Loading...
HomeMy WebLinkAbout2020-178C 2018 CDM Smith All Rights Reserved CHANGE ORDER 6706-221060 Issued for Bid/January 2018 No. 08 - Final Indian River Countv Landfill Segment 3 Cell 2 Expansion, Segment 2 Partial Closure, and Landfill Gas PROJECT Svstem Expansion DATE OF ISSUANCE Auqust 6, 2020 EFFECTIVE DATE August 18, 2020 OWNER Indian River County OWNER'S Contract No. IRC Bid No. 2018025 CDM Smith Project No. 6706- 228608 CONTRACTOR Thalle Construction Co., Inc ENGINEER CDM Smith Inc. You are directed to make the following changes in the Contract Documents: Description: 20 day extension to the Milestone 2 and Final Completion Time Reason for change order: Reconcilliation of Line items material overruns and savings, additional work. Attachments List documents supporting change) CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price Original Contract Times Milestone 1 - November 5, 2018 S 16,034,260.00 Substantial Completion: 5/4/2019 Ready for final payment: 6/3/2019 Days or dates Net changes from previous Change Orders Net change from previous Change Orders No.1 to No. 7 No. 1 to No. 7 Milestones) + 262 days; MS -1 =7/25/2019, MS -2 +242 = $ -$2,659,127.14 1/1/2020, Final Completion +242 = 1/31/2020 Contract Price prior to this Change Order Contract Time prior to this Change Order Milestone 1 - September 5, 2019 S 13,375,132.86 Substantial Completion: January 1, 2020 Ready for final payment: January 31. 2020 Days or dates Net Increase (decrease) in this Change Order Net Increase in this Change Order S ($ 1,228.09) Milestones 2 + 20 days; MS -1 =9/5/19, MS -2 + 20 = 1/21/2020, Final Completion = 02/20/2020 Contract Price with all approved Change Orders Contract Time with all approved Change Orders $13,373,904.77 Substantial Completion: January 21. 2020 Ready for final payment: February 20, 2020 Days or dates RECO E PPR E EPT , F•. v: Z,61dt�l ENG EER ( thorized Signature) By. (Authorize igndture) C T• It uthorized Signature) Date: August 6. 2020 e: A u t 18 2020 a't6 u •-t-t2020 EJCDC No. C-800 (2007 Edition) Prepared by the Engineers Joint Contract Documents Committee ane Associated General CONTRACTORS of America. � C7 AS TO FOP,," A t;,4l p$gnith, Clerk of Ai -,16 Lc�t✓:l�•L S, VIzICIENC`� Su lementary Conditions Circuit Court and Comptroller 00800-33 Change In Contract Summary Log Owner. Indian River County Engineer: CDMSmithlnc. Solid Waste Disposal District Contractor: Thalle Construction Company Date: August 6, 2020 Project: IRC Landfill Segment 3 Cell 2 and Segment 2 Partial Closure and landfill Gas System Expansion T.hln 1 rh...nu n-4— — a 1 — Ible 2. Time Impact to Project CO No. 6(days) Milestone dotes CO No. 71 days) Mkt—dabs CO No.8 Milestone dotes Date Achkwed Dogs beyond Milestone Days Recommended by OS 09 18 CO No 2 (days) // ( r l Milestone dates Item Na. Reference Date Submitted Descriptbn Contractor Changein Addition to Requested Change Engineer's Comments nded Recommended Etp er, Charge Allocated to ARomtedto 21 -Jan -20 8-1an-20 -13 dates Proposal ContractAmount ContractAmount in Contract Time 17 -Mar -19 by Engineer Engl Order No.B Cbsu2 Cott Cell Cost 5-Selt Thalia Letter 4 -May -19 0 Request for time 27 31 -May -19 62 1 -Aug -19 Contractor was 42 19-Nov- ialComple[e 390 3 -tun -19 0 1 dated 2/10/2020 extension for seepage 31 -Aug -19 0 $ - 20 hindered by Leachate 20 $ - $ - $ - 2/20/2020 re air. stud team. Florida Jet Clean ran Request for into pipe blockage Work was in progress Change for two under the existing and was better to 2 additional days 2/13/2020 Segment 2 Landfill Attached $ 15,005.27 0 complete than to 0 $ 15,005.27 $ - $ 15,005.27 to Jet Clean which took two remobilize and incurr Pipe additional days to additional cost. complete the video. The Swale along the Work was necessary to Regrade Swale north side of Segment restore stormwater 3 at the north 1/27/2020 2 was regraded to Attached email $ 19,447.88 0 flow away from lift 0 $ 19,447.88 $ 10,890.81 $ 8,557.07 side of Segment restore runoff flow to station on the north 2 the west. side of Segment 2 g• Coquina Shell Access Materials were Final Pay verun $2.00 $ 20.00 0 confirmed with actual 0 $ 20.00 $ 20.00 Applicaion Overrun quantities in surveys. f. Fabric Formed Materials were 5 Final Pay Concrete Riprap = Material Overun $10.00 $ 500.00 0 confirmed with actual 0 $ 500.00 $ 500.00 Appllwwn Overrun quantities in surveys. c. 4 -Inch Solid SDR 11 Materials were 6 Final Pay HDPE Forceain- m Material Owmn $30.00 $ 1,140.00 0 confirmed with actual 0 $ 1,140.00 $ 633.84 $ 506.16 Applicay Overrun quantities in surveys. Tobi Re uested $ 36,113.15 20 Total Recommended 1 20 $ 36,113.15 $ 12,024.65 $ 24,088.50 Ible 2. Time Impact to Project CO No. 6(days) Milestone dotes CO No. 71 days) Mkt—dabs CO No.8 Milestone dotes Date Achkwed Dogs beyond Milestone Liquidated Liq.idnted Damoges Damages Rate Amo Amount IT Dos r OS 09 18 CO No 2 (days) // ( r l Milestone dates CO No. 3 (days) ! r Mikstone dates CO No. 4 (days) Milestone dates CO No. 5 da / Milesta ne dotes l rs CO No. 6(days)Milestone Milestone 42 19 -Nov -19 43 1 -Jan -20 20 21 -Jan -20 8-1an-20 -13 dates lezcane 1 180 5 -Nov -18 105 18 -Feb -19 27 17 -Mar -19 62 18 -May -19 68 25 -Jul -19 42 5-Selt lest... 2 360 4 -May -19 0 4 -Ma -19 27 31 -May -19 62 1 -Aug -19 68 8 -Oct -19 42 19-Nov- ialComple[e 390 3 -tun -19 0 3 -tun -19 27 30.Jun-19 62 31 -Aug -19 68 7 -Nov -19 42 19 -Dec - NPT CO No. 6(days) Milestone dotes CO No. 71 days) Mkt—dabs CO No.8 Milestone dotes Date Achkwed Dogs beyond Milestone Liquidated Liq.idnted Damoges Damages Rate Amo Amount Milestone 1 42 5 -Se -19 0 S -Se -19 0 5-1e -19 28 -Aug -19 Milestone 42 19 -Nov -19 43 1 -Jan -20 20 21 -Jan -20 8-1an-20 -13 $ 900.00 $ Final Complete 42 19 -Dec -19 43 31 -Jan -20 20 20 -Feb -201 20 -Feb -20 0 $ 650.00 $ 262 Jame S.l.nange In l.Ontract Price New Controcl Total Convect Description I ContractAmount I Change Amount Contlngency No. 4 Order No.7 Order No. 8 304 262 262