HomeMy WebLinkAbout2021-199AGREEMENT FOR PROFESSIONAL SERVICES FOR WATER PLANT AND WATER
RESOURCES ENGINEERING SERVICES RFQ2019070
WORK ORDER 7
Indian River County Department of Utility Services
SCADA System Upgrades at Hobart Water Treatment Plant
This Work Order Number 7 is entered into as of this 7thday of December 2021 pursuant to that
certain AGREEMENT FOR PROFESSIONAL SERVICES FOR WATER PLANT AND WATER RESOURCES ENGINEERING
SERVICES RFQ2019070 entered into as of this 5th day of November, 2019 (collectively referred to as the
"Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida
("COUNTY") and Kimley-Horn and Associates, Inc., ("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The
professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B
(Fee Schedule), attached to this Work Order and made a part hereof by this reference. The Consultant
will perform the professional services within the timeframe more particularly set forth in Exhibit C
(Time Schedule), attached to this Work Order and made a part hereof by this reference all in
accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of
the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement
and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as
if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first
written ahnvP_
CONSULT4N
By: �
Print Nari`le: ;Br:iia ,A. Good, P.E.
Title: Sr. Vice President
BOARD OF COUNTY COMMISSIONERS
OF INDJ RIVER COUNTY
Peter D. O'Bryan,Chai
BCC Approved Date: December 7, 2021
..........•
.. •�O�,1M1Sgj'•
•� ��'ER COU���'
Attest: Jeffrey R. Smith,,� gqClerk of Court and Comptroller
By:
(/ V
Dep ty Clerk
Approved:
Jason Ej Br4wn, County-►cfministrator
Approved as to form and legal sufficiency:
Q§JafrT. Reingold, County Attorney
EXHIBIT #1
Supervisory Control and Data Acquisition (SCADA) System Upgrades
at Hobart Reverse Osmosis Water Treatment Plant
PROJECT UNDERSTANDING
Kimley-Horn recently completed the final design for the Hobart (North) Water
Treatment Plant (WTP) SCADA/PLC system improvements.
Under Work Order No. 2, Indian River County Utilities Department retained the
services of Kimley-Horn to complete design for improvements to the Hobart
(North) Water Treatment Plant Supervisory Control and Data Acquisition
(SCADA) and Programmable Logic Controllers (PLC). These improvements are
going to be implemented to the WTP control system to upgrade antiquated
hardware and add to the County's redundancy and reliability with their
treatment process control. Indian River County Utilities Department desires to
publicly advertise these improvements for bidding and desires to utilize the
services of Kimley-Horn, and it's subconsultants, to provide construction phase
services and programming and integration assistance for these proposed
improvements.
The following scope outlines the work necessary to provide construction phase
services for the proposed improvements, and the integration labor required to
program each of the respective upgrades to the PLCs, remote I/O panels and
various other components.
SCOPE OF WORK
Consultant will utilize the services and provide coordination of Control Systems
Design, Inc., and C&W Engineering in the execution of these tasks.
TASK 1 — CONSTRUCTION PHASE SERVICES
Consultant will attend one (1) pre -construction meeting with the Contractor,
Owner, Electrical Engineer, and Integrator.
Consultant will review shop drawings for conformance with the bid documents.
It is assumed that up to ten (10) shop drawings will be reviewed.
Consultant will respond to a reasonable number of requests for information (up
to 4 assumed).
K:\WPB_Civil\General\Black\Florida\IRCU\Hobart PLC\20211118 - Scope - Hobart PLC Constrnction.docx Page 1 of 5
Consultant will review Contractor's monthly applications for payment.
Consultant will attend up to three (3) progress meetings on-site.
Consultant will assist the Owner with closeout documentation review prior to
completion of the project.
TASK 2 - PROGRAMMING AND INTEGRATION
Consultant will review and completely vet the current HMI migration to
VTScada.
Consultant will modify the main PLC panel to remove the ControlNet modules,
one IA16 module and one ENBT, relocate the two EN2T modules in the CPU
rack and modify all programming to correct the current configuration to ethernet
communications from the CPU rack to the local RIO rack.
Consultant will migrate North Beach communications from North Pump Station
PLC to direct via Red Lion converter at each end to provide data direct to/from
the HMI I/O server.
Consultant will install a new ControlLogix PLC rack with two EN2T modules,
CLX, and a network switch for the RIO -LAN subnet provided by the contractor.
Consultant will prepare a new CLX program ready for ControlLogix I/O after
the conversion, with the possibility of using an additional DHRIO to
communicate with the PLC5 I/O.
Once Contractor completes HSP PLC5 I/O to ControlLogix I/O upgrade,
Consultant will work with the contractor and complete programming check and
migration with new I/O.
After I/O and control have been migrated above, Consultant will remove the
DL4500 DH+ to Ethernet converter used for VTScada.
Consultant will remove the existing PLC5 hardware and finalize all
communications to VTScada, test and verify functionality.
Contractor will upgrade remaining 3 PLC5 RIO Panels to use ControlLogix RIO.
