Loading...
HomeMy WebLinkAbout2021-028ROSELAND ROAD SEWER EXPANSION COST SHARE AGREEMENT This Roseland Road Sewer Expansion Cost Share Agreement (hereinafter "Agreement") is made and entered into on the 16tnday of February_, 2021 by and between: Indian River County, Florida, a political subdivision of the State of Florida ("County"), whose address is 1801 27th Street, Vero Beach, FL, 32960 and the City of Sebastian, a municipality ("City"), whose address is 1225 Main Street, Sebastian, Florida, 32958. Recitals WHEREAS, the City has received a Fiscal Year 20-21 cost share grant from the St. Johns River Water Management District to assist in the funding of the Roseland Road Sewer Expansion project, which will allow for the abandonment of septic tanks that are in close proximity to the Saint Sebastian River which empties into the Indian River Lagoon; and WHEREAS, as part of the Roseland Road Sewer Expansion Project, County and City will only share in the costs of constructing a 6" diameter sanitary sewer force main from the intersection of Roseland Road and Corporate Park Drive approximately 2,215 linear feet north to the intersection of Roseland Road and Sunset Drive, as depicted on Attachment "A", that will allow the Donald MacDonald Campground; City Public Works Compound and various City airport properties to connect to the centralized sewer system. NOW, THEREFORE, in consideration of the mutual covenants contained herein and other good and valuable consideration, the County and City hereby agree as follows: 1. The foregoing recitals are true and incorporated as if fully restated herein. 2. Cost of sanitary force main system along Roseland Road. The estimated cost of the construction of the sanitary sewer force main system is $87,896.19. The County will pay $58,597.52 (2/3 this cost) and the City will pay $31,485.97 which includes the cost estimates of the project ($29,298.67), See Attachment B, and the City's share of the construction bond split 2/3 County to 1/3 City ($2,187.30). 3. Installation of Force Main. Within 30 days of County providing notice to the City that it is ready to construct the sanitary sewer collection and transmission system for Donald MacDonald Campground, City shall pay County $31,485.97. Once the City pays County $31,485.97, the County will begin the construction of the 6" sanitary sewer force main along Roseland Road. Page 1 of 3 4. Finalization of the Costs for the System for Donald MacDonald Campground. Upon completion of the sanitary sewer force main along Roseland Road, the County shall provide the City with the final (actual) cost for the sanitary sewer force main. Within 10 business days of the County providing the City with such costs, City shall pay County the City's proportionate share of the additional costs over the amount estimated in section 2, above, if applicable. If the final (actual) cost for the Roseland Road Sewer Expansion Project is less than the amount estimated in section 2, above, the County shall reimburse City the difference between the City's proportionate share estimated amount and the City's final (actual) proportionate share cost. 5. Applicable Law, Venue. The validity, interpretation, construction, and effect of this Agreement shall be in accordance with and governed by the laws of the State of Florida, only. The location for settlement of any and all claims, controversies, or disputes, arising out of or relating to any part of this Agreement, or any breach hereof, as well as any litigation between the parties, shall be Indian River County, Florida for claims brought in state court, and the Southern District of Florida for those claims justiciable in federal court. 