Loading...
HomeMy WebLinkAbout2021-206FIRST AMENDMENT TO THE DEVELOPER'S AGREEMENT BETWEEN INDIAN RIVER COUNTY AND FLORIDA POWER & LIGHT COMPANY THIS FIRST AMENDMENT is made and entered into this 7th day of December , 2021, by and between INDIAN RIVER COUNTY, FLORIDA, a political subdivision of the State of Florida, 180127 0 Street, Vero Beach, FL 32960 ("County") and FLORIDA POWER & LIGHT COMPANY, a Florida corporation, 700 Universe Boulevard, Juno Beach, FL 33408 ("Developer"). WITNESSETH: WHEREAS, Developer is developing a service center at 1575 98th Avenue in Indian River County, Florida, to be known as the FPL Indian River Service Center; and WHEREAS, the County and the Developer share mutual goals and have determined that they can assist each other with respect to certain roadway, intersection, and drainage improvements as a condition of the Service Center approval; and WHEREAS, the County and the Developer entered into a Developers Agreement on November 30th, 2020 to set forth the terms and conditions to which they have agreed with respect to the matters contained herein; and WHEREAS, unforeseen conditions arose during construction of 98th Avenue have necessitated addressing conditions which were not the responsibility of the Developer; and WHEREAS, the County would have been responsible to construct the infrastructure necessary to address these condition; and WHEREAS, the Developer has addressed these conditions during the construction process and is requesting reimbursement of said infrastructure improvements via this Amendment; NOW, THEREFORE, for and in consideration of these premises, Ten Dollars ($10.00), and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the County and the Developer do hereby covenant, stipulate, and agree as follows: 1. Recitals: The foregoing recitals are incorporated as if fully restated herein. 2. Additional Drainage Improvements: Developer agrees to construct additional drainage improvements to facilitate the reconstruction of 98th Avenue from 161, Street to State Road 60, as a two lane paved street to accommodate offsite drainage not part of the approved plans developed by Kimley Horn and Associates, entitled "Indian River Service Center 98th Avenue & 16th Street; Project Number: 147088006". These drainage improvements are as follows: At station 175+25, the Float -On access drive, the addition of a type "C" drainage inlet, replacement of an existing drainage culvert to facilitate roadway drainage, and an additional asphalt to facilitate the culvert replacement within the driveway. The additional cost of these improvements was $10,800.63 as outlined in attached Exhibit "A". A station 158+00 additional drainage work was necessary to accommodate off- site drainage that was not the responsibility of the Developer. The raising of two inlet tops, the addition of a type "C" inlet, and additional 150-1f of pipe were all necessary to address this issue. The cost of these improvements was $43,700.47 as outlined in Exhibit `B". 3. County Contribution: The County's compensation to the Developer for the design, engineering and construction of these improvements, is amended to include the above and is increased from $378,689.52 to a not to exceed the amount of $433,190.62. 