HomeMy WebLinkAbout2021-095SECTION 00942 - Change Order Form DATE OF ISSUANCE: 5 .25.2021 No. 3 EFFECTIVE DATE: OWNER: Indian River County CONTRACTOR Project: Interior Renovation of the Indian River County Building and Fire Departments OWNER'S Bid No. 2020057 You are directed to make the following changes in the Contract Documents: N/A Description: Extension of Hedrick Brothers Construction Co. Inc.'s General Conditions (GCs) per Article 12 of The Standard Reason for Change Order: General Conditions of the Construction Contract due to a delay to the construction schedule at no fault of Hedrick Brothers.Cause of delay being Owner furnished furniture. Attachments: (List documents supporting change) Revised Schedule (3 pages) Original Schedule (3 pages) CHANGE IN CONTRACT PRICE: Description I Amount Original Contract Price $763,442.00 Net Increase (Decrease) from $36,446.89 previous Change Orders No. 1 to 2 Contract Price prior to this $799,888.89 Change Order: Net increase (decrease) of this $19, 919.60 Change Order: Contract Price with all approved $819, 808.49 Change Orders: ACCEPTED: By: /I �� CONTRACTOR (Signature) Date: 5 .2 5 . 2 0 21 CHANGE IN CONTRACT TIMES Description Time Original Contract Time: (days or dates) Substantial Completion: Final Com letion: 873/2021 Net change from previous Change Orders No. to (days) Substantial Completion: Final Completion: Contract Time prior to this Change Order: (days or dates) Substantial Completion: Final Completion: Net increase (decrease) this Change Order: 19 working days (days or dates) Substantial Completion: Final Com letion: 873-0/2021 Contract Time with all approved Change Orders: (days or dates) Substantial Completion: Final Completion: _aL3 0 /2 021 RECOMMENDED: By: ENGINEER (Signature) Date: APPROVED: By' 7ate R (Signature: July 13, 2021 Attest: Jeffrey R. Smith, Clerk o�� � ���� ��,� � Circuit Court and Comptroller AND, LIA.t C. O-511RAAL Deputy Clerk DEPU"rYO®UNTYATTORNEY 00942 - Change Order Form REV 04-07 00942-1 PABids\2019-2020 FY (2020000)\2020057 Building Division Renovations\Front End Docs\00942 - Change Order Farm REV 04-07.doc Rev. 05101 W:Al61:1QmOwli3041 Indian River County Admin Alterations to Building 'A' IDask Modefl Task Name Duration Start Finish rede<euors New mb r �D canu ry �Fe m �Ma sh ra IMay �Jo a �l ly Au �S p[e ber 7TOTAL PROJECT DURATION 181 days Thu 12/10/20 Mon 8/30/21 )y <NA> <NA> DISCONNECT POWER/ DATA TO MODULAR FURNITURE-HB/IRC(Data) I, DISASSEMBLE EXISTING MODULAR FURNITURE AND PUT IN STORAGE BY OTHERS <NA> <NA> 2 PHASE 1 ENABLING ACTIVITIES (NON -CONSTRUCTION) 3 