HomeMy WebLinkAbout2021-069WORK ORDER NO.3
IRC -1914
JACKIE ROBINSON TRAINING COMPLEX AIR QUALITY
MOLD REMEDIATION DESIGN IN VILLAS
J
This Work Order Number 3 is entered into this '7 Yday of 2021 pursuant to
that certain Continuing Consulting Architectural Services Agreement, dated November 13, 2018,
(collectively referred to as the "Agreement"), by and between INDIAN RIVER COUNTY, a political
subdivision of the State of Florida ("COUNTY") and EDLUND, DRITENBAS, BINKLEY ARCHITECTS &
ASSOCIATES, P.A. ("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The
professional services will be performed by the Consultant for the fee schedule set forth in Exhibit A.
Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with
the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in
each individual Work Order as if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first
written above.
CONSULTANT:
EDLUND, DRITENBAS, BINKLEY ARCHITECTS
AND
By:
Print
Title: Principle
BOARD OF COUNTY COMMISSIONERS
OF INDIAN RIVER COUNTY
By:
Joseph E. Flescher, Chairman
BCC Approved Date: May 4. 2021
Attest: Jeffrey R. Smith, Cl k of Court and Comptroller
By: da
Deputy Clerk
Approved: W k �� I
Jason t. Br n, County dministrator
Approved as to form and legal sufficiency.
William K. DeBraal, Deputyvfounty Attorney
I ON14 111211
EDLUND • DRITENBAS • BINKLEY
ARCHITECTS AND ASSOCIATES, P.A.
65 Royal Palm Pointe, Ste D
Vero Beach, FL 32960
Ph: (772) 569-4320 Fax. (772) 569-9208
April 26, 2021
TO: Indian River County — Engineering Division
180127 1h Street, Building A
Vero Beach, FL 32960
Attn: Michael Heller, Project Specialist
RE: Proposal for Architectural Services for Jackie Robinson Training Center Villas
Remodel
Architect's Comm. #100220VB
Dear Sir.
This letter shall serve as our proposal and agreement for the preparation of documents necessary
to facilitate the remodel of the existing 90 units, approximately 38,665 SF training center villas
located at Jackie Robinson Training Complex at 3901 261h Street East, Vero Beach, FL 32960.
A. Scope
The scope of this project is to provide architectural services for the above referenced project. The
scope of work will be based upon our field discussions and Wood Technical Solutions Mold and
Moisture Assessment Report dated 03/35/2021. See attachment 'A' for work description.
Scope of services is as follows:
1. Field verify and establish an existing AutoCAD floorplans.
2. Develop construction/bidding/pen-nit documents based upon attachment 'A' and Wood report.
I A code review for life safety and building codes will be done to determine if any modifications
are necessary to be code compliant.
4. Meeting with building officials to determine what must be brought up to code.
5. Indicate areas of code compliance modifications and methods of corrections as needed.
6. The Architect will assist the Owner in addressing building department review comments. The
Architect will assist Owner with all building department pen -nits and provide required
documentation. Owner will pay all required building permit fees.
IM281tv
v 1
Our services will include the costs of mechanical, electrical, plumbing, and structural consultants
used to develop the construction documents as needed. We will assist in bidding administration,
answering bid questions as needed.
The Architect will provide limited construction administration which would include periodic
construction observation at a minimum of twice a month during construction, shop drawing
review and requests for information (RFI's), review of pay applications and monthly construction
meetings.
B. Deliverables
The Architect will provide the following documents or electronically sealed set.
1) 5 sets of signed and sealed construction documents.
2) Meetings with Owner as needed.
.3 Meetings with permitting agencies having jurisdiction over the project as needed. Note:
The proposed plans must receive Indian River County building permit. Any site utility
design will be by Owner.
4) AutoCAD files to be delivered to Owner at 100% submittal.
We anticipate the following schedule:
Task
1. Field work, establish base sheets
IL Complete construction documents
III. Bidding, building permit review
IV. Construction
C. Owner's Responsibility
The Owner's Responsibilities shall be as follows:
1. Provide any existing drawings/surveys/GAD files.
2. Civil engineer consultant fees'if needed.
3. All permit and application fees.
4. Asbestos abatement/survey if needed.
5. Termite consultant/treatments if deemed necessary.
6. Any roof replacement/repairs if needed.
Duration
8 weeks
10 weeks
8 weeks
8 months
D. Additional Services
1. Interior design services.
2. Costs to modify completed drawings, previously approved by Owner, for revisions
due to scope changes or value engineering.
