HomeMy WebLinkAbout2020-242SECTION 00942 - Change Order Form
No. 1
DATE OF ISSUANCE: November 8. 2020 EFFECTIVE DATE:
OWNER: Indian River Countv
CONTRACTOR TLC Diversified, Inc.
Project: Oslo Water Treatment Plant Blower Reolaoement .
OWNER'S Bid No. 2020-009
You are directed to make the following changes in the Contract Documents:
Description: Replacement of the five (5) existing post-treatment system off -gas electric
actuators. The existing dampers are to remain.
Reason for Change Order: Field investigation during startup of the newly installed blowers
discovered the dampers are not fully closing/opening. IRC had the actuator field service
technician visit site to service these actuators which identified that the actuators failed, and
repairs would be cost prohibitive. These dampers are critical to off -gas treatment system and
also protect the recently replaced blowers from reverse spinning when not in operation.
Accordingly, it is our recommendation these actuators be replaced immediately.
Attachments: Change proposal from TLC and Limatorque Actuator Evaluation Report.
CHANGE IN CONTRACT
PRICE:
Description
Amount
Original Contract Price
$208,100.00
Net Increase (Decrease)
$Q,,QQ
from previous Change
Orders No. ;
Contract Price prior to this
$ 208.100.00
Change Order:
Net increase (decrease) of
$ 60.194.25
this Change Order:
Contract Price with all
$ 268.294.25
approved Change Orders:
M
/_L
or
Substantial Completion:
Net change from previous Change 0
Orders No.: (days)
Substantial Completion: 0
Final Com lotion: 0
Contract Time prior to this Change
Order: (days or dates)
Substantial Completion: _=
Change Order I (days or dates)
Substantial Completion:
Final Completion:
Change Orders:n
s or dates)
Substantial Completion:
Final Comoletion: 300
RECOMMENDED:
AI'C9 89, ac c,
kEN4AEER
K (,I tty -Naw.,,
(Signature)
Date: //Z , Z U
Attest: Jeffrey R. Smith, Clerk of
CirculiCourt rtd omptroller
Deputy Clerk
Q
Date: 11-17-2020
APPROViEC) AS O FOP,I-`
et9 fc�uiftcrt:�iihdehitirit �'o�' I d N O
OOfi42.1 BY
October 6, 2020
Mr. Nick Mack P.R.
Kimley Morn and Associates
1920 Wekiva Way Suite 200
West Palm Reach, FL 33411
RE, Oslo Water Treatment Plant Blower Replacement
Change Proposal 01 — Replace Limitorque Actuators
Mr. Black,
TLC Diversified, Inc,
Keeping Water Moving,
Environmental Construction
Professionals Serving the Water
g Wastewater Industry
CG C041616
CU 0053963
Please see attached our proposal for furnishing and installing five (5) new Limitorque actuators on the existing
Doges System valves.
We have included all labor, equipment, and materials necessary to complete the following:
1. Replace Limitorque Actuators
a. Furnish and install five (5) new Limitorque actuators on the existing Degas System valves
for the lump sum price of Sixty Thousand One Hundred Ninety Four Dollars and 25/100
($60,194.25)
This additional work will require an extension of Contract time, Please add sixty (60) calendar days to the
Project Completion date.
We appreciate the opportunity to work with you on the project, Should have any questions please free to contact
us, Thanks.
Respectfully,
Michael McCarty
Sr, Project Manager
TLC Diversified, Inc.
561-315-5688
TLC DhrereMed, Ino.
971017th rtron reel
Palmetto, Filtlds 3Irr1
Phone; a11-1221411 PH! Mi -I M1211
0 Ohenp Order Proposal Farm
duBrnldod Tel
'INkk rladl: ,. ...,._..,_ .. _....>,9i
kirrla Nam end Asa_Mlaloo
1192oWuklvaWa:9uda2W _ 111
�wAsr pAlm pea�n. =L )Ml i - d�
� Aem � ...xn�ykie _.�,, ..... ,,..«w.., .. .:: �r!•uw w�u®r
01'NophkE Frva s eW, etwafa% M11 dew Ur,', yr Etat ntai AGT **A VC 0,NW0Iwo, 120VAd
MSMA a/ak Mcivatara .._..,_.... a. Purnih-A 6 naw Qualm
JAI e
Y, Few lmaab, t®n mWPtma9epotam elle fat now Dilve Mulll
i swwmoh 0A11 M
. _.. r LOW Mail; SN M
..�...,�,�.,,. a qn IAD M
V`. ,.;..,...® ,.,, ,,,:.,.-:.�a�a. T• � C IMellltialn tll n6M YUtUafWY
.supo"w NAO M
t Lead Mari NA At
Jo, Laos, 46,10 At
Pr-rf7 Mansy+' IAD Ar
TLC requires an Omni of s Ary p) colmder Boys
TLC Project Menayer Pets • SiSOpor hour
TLC Superintendent w/ TrudaToell Rata . 6118 per hour
TLC Skilled Labor/teed man Alto - $57 ar hour
TLC Labor Rata • {11 per hour
'"eruy An14AULOAN Seta on 0 time "Poe, Aero
Total PMI* of Werit In accordance wM the speeifiutlam for the lump rum amount of I
PAY ihoueead owe Nuruhad Nlnlry Agin Dollard OM 72/200
ILE a/r •,dike, IRE
FAWronmlntal Construction
Pt®hsaiarlals Sank+/ the Water
A Waltewlter Industry
Cr 0941111
CU Corson
Dzfa 1T1�W/l'3070
ro
P'D 0 r 11f1dlafl gleet k'iaumy `
pact Nuin-6er `lotd
prolorl. hew Wolor Ttoalmom pan! aln%%r ROPIAuemenl
Laos, f Mltenel...