6. Indemnification. To the limits and extent set forth in section 768.28, Florida Statutes, City shall indemnify and hold harmless the County, its commissioners, officers, agents, officials, employees, and subcontractors from and against any and all claims, liabilities, losses, damage, or causes of action which may arise from any misconduct, negligent act, or omissions of either the City or any of its respective agents, officers, or employees in connection with the performance of this Agreement. However, nothing contained in this agreement shall be construed as the City waiving its immunity pursuant to §768.28, et seq., Florida Statutes, or any other sovereign or governmental immunity as to the claims of third parties. 7. Effective Date. This Agreement shall become effective upon execution of the parties. IN WITNESS WHEREOF, City and County have executed this instrument this 16th day of February , 2021. Page 2 of 3 CITY OF SEBASTIAN 1225 Main Street, Sebastian, Florida 32958 By: Paul E. Carlisle, City Manager ATTEST: Jeanette Williams, MMC City Clerk !itClli! Approved as to Form an for reliance1v the C' of IOnny AngA, Jr. City Attorney INDIAN RIVER COUNTY, FLORIDA Joseph E. FTescher, Chairm Board of County Commissic .�y �Oh1MlS8j� , lis f„ Approved by BCC February 16, 202 ATTEST: Jeffrey R. Smith, Clerk of Circuit Court and Comptroller By: eputy Clerk 9��fR COUNT:•": Sufficiency Approved as to Form and Legal Sufficiency DA-anReingold County Attorney Jason lf. Blown, CountV Adininistrator EXHIBIT A Ho.aeaei ® canvwc sca.e ISSUED FOR CONSTRUCTION M MASTELLER & MOLER, INC. KEY SHEET" - M I 6o gm-Fam gm@muRa m @1EI& i 1D M RSD 1p m@[E WG1n [gKv fG:9@o [i ] >s�w � d� 3/ i=o 055 V� Sra , sure y4, MO MACK �A, 34960 W✓� (m) FOR ss7-5300 / PAX (m) 74 -11M74 -11Mµ . k. ^,,.,�` ...w �..w 11125/2020 '"" I--- INDIAN RIVER COUNTY UTILITY SERVICES 9�• ASK. °� "'a REVISIONS GERiHOATE OF AUf/g9GANA1 AMER 4204 Mmm �� ROPoOA EARL H. MASTELLER, P.E. FL 26658 Roseland Forcemain Extension & Donald MacDonald Campground Sanitary Sewer Collection / Transmission System IRC BID #2020039 Unit Item Cost Sheet Indian River County Department of Utility Services 2020 Labor Contract 1of3 CK Construction Utililites CoSeb Parks & Rec Item No. Description Quantity Unit Material Unit Price Installed Unit Price Total Unit Price (Material +Installation) SECTION A - UNIT COST/PRICES Al Mobilization (b) Non - Emergency Event 1 EA $ $ 1,500.00 $ 1,500.00 $ 500.00 $ 500.00 $ 500.00 A2 Temporary Traffic Control (b) Arterial Roadway 2125 L.F. $ $ 1.15 $ 2,443.75 $ 814.59 $ 814.58 $ 814.58 A3 Video Documentation (a) Pre -Construction Video 3,435 L.F. $ $ 0.60 $ 2,061.00 $ 687.00 $ 687.00 $ 687.00 (b) Post -Construction Video 3,435 L.F. $ $ 0.60 $ 2,061.00 $ 687.00 $ 687.00 $ 687.00 A4 Force Main - PVC (a) 2 -inch 150 L.F. $ 1.01 $ 14.46 $ 2,320.50 $ - $ - $ 2,320.50 (c) 6 -inch 2125 L.F. $ 5.42 $ 19.47 $ 52,891.25 $ 17,630.42 $ 17,630.42 $ 17,630.41 A7 PVC Gravity Sewer - 8 inch (a) 0'-6' 302 L.F. $ 5.51 $ 18.65 $ 7,296.32 $ - $ - $ 7,296.32 (b) 6'-8' 418 L.F. $ 5.51 $ 20.20 $ 10,746.78 $ - $ $ 10,746.78 (c) 8'40' 253 L.F. $ 5.51 $ 22.04 $ 6,970.15 $ $ $ 6,970.15 (d) 10'-12' 225 L.F. $ 5.51 $ 26.94 $ 7,301.25 $ $ $ 7,301.25 (f) Cost Credit 1198 L.F. NA $ 0.10 $ 119.80 $ $ $ 119.80 A9 Connect to Existing Pipe (<12") (a) 1 (<32") 1 EA $ 385.74 $ 1,467.20 $ 1,852.94 $ 617.66 $ 617.64 $ 617.64 (b) (>=12") 0 EA $ 1,300.38 $ 1,508.17 $ - All Precast Concrete Manhole -Unlined (a) 0'-6' 4 EA. $ 2,427.93 $ 848.61 $ 13,106.16 $ - $ - $ 13,106.16 (b) 6'-8' 3 EA. $ 2,811.46 $ 1,120.18 $ 11,794.92 $ $ $ 11,794.92 (c) 8'-10' 2 EA. $ 3,360.30 $ 1,697.24 $ 10,115.08 $ $ $ 10,115.08 Al2 Mechanical Joint Bell Restraints -PVC (c) 6 -inch 1 56 EA. $ 52.90 $ 62.72 $ 6,474.72 $ 2,158.24 $ 2,158.24 $ 2,158.24 A16 Ductile Iron Fittings 0.65 TONS $ 8.91 $ 5,091.92 $ 3,315.54 $ 1,105.18 $ 1,105.18 $ 1,105.18 (C-153 Compact Fittings) (Interior Epoxy Coated) 1of3 2of3 CK Construction Utililites CoSeb Parks & Rec Item No. Description Quantity Unit Material Unit Price Installed Unit Price Total Unit Price (Material + Installation) A17 Fitting Restraint (Per one (1) unit) (c) 6-inch 10 EA. $ 33.06 $ 54.88 $ 879.40 $ 293.14 $ 293.13 $ 293.13 A19 ITapping Sleeve and Valve (pressure test & tap included) (a) 6"x6" 1 EA. $ 1,778.79 $ 1,467.20 $ 3,245.99 $ 1,082.00 $ 1,082.00 $ 1,081.99 A20 Resilient Seat Gate Valve Assemblies (c) 6-inch 3 EA. $ 704.24 $ 489.44 $ 3,581.04 $ 1,193.68 $ 1,193.68 $ 1,193.68 A25 Sanitary Sewer Services (constructed with new gravity sewer) (a) 0'-6' (single) 3 EA. $ 249.26 $ 565.60 $ 2,444.58 $ - $ - $ 2,444.58 (b) 0'-6' (double) 5 EA. $ 283.25 $ 678.72 $ 4,809.85 $ $ $ 4,809.85 (c) 6'-Over (single) 0 EA. $ 667.44 $ 565.60 $ - $ $ $ - (d) 6'-Over (double) 0 EA. $ 624.18 $ 678.72 $ - $ $ $ - A29 Sanitary Sewer Cleanouts (to existing sanitary sewer laterals) (c) 0'-6' (6") 4 EA. $ 317.24 $ 757.12 $ 4,297.44 $ $ $ 4,297.44 (d) 6'-Over (6") 1 7 EA. $ 317.24 $ 969.92 $ 9,010.12 $ $ $ 9,010.12 A30 Cleanout Ring and Cover 11 EA. $ 105.06 $ 283.36 $ 4,272.62 $ $ $ 4,272.62 (constructed on new or existing cleanouts) A44 Dewatering (a) 0'-6' 720 L.F. NA $ 18.91 $ 13,615.20 $ $ $ 13,615.20 (b) 6'-12' 418 1 L. F. I NA $ 22.16 $ 9,262.88 $ $ $ 9,262.88 SECTION B -Restoration B1 Pavement Repair and Replacement (a) Asphalt Road 363 S.Y. $ 19.57 $ 24.64 $ 16,048.23 $ - $ $ 16,048.23 (d) jAsphalt overlay 91 S.Y. $ 4.64 $ 14.00 $ 1,696.24 $ - $ $ 1,696.24 B2 Milling Asphalt 91 S.Y. $ 5.15 $ 16.80 $ 1,997.45 $ - $ $ 1,997.45 B3 Coquina Rock Base 483 C.Y. $ 14.94 $ 8.96 $ 11,543.70 $ - $ $ 11,543.70 84 Flowable Fill $ - (c) 1> 8cy 12.5 C.Y. $ 139.05 $ 17.92 $ 1,962.13 $ 654.05 $ 654.04 $ 654.04 B6 Sod Replacement (a)Bahia 1450 S.Y. $ 1.08 $ 1.18 $ 3,277.00 $ 1,092.34 $ 1,092.33 $ 1,092.33 B8 Mailbox Removal and Reinstallation 1 EA $ 10.30 $ 140.00 $ 150.30 $ 50.10 $ 50.10 $ 50.10 2of3 3of3 CK Construction Utililites CoSeb Parks & Rec Item No. Description Quantity Unit Material Unit Price Installed Unit Price Total Unit Price (Material +Installation) SECTION C - HDPE Piping & Horizontal Directional Boring C2 I Horizontal Directional Boring (HDPE) -HDD (b) 4 -inch 1 70 1 L.F. SECTION D: Time and Materials Rates (Lift Station Installation) 1 $ 4.96 1 $ 178.08 1 $ 12,812.80 $ $ - $ 12,812.80 D1 Equipment Hourly Rates (a) Trackhoe (specify model) (large) 80 Hr. NA $ 115.00 $ 9,200.00 $ $ - $ 9,200.00 (c) Front end Loader 80 Hr. NA $ 105.00 $ 8,400.00 $ $ - $ 8,400.00 (h) Crew Truck with hand tools 80 Hr. NA $ 25.00 $ 2,000.00 $ $ - $ 2,000.00 (i) Trash Pump 3" 80 Hr. NA $ 10.00 $ 800.00 $ $ - $ 800.00 (n) I Cut off saw (14") 80 Hr. NA $ 6.00 $ 480.00 $ $ - $ 480.00 D2 Crew Hourly Rates (c) Supervisor 14 Hr. NA $ 95.00 $ 1,330.00 $ $ $ 1,330.00 (fl 5 man crew includes 1 supervisor 80 Hr. NA $ 305.00 $ 24,400.00 $ $ $ 24,400.00 SECTION E: Miscellaneous Materials & Sub -Contractors El IDewatering Pump (Lift Station Install.) 1 LS $ 4,380.95 $ - $ $ 4,380.95 Total Labor Contract (CK Construction): $ 298,269.08 $ 28,565.40 $ 28,565.34 $ 241,138.34 SECTION F: Direct Purchase Items F1 Hydra Service, Inc. Lift Station Package (4' dia. x 8.5' deep) 1 Ea. $ 22,982.00 $ - $ - $ 22,982.00 F2 Sub -Contractor -Paragon Electric 1 LS $ 14,277.00 $ $ $ 14,277.00 F3 Stuart Fence 1 LS $ 4,400.00 $ - $ $ 4,400.00 F4 I Survey-Stakeout(MMT) i I LS $ 5,500.00 $ 733.33 $ 733.33 $ 4,033.34 Total Project: $ 345,428.08 $ 29,298.73 $ 29,298.67 $ 286,830.68 3of3