3. 3D animated renderings or additional renderings.
4. Specialized foundation.
5. Consultation concerning replacements of any work damaged by fire or other cause
during construction.
6. Making revisions in drawings, specifications or other documents when such revisions
are inconsistent with instruction previously given by the Owner or any agent
authorized by the Owner.
7. Preparing as built drawings showing significant changes in work during construction
or immediately after building completion.
8. Providing detailed preliminary cost data prior to construction documents.
9. Specialized engineering studies and design (i.e. water and sewer connections outside
of the building footprint which would involve services of a Civil Engineer).
10. Security and surveillance systems design, billed at cost plus 15%.
11. Special consultants outside the normal mechanical, electrical, plumbing, structural
services, billed at cost plus 15%.
In the event additional building solutions, expanded scope, or additional research be requested by
the Owner, EDB Architects will provide them for additional cost at the following hourly rates:
Principals: John Binkley $165.00 per hour
Registered Project Architects $125.00 per hour
Intern Architects $105.00 per hour
Technical level one - Senior CADD Designer $ 85.00 per hour
Technical level two — CADD Designer $ 75.00 per hour
Technical level three — CADD Technician $ 65.00 per hour
Clerical and Accounting $ 50.00 per hour
Services of Engineering Consultants (if needed) — cost plus 15%.
Any agreement to perform Additional Services must be in writing and signed by both parties
prior to commencing any work on the Additional Services.
E. Fee
Our fee will be based upon our anticipated hours at hourly rates. The Architect shall invoice for
completed work of the design team plus reimbursable expenses as they are incurred. Invoicing
may be in part or whole for each phase of service.
Description
Hours
Billing
Rate per
Hour
Cost
I. Architectural
I Principal
150 1
$165
$24,750
Intern Architect
100
$105
$10,500
Sr. AutoCAD
400
$85
$34,000
Clerical
40
$50
$2,000
Subtotal I 571,250
II. MEP
Principal
20
$165
$3.300
En ineer
37
$150
$5,550
AutoCAD Tech
40
$85
$3.400
Clerical
10
$50
$500
Subtotal II 512,750
III. Structural
Engineer
30
$150
$4,500
AutoCAD Tech
43
$75
$3.225
Clerical
10
$45
$450
Subtotal III $8,175
Architects Fee Grand Total 1, I1, III $92,175.00
Estimated Reimbursable Expenses $1,500.00
F. Reimbursable expenses
Reimbursable expenses will be invoiced as incurred, include the following:
Mileage at $ 0.58 per mile.
In-house prints 24" X 36" at $ 2.50 each.
Special postage or mailing: cost plus 15%.
Outsourced prints: cost plus 15%.
Photocopies cc $0.20 per sheet.
CD of all permit documents as a pdf file $10.00.
G. Invoicing
Invoicing shall be monthly based on percentage of completion of deliverables. Payments due the
Architect under this Agreement are payable 30 days from the date of the Architect's invoice.
Amounts unpaid 30 days after the invoice shall bear interest at 1.5% per month. If payments due
the Architect are not received within 45 days of the date of invoice, the Owner agrees to assume
responsibility for the cost of any required collection services, including Architect's time.
Attorney's fees, legal fees and court costs. The Architect and his Consultants shall not be
required to perform any further work on the project and shall not be held liable for any
subsequent associated delays or losses of any kind until outstanding amounts are fully satisfied
or legally adjudicated.
H. General
1) As an instrument of service, all original documents remain the property of the
Architect and may not be reproduced in any form or modified fashion, without the written
consent of the Architect.
2) The Architect shall invoice every two weeks. Invoices will be based on completed
work for the services defined in Article E plus any additional services and
reimbursable expenses accumulated during that period. Note: Architect's
Reimbursable Expenses are listed in Article F of this agreement.
3) If payments due the Architect are not received within 45 days of the date on the invoice, the
Owner agrees to assume responsibility for the cost of all required collection services, legal
fees, mediation or court costs, incurred in the interest of collecting these fees.
4) In the event of any delinquent or disputed invoices, the Owner agrees that the Architect
and his Professional Consultants may cease all ongoing efforts on the project until the
outstanding invoice is paid or legally adjudicated.