A%41N tY INNI%I IAM eYOI„rUli
1%A%M1YiM WkaMMltefl
11%/MHupM W%ad/IIul4
aAY1 Wal MM
total CAanae Ostler Ameunat
Acceptance of Proposal
The &boys prkU, spadflcetlans and eonddamNon are satisfactory end are hereby aecoptod,
You are euthorl2od to do the work a specified, Payment will be made as outlined above. Contractoet 511naturet SNaesIAlt�rM
Date of Aeeeptsncet owna4 Slpwturel
112,7111,14
Ion
16.6711671
bA1
sbsa.0
����a
$37825.00
Tax:
$2319.50
FEL - FT. PIERCE, FL WW 01730
silver To:
Total:
$40144.50
4510 PROSPERITY DRIVE
from: Gary Morgan
WATERWORKS FORT PIERCE, FL 34981-0000
Comments.
Phone: 772.407.0137
Fax., 772.467.0472
10;52,34 OCT OS 2020
FEL -POMPANO BEACH, FL WW #125
Price Quotation
Phone: 772.487-0137
Fax: 772487-0472
Bid No: 8450327
Bid Date: 09/29/20
Quoted By: GM
Customer: TLC DIVERSIFIED INC
271917TH STREET EAST
PALMETTO, FL 34221
Cust PO#: LIMITORQUE
Item Description
SP-LQX2460VOCAWWA LIMITORQUE ELECT ACT QX -2 O/C
OPEN/CLOSE, 120VAC NEMA 4/0
EXISTING 'LY' UNITS ARE OBSOLETE &
CURRENT REPLACEMENT IS QX. EXISTING
MOUNTING BASE CAN BE RE -USED, WE
WILL MACHINE THE NEW DRIVE NUTS,BUT
WILL NEED TO KNOW MAKE/MODEUSTEM
SIZE IN ORDER TO MACHINE PROPERLY,
VERIFY POWERMLINCTION PRIOR TO REL,
3-4 WKS LEAD TIME
""MOUNTING/INSTALL BY OTHERS
"INCLUDES 5 DAYS OF STARTUP
""IF TRAINING NEEDED, ADDT'L DAY
TO BE CHARGED AT PER DAY COST**
Cust Phone: 941-722-0821
Terms: NET 10TH PROX
Ship To: TLC DIVERSIFIED INC
2719 17TH STREET EAST
PALMETTO, FL 34221
Job Name: IRC OSLO BLOWERS
Quantity Not Price UM Total
5 7686.000 EA 37825.00
Net Total:
$37825.00
Tax:
$2319.50
Freight:
$0.00
Total:
$40144.50
Quoted prices are based upon receipt of the total quantity for Immediate shipment (48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE
AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE, QUOTES FOR PRODUCTS SHIPPED FOR RESALE
ARE NOT FIRM UNLESS NOTED OTHERWISE.
Page 1 of 1
CONTACT YOUR SALES REPRESENTATIVE IMMEDIATELY FOR ASSISTANCE WITH DBE/MBEIWBEISMALL BUSINESS REQUIREMENTS.
Seller not responsible for delays, lack of product or Increase of pricing due to causes beyond our control, and/or based upon
Local, State and Federal Jews governing type of products that can be sold or put Into commerce. This Quote Is offend contingent upon the
Buyer's acceptance of Seller's terms and conditions, which are Incorporated by reference and found either following this document, or
on the web at https://www.forguson,com/contenttwobehe-lnfo/torms-of-sale
Govt Buyers: All Items are open market unless noted otherwise.
LEAD LAW WARNING: It Is Illegal to install products that art not "lead free" In accordance with US Federal or other applicable law in potable water
systems antic) ated or human consumption, Products with NP In the description are NOT lead free and can only be Installed In non -potable
applications, Buyer Is solely responsible for product selection.
HOW ARE WE DOING? WE WANT YOUR FEEDBACKI
Scan the OR code or use the link below to
complete a survey about your bids:
https:l/aurvey.inedaliia.corn/?bidsorder&fc-1208&on■4981
Flotech
Your Valve A Automaton Experts
REF; PO# A1730-515
Location; City of Vero Beach
1500 P Street SW
c/o TLC Diversified
Vero Beach, FL 32962
Gary,
Our Technician arrived onsite on 9/11/20 and found that the assemblies in question look to have a loose
fit in the coupling mounting to the actuator. We found that the limits were not set properly, causing the
valve to both open too far and come up short of closing.
The Limitorque LY Actuator was leaking oil Into the electrical compartment, causing damage to the
electric components of the actuator.
The seat Inside of the valve looks to be damaged due to the Incorrect setting of the actuator.
We also found that (1) motor seemed to have bearings going bad. This was discovered via the noise the
bearings are making.
Due to the Issues noted above and the costs that would be incurred to correct the issues found, we are
recommending that the best path forward Is to replace the actuators.
After evaluation, our technician did a final checkout with the End User and exited the facility.
Please let us know if there are any questions or any further Information that is needed.
Thank You
John Allen
Flotech,Inc.