days Thu 12/10/20 Mon 12/14/20 3 M FIELD VERIFY SIZE OF EXISTING MODULAR FURNITURE FOR - FUTURE LOCATIONS 3days Thu 12/10/20 Mon 12/14/20 4 DISCONNECT POWER/ DATA TO MODULAR FURNITURE-HB/IRC(Data) 1 day Thu 12/10/20 Thu 12/10/20 5 , DISASSEMBLE EXISTING MODULAR FURNITURE AND PUT IN - STORAGEBYOTHER5 3 days Thu 12/10/20 Mon 12/14/20 455 6M. TOTAL CONSTRUCTION SCHEDULE 179 days Mon 12/14/20 Mon 8/30/21 <NA> TEMP WALL/ PROTECTION a7 TEMP FILTERS ON EXISTING REGISTERS REMOVE ALL CEILING TILE T SUPPORT EXISTING LIGHTS AND GRILLS REMOVECEIUNGGRID/SOFFITS CAP OFF ANY EXISTING UTILITIES NOT TO BE USED DEMO FLOORS/CABINETS/ SALVAGE SS SINKS FOR OWNER LAYOUT NEW WALLS/ SOFFITS FRAME - MEP ROUGH WATERLIN FROM PHASE THREE TO PHASE ONE ALL DOOR F MES PRIME AND ONE COAT CEILING GRID I AEP ABOVE CEILING/ EXISTING LIGHTS TO B_ I STALL MILLWORK DROP TILE INSTALL FLOORING DOORS AND HARDWARE FINISH PAINT L CO SAVED FOR OWNER 7 1 PHASE ONE 61 days Mon 12/14/20 Fri 3/12/21 e v TEMP WALL / PROTECTION 2 days Mon 12/14/20 Tue 12/15/20 3SS 9 TEMP FILTERS ON EXISTING REGISTERS 1 day Mon 12/14/20 Man 12/14/20 85S t0 REMOVE ALL CEILING TILE 2days Mon 12/14/20 Tue 12/15/20 9SS 11 SUPPORT EXISTING LIGHTS AND GRILLS 2 days Mon 12/14/20 Tue 12/15/20 1055 12 REMOVE CEILING GRID/SOFFITS 3days Wed 12/16/20 Fri 12/18/20 11 13 CAP OFF ANY EXISTING UTILITIES NOT TO BE USED 3 days Mon 12/14/20 Wed 12/16/20 8SS 14 ®4 DEMO FLOORS/CABINETS/SALVAGE SS SINKS FOR OWNER 7days Thu 12/17/20 Tue 12/29/20 13 15 LAYOUT NEW WALLS/SOFFITS Iday Wed 12/30/20 Wed 12/30/20 14 16 4 FRAME 3 days Wed 12/30/20 Man 1/4/21 1555 17 MEP ROUGH 5 days Thu 12/31/20 Thu 1/7/21 1655+1 day 18 WATER LINE FROM PHASE THREE TOPHASE ONE "1 day Tue 12/15/20 Tue 12/15/20 5 19 HTF DRYWALL 7 days Fri 1/8/21 Tue 1/19/21 17 20 M DOOR FRAMES 1 day Wed 1/20/21 Wed 1/20/21 19 21 aC PRIME AND ONE COAT 3 days Mon 2/8/21 Wed 2/10/21 19FS+13 days 22 -9 CEILING GRID 10 days Thu 2/11/21 Wed 2/24/21 21 23 MEPABOVE CEILING / EXISTING LIGHTS TO BE SAVED FOR OWNER 6 days Mon 2/15/21 Man 2/22/21 2255+2 days 24 INSTALL MILLWORK 5 days Mon 2/15/21 Fri 2/19/21 2355 25 -3 DROP TILE 2 days Thu 2/25/21 Fri 2/26/21 23,22 26 INSTALL FLOORING 5 days Mon 3/1/21 Fri 3/5/21 25 27 DOORS AND HARDWARE 3 days Mon 3/8/21 Wed 3/10/21 26 28 M. FINISH PAINT 5 days Mon 3/8/21 Fri 3/12/21 27SS 29 M. TCO 1 day Fri 3/12/21 Frl 3/12/21 28FS-1 day D.. etect IRC BUILDING &FIRE Date: Man 52421 Task Summery r1 Inacfrve Milertone O Dura.—nly Starr -only C External M11 -...O cmkal split .. ,.."..,, SpIR ... , ........ Pr Jett Summary I---------1 Inattive Summary T 8 Manual Sammary 0.ollup Finish -only 7 Deatlline 8 Progress Milertone InaRive Task C� Manual Task Manual5ummary L ------ -i External Tasks Critical Maneal Progress Page 1 REVISED 5.19.2021 Indian River County Admin Alterations to Building 'A' ID askask Mode Name Duration Start Finish Predecessors Nw mb r �D ce anu ry �Fe m IMa rh rJ ey ry Au urt �lu a �9146/116/18611=1 PHASE 1 O PHASE 1 G MODULAR FURNITURE IN P2 & 4 OFFICES AND P REGISTERS TO REMAIN AT WORKSTATIONS 117 AND OF ROOM 127 AND GRILLS E COAT CEILING / EXISTING LIGHTS TO BE SAVED FOR OW FLOORING RS AND HARDWARE PAINT <NA> ABI - INSTALL WORK STATIONS IN PH pte ber 26 IN STORAGE BY ICES IER ISE 2 30 PHASE 2 ENABLING ACTIVITIES 11 days Mon 3/15/21 Mon 3/29/21 <NA> ABI - INSTALL WORK STATIONS IN ® IT INSTALL IRC - OWNER MOVE BACK I ABI - DISASSEMBLE EXIS7IP 4N EMP WALL / PROTECTION TEMP FILTERS ON EXISTING PROTECT MODULAR FURNLRE 1 PROTECT EXISTING CONFERENCE EMOVE ALL CEILING TILS UPPORT EXISTING LIGHT'S B REMOVE CEIl1NG GRIDI�I DEMO FLOORS /CABINIETS LAYOUT NEW WALLS FRAME MEP ROUGH 14TF DRYWALL 1 DOORFRAMES PRIME AND OF - CEILING GRI MEP ABOVE 31 INSTALL MULLWORK DROP THE INSTALL DOC F 1 CO 31 ABI -INSTALL WORK STATIONS IN PHASE 1 2 days Mon 3/15/21 Tue 3/16/21 28 32 IT INSTALL 8 days Tue 3/16/21 Thu 3/25/21 31FS-1 day 33 IRC - OWNER MOVE BACK INTO PHASE 1 8 days Tue 3/16/21 Thu 3/25/21 31FS-1 day 34 ABI - DISASSEMBLE EXISTING. MODULAR. FURNITURE IN P2 & 4 2 days Fri 3/26/21 Mon 3/29/21 33 OFFICES AND PUT IN STORAGE BYOTHERS 35 PHASE TWO 32days Mon3/29/21 Wed 5/12/21 36 TEMP WALL / PROTECTION 1 day Mon 3/29/21 Mon 3/29/21 34FS-1 day 37 TEMP FILTERS ON EXISTING REGISTERS 1 day Mon 3/29/21 Mon 3/29/21 3655 38 PROTECT MODULAR FURNITURE TO REMAIN AT WORK 1 day Mon 3/29/21 Mon 3/29/21 36SS STATIONS 117 AND OFFICES 39 PROTECT EXISTING CONFERENCE ROOM 127 1 day Tue 3/30/21 Tue 3/30/21 36 40 REMOVE ALL CEILING TILE 3days Tue 3/30/21 Thu 4/1/21 37 41 M. SUPPORT EXISTING LIGHTS AND GRILLS 3 days Tue 3/30/21 Thu 4/1/21 40SS 42 M REMOVE CEILING GRID 3 days Mon 4/5/21 Wed 4/7/21 41 43 DEMO FLOORS/CABINETS 4days Mon 4/5/21 Thu 4/8/21 40 ba LAYOUT NEW WALLS 3 days Wed 4/7/21 Fri 4/9/21 43SS+2 days 45 FRAME 3days Wed 4/7/21 Fri 4/9/21 44SS 46 MEP ROUGH 3 days Fri 4/9/21 Tue 4/13/21 45SS+2 days 47 HTF DRYWALL 4 days Wed 4/14/21 Mon 4/19/21 46 48 DOORFRAMES 1day Tue 4/20/21 Tue 4/20/21 47 49 PRIME AND ONE COAT 3 days Tue 4/20/21 Thu 4/22/21 47 5D CEILING GRID 2 days Fri 4/23/21 Mon 4/26/21 49 51 ® MEP ABOVE CEILING / EXISTING LIGHTS TO BE SAVED FOR 3 days Tue 4/27/21 Thu 4/29/21 50 OWNER 52 INSTALL MILLWORK 3 days Tue 