4. Miscellaneous: Except as amended above, the Developers' Agreement dated November 30, 2020 shall remain in full force and effect. IN WITNESS WHEREOF, the parties have executed this Agreement as of the day and year first above written. Approved by: Jason E. B o , County ministrator Approved as to Form and Legal iciency illiam K. DeBraal, Deputy County Attorney K BOARD OF COUNTY COMMISSIONE •• ""•• •. pASM(S •., IND IVER COUN TtY FLORIDA J��y••' ' S�o'✓F�o. By: Peter D. O'Bryan, Chairman BCC Approved: December 7, 2021 ••:... ••.•�!ER COUN.• Attest: Jeffery R. Smith, Clerk of Court and Com troller r By: Deputy Clerk IN WITNESS WHEREOF, the parties have executed this Agreement as of the day and year first above written. Signed, sealed and delivered in the presence of: `u, G LaToya Reese Printed Printed Name: — Stacy B. Nnnubst STATE OF FLORID COUNTY OF FLORIDA POWER & LIGHT COMPANY a Florida Corporation By: Printed Name: Mathew Barrows Title: Senior Director, Corporate Real Estate The foregoing instrument was acknowledged before me by means of physical presence or online notarization this�nb day of%kt,►em)Wr- , 2021, by MOAN\ "t-Atcow 3 , as 5.Met}�� 041k_ of FLORIDA POWER & LIGHT COMPANY, a Florida CORPORATION, on behalf of the corporation, who is personally known to me or who has produced as identification. (Notary Seal) LATO YA N. R E E S E WW Notary Public -State of Florida Commission # HH 102668 My Commission Expires March 10, 2025 3 CS�0�±N Print Nam . LaToya Reese Notary Public My Commission Expires: Mt�rCh �O 2o2�J EXHIBIT "A" ASI 016 - PCO #51 Architect's Supplemental Instructions PROJECT: CONTRACT INFORMATION: ASI INFORMATION: FPL Indian River Service Center 1575 98th Avenue Vero Beach, FL 32966 OWNER: Florida Power & Light 700 universe Blvd Juno Beach, FL 33408 Contract For: General Construction Date: 04/06/2020 ENGINEER OF RECORD: Kimley-Horn and Associates, Inc. 445 24th Street, Suite 200 Vero Beach, FL 32960 ASI Number: 016 Date: 02/10/2021 CONTRACTOR: Kast Construction 701 Northpoint Parkway, Suite 400 West Palm Beach, FL 33407 The Contractor shall carry out the Work in accordance with the following supplemental instructions and in accordance with the terns and conditions outlined in Article 9 of the Owner / Contractor Agreement as it relates to Contract Sum and Contract Time. Regarding changes to plan sheets listed below: • Plan sheet 14 of 981 Avenue o Addition of a Type "C" ditch bottom inlet (S -114B) for future connection from the Float On property owner, replacement of existing culvert with the widening of the existing driveway o Addition of 39 LF of 15" HDPE pipe o Addition of 18.1 SY of asphalt concrete turnout ISSUED BY THE ENGINEER OF RECORD: Blaine Berastresser, P.E. ENGINEER ,...► SIGNATURE Blaine Bergstresser / Civil Engineer PRINTED NAME AND TITLE 02/10/2021 DATE SUMMARY OF EARTHWORK REGULAR IXCAVATION STREETNAME VOL(CY) PLAN FINAL EMBANKMENT VOL ICY) PLAN FINAL SUMMARY OF TURNOUTS STREET NAME STATION SIDE APRON LENGTH (FT) WIDTH (FT) CONCRETE AREA (SY) CONCRETE SIDEWALK (IV THICK) PLAN FINAL ASPHALT AREA SY TYPE SP -12.5 STR. CRS.(TRAF. C)(2) FIELDBOOK COQUINA OR UMEROCK(LBR 10D)(4") REFERENCE PLAN FINAL TOTAL 5,202 4,813 98TH AV ENUE 163+05.02 LT 11 24.2 84.4 165+43.50 LT 11 2&1 47.7 167+35.36 LT 11 1 25.8 45.2 75+32.58 LT 11 ASI 29.2 I 177+78.65 LT Il 20. 37.8 TOTAL 1 84.4 159.9 SUMMARY OF EARTHWORK REGULAR IXCAVATION STREETNAME VOL(CY) PLAN FINAL EMBANKMENT VOL ICY) PLAN FINAL 98TH AVENUE 3,629 2,364 16TH STR E ET 1,573 21449 TOTAL 5,202 4,813 DATE I BY I DESCRIPTION A E BY DRAINAGE DESIGN REVISION DESCRIPTION �umiey>»Horn I FLORIDA POWER &LIGHT I SHEEr 2110121 Off NO, "n"Fas%Rr°w INDIARIVER SERVICE CENTER SUMMARY OF QUANTITIESN ICAST E- EXIST.