HomeMy WebLinkAbout2021-095SECTION 00942 - Change Order Form
DATE OF ISSUANCE: 5 .25.2021
No. 3
EFFECTIVE DATE:
OWNER: Indian River County
CONTRACTOR
Project: Interior Renovation of the Indian River County Building and Fire Departments
OWNER'S Bid No. 2020057
You are directed to make the following changes in the Contract Documents: N/A
Description:
Extension of Hedrick Brothers Construction Co. Inc.'s
General Conditions (GCs) per Article 12 of The Standard
Reason for Change Order: General Conditions of the Construction Contract due to a
delay to the construction schedule at no fault of
Hedrick Brothers.Cause of delay being Owner furnished furniture.
Attachments: (List documents supporting change)
Revised Schedule (3 pages)
Original Schedule (3 pages)
CHANGE IN CONTRACT PRICE:
Description I Amount
Original Contract Price $763,442.00
Net Increase (Decrease) from $36,446.89
previous Change Orders No.
1 to 2
Contract Price prior to this $799,888.89
Change Order:
Net increase (decrease) of this $19, 919.60
Change Order:
Contract Price with all approved $819, 808.49
Change Orders:
ACCEPTED:
By: /I ��
CONTRACTOR (Signature)
Date: 5 .2 5 . 2 0 21
CHANGE IN CONTRACT TIMES
Description
Time
Original Contract Time:
(days or dates)
Substantial Completion:
Final Com letion:
873/2021
Net change from previous Change
Orders No. to
(days)
Substantial Completion:
Final Completion:
Contract Time prior to this Change
Order:
(days or dates)
Substantial Completion:
Final Completion:
Net increase (decrease) this
Change Order: 19 working days
(days or dates)
Substantial Completion:
Final Com letion:
873-0/2021
Contract Time with all approved
Change Orders:
(days or dates)
Substantial Completion:
Final Completion:
_aL3 0 /2 021
RECOMMENDED:
By:
ENGINEER (Signature)
Date:
APPROVED:
By'
7ate
R (Signature: July 13, 2021
Attest: Jeffrey R. Smith, Clerk o�� � ���� ��,� �
Circuit Court and Comptroller
AND,
LIA.t C. O-511RAAL
Deputy Clerk DEPU"rYO®UNTYATTORNEY
00942 - Change Order Form REV 04-07
00942-1
PABids\2019-2020 FY (2020000)\2020057 Building Division Renovations\Front End Docs\00942 - Change Order Farm REV 04-07.doc Rev. 05101
W:Al61:1QmOwli3041
Indian River County
Admin Alterations to Building 'A'
IDask
Modefl
Task Name
Duration Start Finish rede<euors
New mb r �D canu ry �Fe m �Ma sh ra IMay �Jo a �l ly Au
�S p[e ber
7TOTAL
PROJECT DURATION
181 days Thu 12/10/20 Mon 8/30/21
)y <NA>
<NA>
DISCONNECT POWER/ DATA TO MODULAR FURNITURE-HB/IRC(Data)
I, DISASSEMBLE EXISTING MODULAR FURNITURE AND PUT IN STORAGE BY OTHERS
<NA>
<NA>
2
PHASE 1 ENABLING ACTIVITIES (NON -CONSTRUCTION)
3 days Thu 12/10/20 Mon 12/14/20
3 M
FIELD VERIFY SIZE OF EXISTING MODULAR FURNITURE FOR -
FUTURE LOCATIONS
3days Thu 12/10/20 Mon 12/14/20
4
DISCONNECT POWER/ DATA TO MODULAR
FURNITURE-HB/IRC(Data)
1 day Thu 12/10/20 Thu 12/10/20
5
, DISASSEMBLE EXISTING MODULAR FURNITURE AND PUT IN -
STORAGEBYOTHER5
3 days Thu 12/10/20 Mon 12/14/20 455
6M.