4/27/21 Thu 4/29/21 S15S 53 M DROP TILE 2 days Fri 4/30/21 Mon 5/3/21 51 54 -R INSTALL FLOORING 4days Tue 5/4/21 Fri 5/7/21 53 55 DOORS AND HARDWARE 3 days Man 5/10/21 Wed 5/12/21 54 56 M. FINISH PAINT 3 days Mon 5/10/21 Wed 5/12/21 55SS 57 en TCO 1 day Wed 5/12/21 Wed 5/12/21 56FS-1 day 58 PHASE 3 ENABLING ACTIVITIES 28'days hu 5/13/21 Tue 6/22/21 59 ABI - INSTALL WORK STATIONS IN PHASE 2 22 days u 5/13/21 Mon 6/14/21 56 Project IRC BUILDING Be Date on S/24/21 Test sammery Sput �........... ProjeR Summary 1'--1 Milertone Inactive Task ^ metti.e Mneaone Inattive Sammary 0 Manual Task O D.mti—be sten-any [ 1 1 Manual Summary Rdlup Finish -only 7 1 Manual Summery r ----1 Eattmal Tests Fxtem.l Mnaseo�e O cmml splir .........,,, Deadline b Progres Cddml Manuel Progress Page 2 REVISED 5.19.2021 Indian River County Admin Alterations to Building'A' ID Task ask Name Mode 60 IT INSTALL Duration 6 days Start Mon 6/14/21 Frush Mon 6/21/21 Predecessors 9FS-1 day Nwemb r �D e � aru ry �fe ru Me rA � r3 � ey R INSTALL RC- OWNER MOVE BACK INTO P ;.,ABI - DISASSEMBLE EXISTING MO PROTECTION ON EXISTING REG CEILING TILE ISTING LIGHTS AND CEILING GRID / SOF LOORS/CABINETS NEW WALLS / SOFFl E P ROUGH HTF DRYWALL 1 DOORFRAMES PRIME AND ONE CEILING GRID IMEPABOVE - MEP ABOVE I DROP TILE PORCEU ,>® INSTALL INSTALI INS EXIST S STO I CA AC ISS LLD ho FI pte ber E 2 and PHASE 1 ULAR FURNITURE <NA> ERS GRILLS S AT FlLING/EXISTIN INTI E AILLWORK FLOORING LLWORKSTATIO NG RECEPTION DE CURITY GLASS O FRONT PARTMO RS AND HARDW SH PAINT TCO / CO 61 IRC -OWNER MOVE BACK INTO PHASE 2 and PHASE 1 6 days Mon 6/14/21 Mon 6/21/21 59FS-1 day 62 ABI -DISASSEMBLE EXISTING MODULAR FURNITURE IN P3 AND 2 days Mon 6/21/21 ue 6/22/21 61FS-1 day PUT IN STORAGE BY OTHERS 63 PHASETHREE 49 days Tue 6/22/21 Mon 8/30/21 64 TEMP WALL/ PROTECTION 1 day Tue 6/22/21 Tue 6/22/21 62FS-1 day 65 TEMP FILTERS ON EXISTING REGISTERS 1 day Tue 6/22/21 Tue 6/22/21 6455 66 REMOVE ALL CEILING TILE 3days Wed 6/23/21 Fri 6/25/21 65 67 SUPPORT EXISTING LIGHTS AND GRILLS 3 days Wed 6/23/21 Fri 6/25/21 6655 68 REMOVE CEILING GRID /SOFFITS 3 days Mon 6/28/21 Wed 6/30/21 67 69 DEMO FLOORS /CABINETS 5days Mon 6/28/21 Fri 7/2/21 685S 70 LAYOUT NEW WALLS/ SOFFITS 1 day u 7/1/21 Thu 7/1/21 69SS+3 days 71 FRAME 3 days Thu 7/1/21 Tue 7/6/21 7055 72 MEP ROUGH 5 days Tue 7/6/21 Mon 7/12/21 7155+2 days 73 HTF DRYWALL 6 days Tue 7/13/21 Tue 7/20/21 72 74 DOOR FRAMES 1 day Wed 7/21/21 Wed 7/21/21 73 75 PRIMEANDONECOAT 3days Wed 7/21/21 Fri 7/23/21 73 76 CEILING GRID 4 days Mon 7/26/21 Thu 7/29/21 75 77 MEP ABOVECEILING/ EXISTING LIGHTS