[ FM 11 ERJ 4ul CONST. 39 LF -.�—T ®Am-- OF IS" HDPEP b STA. 177+00.00, 26.01' LT 0 70 40 h n1 � �O v, ul O PROP. 10'X60' O O d CONST. TYPE 'C' DBI � ul vi 00 ]7 �i 00 uj uj x1 ! i NN � hi LIC. AGREEMENT T! TD EXIST. DRIVEWAY GRATE EL. = 23.68 8 6; 77 17 00 7 CONST. ASPHALT DRIVEWAY + 4.35 3.23' LT BOTTOM EL18.006.00 Feet © Ns PER FDOT INDEX 000-515 TTI11ET0 ! T. RV m m ear. coon x FLORIDA POWER & LIGHT 98TH A VENUE sHEEr No. DATE BY D1rscR/Pnox ?�� ur L 2020 MKL CONTRACTOR TO CUT BACK EXIST, IS" CPP CONST. ASPHALT DRIVEWAY MCF DRAINAGE DESIGN REVISION 03730 0972020 s� r3.05 EXIST. CULVERT '3 TD BE REMOVED �l EXIST. STRUCTURE AND r 5-1148 AS TO NOT CONFLICT W1TH PROP. STRUCTURE. ER FOOT INDEX 000-515 1/4/11 MCF QSCRIPTOR ERROR REVISION EXIST. RJW t� CULVERT TO REMAIN 987H AVENUE & 16TH STREET ]4 PROPERTY OWNER WILL CONNECT AT A LATER DATE. TO STRUCTURE Fes. y CONST. 5' PAVED SHLDR 8 � 23 a Z3 w a CD ^ ••- — — — — O 235. Q S-.1 I S E��`- .. 5-] 1 ��` r) T ^ CONST SI LF OF 1 •-. o .... _ -174 _ �— - 175. 176 177 _ 178' rn Q 10' (TYPJ V) 98TH AVENUECONST. CONST, N 0° 1-T 08" E 50 LF OF 18" RCP—1 Ln y W 35' R J CONST 5' PAVED SHLDR +92. +78.15 V co _ RT CONST. 5' PAVED SHLDR _ Q EXIST. R/W EXIST. CULVERT TO REMAIN) .. CONST. 20 LF OF 18" CAP W/ CONC. TIE TO EXIST. RIVEWAY COLLAR, OUTFALL INV. = 18.60 + R CONST. 20 LF OF 18" CAP W/ CONC. ® IQ TIE TO EXIST, DRIVEW Y COLLAR, OUTFALL INV. = 17.90 5-114A 5-1148 5 -dl LEGEND: STA. 174+45.73, 26:08 LT CONST, TYPE 'C' DBI GRATE EL. = 24.50 STA. 175+55.07, 78.24' LT CONST. TYPE 'C' DBI W/ SLOT GRATE EL. = 24.15 STA. 175+12.93, 28.31' LT MODIFY EXIST. STRUCTURE' GRATE = 24.15* PROPOSED ROADWAY WIDENING �' AH INV. = 12.22± RT INV. = 18.70 AH SLOT = 23.75 BK INV. = 22.60 Ali INV. = 22.60 BK INV. = 22.575 <-I- OVERLAND FLOW DIRECTION BOTTOM EL. = 16.70 LT INV. = 22.60 (15" KNOCK OUT BRICKED UP) BOTTOM = EXIST. BOTTOM EL. = 20.60 PROFILE': GRADE LINE 71! o I 18 ory I W9.04 -- :__ ;._ .;_� —. (+ 0,0101" f—}IA3:13 �—t �— ~0.1 1 — — w _ . — — 4% E- EXIST.[ FM ERJ 4ul -.�—T . •-. N b xD ry I V h n1 � �O v, ul O O O d I � ul vi 00 ]7 �i 00 uj uj x1 ! i NN Nxj hi O Ih hN xj 6; 77 17 00 7 00 77 D 1 ]7 00 16 aevlslo Ns m m ear. coon x FLORIDA POWER & LIGHT 98TH A VENUE sHEEr No. DATE BY D1rscR/Pnox DITe ur DESCRIPTION 2020 MKL ® DRAINAGE REVISION 1/10/21 MCF DRAINAGE DESIGN REVISION 03730 0972020 MCF BKHA DRAINAGE REVISION r 111 .1. erxr zosoF INDIAN RIVER SERVICE CENTER PLAN & PROFF�LE 1/4/11 MCF QSCRIPTOR ERROR REVISION -111u.r or 987H AVENUE & 16TH STREET ]4 KAST CONSTRUCTION KAST Construction Company, LLC 701 Northpoint Pkwy, Suite 400 West Palm Beach, Florida 33407 Phone: (561) 689-2910 PCO #051 Project: 20-002-01 - FPL - Indian River Service Cen 1575 98th Avenue Vero Beach, Florida 32966 Prime Contract Potential Change Order #051: ASI -016 Float ON Drainage TO: FLORIDA POWER & LIGHT FROM: KAST CONSTRUCTION ATTN: PPC/GO RM 2420 9250 W FLAGLER 701 Northpoint Pkwy, Suite 400 STREET West Palm Beach Florida, 33407 MIAMI Florida, 33174 PCO NUMBERIREVISION: 051 /0 CONTRACT: 1 - FPL - Indian River Service Cen Prime Contract REQUEST RECEIVED FROM: Jack McGowan (CBRE/Global Workplace CREATED BY: James Lent (KAST CONSTRUCTION) Solutions - FPL) STATUS: Approved CREATED DATE: 2/22/2021 REFERENCE: FIELD CHANGE: No LOCATION: Site>98th Ave PRIME CONTRACT None CHANGE ORDER: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: 