TOTAL CONSTRUCTION SCHEDULE
179 days Mon 12/14/20 Mon 8/30/21
<NA>
TEMP WALL/ PROTECTION
a7 TEMP FILTERS ON EXISTING REGISTERS
REMOVE ALL CEILING TILE
T SUPPORT EXISTING LIGHTS AND GRILLS
REMOVECEIUNGGRID/SOFFITS
CAP OFF ANY EXISTING UTILITIES NOT TO BE USED
DEMO FLOORS/CABINETS/ SALVAGE SS SINKS FOR OWNER
LAYOUT NEW WALLS/ SOFFITS
FRAME
- MEP ROUGH
WATERLIN FROM PHASE THREE TO PHASE ONE
ALL
DOOR F MES
PRIME AND ONE COAT
CEILING GRID
I AEP ABOVE CEILING/ EXISTING LIGHTS TO B_
I STALL MILLWORK
DROP TILE
INSTALL FLOORING
DOORS AND HARDWARE
FINISH PAINT
L CO
SAVED FOR OWNER
7 1
PHASE ONE
61 days Mon 12/14/20 Fri 3/12/21
e v
TEMP WALL / PROTECTION
2 days Mon 12/14/20 Tue 12/15/20 3SS
9
TEMP FILTERS ON EXISTING REGISTERS
1 day Mon 12/14/20 Man 12/14/20 85S
t0
REMOVE ALL CEILING TILE
2days Mon 12/14/20 Tue 12/15/20 9SS
11
SUPPORT EXISTING LIGHTS AND GRILLS
2 days Mon 12/14/20 Tue 12/15/20 1055
12
REMOVE CEILING GRID/SOFFITS
3days Wed 12/16/20 Fri 12/18/20 11
13
CAP OFF ANY EXISTING UTILITIES NOT TO BE USED
3 days Mon 12/14/20 Wed 12/16/20 8SS
14 ®4
DEMO FLOORS/CABINETS/SALVAGE SS SINKS FOR OWNER
7days Thu 12/17/20 Tue 12/29/20 13
15
LAYOUT NEW WALLS/SOFFITS
Iday Wed 12/30/20 Wed 12/30/20 14
16 4
FRAME
3 days Wed 12/30/20 Man 1/4/21 1555
17
MEP ROUGH
5 days Thu 12/31/20 Thu 1/7/21 1655+1 day
18
WATER LINE FROM PHASE THREE TOPHASE ONE "1
day Tue 12/15/20 Tue 12/15/20 5
19
HTF DRYWALL
7 days Fri 1/8/21 Tue 1/19/21 17
20 M
DOOR FRAMES
1 day Wed 1/20/21 Wed 1/20/21 19
21 aC
PRIME AND ONE COAT
3 days Mon 2/8/21 Wed 2/10/21 19FS+13 days
22 -9
CEILING GRID
10 days Thu 2/11/21 Wed 2/24/21 21
23
MEPABOVE CEILING / EXISTING LIGHTS TO BE SAVED FOR
OWNER
6 days Mon 2/15/21 Man 2/22/21 2255+2 days
24
INSTALL MILLWORK
5 days Mon 2/15/21 Fri 2/19/21 2355
25 -3
DROP TILE
2 days Thu 2/25/21 Fri 2/26/21 23,22
26
INSTALL FLOORING
5 days Mon 3/1/21 Fri 3/5/21 25
27
DOORS AND HARDWARE
3 days Mon 3/8/21 Wed 3/10/21 26
28 M.
FINISH PAINT
5 days Mon 3/8/21 Fri 3/12/21 27SS
29 M.
TCO
1 day Fri 3/12/21 Frl 3/12/21 28FS-1 day
D..
