HomeMy WebLinkAbout1992-202As -Built (Fourth Raeo.) 8/10/92(ENG)RES4.MAG\gfk
RESOLUTION NO. 92- 202
A RESOLUTION OF INDIAN RIVER COUNTY CERTIFYING
"AS -BUILT" COSTS FOR CERTAIN PAVING AND DRAINAGE
IMPROVEMENTS TO 44TH AVENUE BETWEEN 16TH STREET
AND PINEWOOD SUBDIVISION, DESIGNATED AS PROJECT
NO. 8711, AND OTHER CONSTRUCTION NECESSITATED BY
SUCH PROJECT; PROVIDING FOR FORMAL COMPLETION
DATE, AND DATE FOR PAYMENT WITHOUT PENALTY AND
INTEREST.
WHEREAS, the Board of County Commissioners of Indian
River County determined that the improvements described herein
specially benefited the property located within the boundaries as
described in this title, designated as Project No. 8711, are in
the public interest and promote the public welfare of the county;
and
WHEREAS, on October 23, 1990, and continued to November
6, 1990, the Board held a public hearing in the Commission
Chambers at which time the owners of the property to be assessed
were afforded an opportunity to appear before the Board to be
heard as to the propriety and advisability of making such
improvements; and
WHEREAS, after such public hearing was held the County
Commission adopted Resolution No. 90-168, which confirmed the
special assessment cost of the project to the property specially
benefited by the project in the amounts listed in an attachment
to that resolution; and
WHEREAS, the Director of Public Works has certified the
actual "as -built" cost now that the project has been completed is
$15.20 per front foot, which is less than $17.73 per front foot
in the confirming Resolution No. 90-168,
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA, that:
1. Resolution No. 90-168 is modified as follows: The
completion date for Project No. 8711 is declared to be September
22, 1992, and the last day that payment may be made avoiding
interest and penalty charges is ninety (90) days after passage of
this resolution.
2. Payments bearing interest at the rate of 9 %% per
annum may be made in two (2) equal installments, the first to be
made twelve (12) months from the due date and the subsequent
1
i
No. 92-202
payments to be due yearly from the due date. The due date is
ninety (90) days after the passage of this resolution.
3. The final assessment roll for said project listed in
Resolution No. 90-168 shall be as set forth in attached Exhibit
"A" to this resolution.
4. The assessments as shown in attached Exhibit "A" shall
stand confirmed and remain legal, valid, and binding first liens
against the property against which such assessments are made
until paid.
5. The assessments shown in Exhibit "A", attached to
Resolution No. 90-168 were recorded by the County on the public
records of Indian River County, and the lien shall constitute
prima facie evidence of its validity.
This resolution was moved for adoption by Commissioner
Srurlork , and the motion was seconded by
Commissioner Rirrl and, upon being put
to a vote, the vote was as follows:
Chairman Carolyn K. Eggert Aye
Vice -Chairman Margaret C. Bowman Aye
Commissioner Don C. Scurlock, Jr. Aye
Commissioner Richard N. Bird Aye
Commissioner John W. Tippin Aye
The Chairman thereupon declared the resolution duly
passed and adopted this 10 day of November
19 -. '
BOARD OF COUNTY COMMISSIONERS
OF INDIAN RIVER COUNTY, FLORIDA
ByA
CAROLY K. EGG ,
Chair n
Attest:
JEFFREY -K. BARTON,
Clerk
�?'?A Apprmved
Attachment: Exhibit "A" Admin. ISe
Legal
44asblt. res Budget
Eng
Dept
LAlsh Mgr.
0
Z
N
V
1
1
�D
N
N
t '
J
0 o E
o o
o x
tJ
l,W
tJ
IV
E� tri
C)
rr-�
aCD
�
N
V
1
1
�D
N
R yC 5� c ov'o tnMtna
5 tro Ez W w
�.zc 0'0o W aa�W , —
Si
y tm T�
tM A O O �O 0 p O O,n p O Z y H
(D W fA
J 7 b i1 O z o �^
o n 0 E i? ti o � o a o� o C
a c�yao 0�No o No O0 o
a o R w o °O
E�.� ° o•w y cCD 0
w ��
t =" tri ti
c2 !f �2
G
N
b9
J
0 o E
o o
o x
tJ
l,W
tJ
E� tri
C)
rr-�
aCD
�
8
o ti
a
C)
rn
a
co'
R yC 5� c ov'o tnMtna
5 tro Ez W w
�.zc 0'0o W aa�W , —
Si
y tm T�
tM A O O �O 0 p O O,n p O Z y H
(D W fA
J 7 b i1 O z o �^
o n 0 E i? ti o � o a o� o C
a c�yao 0�No o No O0 o
a o R w o °O
E�.� ° o•w y cCD 0
w ��
t =" tri ti
c2 !f �2
G
N
b9
J
NJ
tJ
l,W
tJ
J�
O
�
8
v
,.