0 days TOTAL AMOUNT: $10,800.63 POTENTIAL CHANGE ORDER TITLE: ASI -016 Float ON Drainage CHANGE REASON: Client Request POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #082 - ASI -016 Float ON Drainage "Cut / demo newly installed 1 st lift of asphalt/base Rock installed as proposed on sheet 14 of the 98th Ave & 16th St Service Center plans for installation of new pipe and restore asphalt profile to the driveway apron configuration provided per plan". ATTACHMENTS: IRCSS CO proposal 23 rev.pdf Float On N Driveway Rev.odf # Cost Code Description Type Amount 1 02-300 - EARTHWORK ASI -016 Float On Drainage SUBCONTRACTOR $ 10,150.00 Subtotal: $10,150.00 GL Insurance : 1.07% Applies to all line item types. $ 108.61 Builder's Risk: 0.27% Applies to all line item types. $2 . Fee: 5.00% Applies to all line item types. $ 514.32 Grand Total: $10,800.63 This proposal expires after calendar days and is subject to review and possible adjustment of Cost and Time thereafter. The Contract Time will be unchanged at this time, however this change impacts the Construction Schedule by calendar days for completion of this area, and at this time does not by itself, affect the critical path or Substantial Completion date, so long as approval of this pricing is received prior to the expiration date. Due to the late receipt of this change and the aggregate impact of additional changes that may cause a delay to project completion, the Contractor reserves the right to request additional Contract Time. KAST Construction Company, LLC page 1 of 2 Printed On: 3/1/ 2021 04 :05 PM KAST CONSTRUCTION PCO #051 By signing below, Owner and Contractor indicate their agreement upon the adjustments to the Guaranteed Maximum Price and Contract Time described in this Prime Contract Potential Change Order (PCO), and by signing shall convert this PCO to a Change Order as defined in the General Conditions of the Contract for Construction, which may be recapped in a subsequent formal Prime Contract Change Order (PCCO) document. FLORIDA POWER & LIGHT KAST CONSTRUCTION ATTN: PPC/GO RM 2420 9250 W FLAGLER STREET 701 Northpoint Pkwy, Suite 400 MIAMI, Florida 33174 West Palm Beach, Florida 33407 SIGNATURE DATE SIGNATURE DATE KAST Construction Company, LLC page 2 of 2 Printed On: 3/1/ 2021 04 :05 PM March 1, 2021 TO: Mr. James Lent Sr. Project Manager KAST Construction 701 Northpoint Pkwy,. Suite 400 West Palm Beach, FL 33407 RE: FPL Indian River Service Center 1575 98th Avenue Vero Beach, FL 32966 Change Order Proposal #23 DICKERSON FLORIDA, INC. A COMPANY OF THE DICKERSON GROUP, INC. PO Box 910 Fort Pierce, FL 34954-0910 phone 772-429-4444 fax 772-429-4445 Subject: Proposal for Change Event # 082: New pipe and structure at north driveway of Float On business Note: C.O. to be governed by existing contract. Sincerely, Dickerson FL, Inc. John L. Pluswick ITEM NO. DESCRIPTION QTY UNIT UNIT PRICE TOTAL 1 Remove and dispose of existing pipe 30 LF $15.00 $450.00 2 Install 15" ADS pipe 40 LF $50.00 $2,000.00 3 Type C Inlet 1 EA $4,000.00 $4,000.00 41 Rock / asphalt patch 1 LS $3,700.00 $3,700.00 Cut / demo newly installed 1 st lift of asphalt / base rock installed as proposed on Sheet 14 of the 98th Ave & 16th St Service Center plans for installation of new pipe and restore asphalt profile to the driveway apron configuration rovided per plan. Total 1 LS $10,150.00 Note: C.O. to be governed by existing contract. Sincerely, Dickerson FL, Inc. John L. Pluswick