TO BE SAVED FOR 5days Wed 7/28/21 ue 8/3/21 7655+2 days OWNER 78 DROP TILE 3days Wed 8/4/21 Fri 8/6/21 77 79 PORCELAIN TILE 6days Wed 8/4/21 Wed 8/11/21 77 80 INSTALL MILLWORK 5days Wed8/4/21 Tue8/10/21 7855 81 INSTALL FLOORING 5 days Fri 8/6/21 Thu 8/12/21 785S+2 days 82 M. INSTALL WORK STATIONS BY OTHERS 3days Thu 8/12/21 Mon 8/16/21 79 83 �IXISTING RECEPTION DESK INSTALL , 3 days Thu 8/12/21 Mon 8/16/21 79 84 SECURITY GLASS ON TOP OF COUNTERS 12 days Tue 8/10/21 Wed 8/25/21 82FS-5 days 85 STORE FRONT PARTITION 5 days Tue 8/10/21 Mon 8/16/21 8455 86 CARDACCESS 3days Wed 8/4/21 Fri 8/6/21 77 87 M DOORS AND HARDWARE 3 days Tue 8/17/21 Thu 8/19/21 85 88 FINISH PAINT 4 days Tue 8/17/21 Fri 8/20/21 85 89 TCO / CO 3 days Thu 8/26/21 Mon 8/30/21 84 Project IRC BUILDING & FIRE Date; Mon 524/21 reek svmmay Split ............ Pmjea Summary Mile— ♦ Inaclire Tesk rr r -----1 Leake Miksnone Inaarve Summary 0 Manuel Task o W—I Mik.— O L B Manual Summary Rdlup Finishonly 7 Deadline b M.—I 5vmmary Cdpul Crib., Spgt ............ P.9— Manual Progress Page 3 Original Schedule Indian River County Admin Alterations to Building 'A' ID Task Mode [Task Name ostar, Finish rdecsorswemr e a em �J y Au ld yA Gffik/136 7/4ry ULAR FURNITURE-HB/IRC(Data) RNITURE AND PUT IN STORAGE BY OTHERS rt pte bar <NA> <NA> 1 -TOTAL PROJECT DURATION 16Z days Thu 12/10/20 Tue 8/3/21 h <NA> <NA> DISCONNECT POWER/ DATA TO MO DISASSEMBLE EXISTING MODULAR 2 PHASE 1 ENABUNG ACTIVITIES (NON -CONSTRUCTION) 3 days Th. 12/10/20 on 3 n FIELD VERIFY SIZE OF EXISTING MODULAR FURNITURE FOR FUTURE LOCATIONS 3days Thu 12/10/20 Mon 12/14/20 4 M DISCONNECT POWER /DATA TO MODULAR FURNITURE-HB/IRC(Data) Iday Thu 12/10/20 Thu 12/10/20 5 DISASSEMBLE EXISTING MODULAR FURNITURE AND PUT IN STORAGE BY OTHERS 3 days Thu 12/10/20 Mon 12/14/20 4SS 6 M. TOTAL CONSTRUCTION SCHEDULE 160 days Mon 12/14/20 Tue 8/3/21 r I - TEMP WALL/ PROTECTION ; TEMP FILTERS ON EXISTING REGIST REMOVE ALL CEILING TILE #7 SUPPORT EXISTING LIGHTS AND G 3 REMOVE CEILING GRID / SOFFITS CAP OFF ANY EXISTING UTILITIES rIJOT DEMO FLOORS/CABINETS LAYOUT NEW WALLS/ SOF FRAME MEP ROUGH WATERLIN FROMPHASETHREETOPHASEONE ALL k DOOR MES PRIM y 1 1 <NA> ITS ILLS TO BE USED SALVAGE SS SINKS FOR OWNER ITS AND ONE COAT CEILING GRID I AEP ABOVE CEILING / EXISTING LIGHTS TO BE SAVED FOR OWNER STALL MILLWORK DROP TILE INSTALL FLOORING DOORS AND HARDWARE FINISH PAINT 1 CO 7 /1 PHASE ONE 61 days Mon 12/14/2D Fri 3/12/21 8 TEMP WALL / PROTECTION 2 days Mon 12/14/20 Tue 12/15/20 3SS 9 S TEMP FILTERS ON EXISTING REGISTERS 1 day Mon 12/14/20 Mon 12/14/20 8SS 10 