Consultant will modify the PLC program for the new CLX I/O, test and verify
functionality. CSD will modify the VTScada database for any I/O tags that may
have changed and verify functionality.
K:\WPB_Civil\General\Black\Florida\IRCU\Hobart PLC\20211118 - Scope - Hobart PLC Construction.docx Page 2 of 5
Consultant will remove DHRIO modules from the configuration and perform
PLC panel completion.
Contractor will perform a radio survey to provide ethernet radio connectivity
from North Beach to the WTP.
Contractor will upgrade RIO racks and work with Consultant to upgrade North
Beach to CompactLogix PLC.
Consultant will install a new L72 PLC in the main PLC panel at a later version of
Studio 5000 to be determined.
The existing warm back up rack will be either removed or have a second L72
CPU installed.
Consultant will provide any further programming on various systems, startup all
systems together and finalize the entire system.
Consultant will replace Rotork Pakscan communication network. Contractor will
install option cards in all of the Rotork actuators which will allow the valves to
be controlled via a 4-20ma signal. Contractor and Consultant will add any
additional analog I/O, if needed, and CSD will modify the PLC program to use
analog I/O for control. Consultant will make any updates needed in the
VTScada database. Consultant will test and verify functionality.
Consultant will revamp the Lime Slurry panel PLC from the existing MicroLogix
to ControlLogix remote I/O and incorporate into the main PLC program.
Consultant will test and verify operation.
SCHEDULE
In general, the following schedule is anticipated and consultant will work as
expeditiously as possible to meet it:
Task 1: 8 -10 months after Contractor awarded project
Task 2: To occur concurrent to Task 1
K:\WPB_Civil\General\Black\Florida\IRCU\Hobart PLC\20211118 - Scope - Hobart PLC Construction.docx Page 3 of 5
ADDITIONAL SERVICES
The following services are not included in the Scope of Services for this project,
but may be required depending on circumstances that may arise during the
execution of this project. Additional services include, but may not be limited to
the following:
Radio survey
Purchase/ installation of PLC hardware, panels, electrical components, etc.
ITEMS FURNISHED BY OWNER
The following items will be furnished by the Owner and are necessary for
completion of the tasks described herein.
• Access to WTP site
• Panel record drawings
• Coordination during programming and integration
FEE SCHEDULE
We will provide these services in accordance with our Continuing Consulting
Engineering Services Agreement for Professional Services dated April 17`th, 2018,
by and between INDIAN RIVER COUNTY, a political subdivision of the State of
Florida ("COUNTY") and Kimley-Horn and Associates, Inc., ("Consultant").
The Consultant will provide professional services for a lump sum fee as follows:
Task No. Task Task Fee
Task 1 Update report and Network Diagram $ 18,650
Task 2 Design Phase $ 236,568
TOTAL LUMP SUM FEE $ 255,219
K:\WPB_Civil\General\Black\Florida\IRCU\Hobart PLC\20211118 - Scope - Hobart PLC Construction.docx Page 4 of 5
ESTIMATE FOR ENGINEERING SERVICES
PROJECT: Hobart ROWTP SCADA SystemItnpmvements SHEET 1 OF 1
CLIENT: Indian River County Utilities FILE NO.
ESTIMATOR NB DATE: 3/2/2021
DESCRIPTION:
Hobart SCADA System ImprovementsDir
DIRECT LABOR MAN-HOURS
NZINC
SEN
PROF
REG
PROF
DES/
P2
CLK
P1
EXP
SUB
EXP
SUB
Exp
LINE
TOTAL
NO. TASK
1 CONSTRUCTION PHASE SERVICES
Kickoff Meeting
4
8
$98
$2,239
Shop Drawings (10)
2
6
$63
$1,433
RFIs (4)
2
4
$49
$1,119
Pay App Review (8)
1
8
$66
$1,501
Site Visits (3)
4
12
$126
$2,866
Closeout Documentation
1
4
$38
$874
C&W
2
4
1 $7,500
$49
$8,619
2 PROGRAMMING & INTEGRATION
CSD
8
24
5224,100
S252
$229,832
Coordination
81
i 24
101
5296
$6,736
TOTALHOURS
32
0 94
0 10
0 231600
$1,039
$255,219
LABOR (S/HOW
235
225 150
105 96
25
$0
$0
SUBTOTAL
7520
0 14100
0 9601
0 231600
$254,180
$255,219
K:\WPB_Civil\General\Black\Florida\IRCU\Hobart PLC\2021 1 118 - Scope - Hobart PLC Construction.docx Page 5 of 5
$18,651
$236,568
C & W engineering, Inc
Electrical Consultants
6903 Vista Parkway North, #10
West Palm Beach, FL 33411
(561) 642-5333
February 18, 2021
Nick Black, P.E.
Kimley Horn & Associates
1920 Wekiva Way
Suite 200
West Palm Beach, FL 33411
Subject: IRC Hobart WTP Electrical PLC-SCADA Improvements Construction
Services Proposal
C&W Ref. 66437.CS
Dear Nick:
I am pleased to submit this proposal for your consideration to provide Electrical
Engineering Services during the construction phase of the PLC improvements to the
Hobart WTP. Below is a summary of our tasks during construction.
