to Consultant in CAD and hardcopy formats as required for the project. Electrical power to
the site will be required to support the bathroom facility and pavilions, as applicable, and will be
designed and coordinated under this contract. Finally, it is understood that all the County will be
responsible for the Outdoor Classroom and Public Pavilion structural designs and permitting and that
Consultant will be responsible for all site pad layout and infrastructure to support the construction of
the pavilions. As such, MBV Engineering, Inc., the "Consultant", will provide for the project's site
design, permitting, bidding and construction administration services, as well as the restroom facility
Architectural design, bidding and construction administration services as related to the above activities
and as further described below.
Task 1: Survey (Existing Conditions) Coordination
The CONSULTANT will coordinate with Hayhurst Land Surveying as needed to obtain the necessary
survey files for incorporation into the Civil base plans. All survey services will be provided by others and
routed through COUNTY. Consultant will utilize the existing boundary, tree, topographic and off-site
route survey by Hayhurst Land Surveying, Inc. as the base for the existing conditions for the area to
receive the improvements. It is understood that the current survey will need to be updated to be within
6 months of date of submittal for permits and that the Surveyor shall provide the Consultant the file in
AutoCAD format to be utilized and relied upon for design. Should said survey not contain all the
required existing information to support the design for the proposed improvements, Consultant will
coordinate with County and surveyor so that County may provide the additional survey necessary to
complete the design and permitting phase.
Task 2: Geotechnical Coordination
The Consultant will coordinate with a geotechnical firm to provide a scope for the necessary borings
and tests for design of the proposed buildings and the site. Consultant will coordinate with Architect
and develop a "Boring map" and scope for the soil tests related to the restroom facility. The County
shall be responsible for payment of the testing and report and shall provide said report to the
Consultant, as either pdf or hard copy. If there are any modifications to the proposed improvements
that require additional testing, then it will be incumbent on the County to provide for the additional
testing.
Task 3: Architectural Coordination
The Consultant shall be responsible for retaining and contracting with the architectural for the design
services needed for the proposed restroom building. The Consultant will coordinate with the
architectural consultant on the various project related items to include: Building size and layout,
building utilities entry points and sizes, parking lot light pole details and specifications, if applicable.
The Consultant and Architect shall coordinate and provide the necessary architectural / civil drawings
to one another in AutoCAD formats in development of the project plans. Consultant and Architect shall
coordinate as needed throughout the project.
Task 4: Civil Design Plans
Conceptual Plans
Based on previous discussions, the Consultant will provide a new conceptual layout to be
approved by County Parks Division staff. The Parks Divisions' comments on the plan will be
incorporated into the design plans that will be submitted for permitting. This task includes one
(1) coordination meeting with County to review design and (1) revision to the conceptual plan
to incorporate the County's comments from the review meeting.
Construction Plans
The Consultant will prepare 24" x 36" design drawings for the above described improvements
in accordance with the final Conceptual Plan layout from (a) above. The design drawings will
include existing conditions plan (survey provided to Consultant by others), General Notes and
Specifications, erosion control plan, site plan, paving grading and drainage plan, utility plan,
plan & profile sheets for 1,500 LF of off-site sewer design, lift station plan, and associated Civil
design details sheets. Landscape Plans to be developed in-house by County.
County Reviews
The Consultant will attend three (3) progress review meetings with the County Parks Division
staff at approximately 30, 60 and 100 percent levels of design completion. A single set of review
comments shall be provided to Consultant prior to each review meeting. This task includes
revisions to plans from each County review within reasonable scope of the project.
Task 5: Civil Permitting
The Consultant will prepare the following permit applications and associated submittals for the
following agencies:
Applications
• Indian River County Pre -Application Meeting (Includes attendance at IRC Pre -Application
Meeting)
• Indian River County Major Site Plan (Includes attendance at IRC TRC Meeting)
• Indian River County Conditional Concurrency
• Indian River County Final Concurrency
• Indian River County Stormwater
• Indian River County ROW
• Indian River County Utilities Approval
• Indian River County Fire Department Approval
• FDEP Domestic Wastewater
• SIRWMD 10-2 Self Certification for Stormwater Design
Modeling, Calculations & Reports
• Stormwater Modeling for Dry Pond Design
• Development of Stormwater Calculations in accordance with regulatory requirements
• Development of Final Stormwater Report for Permit Submissions
• Development of Private Lift Station Calculations
• Development of Final Lift Station Report for Permit Submissions
No endangered species, wetlands or other ecological permitting is anticipated or included herein. It
should be noted that the site may have existing gopher tortoises and that ail coordination and
permitting associated with the relocation of the tortoises will be provided by the County.
The Consultant shall respond up to three (3) requests for additional information by the permitting
agency.
The County will be responsible for all permit fees and the Consultant will prepare all necessary
applications and provide to County for signature.
Task 6: Architectural Design
Architect / MEP/ Structural
• Establishment of design criteria for the proposed 320 SF Restroom Facility
• On-site visit for field verification of the existing site conditions.
• Preparation of architectural construction documents consisting of floor plans, elevations,
roof plans and details, life safety plan, code review, schedules, general/construction details,
notes and specifications.
• Coordination with MEP and Structural.
• Coordination with Owners Civil Engineer.
• Establish design criteria for ventilation, electrical and plumbing.
• Construction documents and specifications for electrical and plumbing, which include but
are not limited to: floor plans, schedules, electrical and plumbing risers, electrical panels,
reflected ceiling plans, details, etc.