etect IRC BUILDING &FIRE
Date: Man 52421
Task Summery r1 Inacfrve Milertone O Dura.—nly Starr -only C External M11 -...O cmkal split .. ,.."..,,
SpIR ... , ........ Pr Jett Summary I---------1 Inattive Summary T 8 Manual Sammary 0.ollup Finish -only 7 Deatlline 8 Progress
Milertone InaRive Task C� Manual Task Manual5ummary L ------ -i External Tasks Critical Maneal Progress
Page 1
REVISED 5.19.2021
Indian River County
Admin Alterations to Building 'A'
ID askask
Mode
Name
Duration
Start
Finish
Predecessors
Nw mb r �D ce
anu ry �Fe m
IMa rh rJ ey
ry Au urt
�lu a �9146/116/18611=1
PHASE 1
O PHASE 1
G MODULAR FURNITURE IN P2 & 4 OFFICES AND P
REGISTERS
TO REMAIN AT WORKSTATIONS 117 AND OF
ROOM 127
AND GRILLS
E COAT
CEILING / EXISTING LIGHTS TO BE SAVED FOR OW
FLOORING
RS AND HARDWARE
PAINT
<NA>
ABI - INSTALL WORK STATIONS IN PH
pte ber
26
IN STORAGE BY
ICES
IER
ISE 2
30 PHASE 2 ENABLING ACTIVITIES 11 days Mon 3/15/21 Mon 3/29/21
<NA>
ABI - INSTALL WORK STATIONS IN
® IT INSTALL
IRC - OWNER MOVE BACK I
ABI - DISASSEMBLE EXIS7IP
4N
EMP WALL / PROTECTION
TEMP FILTERS ON EXISTING
PROTECT MODULAR FURNLRE
1 PROTECT EXISTING CONFERENCE
EMOVE ALL CEILING TILS
UPPORT EXISTING LIGHT'S
B REMOVE CEIl1NG GRIDI�I
DEMO FLOORS /CABINIETS
LAYOUT NEW WALLS
FRAME
MEP ROUGH
14TF DRYWALL
1 DOORFRAMES
PRIME AND OF
- CEILING GRI
MEP ABOVE
31 INSTALL MULLWORK
DROP THE
INSTALL
DOC
F
1 CO
31 ABI -INSTALL WORK STATIONS IN PHASE 1 2 days Mon 3/15/21 Tue 3/16/21 28
32 IT INSTALL 8 days Tue 3/16/21 Thu 3/25/21 31FS-1 day
33 IRC - OWNER MOVE BACK INTO PHASE 1 8 days Tue 3/16/21 Thu 3/25/21 31FS-1 day
34 ABI - DISASSEMBLE EXISTING. MODULAR. FURNITURE IN P2 & 4 2 days Fri 3/26/21 Mon 3/29/21 33
OFFICES AND PUT IN STORAGE BYOTHERS
35 PHASE TWO 32days Mon3/29/21 Wed 5/12/21
36 TEMP WALL / PROTECTION 1 day Mon 3/29/21 Mon 3/29/21 34FS-1 day
37 TEMP FILTERS ON EXISTING REGISTERS 1 day Mon 3/29/21 Mon 3/29/21 3655
38 PROTECT MODULAR FURNITURE TO REMAIN AT WORK 1 day Mon 3/29/21 Mon 3/29/21 36SS
STATIONS 117 AND OFFICES
39 PROTECT EXISTING CONFERENCE ROOM 127 1 day Tue 3/30/21 Tue 3/30/21 36
40 REMOVE ALL CEILING TILE 3days Tue 3/30/21 Thu 4/1/21 37