REMOVE ALL CEILING TILE 2days Mon 12/14/20 Tue 12/15/20 ISS 11 SUPPORT EXISTING LIGHTS AND GRILLS 2 days Mon 12/14/20 Tue 12/15/20 1055 12 ®1 REMOVE CEILING GRID / SOFFITS 3 days Wed 12/16/20 Fri 12/18/20 11 13 CAP OFF ANY EXISTING UTILITIES NOT TO BE USED 3 days Mon 12/14/20 Wed 12/16/20 855 14 DEMO FLOORS/CABINETS/ SALVAGE SS SINKS FOR OWNER 7days Thu12/17/20 Tue 12/29/20 13 15 LAYOUT NEW WALLS/ SOFFITS Iday Wed 12/30/20 Wed 12/30/20 14 16 1 FRAME 3 days Wed 12/30/20 Mon 1/4/21 1555 17 MEP ROUGH 5 days u 12/31/20 Thu 1/7/21 165S+1 day 18 WATER LINE FROM PHASE THREE TO PHASE ONE Iday Tue 12/15/20 Tue 12/15/20 5 19 HTF DRYWALL 7 days Fri 1/8/21 Tue 1/19/21 17 20 DOOR FRAMES 1 day Wed 1/20/21 Wed 1/20/21 19 21 S PRIME AND ONE COAT 3 days Mon 2/8/21 Wed 2/10/21 19FS+13 days 22 CEILING GRID 10 days Thug/11/21 Wed 2/24/21 21 23 R. MEP ABOVE CEILING / EXISTING LIGHTS TO BE SAVED FOR OWNER 6 days Man 2/15/21 Mon 2/22/21 2255+2 days 24 INSTALL MILLWORK 5 days Mon 2/15/21 Fri 2/19/21 2355 25 DROP TILE 2days Thu 2/25/21 Fri 2/26/21 23,22 26 INSTALL FLOORING 5 days Mon 3/1/21 Fri 3/5/21 25 27 -4 DOORS AND HARDWARE 3 days Mon 3/8/21 Wed 3/10/21 26 28 FINISH PAINT 5 days Man 3/8/21 Fri 3/12/21 2755 29 TCO 1 day Fri 3/12/21 Fri 3/12/21 28FS-1 day Pr jeaD IRC BUILDING & FIRE Date: Wed 2/24/21 Tast su,nmey ^ 1re m su, s e O ou..eiomony s ­ t, [ snemn Maenena O crrosnl ivgt .......... . split ............ Pr Je[t Summary r -------- -1 Inactive Summary I 1 Manual Summary Rdlup Finishronly 3 Deadiae 8 P.9- mi.- ♦ Inactive Tesk 0 Manuel Task Manuel Summery r ---------- I Frtemal Tasks Cdc.1 Manual Progress Page 1 Original Schedule Indian River County Admin Alterations to Building 'A' ID Task Task Name Mode Duration Start Finish Predecessors NPvemb r ID cem er anu ry �h m �Ma dl IMay �Jo a �J IY Au n pte ber 30 PHASE 2 ENABLING ACTIVITIES 11 days Mon 3/15/21 Mon 3/29/21 I �NA� ABI - INSTALL WORK STATIONS IN PHASE 1 ® 1T INSTALL OWNER MOVE BACK INTO PHASE 1 ABI - DISASSEMBLE EXISTING MODULAR FURNITURE IN P2 & 4 �NA� EMP WALL/ PROTECTION TEMP FILTERS ON EXISTING REGISTERS T PROTECT MODULAR FURNITURE TO REMAIN AT WORK STATION PROTECT EXISTING CONFERENCE ROOM 127 EMOVE ALL CEILING TILE UPPORT EXISTING LIGHTS AND GRILLS B REMOVE CEILING GRID DEMO FLOORS /CABINETS LAYOUT NEW WALLS FRAME MEP ROUGH HTF DRYWALL t DOOR FRAMES PRIME AND ONE COAT CEILINGGRID MEP ABOVE CEILING/ EXISTING LIGHTS TO BES INSTALL MILLWORK DROP TILE INSTALL FLOORING DOORS AND HARDWARE FINISH PAINT 1 CO �NA> ABI - INSTALL WORK STATIONS IN PHA FFICES AND PUT IN STORAGE BY 117 AND OFFICES LVED FOR OWNER 2 31 n