SII. ASI 017 - PCO 4060 & 4061 Architect's Supplemental Instructions PROJECT: FPL Indian River Service Center 1575 98th Avenue Vero Beach, FL 32966 OWNER: Florida Power & Light 700 universe Blvd Juno Beach, FL 33408 CONTRACT INFORMATION: Contract For: General Construction Date: 04/06/2020 ENGINEER OF RECORD: Kimley-Hom and Associates, Inc. 445 24th Street, Suite 200 Vero Beach, FL 32960 ASI INFORMATION: ASI Number: 017 Date: 04/15/2021 CONTRACTOR: Kast Construction 701 Northpoint Parkway, Suite 400 West Palm Beach, FL 33407 The Contractor shall carry out the Work in accordance with the following supplemental instructions and in accordance with the terms and conditions outlined in Article 9 of the Owner / Contractor Agreement as it relates to Contract Sum and Contract Time. Regarding changes to plan sheets listed below: • Plan sheet 11 of 98th Avenue o Addition of grate collars to S-107 and S-110 o Relocation of fire hydrant at Sta 181+00 o Addition of Type "C" ditch bottom inlet (S -105A) o Addition of 150 LF of 15" HDPE pipe o Additional grading of swale along 98th Avenue ISSUED BY THE ENGINEER OF RECORD: Blaine Bergstresser, P.E. ENGINEER SIGNATURE Blaine Bergstresser / Civil Engineer PRINTED NAME AND TITLE 04/15/2021 DATE 61 00 ! )6t OQ 16 SHEET 98TH A VENUE No. PLAN & PROM R 17 EXIST. MONUMENT SIGN, SEATING AREA TIE TO EX15T. DRIVEWAY AND TIE TO EXI T. DRIVEWAY + , 68�[� DEFLECT EXIST. Z" WATER SERIVCE EXIST 12' CMP i + BELOW ]5" HDPE (6" SEP IO MIN. 18 RCPEXIST 61 ADE, it CON5T5 EXIST. SWK +46.8 TO REMAIN ' 0 70 40 EXIST. R : +6889" --- RE -GRADE EXIST. SWALE 15' HDPEP CONST. ' PAVEP ,SHL R .. TO PROVIDE CONVEYANCE TO 5-/OSA f® CONST. 75 LF OF 18" RCP - EXIST. CATCH BASIN AND ADJUST EXIST. FIRE HYDRANT 5-70 EXIST - 12 CMP-: - ® S -IDSA 1 r CULVERTS TO BE REMOVED .m I ( IREFER REMAIN) + TEMPORARY CONSTRUCTION TO UTILITY POLE ', S-10 00 JS m EASEMENT (EXIST. TOP OF BANK) )5 Otl 166.4-00 ING DETAIL/j' .::....» EXIST. R/W S 10 N5 _]_«. Kim ey»>Horn °'03/30 CONST. 150 LFOF —_ RY DESCRIPTION eY DESCRIPTION 15. ttDHkp CONST. 5' PAVED SHLDR iQ REVISED PIPE CROSSING ON PL22MCF � f RIVER SERVICE CENT1REVISED tDAOT2EO 2020MCF — 14�Der<*H FLr,surteiaoINDIAN J� y y STRUCTURE INFO. 411412021 3:]9:49 PM _ O + 6 0 ,. DEFLECT 15" HOPED ASE NOG DISTURB EXIST. A10NUMENT SIGN -- ,.. +9888 357 z 00LT 158 — _;,_ 760 761 7 m V~j 8TH AVENUE �-- 70 N (P 13' 08" E REFER TO UTILITY POLE PAVING DETAIL 10 ' LA W CONST. CONST 68 IF OF 18" RCP J _ ADJUST EXIST VALVES (TYP.) -... -_ - CONST 5 PAVED SHLDR � -- O O EXIST. CONTRACTOR TO REMOVE EXIST 18' CMP OUTFALL CONST, 20 IF 18" CAP W/ CONC, R/W AND STABILIZE WITH PEGGED SOD. COLLAR, OUTFALLL INV, = 19.00 L CONST. WIDE CULVERT REVETMENT TO (REFER TO DETAIL) LEGEND: 50%157+18.07, 50.00' LT STAS157+99.00, 45.60' CONST. 4:1 MES CONST. TYPED' D81 LT S AO 159+®.05, CONST TYPE'C 46.27' LT OMITTED D8l� PROPOSED ROADWAY FOOT INDEX 430-021 FDOT INDEX 425-052 GRATE EL. 22. E0 k ui WIDENING FL EL = 22.70 BK INV. 20.00 E'� OVERLAND FLOW DIRECTION © EV= BOTTOM = 18.00 EXIST. POWER POLE TO 8E RELOCATED (BY OTHERS) IT INV, 22.00* BOTTOM = 17.10 4L 61 00 ! )6t OQ 16 SHEET 98TH A VENUE No. PLAN & PROM R 17 EXIST 12' CMP i ---- 18 RCPEXIST 61 ADE, it CON5T5 I 20 15' HDPEP ...._ .x_1.0 EXIST 17 WMEXIST ..... ._ -. 