5) Disputes regarding this agreement shall be settled in the following order of precedence:
Party to Party, Mediation, and Legal Adjudication. This agreement can be terminated by
either party with (7) seven calendar days written notice. The Architect and his
subcontractors shall be compensated for all work completed up to the date of termination
notice, including any reimbursable expenses incurred to the date.
6) The Architect shall be compensated 6% as a fee for the cost of Additive Change Orders
generated by the Owner during the Construction Phase. There shall be no deduction of the
Architect's fee on Deductive Change Orders if the item(s) were originally designed into
the project and approved by the Owner or contracted for construction by the General
Contractor.
7) The Architect shall provide architectural services for the Project as described in this
Agreement in a manner consistent with locally accepted standards for professional skill
and care.
8) EDB maintains Professional Liability insurance. In recognition of the relative risks,
rewards and benefits of the Project to both the Owner and EDB, the risks have been
allocated such that the Owner agrees, to the fullest extent permitted by law, to limit the
a
liability of EDB to the Owner for any and all claims, losses, costs, damages of any nature
whatsoever or claims expenses from any cause or causes, including attorney's fees and
costs and expert -witness fees and costs, so that the total aggregate limit of EDB to the
Owner shall not exceed $50,000.00, or EDB's total fee for services rendered on this
Project, whichever is greater. It is intended that this limitation apply to any liability or
cause of action for professional liability however alleged or arising unless otherwise
prohibited by the laws of the State of Florida. Please note: According to Florida Statute
558.0035 an individual employee or agent may not be held individually liable for
negligence.
If you have any questions regarding this agreement, please call. Please initiate this agreement
and return a signed copy to the architect to authorize commencement of the project.
Re ectfully Submitted,
l
Jo ` i . Binkley chitect.A.I.A.
Owner's Agent:
Printed Name & Title:
Date:
Attachment A
Recommendations for reduction of suspected biological growth on surfaces are:
• Removal of all existing ductwork from the attic space, A/C units in attic to remain in place
or abandoned. Remove all ceiling A/C grills with moisture resistant gypsum board where
duct system penetrations are removed.
• Replacement of attic access panels with insulated access panels.
• Adjust the soffit height around the counter area to a height of approximately 8 feet from
the floor. (The current soffit is 24" and is recommended to be cut down to 8" from the
ceiling level.) Remove all visible mold drywall and replace in bar area and high moisture
areas identified in Wood report.
• Install adequate exhaust in the restroom areas.
• Increase the insulation value in the attic space to R-38
• Provide baffles at the eave line to restrict insulation from blocking the exterior soffit
ventilation space.
• Replace the soffit ventilation opening registers with a screened unit having greater than
40 percent free area.
• Repaint/replace drywall in bathrooms affected by visible growth with an epoxy -based
paint.
2. Recommendations for reducing the moisture in the front wood wall under the window unit:
• Provide a continuous layer of insulation on the outside of the wood framing below the
window unit, sealed to the vapor barrier. Replace T -III with new beveled hardiboard
siding.
• Provide a moisture/vapor impermeable cover, likely metal or fiberglass, to the assembly
below the window unit and seal the cover to the masonry.
Recommendations for other areas to help with moisture intrusion:
• Provide a moisture/vapor barrier between the wood and masonry units.
• Provide a moisture/vapor barrier between the window unit and the wood perimeter
frame.
• Rest doors and weather stripping to provide an effective weather seal.
• Provide a stoned maintenance area adjacent to the wall surfaces with the bottom of the
stone being below the bottom of the interior slab elevation. This will allow for proper
drainage and run off from the roof and condensing units. Recommend this to be
approximately 12" deep and a minimum of four feet from the wall edge out.
4. Additional recommendations for HVAC system not previously mentioned above include:
• HVAC equipment replacement — Provide new PTAC units in lieu of the ductless split
systems currently used. Remove wall units. PTAC units shall provide outdoor air into the
system (the unit would install under the front window of the room and is a self-contained
u n it).
• Replace windows in all villa rooms with new impact rated, single -hung windows.
I DWI :IIS
5. Cosmetic repairs/misc.
• Address cracked spalled stucco at door thresholds.
• Remove all carpet and VCT and replace with LVT flooring.
• Address rusted tapcon screws in all exterior door frames.
• Remove all rusted fasteners at door closers and reinstall with stainless hardware.
• Close off electrical room attic space from adjacent unit.
• Replace/repaint drywall in high moisture areas where indicated in Wood report.
• Move transom light electric to hallway, provide new light fixture.