41 M. SUPPORT EXISTING LIGHTS AND GRILLS 3 days Tue 3/30/21 Thu 4/1/21 40SS
42 M REMOVE CEILING GRID 3 days Mon 4/5/21 Wed 4/7/21 41
43 DEMO FLOORS/CABINETS 4days Mon 4/5/21 Thu 4/8/21 40
ba LAYOUT NEW WALLS 3 days Wed 4/7/21 Fri 4/9/21 43SS+2 days
45 FRAME 3days Wed 4/7/21 Fri 4/9/21 44SS
46 MEP ROUGH 3 days Fri 4/9/21 Tue 4/13/21 45SS+2 days
47 HTF DRYWALL 4 days Wed 4/14/21 Mon 4/19/21 46
48 DOORFRAMES 1day Tue 4/20/21 Tue 4/20/21 47
49 PRIME AND ONE COAT 3 days Tue 4/20/21 Thu 4/22/21 47
5D CEILING GRID 2 days Fri 4/23/21 Mon 4/26/21 49
51 ® MEP ABOVE CEILING / EXISTING LIGHTS TO BE SAVED FOR 3 days Tue 4/27/21 Thu 4/29/21 50
OWNER
52 INSTALL MILLWORK 3 days Tue 4/27/21 Thu 4/29/21 S15S
53 M DROP TILE 2 days Fri 4/30/21 Mon 5/3/21 51
54 -R INSTALL FLOORING 4days Tue 5/4/21 Fri 5/7/21 53
55 DOORS AND HARDWARE 3 days Man 5/10/21 Wed 5/12/21 54
56 M. FINISH PAINT 3 days Mon 5/10/21 Wed 5/12/21 55SS
57 en TCO 1 day Wed 5/12/21 Wed 5/12/21 56FS-1 day
58 PHASE 3 ENABLING ACTIVITIES 28'days hu 5/13/21 Tue 6/22/21
59 ABI - INSTALL WORK STATIONS IN PHASE 2 22 days u 5/13/21 Mon 6/14/21 56
Project IRC BUILDING Be
Date on S/24/21
Test sammery
Sput �........... ProjeR Summary 1'--1
Milertone Inactive Task
^ metti.e Mneaone
Inattive Sammary
0 Manual Task
O D.mti—be sten-any [
1 1 Manual Summary Rdlup Finish -only 7
1 Manual Summery r ----1 Eattmal Tests
Fxtem.l Mnaseo�e O cmml splir .........,,,
Deadline b Progres
Cddml Manuel Progress
Page 2
REVISED 5.19.2021
Indian River County
Admin Alterations to Building'A'
ID Task ask Name
Mode
60 IT INSTALL
Duration
6 days
Start
Mon 6/14/21
Frush
Mon 6/21/21
Predecessors
9FS-1 day
Nwemb r �D
e � aru ry �fe ru Me rA � r3 � ey
R INSTALL
RC- OWNER MOVE BACK INTO P
;.,ABI - DISASSEMBLE EXISTING MO
PROTECTION
ON EXISTING REG
CEILING TILE
ISTING LIGHTS AND
CEILING GRID / SOF
LOORS/CABINETS
NEW WALLS / SOFFl
E
P ROUGH
HTF DRYWALL
1 DOORFRAMES
PRIME AND ONE
CEILING GRID
IMEPABOVE
- MEP ABOVE
I DROP TILE
PORCEU
,>® INSTALL
INSTALI
INS
EXIST
S
STO I
CA AC ISS
LLD
ho FI
pte ber
E 2 and PHASE 1
ULAR FURNITURE
<NA>
ERS
GRILLS
S
AT
FlLING/EXISTIN
INTI E
AILLWORK
FLOORING
LLWORKSTATIO
NG RECEPTION DE