8 FM mo .m I e' V5 00 JS 00 )5 Otl 166.4-00 REV I S 10 N5 Kim ey»>Horn °'03/30 FLORIDA POWER & LIGHT DATE RY DESCRIPTION eY DESCRIPTION 2020 MKL iQ REVISED PIPE CROSSING ON PL22MCF ® DESIGN REV. PER RFI 49 RIVER SERVICE CENT1REVISED tDAOT2EO 2020MCF UTILITY POLE REMOVAL 14�Der<*H FLr,surteiaoINDIAN 7ee.7"'w STRUCTURE INFO. 411412021 3:]9:49 PM 5/1 KAVBB LDEV\147086006 MCF ®OFF-SITE DRAINAGE CONVEYANCE 1- Po 1 Se ROABWAYIPLANP003 °'tel11" o - 9Bl 1. 987w AVENUE & [Garr STREET 61 00 ! )6t OQ 16 SHEET 98TH A VENUE No. PLAN & PROM R 17 KAST CONSTRUCTION KAST Construction Company, LLC 701 Northpoint Pkwy, Suite 400 West Palm Beach, Florida 33407 Phone: (561) 689-2910 PCO #060 Project: 20-002-01 - FPL - Indian River Service Cen 1575 98th Avenue Vero Beach, Florida 32966 Prime Contract Potential Change Order #060: CE #096 - Parker Additional Drainage TO: FLORIDA POWER & LIGHT FROM: KAST CONSTRUCTION ATTN: PPC/GO RM 2420 9250 W FLAGLER 701 Northpoint Pkwy, Suite 400 STREET West Palm Beach Florida, 33407 MIAMI Florida, 33174 PCO NUMBERIREVISION: 060/0 CONTRACT: 1 - FPL - Indian River Service Cen Prime Contract REQUEST RECEIVED FROM: Jack McGowan (CBRE/Global Workplace CREATED BY: James Lent (KAST CONSTRUCTION) Solutions - FPL) STATUS: Approved CREATED DATE: 4/23/2021 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: Site>98th Ave ACCOUNTING Amount Based n METHOD: SCHEDULE IMPACT: 5 days TOTAL AMOUNT, $43,700.47 POTENTIAL CHANGE ORDER TITLE: CE #096 - Parker Additional Drainage CHANGE REASON: Design Development POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #096 - Parker Additional Drainage Additional structure and pipe to to tie in existing ditch along the north side of Parker Industries and drain to previously installed Structure 105. All MOT, materials, excavation, backfill, grading, sodding, flowable fill (if Necessary) and surveying required as part of the scope. ATTACHMENTS: 210423 FPL IRSC Parker Additional IRC requested Drainage Ddf Revised Parker Offsite Drainage.Ddf # Cost Code Description Type Amount 1 02-300 - EARTHWORK Parker Additional Drainage SUBCONTRACTOR $ 35,700.00 2 01-125 - PROJECT MANAGER 01 Parker Additional Drainage Management LABOR $ 5,368.00 Subtotal: $41,068.00 GL Insurance : 1.07% Applies to all line item types. $ 439.43 Builder's Risk :0.27% Applies to all line item types. $ 112.07 Fee: 5.00% Applies to all line item types. $ 2,080.97 Grand Total: $43,700.47 This proposal expires after calendar days and is subject to review and possible adjustment of Cost and Time thereafter. Because the timing of this Change and/or the aggregate impact of additional Changes may cause an unforeseen delay to project completion, Contractor reserves the right to request additional Time. KAST Construction Company, LLC page 1 of 2 Printed On: 4/28/ 2021 12 :37 PM KAST CONSTRUCTION PCO #060 By signing below, Owner and Contractor indicate their agreement upon the adjustments to the Guaranteed Maximum Price and Contract Time described in this Prime Contract Potential Change Order (PCO), and by signing shall convert this PCO to a Change Order as defined in the General Conditions of the Contract for Construction, which may be recapped in a subsequent formal Prime Contract Change Order (PCCO) document. FLORIDA POWER & LIGHT KAST CONSTRUCTION ATTN: PPC/GO RM 2420 9250 W FLAGLER STREET 701 Northpoint Pkwy, Suite 400 MIAMI, Florida 33174 West Palm Beach, Florida 33407 SIGNATURE DATE SIGNATURE DATE KAST Construction Company, LLC page 2 of 2 Printed On: 4/28/2021 12 :37 PM April 22, 2021 TO: Mr. James Lent Sr. Project Manager KAST Construction 701 Northpoint Pkwy,. Suite 400 West Palm