HomeMy WebLinkAbout2021-189WORK ORDER NUMBER 46 69" STREET UTILITY IMPROVEMENT PROJECT This Work Order Number 46 is entered into as of this 16 day of Novembez 2021, pursuant to that certain Continuing Contract Agreement for Continuing Engineering Services, dated April 17, 2018, renewed and amended as of May 18, 2021 (collectively referred to as the "Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and KIMLEY-HORN AND ASSOCIATES, INC. ("Consultant"). The COUNTY has selected the Consultant to perform the professional services set forth on Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B (Fee Schedule), attached to this Work Order and made a part hereof by this reference. The Consultant will perform the professional services within the timeframe more particularly set forth in Exhibit C (Time Schedule), attached to this Work Order and made a part hereof by this reference all in accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. EXHIBIT A— SCOPE OF WORK 69TH Street Utilitv Improvement Proiect — 58th Avenue to 650' west of 39th Court The County desires to complete the installation of a 12" water main along 69th Street between 58th Avenue to 650' west of 3911 Court, approximately 5,900 linear feet. This will enable a looped water main connection between 58th Avenue and Old Dixie Highway providing for a more resilient potable water distribution system. The County desires that these improvements to be concurrently bid with the County's planned 69th Street Resurfacing Project that is tentatively scheduled to be advertised for bidding first quarter 2022. A. Utility Plans: The following is the anticipated utility improvement associated within the project limits: 1. The utility plan sheets will be drawn at a scale of 1" = 100' prepared on 11" x 17" sheets. 2. All quantities shall reference FDOT Pay Item Numbers. 3. All specifications shall reference the FDOT Specifications for Road and Bridge Construction and/ or Indian River County Utility Standards. Any deviations or special specifications not included in specifications will be provided in the Technical Specifications. The proposed utility improvements will be submitted to the COUNTY for review and comment at Constructability (60%), Biddability (90%) and Production (100%) design submittal stages. Review submittals will consist of three (3) hard copies of utility plans along with an opinion of probable construction cost. B. Utility Permit: To support the above described utility improvement, the Consultant will prepare and submit a Florida Department of Environmental Protection (FDEP) Specific Permit to Construct Public Water Systems Components and an IRFWCD Application for Utility Construction Permit. Permit agency coordination assumes one (1) request for additional information (RAI) to be received from FDEP and IRFWCD associated with the applications. The Consultant has included the $650 FDEP application fee within the work order fee. The Final Plans will be provided in Autodesk Civil 3D format. FEE SCHEDULE The COUNTY agrees to pay and the Consultant agrees to accept for services rendered pursuant to this Agreement fees inclusive of expenses in accordance with the following: A. Professional Services Fee The basic compensation mutually agreed upon by the Consultant and the COUNTY is as follows: Lump Sum Components Task Labor Fee Utility Plans $82,025 Utility Permits $7,490 Project Total $89,515 TIME SCHEDULE Upon authorization to proceed by the COUNTY, final design documents are expected to take approximately three (3) months from the Notice to Proceed (NTP). NTP contingent upon BOCC approval Constructability Submittal (60% Design Drawings) Biddability Submittal (90% Design Drawings) Permit Submittal Production Submittal (100% Design Drawings) 1 months following NTP 2 months following NTP 2 months following NTP 3 months following NTP (THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first written above. � iiTY CO."'• CONSULTANT: BOARD OF COUNTY COMIV�JS`i� ERS'• !!2i%s;. KIMLEY-HO ASSOCIATES, OF INDIAN RIVER COUNTY •'.`�%z, INC. �F�yv By: Good, P.E. Title: Senior Vice President By: Pe er D. 0' Bryan, hair poli •.NTY F1.0 BCC Approved Date: November 16, 2021 Attest: Jeffrey R. Smith, Clerk of Court and Comptroller By:6anda Deputy Clerk Approved: K " -- 1 — Jason V. Br wn, County Administrator Approved as to form and legal sufficiency: ylan T. Reingold, County Attorney Summary Project Name 69th Street Utility Improvement Project - 58th Avenue to 650' west of 39th Court Task Summary Manhours for project Task Principle Senior Registered Professional Designer Support Remarks Professional Professional 1 Staff $235 $205 $150 $115 $135 $75 Construction Plans 101 651 1871 1051 1851 8 Permiting 101 161 161 01 16 Total Hours = 10 75 203 121 185 24 Labor Fee= $2,350 $15,375 $30,450 $13,915 $24,975 $1,800 Sub -Total Fee = $88,865 FDEP Application Fees = $650 Project Total Fee = $89,515 69th Street WM Extension WO46 Work Plan.xls Page 1 Utility Plans Activity: Utility Plans Task Principle Senior Professional Registered Professional Professional 1 Designer Support Staff Clerical Plan Sheets 69th Street 12 96 60 72 12 sheets @ 20 hrs/ sht Cross Sections 69th Street 6 47 30 35 100 ft Sections 59 2.0 hrs / x -sect Cost Estimates 2 16 10 12 Ph I through Ph IV Lateral V Canal HDD Details 20 40 Standard Const. Details 1 8 5 6 2 sheets of details @ 10hrs/sht Coordination with IRCO 40 20 1 8 QC/QA 1 10 Project Management 4 Subtotal 10 65 187 105 185 8 Page 2 Activity: Permitting Task Senior Professional Registered Professional Professional Designer 1 Support Remarks Staff Permttin / Coordination FDEP 4 8 8 8 Public Water System GP IRFWCD 2 8 8 8 Utility Permit Project Management 4 Subtotal 10 16 16 0 16 Permits Required FDEP Permit to Construct Public Water Systems Components IRFWCD Utility Permit