cAD
OA O d R H G CD O w
00
. N
� � G
rn E H
N �• � 5. ,,,.,� o N arr o �,
R
oo G m
5
N(D O O10 G
r CD yCT C
WO, � ��y11
G°7 oH
O
^f +e o
r
tom-'
d
zz
0
ITJ
Irl
P
m
m
z
v
,.
cAD
OA O d R H G CD O w
00
. N
� � G
rn E H
N �• � 5. ,,,.,� o N arr o �,
R
oo G m
5
N(D O O10 G
r CD yCT C
WO, � ��y11
G°7 oH
O
^f +e o
r
tom-'
d
zz
0
ITJ
Irl
m
m
O Opo
d
m
N
O
a
ti
O
ON 00 ry�
vi O ".'A f5D � �+ M
11
5•cs��c5,
vo �.c�o
W�-W
aAAw
„oGti.
�yO
W O faD O �p (nw
'Cr1
(8,
A
f>
tro fD
0 N
C7
00
C
— o
i
�O
y o
O .7. O �'
g "
�-n O p ti
ry O
vii O
O, O y N
N O W 0
zyao
o
O
-no
N0 1�
nyp•,1
b
z
ny
O
,o.
CD
z
ql
o -n
0
o
w
y0 O
ko
0
�f l
ITI
C)
0
0
o
--I
A
66
O
N
n
00
0
0
W
C)
Ga M N �W
tri N J W
N �1 pO
S
o
�aN
� � o
h
_N
J
O
N
V
1
O
n
<O
N
0
00
aro !Otte d CDaiC—Diosr
p (p
CD
y °�°� m e y.
ao
(D
00
0n
:3 0PV r -
s
U3 0 000 tri
a
d
d
'Tl
M
0
2t
pri 01 N W
00
M M N W
M 1 N W
A:
IIS=' S
m
oo
o U
Z
o
D
Jp g
pri 01 N W
00
M M N W
M 1 N W
�..
IIS=' S
H
oo
o U
o
o
D
Jp g
Z O�
`�'
Vi Cr1 w
H O Z Oo�
m
O
o'6
N
000C
CD C)
N C
�'o�o'
1S
r0
y o
o
D o
c.y9
N
N
O
N
G
ON
\ O
a,
�
b
0
O
y
pri 01 N W
M M N W
M M N W
M 1 N W
�..
IIS=' S
H
>
O
D
Jp g
Z O�
`�'
Vi Cr1 w
H O Z Oo�
m
O
o'6
N
000C
CD C)
N C
�'o�o'
1S
r0
y o
o
D o
o
N
N
O
N
OJ J J
0 0 0 0
(�1 U
= o 0 0 0
a
�..
IIS=' S
�..
x0
H
>
O
z
z
x
80;
C
�
N
C/)
H
00
� C/1
M
O
W
to
N
O�
x
tri
Z
�
y
O
y
r
r
o
OtO
r
�
7d
d
CL1
o
�
cz
c
z
O
'n
V
V
Oro
80;
C
�
N
H
00
� C/1
W
to
N
FINAL COST FOR:
44TH AVENUE BETWEEN 16TH STREET & PINEWOOD SUBDIVISION
DATE: 10/22/92
PROJECT NO, 8711
TOTAL F.F. 2865.08
FINAL COST
CONSTRUCTION
Labor
$4,700.89
Equipment
$5,845.50
Soil Cement
$8,350.75
Asphalt
$4,662.97
Sod
$4,281.19
Pipe
$1,458.20
Limerock
$18,434.00
Stakes
$21.78
Testing
$115.00
Miscellaneous
$43.00
$47,913.28 $47,913.28
ROW ACQUISITION $2,595.26
ENGINEERING
By Lloyd & Associates
$4,345.09
Construction
Stake Out 8 hrs ®
$25.30 $202.40
$4,547.49
$4,547.49
Sub -Total
$55,056.03
Administration 2.9852316%
$1,643.55
Recording Fees
$227.50
TOTAL
$56,927.08
25% County's Cost
$14,231.77
75% Property Owner's Assessment
$42,695.31
2% Tax Collector's Fee (75% Figure)
$853.91
TOTAL ASSESSMENT $43,549.22
Assessment = $43,549.22 = $15.20
2865.08
44avfin.wkl 23 -Oct -92