Loading...
HomeMy WebLinkAbout2021-087AMENDMENT NUMBER 1 CCNA2018 WORK ORDER NUMBER 10 NORTH COUNTY SEWER & WATER SYSTEM — PHASE TWO PRIVATE PROPERTY RESEARCH & DESIGN This Amendment 1 to Work Order Number 10 is entered into as of this 15 day of June , 2021, pursuant to that certain Continuing Consulting Engineering Services Agreement for Professional Services entered into as of the 17t6. day of April, 2018 (collectively referred to as the "Agreement"), and that certain Extension of Continuing Contract Agreement for Professional Services entered into as of the 181h day of May, 2021 (collectively referred to as the "Agreement") by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and Masteller & Moler, Inc. ("Consultant"). 1. The COUNTY has selected the Consultant to perform the professional services set forth in existing Work Order Number 10, Effective Date May 18, 2021. 2. The COUNTY and the Consultant desire to amend this Work Order asset forth on Exhibit A (Scope of Work) attached to this Amendment and made part hereof by this reference. The professional services will be performed by the Consultant for the fee schedule and within the timeframe more particularly set forth in Exhibit A, all in accordance with the terms and provisions set forth in the Agreement. 3. From and after the Effective Date of this Amendment, the above -referenced Work Order is amended as set forth in this Amendment. Pursuant to paragraph 1.4 of the Agreement, 'nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein IN WITNESS WHEREOF, the parties hereto have executed this Amendment 1 to Work Order 10 as of the date first written above. CONSULTANT: MASTELLER & MOLER, INC. By:� By: Print Name: Earl H. Masteller, PE, BCEE BOARD OF COUNTY COMMISSIONERS,........, OF INDIAN RIVER COUNTY .�� �Oh..... E. Flesch, Chairman Title: President BCC Approved Date: June 15, 2021 Attest: Jeffrey Smith, Clerk'of Court and Comptroller By: Deuty Clerk Approved: Jason r. Brown, County—Administrator Approved as to form and legal sufficiency: yIan T. Reingold, County Attorney EXHIBIT "A" AMENDMENT NUMBER 1 CCNA2018 WORK ORDER NUMBER 10 NORTH COUNTY SEWER & WATER SYSTEM — PHASE TWO PRIVATE PROPERTY RESEARCH & DESIGN GENERAL INFORMATION The purpose of thisAmendmentNumber 1 to Work Order Number 10 is to authorize Masteller & Moler, Inc. to provide Research and Design for the Private Property water & sewer connections for this project. A brief description of the scope of services and deliverables for this Amendment 1:is provided as follows: SCOPE OF SERVIC Research and Design of water and sewer connections for approximately 200 private property parcels Masteller & Molerinc. will provide engineering services including research, field visits, and design generally including the following: 1. Research and collect necessary data and prepare preliminary design of the most cost-effective sanitary sewer and potable water connections for approximately 200 private property parcels. 2. Prepare final design construction plans showing and describing each private parcel sanitary sewer connection '(gravity or pump station/force main) to the project's public sewer system and the potable water service pipeline from the project's public water system to the house. 3. Revise and/or amend public right-of-way construction plans as needed to eliminate any inconsistencies with the private property utility construction plans. 4. Prepare quantity take -off and form of proposal for private property portion of the project to facilitate contractor's construction contract negotiations with the County. Note: IRCDUS to provide the latest aerial photo plans of the project area for our use as Base Plans to prepare our scaled final design plans of each private property parcel. Deliverables — The ENGINEER shall provide the COUNTY: • Final Private:Property Design Plans 1 Hard Copy Set & 1 Electronic • Copy of form of proposal of quantities TIME SCHEDULE The estimated timeframe for completion of Research, Field Visits, 90 Calendar Days and Final Design Plains (after Contractor's Notice of Commencement Date): FEE SCHEDULE Masteller & Moler, Inc. proposes to provide the outlined Scope of Services based on the following fees: Private Property Portion of the Project Research, $ 159,885.00 Field Visits, and Final Design Plans Not To Exceed Fee - See Attachment 1 Estimated Fee Breakdown) FBe#1422-3 - Exhibit "A" - 1 (1422-3_S2S_Phase2-WO10-AmendOl-Private_21-0602.docx) i H AMENDMENT NO. 1 TO WORK ORDER NO. 10 - ATTACHMENT 1 INDIAN RIVER COUNTY NORTH COUNTY SEWER & WATER SYSTEM PRIVATE PROPERTY PORTION OF PROJECT (APPROX. 200 PARCELS) PRIVATE PROPERTY RESEARCH & DESIGN ESTIMATED FEE BREAKDOWN Engineering Reaserch, .Field Visits & Final Design Plans $ 149,885.00 Surveying Services $ 10,000.00 File M 1422-3 i 1422-3_ Fee_Breakdown_manhour5 21=06o2.Au i Total Lump Sum Fee $ 159,885.00 i i Principal / PE Professional Engineer CAD Draftsperson Project Inspector Administration $ 190.00 $ 165.00 $ 110.00 $ 90.00 $ 75.00 Total Costs Hoursl Amount Hours Amount Hours Amount Hours Amount Hours Amount Research &Data Collection; 76 $ 14,440.00 96 $ 15,840.00 200 $ 22,000.00 205 $ 18,450.00 80 $ 6,000.00 $ 76,730.00 Preliminary Design r Final Design & Preparation of 40 $ 7,600.00 75 $ 12,375.00 320 $ 35,200.00 $ 14 $ 1,050.00 $ 56,225.00 Construction Plans Revise / Amend Public 10 $ 1,900.00 30 $ 4,950.00 40 $ 4,400.00 $ 14 $ 1,050.00 $ 12,300.00 R.O.W. Plans Prepare Quantity Take -off & 4 $ 760.00 18 $ 2,970.00 - $ $ 12 $ 900.00 $ 4,630.00 Form of Proposal Total (hrs/cost) 130 $ 24,700.00 219 $ 36,135.00 560 $ 61,600.00 205 $ 18,450.00 120 $ 9,000.00 $ 149,885.00 Engineering Reaserch, .Field Visits & Final Design Plans $ 149,885.00 Surveying Services $ 10,000.00 File M 1422-3 i 1422-3_ Fee_Breakdown_manhour5 21=06o2.Au i Total Lump Sum Fee $ 159,885.00 i i