CURITY GLASS O
FRONT PARTMO
RS AND HARDW
SH PAINT
TCO / CO
61 IRC -OWNER MOVE BACK INTO PHASE 2 and PHASE 1 6 days Mon 6/14/21 Mon 6/21/21 59FS-1 day
62 ABI -DISASSEMBLE EXISTING MODULAR FURNITURE IN P3 AND 2 days Mon 6/21/21 ue 6/22/21 61FS-1 day
PUT IN STORAGE BY OTHERS
63 PHASETHREE 49 days Tue 6/22/21 Mon 8/30/21
64 TEMP WALL/ PROTECTION 1 day Tue 6/22/21 Tue 6/22/21 62FS-1 day
65 TEMP FILTERS ON EXISTING REGISTERS 1 day Tue 6/22/21 Tue 6/22/21 6455
66 REMOVE ALL CEILING TILE 3days Wed 6/23/21 Fri 6/25/21 65
67 SUPPORT EXISTING LIGHTS AND GRILLS 3 days Wed 6/23/21 Fri 6/25/21 6655
68 REMOVE CEILING GRID /SOFFITS 3 days Mon 6/28/21 Wed 6/30/21 67
69 DEMO FLOORS /CABINETS 5days Mon 6/28/21 Fri 7/2/21 685S
70 LAYOUT NEW WALLS/ SOFFITS 1 day u 7/1/21 Thu 7/1/21 69SS+3 days
71 FRAME 3 days Thu 7/1/21 Tue 7/6/21 7055
72 MEP ROUGH 5 days Tue 7/6/21 Mon 7/12/21 7155+2 days
73 HTF DRYWALL 6 days Tue 7/13/21 Tue 7/20/21 72
74 DOOR FRAMES 1 day Wed 7/21/21 Wed 7/21/21 73
75 PRIMEANDONECOAT 3days Wed 7/21/21 Fri 7/23/21 73
76 CEILING GRID 4 days Mon 7/26/21 Thu 7/29/21 75
77 MEP ABOVECEILING/ EXISTING LIGHTS TO BE SAVED FOR 5days Wed 7/28/21 ue 8/3/21 7655+2 days
OWNER
78 DROP TILE 3days Wed 8/4/21 Fri 8/6/21 77
79 PORCELAIN TILE 6days Wed 8/4/21 Wed 8/11/21 77
80 INSTALL MILLWORK 5days Wed8/4/21 Tue8/10/21 7855
81 INSTALL FLOORING 5 days Fri 8/6/21 Thu 8/12/21 785S+2 days
82 M. INSTALL WORK STATIONS BY OTHERS 3days Thu 8/12/21 Mon 8/16/21 79
83 �IXISTING RECEPTION DESK INSTALL , 3 days Thu 8/12/21 Mon 8/16/21 79
84 SECURITY GLASS ON TOP OF COUNTERS 12 days Tue 8/10/21 Wed 8/25/21 82FS-5 days
85 STORE FRONT PARTITION 5 days Tue 8/10/21 Mon 8/16/21 8455
86 CARDACCESS 3days Wed 8/4/21 Fri 8/6/21 77
87 M DOORS AND HARDWARE 3 days Tue 8/17/21 Thu 8/19/21 85
88 FINISH PAINT 4 days Tue 8/17/21 Fri 8/20/21 85
89 TCO / CO 3 days Thu 8/26/21 Mon 8/30/21 84
Project IRC BUILDING & FIRE
Date; Mon 524/21
reek svmmay
Split ............ Pmjea Summary
Mile— ♦ Inaclire Tesk
rr
r -----1
Leake Miksnone
Inaarve Summary
0 Manuel Task
o W—I Mik.— O
L B Manual Summary Rdlup Finishonly 7 Deadline b
M.—I 5vmmary Cdpul
Crib., Spgt ............