Beach, FL 33407 RE: FPL Indian River Service Center 1575 98th Avenue Vero Beach, FL 32966 Change Order Proposal #30 Subiect: Proposal for Chanqe Event #096: Parker Additional Drainage DICKERSON FLORIDA, INC. A COMPANY OF THE DICKERSON GROUP, INC. PO Box 910 Fort Pierce, FL 34954-0910 phone 772-429-4444 fax 772-429-4445 Sincerely, Dickerson FL, Inc. i John L. Pluswick ITEM NO. DESCRIPTION QTY UNIT UNIT PRICE TOTAL 1 Mobilization 1 LS $4,500.00 $4,500.00 2 Water service relocate 1 EA $2,200.00 $2,200.00 3 Core ex. Structure _ me 1 EA $3,000.00 $3,000.00 4115" HDPE 1-2 miks leadthme150 LF $120.00 $18,000.00 5 T e C Inlet 1 EA $4,500.00 $4,500.00 6 Re rade swale / sod stabilize 1 LS $3,500.00 $3,500.00 days Totall 1 1 LS $35,700.00 Sincerely, Dickerson FL, Inc. i John L. Pluswick KAST CONSTRUCTION KAST Construction Company, LLC 701 Northpoint Pkwy, Suite 400 West Palm Beach, Florida 33407 Phone: (561) 689-2910 PCO #061 Project: 20-002-01 - FPL - Indian River Service Cen 1575 98th Avenue Vero Beach, Florida 32966 Prime Contract Potential Change Order #061: T&M Potholing & Parker Survey TO: FLORIDA POWER & LIGHT FROM: KAST CONSTRUCTION ATTN: PPC/GO RM 2420 9250 W FLAGLER 701 Northpoint Pkwy, Suite 400 STREET West Palm Beach Florida, 33407 MIAMI Florida, 33174 PCO NUMBER/REVISION: 061 /0 CONTRACT: REQUEST RECEIVED FROM: Jack McGowan (CBRE/Global Workplace CREATED BY: Solutions - FPL) STATUS: REFERENCE: Approved 1 - FPL - Indian River Service Cen Prime Contract James Lent (KAST CONSTRUCTION)Y CREATED DATE: 4/23/2021 PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: Site>98th Ave ACCOUNTING Amount Based METHOD: SCHEDULE IMPACT: TOTAL AMOUNT: $2,907.33 POTENTIAL CHANGE ORDER TITLE: T&M Potholing & Parker Survey CHANGE REASON: Client Request POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #097 - T&M Potholing & Parker Survey 1. Additional potholing at Parker to identify existing utilities to allow for IRC required additional drainage 2. Full survey of ditch at north side of Parker from eastern most point to western retention lake ATTACHMENTS: IRCSS CO proposal 31.0f _IRCSS CO proposal 32.pdf # Cost Code Description Type Amount 1 02-300 - EARTHWORK Parker T&M Potholing SUBCONTRACTOR $ 1,640.20 2 02-300 - EARTHWORK Parker T&M Ditch Survey SUBCONTRACTOR $ 1,092.00 Subtotal: $2,732.20 GL Insurance : 1.07% Applies to all line item types. $ 29.23 Builder's Risk : 0.27% Applies to all line item types. $ 7.46 Fee: 5.00% Applies to all line item types. $ 138.44 Grand Total: $2,907.33 This proposal expires after calendar days and is subject to review and possible adjustment of Cost and Time thereafter. The Contract Time will be unchanged at this time, however this change impacts the Construction Schedule by calendar days for completion of this area, and at this time does not by itself, affect the critical path or Substantial Completion date, so long as approval of this pricing is received prior to the expiration date. Due to the late receipt of this change and the aggregate impact of additional changes that may cause a delay to project completion, the Contractor reserves the right to request additional Contract Time. KAST Construction Company, LLC page 1 of 2 Printed On: 4/28/ 2021 06:15 AM KAST CONSTRUCTION PCO #061 By signing below, Owner and Contractor indicate their agreement upon the adjustments to the Guaranteed Maximum Price and Contract Time described in this Prime Contract Potential Change Order (PCO), and