ABI - INSTALL WORKSTATIONS IN PHASE 1 2 days Mon 3/15/21 Tue 3/16/21 28 32 an IT INSTALL 8 days Tue 3/16/21 Thu 3/25/21 31FS-1 day 33 M. IRC - OWNER MOVE BACK INTO PHASE 1 8 days Tue 3/16/21 Thu 3/25/21 31FS-1 dayIRC- 34 ABI - DISASSEMBLE EXISTING MODULAR FURNITURE IN P2 & 4 OFFICES AND PUT IN STORAGE BY OTHERS 2 days Fri 3/26/21 Mon 3/29/21 33 35 PHASE TWO 32 days Mon 3/29/21 Wed 5/12/21 36 TEMP WALL / PROTECTION 1 day Mon 3/29/21 Mon 3/29/21 34FS-1 day 37 TEMP FILTERS ON EXISTING REGISTERS 1 day Mon 3/29/21 Mon 3/29/21 3655 38 M. PROTECT MODULAR FURNITURE TO REMAIN AT WORK STATIONS 117 AND OFFICES Iday Mon 3/29/21 Mon 3/29/21 3655 39 3M PROTECT EXISTING CONFERENCE ROOM 127 1 day Tue 3/30/21 Tue 3/30/21 36 40 REMOVE ALL CEILING TILE 3 days Tue 3/30/21 Thu 4/1/21 37 41 R. SUPPORT EXISTING LIGHTS AND GRILLS 3 days Tue 3/30/21 Thu 4/1/21 40SS 42 REMOVE CEILING GRID 3days Mon 4/5/21 Wed 4/7/21 41 43 DEMO FLOORS /CABINETS 4 days Mon 4/5/21 Thu 4/8/21 40 44 LAYOUT NEW WALLS 3 days Wed 4/7/21 Fri 4/9/21 4355+2 days 45 FRAME 3days Wed 4/7/21 Fri 4/9/21 44SS 46 MEP ROUGH 3 days Fri 4/9/21 Tue 4/13/21 4555+2 days 47 HTF DRYWALL 4 days Wed 4/14/21 Mon 4/19/21 46 48 DOOR FRAMES 1 day Tue 4/20/21 Tue 4/20/21 47 49 PRIME AND ONE COAT 3 days Tue 4/20/21 Thu 4/22/21 47 so CEILING GRID 2days Fri 4/23/21 Mon 4/26/21 49 51 MEP ABOVE CEILING/ EXISTING LIGHTS TO BE SAVED FOR OWNER 3days Tue 4/27/21 Thu 4/29/21 50 52 INSTALL MILLWORK 3days Tue 4/27/21 Thu 4/29/21 5155 53 -% DROP TILE 2 days Fri 4/30/21 Mon 5/3/21 51 54 INSTALL FLOORING 4 days Tue 5/4/21 Fri 5/7/21 53 55 DOORS AND HARDWARE 3 days Mon 5/10/21 Wed 5/12/21 54 56 M. FINISH PAINT 3 days Mon 5/10/21 Wed 5/12/21 5555 57 TCO 1 day Wed 5/12/21 Wed 5/12/21 56FS-1 day 58 215 PHASE 3 ENABLING ACTIVITIES 19 days hhu 5/13/21 Tue 5/25/21 59 ABI - INSTALL WORK STATIONS IN PHASE 2 2 days Thu 5/13/21 Fri 5/14/21 56 Project IRC BUILDING &FIRE Date: Wed 2/24/21 TeA Summery r1 In.6-Mi -- O Dur W -only Stag -only C &temal Milertone O C66.1 sort .. ... .. ..... Z. Projen Sommary F'�1 InaRive Summary 1 1 Manual Summary Rollup Tinishonly 7 Deadline + P'.9— mil—r. ♦ Inacdve Test Q Manual Task 1 Manuel Summary 1------1 Evlemal Tasks Cntiral Manual Progress Page 2 Original Schedule Indian River County Admin Alterations to Building 'A' ask Name Duration Start Finish Predecessors10 n, r �D 1 11 a awry �i< ma �Me rd ry flu a �J lyMode IT INSTA IRC- OWNER MOVE BACK INTO PH ABI - DISASSEMBLE EXISTING MOD EMP WALL/ PROTECTION TEMP FILTERS ON EXISTING REGISI EILING TILE ING LIGHTS AND ILING GRID /SOFF ORS /CABINETS W WALLS / SOFFI OUGH TF