P.9—
Manual Progress
Page 3
Original Schedule
Indian River County
Admin Alterations to Building 'A'
ID
Task
Mode [Task Name
ostar, Finish
rdecsorswemr
e a em
�J y Au
ld yA Gffik/136 7/4ry
ULAR FURNITURE-HB/IRC(Data)
RNITURE AND PUT IN STORAGE BY OTHERS
rt pte bar
<NA>
<NA>
1
-TOTAL PROJECT DURATION
16Z days Thu 12/10/20 Tue 8/3/21
h <NA>
<NA>
DISCONNECT POWER/ DATA TO MO
DISASSEMBLE EXISTING MODULAR
2
PHASE 1 ENABUNG ACTIVITIES (NON -CONSTRUCTION)
3 days Th. 12/10/20 on
3
n FIELD VERIFY SIZE OF EXISTING MODULAR FURNITURE FOR
FUTURE LOCATIONS
3days Thu 12/10/20 Mon 12/14/20
4
M DISCONNECT POWER /DATA TO MODULAR
FURNITURE-HB/IRC(Data)
Iday Thu 12/10/20 Thu 12/10/20
5
DISASSEMBLE EXISTING MODULAR FURNITURE AND PUT IN
STORAGE BY OTHERS
3 days Thu 12/10/20 Mon 12/14/20
4SS
6
M. TOTAL CONSTRUCTION SCHEDULE
160 days Mon 12/14/20 Tue 8/3/21
r
I
- TEMP WALL/ PROTECTION
; TEMP FILTERS ON EXISTING REGIST
REMOVE ALL CEILING TILE
#7 SUPPORT EXISTING LIGHTS AND G
3 REMOVE CEILING GRID / SOFFITS
CAP OFF ANY EXISTING UTILITIES rIJOT
DEMO FLOORS/CABINETS
LAYOUT NEW WALLS/ SOF
FRAME
MEP ROUGH
WATERLIN FROMPHASETHREETOPHASEONE
ALL
k DOOR MES
PRIM
y 1
1 <NA>
ITS
ILLS
TO BE USED
SALVAGE SS SINKS FOR OWNER
ITS
AND ONE COAT
CEILING GRID
I AEP ABOVE CEILING / EXISTING LIGHTS TO BE SAVED FOR OWNER
STALL MILLWORK
DROP TILE
INSTALL FLOORING
DOORS AND HARDWARE
FINISH PAINT
1 CO
7
/1 PHASE ONE
61 days Mon 12/14/2D Fri 3/12/21
8
TEMP WALL / PROTECTION
2 days Mon 12/14/20 Tue 12/15/20
3SS
9
S TEMP FILTERS ON EXISTING REGISTERS
1 day Mon 12/14/20 Mon 12/14/20
8SS
10
REMOVE ALL CEILING TILE
2days Mon 12/14/20 Tue 12/15/20
ISS
11
SUPPORT EXISTING LIGHTS AND GRILLS
2 days Mon 12/14/20 Tue 12/15/20
1055
12
®1 REMOVE CEILING GRID / SOFFITS
3 days Wed 12/16/20 Fri 12/18/20
11
13
CAP OFF ANY EXISTING UTILITIES NOT TO BE USED
3 days Mon 12/14/20 Wed 12/16/20
855
14
DEMO FLOORS/CABINETS/ SALVAGE SS SINKS FOR OWNER
7days Thu12/17/20 Tue 12/29/20
13
15
LAYOUT NEW WALLS/ SOFFITS
Iday Wed 12/30/20 Wed 12/30/20
14
16
1 FRAME
3 days Wed 12/30/20 Mon 1/4/21
1555
17
MEP ROUGH
5 days u 12/31/20 Thu 1/7/21
165S+1 day
18
WATER LINE FROM PHASE THREE TO PHASE ONE
Iday Tue 12/15/20 Tue 12/15/20
5
19
HTF DRYWALL
7 days Fri 1/8/21 Tue 1/19/21
17
20
DOOR FRAMES
1 day Wed 1/20/21 Wed 1/20/21
19
21
S PRIME AND ONE COAT
3 days Mon 2/8/21 Wed 2/10/21
19FS+13 days
22
CEILING GRID
10 days Thug/11/21 Wed 2/24/21
21
23
R. MEP ABOVE CEILING / EXISTING LIGHTS TO BE SAVED FOR
OWNER
6 days Man 2/15/21 Mon 2/22/21
2255+2 days
24
INSTALL MILLWORK
5 days Mon 2/15/21 Fri 2/19/21
2355
25
DROP TILE
2days Thu 2/25/21 Fri 2/26/21
23,22
26
INSTALL FLOORING
5 days Mon 3/1/21 Fri 3/5/21
25
27
-4 DOORS AND HARDWARE
3 days Mon 3/8/21 Wed 3/10/21
26
28
FINISH PAINT
5 days Man 3/8/21 Fri 3/12/21
2755
29
TCO
1 day Fri 3/12/21 Fri 3/12/21
28FS-1 day
Pr jeaD IRC BUILDING & FIRE
Date: Wed 2/24/21
Tast su,nmey ^ 1re m su, s e O ou..eiomony s t, [ snemn Maenena O crrosnl ivgt .......... .
split ............ Pr Je[t Summary r -------- -1 Inactive Summary I 1 Manual Summary Rdlup Finishronly 3 Deadiae 8 P.9-