by signing shall convert this PCO to a Change Order as defined in the General Conditions of the Contract for Construction, which may be recapped in a subsequent formal Prime Contract Change Order (PCCO) document. FLORIDA POWER & LIGHT KAST CONSTRUCTION ATTN: PPC/GO RM 2420 9250 W FLAGLER STREET 701 Northpoint Pkwy, Suite 400 MIAMI, Florida 33174 West Palm Beach, Florida 33407 SIGNATURE DATE SIGNATURE DATE KAST Construction Company, LLC page 2 of 2 Printed On: 4/28/ 2021 06:15 AM April 23, 2021 TO: Mr. James Lent Sr. Project Manager KAST Construction 701 Northpoint Pkwy,. Suite 400 West Palm Beach, FL 33407 RE: FPL Indian River Service Center 1575 98th Avenue Vero Beach, FL 32966 Change Order Proposal #31 DICKERSON FLORIDA, INC. A COMPANY OF THE DICKERSON GROUP, INC. PO Box 910 Fort Pierce, FL 34954-0910 phone 772-429-4444 fax 772-429-4445 Subject: Proposal for T&M work to pothole and survey in front of Parker for drainage design. Note: Extra work agreement tickets attached. Sincerely, Dickerson FL, Inc. John L. Pluswick ITEM NO. I DESCRIPTION QTY I UNIT I UNIT PRICE TOTAL 1 work on 04-09-2021 1 LS $957.70 $957.70 2 work on 04-12-2021 1 LS $682.50 $682.50 Total 1 LS $1,640.20 Note: Extra work agreement tickets attached. Sincerely, Dickerson FL, Inc. John L. Pluswick DICKERSON FLORIDA, INC. NQ_ 2560 RENTAL OR EXTRA WORK AGREEMENT INVOICE TO: ICS 5 DATE: 17 ".2 UZ! Address: JOB or P.O. No.. COUNTY: T'ila "g"l LOCATION: -XR. _ 1 yri' igVr WORK PERFORMED: Pct / . _ flG_(Pd_Se- T" <<�e�l/'CT ea-i'�� LABOR NO. OF EMP HRS.PER EMP TOTAL HOURS RATE $ AMOUNT Unskilled Laborers 2 1 v y 9? Zo Skilled Laborers Foreman/Supervision Survey Crew EQUIPMENT RENTED WITH OPERATOR EQUIP NO. TYPE OF EQUIPMENT HOURS RATE $AMOUNT �v S� 3 .7o MATERIALS USED: SUPPLIER, DATE, TYPE AND QUANTITY AITACHDELIVERY T►CW! Desai tion Quantity Price $Amount APR TOTAL RENTAL WORK THIS DATE: $J S7, -70 Accepted Report Made By J r4 S, -ti l ,11-e- y Owner or Agent DFI Superintendent Green -Main Office Yellow -Customer Pink -Field Office Gold -Accounting DICKERSON FLORIDA, INC. NO. 2559 LABOR RENTAL OR EXTRA WORK AGREEMENT HRS. PER TOTAL RATE EMP HOURS INVOICE TO: ��� 5 �� DATE: a Address: Skilled Laborers JOB or. Foreman/Supervision P.O. No.: Yd l f COUNTY:�/d,'�r, ;2!Yr� LOCATION: -1-r.'<;-�i,---- Z. sn 9 S 4 4 Ve WORK PERFORMED: PL"T Pe.E/ea5' t„.•ti.n, e7,yl cil.n_lti. r LABOR NO. OF EMP HRS. PER TOTAL RATE EMP HOURS $ AMOUNT Unskilled Laborers Skilled Laborers Foreman/Supervision Survey Crew 36 , so Z. sn EQUIPMENT RENTED WITH OPERATOR EQUIP NO. TYPE OF EQUIPMENT HOURS RATE $AMOUNT MATERIALS USED: SUPPLIER, DATE, TYPE AND QUANTITY ATTACH DELIVERYTICRET! Accepted ption *,uantity Price$Amount Owner or Agent TOTAL RENTAL WORK THIS DATE: $ 6 g 2. s' Report Made By: 11/r°y DFI Superintendent Green -Main Office Yellow -Customer Pink -Field Office Gold -Accounting April 23, 2021 TO: Mr. James Lent DICKERSON Sr. Project Manager FLORIDA, INC. KAST Construction A COMPANY OF THE DICKERSON GROUP, INC. 701 Northpoint Pkwy,. Suite 400 PO Box 910 West Palm Beach, FL 33407 Fort Pierce, FL 34954-0910 phone 772-429-4444 RE: FPL Indian River Service Center fax 772-429-4445 1575 98th Avenue Vero Beach, FL 32966 Change Order Proposal #32 Subject: Proposal to survey entire ditch along north side of Parker. ITEM NO. DESCRIPTION QTY UNIT UNIT PRICE TOTAL 1 Survey crew 8 HR $136.50 $1,092.00 Total 1 LS $1,092.00 Sincerely, Dickerson FL, Inc. C— John L. Pluswick