• Utility coordination for new electrical service.
• Establish structural design criteria
• Review of soil investigative reports as provided by Owner.
• Design and preparation of the following:
o Foundation plans and sections based on a conventional shallow foundation system with
a minimum allowable soil bearing pressure of 2,000 psf.
o Roof framing plan and sections.
o Wind design pressures.
• Structural specifications in short format on plans.
• Building and Wall Sections, Roof Framing Plans, Details and Specifications.
• Preparation of Documents for Building Permit Submittal.
• Responses to Building Permit review comments.
Task 7: Cost Estimates
The Consultant will prepare an Engineer's Opinion of Probable Costs at approximately 30, 60 and 100
percent levels of design completion.
Task 8: Biddiniz Services
The COUNTY shall be responsible for setting the providing the front-end bid documents, bid opening
date, advertisement of the bid, scheduling the pre-bid meeting, and scheduling the bid opening. The
Consultant will provide the following:
• Preparation of Civil and Architectural Documents for Bidding
• Attendance at (1) Pre -Bid Meeting
• Response to requests for additional information (RAls) for bidders
NOTE: All construction specifications will be on the applicable plan sheets in lieu of a specifications
manual. The Consultant will prepare a pdf file of the final bid package for the COUNTY's use in
distribution to prospective bidders via Demandstar.
Task 9: Construction Services
The Consultant will provide the following scope of services during the construction phase:
Civil Construction Services
• Attendance to two (2) pre -construction meetings, if required
• Shop drawing review of civil site components
• One (1) inspection during subbase construction
• One (1) inspection during sidewalk formboards
• One (1) inspection for driveway surface construction
• One (1) inspection for water line tap
• One (1) inspection for water line pressure test
• One (1) inspection for sewer line directional bore
• One (1) inspection for sewer line FM pressure test
• One (1) inspection for grinder lift station start-up
• One (1) inspection for punchlist prior to final inspection
• One (1) site visit for final walkthrough with County inspector in attendance
• Two (2) additional inspections, if required
• Review of testing reports and as-builts provided by others
• Coordination with County Parks Division and Public Works inspection staff
• Coordination with Contractor
• Certification by E.O.R. to County and FDEP
Architectural Construction Services
Architect
• Shop Drawing review of Architectural items
• Responses to Request for Information
• (3) visits during construction
MEP
• Shop Drawing review of MEP items
• Responses to Request for Information
• (2) visits during construction
Structural
• Shop Drawing review of Structural items
• Responses to Request for Information
• (2) visits during construction
NOTE: Above inspections are based on a round-trip duration of 2.5 hours each. The above
inspections are based on reasonable construction inspection sequencing and does not include
additional site inspections due to failed tests or contractor scheduling errors.
EXHIBIT B - SCHEDULE
Upon authorization to proceed by the COUNTY, the above described services will be provided based
on the following schedule:
• Initial Submittal (30% design drawings) 1 month from issuance of Notice to Proceed
• Permit Plans Submittal (60% design drawings) 2.5 months from issuance of Notice to Proceed
• Final Submittal (100% design drawings) 5.5 months from issuance of Notice to Proceed
EXHIBIT C - DELIVERABLES
The CONSULTANT shall provide the COUNTY with the following at the designated milestones:
• Initial (30%) completion:
o Two (2) sets of plans in 24" x 36" format
o One (1) Opinion of Probable Cost (OPC)
o One (1) CD with drawings in PDF format
• Permit Plans (60%) completion:
o Two (2) sets of plans in 24" x 36" format
o One (1) Opinion of Probable Cost (OPC)
o One (1) CD with drawings in PDF format
• Final (100%) completion:
o Two (2) sets of plans in 24" x 36" format (signed & sealed)
o One (1) Opinion of Probable Cost (OPC)
o One (1) electronic version of the plans in pdf and CAD format
EXHIBIT D - FEE SCHEDULE
The COUNTY agrees to pay and the Consultant agrees to accept for services rendered, pursuant to this
Agreement, fees inclusive of expenses in accordance with the following:
Task
Fee
Task 1: Survey Coordination
$ 500
Task 2: Geotechnical Coordination
$ 500
Task 3: Architectural Coordination
$ 500
Task 4: Civil Design Plans
$ 24,750
Task 5: Civil Permitting
$ 7,750
Task 6: Architectural Design
$ 8,000
Task 7: Cost Estimates
$ 2,200
Task 8: Bidding Services
$ 1,250
Task 9: Construction Services
Civil Construction Services
$ 9,500
Architect team Construction Services
$ 1,500
Work Authorization Total
$ 56,450
ADDITIONAL SERVICES
When required by the COUNTY or the Contract Documents, where circumstances exist beyond the
Consultant's control, Consultant shall provide or obtain from others, as circumstances required, those
additional services not listed as part of the Work Order, the Consultant shall notify the COUNTY
promptly prior to commencing said Additional Services, and if agreed upon, will be paid for by County
in accordance with the Master Agreement, Professionals and vendor intended to provide additional
services shall first be approved by the COUNTY, in writing, by the COUNTY's Project Manager.
The COUNTY has selected the Consultant to perform the professional services set forth on this Work
Order. The professional services will be performed by the Consultant for the fee schedule set forth in
this Work Order. The Consultant will perform the professional services within the timeframe more
particularly set forth in this Work Order in accordance with the terms and provisions set forth in the
Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall
conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be
incorporated in each individual Work Order as if fully set forth herein.