1. Attend a Pre -construction meeting and respond to questions.
2. Review shop drawings.
3. Respond to Contractor RFls.
4. Provide a field progress observation to the site during different phases
of construction, provide a report for each visit. Total of 3.
5. Attend the startup of RIO 5 PLC and Plant site Pump Station Panel
when these get upgraded with the PLC Kit.
6. Attend the startup of one MOV at the south process area (Trains 1
through 4) and one MOV at the north process area (Trains 5 through 8)
7. Attend 3 VIRTUAL monthly meetings during construction.
8. Review O&M manuals.
9. Provide as -built drawings based on Contractor provided redlines.
CONSTRUCTION SERVICES
Coordination
Kimley Horn and Associates
Owner
CSD personnel
Contractor
C&W REF 66437.CS
Attend 3 VIRTUAL Progress Monthly Meetings
Progress field inspections during construction total of 3
Review Electrical Equipment shop drawings
Review PLC and Control Panel instrumentation shop drawings
Prepare response to Contractor RFI requests
Attend a startup and testing field visit and provide a punch list to the
inspected PLC and upgrade work, including the MOV valves changed out
to hard wired controls.
Provide review of O&M manuals and confirm spare parts.
Provide as -built drawings based on redlines form the Contractor.
ELECTRICAL CONSTRUCTION SERVICES PHASE FEE: $7,500 lump sum
I trust the scope and fee are in agreement with your needs and expectations.
Please contact me with questions or comments. Thanks for this opportunity.
Very truly yours,
C&W Engineering, Inc.
Michael A. Guida, PE
JLR/nl
$ 224.100.00
$135.00
IRC - Hobart Scada Upgrade Summary of Tasks Versus Cost and Time as of 2/19/2021- Page 1 of 1
LABOR ESTIMATE
TASK
SCOPE DESCRIPTION
CSD
CSD Manhour Estimate
PROGRAMMING
CSD will review and completely vet the
current HMI migration to VTScada.
CSD will modify the main PLC panel to
remove the ControlNet modules, one
IA16 module and one ENBT, relocate the
two EN2T modules in the CPU rack and
modify all programming to correct the
1
current configuration to ethernet
160
$ 21,600.00
communications from the CPU rack to
the local RIO rack.
CSD will migrate North Beach
communications from North Pump
Station PLC to direct via Red Lion
converter at each end to provide data
direct to/from the HMI 1/0 server.
CSD will install a new ControlLogix PLC
rack with two EN2T modules, CLX, and a
network switch for the RIO—LAN subnet
provided by the contractor.
2
Have a new CLX program ready for
240
$ 32,400.00
ControlLogix 1/O after the conversion,
with the possibility of using an additiona
DHRIO to communicate with the PLCS
11/0.
Contractor to upgrade HSP PLC51/0 to
ControlLogix 1/0 and CSD will work with
3
the contractor and complete
240
$ 32,4DO.00
programming check and migration with
new 1/0.
After I/O and control have been
migrated above, CSD removes the
DL4500 DH+to Ethernet converter used
for VTScada.
4
80
$ 10,800.00
CSD will remove the existing PLCS
hardware and finalize all
communications to VTScada, test and
Iverifv functionality.
Contractor will upgrade remaining 3
PLCS RIO Panels to use ControlLogix RIO.
CSD will modify the PLC program for the
5
new CLX 1/0, test and verify
320
$ 43,200.00
functionality. CSDwill modify the
VrScada database for any 1/0 tags that
may have changed and verify
functional'
PLC Panel Completion. CSD will remove
6
DHRIO modules from the configuration.
80
$ 10,800.00
Contractor will perform a radio survey to
provide ethernet radio connectivity from
North Beach to the WTP.
7
120
$ 16,200.00
Contractor will upgrade RIO racks and
work with CSD to upgrade North Beach
to Com actLo 'x PLC.
CSD will install a new L72 PLC in the main
PLC panel at a later version of Studio
5000 to be determined.
The existing warm back up rack will be
8
either removed or have a second L72
160
$ 21,600.00
CPU installed.
CSD will provide any further
programming on various systems,
startup all systems together and finalize
the entire system.
Replace Rotork Pakscan communication
network. Contractor will install option
cards in all of the Rotork actuators which
will allow the valves to be controlled via
a 4-20ma signal. Contractor and CSD will
9
add any additional analog 1/O, if needed,
160
$ 21,600.00
and CSD will modify the PLC program to
use analog 1/0 for control. CSD will
make any updates needed in the
VTScada database. Test and verify
functionality.
Revamp the Lime Slurry panel PLC from
the existing MicroLogix to ComrolLogix
10
remote 1/O and incorporate into the
100
$ 13,500.00
main PLC program. Test and verify
operation.
$ 224.100.00
$135.00
IRC - Hobart Scada Upgrade Summary of Tasks Versus Cost and Time as of 2/19/2021- Page 1 of 1