mi.- ♦ Inactive Tesk 0 Manuel Task Manuel Summery r ---------- I Frtemal Tasks Cdc.1 Manual Progress
Page 1
Original Schedule
Indian River County
Admin Alterations to Building 'A'
ID Task Task Name
Mode
Duration Start Finish Predecessors
NPvemb r ID cem er anu ry �h m �Ma dl IMay �Jo a �J IY Au n pte ber
30 PHASE 2 ENABLING ACTIVITIES
11 days Mon 3/15/21 Mon 3/29/21
I �NA�
ABI - INSTALL WORK STATIONS IN PHASE 1
® 1T INSTALL
OWNER MOVE BACK INTO PHASE 1
ABI - DISASSEMBLE EXISTING MODULAR FURNITURE IN P2 & 4
�NA�
EMP WALL/ PROTECTION
TEMP FILTERS ON EXISTING REGISTERS
T PROTECT MODULAR FURNITURE TO REMAIN AT WORK STATION
PROTECT EXISTING CONFERENCE ROOM 127
EMOVE ALL CEILING TILE
UPPORT EXISTING LIGHTS AND GRILLS
B REMOVE CEILING GRID
DEMO FLOORS /CABINETS
LAYOUT NEW WALLS
FRAME
MEP ROUGH
HTF DRYWALL
t DOOR FRAMES
PRIME AND ONE COAT
CEILINGGRID
MEP ABOVE CEILING/ EXISTING LIGHTS TO BES
INSTALL MILLWORK
DROP TILE
INSTALL FLOORING
DOORS AND HARDWARE
FINISH PAINT
1 CO
�NA>
ABI - INSTALL WORK STATIONS IN PHA
FFICES AND PUT IN STORAGE BY
117 AND OFFICES
LVED FOR OWNER
2
31 n ABI - INSTALL WORKSTATIONS IN PHASE 1
2 days Mon 3/15/21 Tue 3/16/21 28
32 an IT INSTALL
8 days Tue 3/16/21 Thu 3/25/21 31FS-1 day
33 M. IRC - OWNER MOVE BACK INTO PHASE 1
8 days Tue 3/16/21 Thu 3/25/21 31FS-1 dayIRC-
34 ABI - DISASSEMBLE EXISTING MODULAR FURNITURE IN P2 & 4
OFFICES AND PUT IN STORAGE BY OTHERS
2 days Fri 3/26/21 Mon 3/29/21 33
35 PHASE TWO
32 days Mon 3/29/21 Wed 5/12/21
36 TEMP WALL / PROTECTION
1 day Mon 3/29/21 Mon 3/29/21 34FS-1 day
37 TEMP FILTERS ON EXISTING REGISTERS
1 day Mon 3/29/21 Mon 3/29/21 3655
38 M. PROTECT MODULAR FURNITURE TO REMAIN AT WORK
STATIONS 117 AND OFFICES
Iday Mon 3/29/21 Mon 3/29/21 3655
39 3M PROTECT EXISTING CONFERENCE ROOM 127
1 day Tue 3/30/21 Tue 3/30/21 36
40 REMOVE ALL CEILING TILE
3 days Tue 3/30/21 Thu 4/1/21 37
41 R. SUPPORT EXISTING LIGHTS AND GRILLS
3 days Tue 3/30/21 Thu 4/1/21 40SS
42 REMOVE CEILING GRID
3days Mon 4/5/21 Wed 4/7/21 41
43 DEMO FLOORS /CABINETS
4 days Mon 4/5/21 Thu 4/8/21 40
44 LAYOUT NEW WALLS
3 days Wed 4/7/21 Fri 4/9/21 4355+2 days
45 FRAME
3days Wed 4/7/21 Fri 4/9/21 44SS
46 MEP ROUGH
3 days Fri 4/9/21 Tue 4/13/21 4555+2 days
47 HTF DRYWALL
4 days Wed 4/14/21 Mon 4/19/21 46
48 DOOR FRAMES
1 day Tue 4/20/21 Tue 4/20/21 47
49 PRIME AND ONE COAT
3 days Tue 4/20/21 Thu 4/22/21 47
so CEILING GRID
2days Fri 4/23/21 Mon 4/26/21 49
51 MEP ABOVE CEILING/ EXISTING LIGHTS TO BE SAVED FOR
OWNER
3days Tue 4/27/21 Thu 4/29/21 50
52 INSTALL MILLWORK
3days Tue 4/27/21 Thu 4/29/21 5155
53 -% DROP TILE
2 days Fri 4/30/21 Mon 5/3/21 51
54 INSTALL FLOORING
4 days Tue 5/4/21 Fri 5/7/21 53
55 DOORS AND HARDWARE
3 days Mon 5/10/21 Wed 5/12/21 54
56 M. FINISH PAINT
3 days Mon 5/10/21 Wed 5/12/21 5555
57 TCO
1 day Wed 5/12/21 Wed 5/12/21 56FS-1 day
58 215 PHASE 3 ENABLING ACTIVITIES
19 days hhu 5/13/21 Tue 5/25/21
59 ABI - INSTALL WORK STATIONS IN PHASE 2
2 days Thu 5/13/21 Fri 5/14/21 56
Project IRC BUILDING &FIRE
Date: Wed 2/24/21
TeA Summery r1 In.6-Mi -- O Dur W -only Stag -only C &temal Milertone O C66.1 sort .. ... .. .....