DRYWALL OOR FRAMES PRIME AND ONE CEILING GRID MEPABOVE IMEPABOVE DROP TI PORCEU INSTALL INSTALI 1 INSTALL yg EXIST 5 STO Y'CA D A 11 Dc C yEp1 1 E2 JLAR FURNITURE IN P3 AND PU �NA� ERS RILLS S AT EKING/EXISTING LIGHTS TOB JN TILE MILLWORK FLOORING WORK STATIONS BY OTHER NG RECEPTION DESK INSTALL ECURITY GLASS ON TOP OF COU FRONT PARTITION FSS RS AND HARDWARE SH PAINT TCO / CO IT INSTALL 6 days Fri 5/14/21 Fri 5/21/21 59F5-1 day r1Dask IRC-OWNER MOVE BACK INTO PHASE 2 6 days Fri 5/14/21 Fri 5/21/21 59FS-1 day ABI -DISASSEMBLE EXISTING MODULAR FURNITURE IN P3 AND 2 days Mon 5/24/21 Tue 5/25/21 61 PUT IN STORAGE BY OTHERS 63 M. PHASE THREE 49 days Tue 5/25/21 Tue 8/3/21 64 TEMP WALL/ PROTECTION 1 day Tue 5/25/21 Tue 5/25/21 62FS-1 day 65 TEMP FILTERS ON EXISTING REGISTERS I day Tue 5/25/21 Tue 5/25/21 6455 66 REMOVE ALL CEILING TILE 3days Wed5/26/21 Fri 5/28/21 65 67 SUPPORT EXISTING LIGHTS AND GRILLS 3 days Wed 5/26/21 Fri 5/28/21 6655 68 REMOVE CEILING GRID/SOFFITS 3days Tue 6/1/21 Thu 6/3/21 67 69 DEMO FLOORS/CABINETS 5 days Tue 6/1/21 Mon 6/7/21 6955 70 LAYOUT NEW WALLS /SOFFITS 1 day Fri 6/4/21 Fri 6/4/21 69SS+3 days 71 FRAME 3 days Fri 6/4/21 ue 6/8/21 7055 72 MEP ROUGH 5 days Tue 6/8/21 Mon 6/14/21 7155+2 days 73 HTF DRYWALL 6 days Tue 6/15/21 Tue 6/22/21 72 74 DOOR FRAMES 1 day Wed 6/23/21 Wed 6/23/21 73 75 PRIME AND ONE COAT 3days Wed 6123/21 Fri 6/25/21 73 76 CEILING GRID 4 days Mon 6/28/21 u 7/1/21 75 77 MEP ABOVE CEILING/ EXISTING LIGHTS TO BE SAVED FOR 5days Wed 6/30/21 Wed 7/7/21 7655+2 days OWNER 78 DROP TILE 3 days Thu7/8/21 Mon 7/12/21 77 79 PORCELAIN TILE 6 days Thu 7/8/21 Thu 7/15/21 77 80 INSTALL MILLWORK 5 days Thu 7/8/21 Wed 7/14/21 7855 81 INSTALL FLOORING 5 days Mon 7/12/21 Fri 7/16/21 7855+2 days 82 INSTALL 'WORKSTATIONS/ By OTHERS - 3days Fri 7/16/21 Tue 7/20/21 79 83 M. EXISTING RECEPTION DESK INSTALL 3 days Fri 7/16/21 Tue 7/20/21 79 84 M. SECURITY GLASS ON TOP OF COUNTERS 12 days Wed 7/14/21 Thu 7/29/21 82FS-S days 85 STORE FROM PARTITION 5 days Wed 7/14/21 Tue 7/20/21 8455 86 CARD ACCESS 3 days Thu 7/8/21 Mon 7/12/21 77 87 n DOORS AND HARDWARE - 3 days Wed 7/21/21 Fri 7/23/21 85 88 FINISH PAINT 4 days Wed 7/21/21 Mon 7/26/21 85 89 TCO / CO 3 days Fri 7/30/21 ue 8/3/21 84 ProjeTask Date: ed2/24LDING Bf FlRE Date: Wed 2/24/21 Summery ,,,,,, P.I.Summa Spin � .. � . , ry Milestone Inacdve Task F-� Iii I-e6ve Milestone Inactive Summary 0 Manuel Task O Dunt —rly Sbrtronly C I'�-'-0 Manuel Summary Rollu Finish -only 3 p ManualEatemel Tasks ® E.temel Milertone O cn[-SPH .•.......... Deadline + progress "dotal Manuel Progress Page 3