MODIFICATION TO
CONTRACT FOR CONSTRUCTION FOR FINAL LIFT OF ASPHALT
CONTRACT NO. PD -16 -12 -07 -FLA (2004010124-83766)
THIS MODIFICATION, made and entered into this day of October, 2021,
by and between DIVOSTA HOMES, L.P., a Delaware limited partnership, hereinafter
referred to as "Developer", and INDIAN RIVER COUNTY, a political subdivision of
the State of Florida, by and through its Board of County Commissioners,
hereinafter referred to as "County".
WITNESSETH:
WHEREAS, Developer entered into a Contract for Construction for Final Lift of
Asphalt, Contract No. PD -16 -12 -07 -FLA (2004010124-83766) guaranteeing the
installation of the final lift of asphalt the earlier of 2 years from the project's Certificate of
Completion (November 27, 2019) or 60 days prior to turnover to homeowner
association or prior to certificate of occupancy for the last residence in this phase of the
subdivision; and the Developer posted letter of credit in the amount of $41,165.00 as
security to guarantee completion; and
WHEREAS, the developer has
requested an additional 2 -year extension to November 27, 2023 to install
the final lift of asphalt, as allowed by code;
2. provided an updated certified cost estimate attached as Exhibit "A" which
amount has been approved by County engineering and did change from
the initial cost estimate;
3. increased the initial cost estimate of $41,165.00 to $59,848.95; and
4. paid the required $660.00 extension fee request to County.
NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS
AND PROMISES HEREIN CONTAINED, the parties agree as follows:
1. The date for completion of the final lift of asphalt as outlined in the Contract for
Construction for Final Lift of Asphalt, Contract No PD -16 -12 -07 -FLA
(2004010124-83766) is extended to November 27, 2023.
2. The developer's engineer's updated certified cost estimate as approved by
County engineering, attached as Exhibit "A" represents 125% of the updated
cost of the final lift of asphalt to be completed.
A TRUE COPY
CERTIFICATION ON LAST PAGE
J.R. SMITH, CLERK
3. Prior to November 27, 2021, the $41,165.00 Wells Fargo Bank N.A. Irrevocable
Standby Letter of Credit No. IS000108534U is required to be amended (1) to
increase the amount to $59,848.95, (2) to extend its final expiration to February
27, 2023, and (3) to reference the Contract for Construction for Final Lift of
Asphalt as being modified, otherwise this Modification is null and void.
4. The extension fee in the amount of $660.00 established by Resolution No. 2005-
041 and pursuant to Section 913.10(1)(G) of the Indian River County Code has
been paid.
5. All other terms set out in the Contract for Construction for Final Lift of Asphalt,
Contract No. PD -16 -12 -07 -FLA (2004010124-83766) remain in full force and
effect.
IN WITNESS WHEREOF, the parties hereto have set their hands and seals on
the day and year first above written.
ATTEST: Jeffrey R. Smith, Clerk
1-2 of Courta d Comptroller
By:
)Deputy Clerk
Approved as to form
andlegal ufficie y:
By:
William K. Det§raal
Deputy County Attorney
DIVOSTA HOMES, L.P., a Delaware limited
partnership
By DIVOSTA HOMES HOLDINGS, LLC, a
Delaware limited liability company, its
General Partner
Developer
By:
Print Name:
Title:
INDIAN RIVER COUNTY, FLORIDA
by and through its Board of County
Commissioners
•Y",� �pM11MlsS�0
oJ� ,F9J's.
By: _ : Q: t
2os h E. Flesc er, Chairman
approved: October 19 2021
y`9�Ri
2
Lakes at Waterway Village Plat Pod U
STATE OF FLORIDA
INDIAN RIVER COUNTY
THIS 18 T ERTIFY THAT THIS 18 A TRUE AND CORRECT
COPY E ORIGINAL ON FI THIS OFfXE.
A, JEFFf*Y R. F, ITH CLERK// i
FINAL LIFT BOND - OPC 9/15/2021
TOTALS $ 47,879.16
PROPOSED BOND AMOUNT (125%) $ 59,848.95
��11111111//,
Kimley Horn and Nil(ARR/s
P.•'•LICE ''• �/ ��
NSF •'•S9
No.
75481 -e-
0(/IS/,Z(
IRC ENGINEERING
DIVISIDN
Accepted
insufficient___
Kinan Husgjr `� P.E. yr
FL Reg #7548
-C� •. STgT�
Kim�� o.
N
'//,� /ALE \\\`
The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive
bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only
the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals,
bids, or actual construction costs will not vary from its opinions of probable costs.
PAVING
DESCRIPTION
QUANTITY UNIT
UNIT COST
TOTAL
1" ASPHALT (FINAL COURSE) - Pods-S-�
3,822 SY
$ 9.78
$
37,379.16
SIGNING AND STRIPING
1 LS
$ 2,500.00
$
2,500.00
SET PRM'S, PCP's, LOT CORNERS
1 LS
$ 8,000.00
$
8,000.00
TOTAL
1 $
47,879.16
TOTALS $ 47,879.16
PROPOSED BOND AMOUNT (125%) $ 59,848.95
��11111111//,
Kimley Horn and Nil(ARR/s
P.•'•LICE ''• �/ ��
NSF •'•S9
No.
75481 -e-
0(/IS/,Z(
IRC ENGINEERING
DIVISIDN
Accepted
insufficient___
Kinan Husgjr `� P.E. yr
FL Reg #7548
-C� •. STgT�
Kim�� o.
N
'//,� /ALE \\\`
The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive
bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only
the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals,
bids, or actual construction costs will not vary from its opinions of probable costs.