Z. Projen Sommary F'�1 InaRive Summary 1 1 Manual Summary Rollup Tinishonly 7 Deadline + P'.9—
mil—r. ♦ Inacdve Test Q Manual Task 1 Manuel Summary 1------1 Evlemal Tasks Cntiral Manual Progress
Page 2
Original Schedule
Indian River County
Admin Alterations to Building 'A'
ask Name
Duration
Start
Finish
Predecessors10
n, r �D
1 11
a awry �i< ma
�Me
rd ry flu a �J lyMode
IT INSTA
IRC- OWNER MOVE BACK INTO PH
ABI - DISASSEMBLE EXISTING MOD
EMP WALL/ PROTECTION
TEMP FILTERS ON EXISTING REGISI
EILING TILE
ING LIGHTS AND
ILING GRID /SOFF
ORS /CABINETS
W WALLS / SOFFI
OUGH
TF DRYWALL
OOR FRAMES
PRIME AND ONE
CEILING GRID
MEPABOVE
IMEPABOVE
DROP TI
PORCEU
INSTALL
INSTALI
1 INSTALL
yg EXIST
5
STO
Y'CA D A
11 Dc C
yEp1 1
E2
JLAR FURNITURE IN P3 AND PU
�NA�
ERS
RILLS
S
AT
EKING/EXISTING LIGHTS TOB
JN TILE
MILLWORK
FLOORING
WORK STATIONS BY OTHER
NG RECEPTION DESK INSTALL
ECURITY GLASS ON TOP OF COU
FRONT PARTITION
FSS
RS AND HARDWARE
SH PAINT
TCO / CO
IT INSTALL 6 days Fri 5/14/21 Fri 5/21/21 59F5-1 day
r1Dask
IRC-OWNER MOVE BACK INTO PHASE 2 6 days Fri 5/14/21 Fri 5/21/21 59FS-1 day
ABI -DISASSEMBLE EXISTING MODULAR FURNITURE IN P3 AND 2 days Mon 5/24/21 Tue 5/25/21 61
PUT IN STORAGE BY OTHERS
63 M. PHASE THREE 49 days Tue 5/25/21 Tue 8/3/21
64 TEMP WALL/ PROTECTION 1 day Tue 5/25/21 Tue 5/25/21 62FS-1 day
65 TEMP FILTERS ON EXISTING REGISTERS I day Tue 5/25/21 Tue 5/25/21 6455
66 REMOVE ALL CEILING TILE 3days Wed5/26/21 Fri 5/28/21 65
67 SUPPORT EXISTING LIGHTS AND GRILLS 3 days Wed 5/26/21 Fri 5/28/21 6655
68 REMOVE CEILING GRID/SOFFITS 3days Tue 6/1/21 Thu 6/3/21 67
69 DEMO FLOORS/CABINETS 5 days Tue 6/1/21 Mon 6/7/21 6955
70 LAYOUT NEW WALLS /SOFFITS 1 day Fri 6/4/21 Fri 6/4/21 69SS+3 days
71 FRAME 3 days Fri 6/4/21 ue 6/8/21 7055
72 MEP ROUGH 5 days Tue 6/8/21 Mon 6/14/21 7155+2 days
73 HTF DRYWALL 6 days Tue 6/15/21 Tue 6/22/21 72
74 DOOR FRAMES 1 day Wed 6/23/21 Wed 6/23/21 73
75 PRIME AND ONE COAT 3days Wed 6123/21 Fri 6/25/21 73
76 CEILING GRID 4 days Mon 6/28/21 u 7/1/21 75
77 MEP ABOVE CEILING/ EXISTING LIGHTS TO BE SAVED FOR 5days Wed 6/30/21 Wed 7/7/21 7655+2 days
OWNER
78 DROP TILE 3 days Thu7/8/21 Mon 7/12/21 77
79 PORCELAIN TILE 6 days Thu 7/8/21 Thu 7/15/21 77
80 INSTALL MILLWORK 5 days Thu 7/8/21 Wed 7/14/21 7855
81 INSTALL FLOORING 5 days Mon 7/12/21 Fri 7/16/21 7855+2 days
82 INSTALL 'WORKSTATIONS/ By OTHERS - 3days Fri 7/16/21 Tue 7/20/21 79
83 M. EXISTING RECEPTION DESK INSTALL 3 days Fri 7/16/21 Tue 7/20/21 79
84 M. SECURITY GLASS ON TOP OF COUNTERS 12 days Wed 7/14/21 Thu 7/29/21 82FS-S days
85 STORE FROM PARTITION 5 days Wed 7/14/21 Tue 7/20/21 8455
86 CARD ACCESS 3 days Thu 7/8/21 Mon 7/12/21 77
87 n DOORS AND HARDWARE - 3 days Wed 7/21/21 Fri 7/23/21 85
88 FINISH PAINT 4 days Wed 7/21/21 Mon 7/26/21 85
89 TCO / CO 3 days Fri 7/30/21 ue 8/3/21 84
ProjeTask
Date: ed2/24LDING Bf FlRE
Date: Wed 2/24/21
Summery
,,,,,, P.I.Summa
Spin � .. � . , ry
Milestone Inacdve Task
F-�
Iii
I-e6ve Milestone
Inactive Summary
0 Manuel Task
O Dunt —rly Sbrtronly C
I'�-'-0 Manuel Summary Rollu Finish -only 3
p
ManualEatemel Tasks ®
E.temel Milertone O cn[-SPH .•..........
Deadline + progress
"dotal Manuel Progress
Page 3