Lagoon Plan
This Work Order Number 10 is entered into as of this 14 day of December, 2021, pursuant to
that certain Continuing Consulting Engineering Services Agreement for Professional Services entered
into as of this 17th day of April, 2018 (collectively referred to as the "Agreement"), by and between
INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and Tetra Tech, Inc.
("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The
professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B
(Fee Schedule), attached to this Work Order and made a part hereof by this reference. The Consultant
will perform the professional services within the timeframe more particularly set forth in Exhibit C
(Time Schedule), attached to this Work Order and made a part hereof by this reference all in
accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of
the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement
and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as
if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first
written above. "ouri`
CONSULTANT: BOARD OF COUNTY COMMISS ERS'-.,
OF INDIAN RIVER C014i11TY
By: ! By:
Matthew Shelton Peter D. O'Brw;rad
Print Name: "
Title: Project Manager BCC Approved Date: December 14, 2021
Attest: Jeffrey R. Smith, Clerk of Court and Comptroller
Deputy Clerk
Approved:
Jason E. Pro*n, County Administrator
V
Approved as to form and legal sufficiency:
Dylan T. Reingold, County Attorney
Exhibit A
TETRA TECH
November 1, 2021
Eric Charest
Indian River County Department of Public Works
1801 27th Street
Vero Beach, FL 32960-3388
Email: echarest a)irc og_v.com
Subject: Proposal to Indian River County for Development of an Indian River Lagoon
Management Plan
Dear Mr. Charest:
Tetra Tech, Inc. (Tetra Tech) is pleased to provide Indian River County (IRC) with this proposal
for services to carry forward the development of a comprehensive Indian River Lagoon (IRL)
Management Plan in IRC.
BACKGROUND
IRC is located along the IRL, which is one of the nation's most ecologically diverse estuaries
and an important ecosystem in the state of Florida. The local governments and state agencies
have been working together to restore this system, which has been impaired by excessive
nutrient inputs that are causing algal blooms and low dissolved oxygen conditions.
IRC has been collecting data on its portion of the IRL and providing regular updates to the
County Commission on research areas since 2019. Based on the information provided, the
Commission has asked IRC staff to begin preparing a Lagoon Management Plan.
Tetra Tech has been working with IRC to develop the IRL Management Plan since 2018. In
2019, IRC hired an IRL Plan Environmental Specialist who will take the lead on preparing the
plan. The proposed plan should include and possibly be organized by the 17 subject areas
presented to the County Commissioners. The plan should also include potential projects to
achieve the goals and an estimate of the economic benefit of a healthy IRL to ensure projects are
being prioritized to achieve the greatest impact in IRC. This plan will be used to guide future
project implementation within IRC and to provide information necessary to apply for grants and
other matching funds. It is anticipated that the plan will be updated every three to five years.
SCOPE OF WORK
Task 1: Plan Support
Tetra Tech will work collaboratively with IRC staff during plan development to assist IRC's IRL
Plan Environmental Specialist to ensure that all necessary information is included. Tetra Tech
Tetra Tech, Inc.
I I Riverside Drive, Suite 204, Cocoa, FL 32922
Tel 321.636.6470 Fax 321.636.6473 www.tetratech.com
Mr. Eric Charest
November 1, 2021
Page 2 of 4
will assist with the review of the data gaps for IRC to determine potential projects to achieve the
required load reductions. Tetra Tech will also meet with IRC staff and officials from various
departments to determine what other specific goals and visions are intended for the IRL
Management Plan and compile a list of projects that are already planned or identified within the
IRL Basin. Tetra Tech will also compile available economic evaluations for the IRL Basin,
which will be used to determine the economic benefit of an improved IRL specifically for IRC.
Tetra Tech will use this information to develop an outline of the IRL Management Plan and an
initial vision for a cohesive plan that outlines the potential water quality projects and
management actions for the protection and restoration of the IRL in IRC.
PROJECT SCHEDULE
The approximate duration noted for each task is based on our current understanding and best
estimates of time required to perform the basic services and may be subject to change upon
agreement between IRC and Tetra Tech.
Task Timeline
Notice to Proceed TP November 1, 2021
Draft IRL Manage ent Plan July 2022
ASSUMPTIONS
Tetra Tech's scope of services and project costs were developed with the following assumptions:
• Tetra Tech will review available data provided by IRC. No field sampling or analysis will
be conducted by Tetra Tech.
• Tetra Tech staff will be compiling the project information provided by IRC. Tetra Tech
will assist in identifying projects; however, design services are not included in this
proposal.
• IRC's IRL Plan Environmental Specialist will lead the effort to coordinate with IRC
departments to gather information on existing projects, planned projects, priorities, and
other necessary details for the plan.
• Additional restrictions or limitations as a result of COVID-19, weather, or other
unforeseen circumstances will not inhibit Tetra Techs level of effort or schedule.
PROJECT COST
The estimated costs are based on our current understanding of the project requirements and best
estimates of level of effort required to perform the basic services and may be subject to change
upon agreement between IRC and Tetra Tech. Our Time and Materials price proposal includes
labor hours and travel costs in the amount of $40,576.00, as outlined in Table 1.
Tetra Tech will invoice IRC each month for services rendered during the previous calendar
month based on work completed for each task. Tetra Tech shall be paid for all invoices within 30
days of an approved submittal.
TETRA TECH
Mr. Eric Charest
November 1, 2021
Page 3 of 4
PERIOD OF PERFORMANCE
Tetra Tech anticipates commencing project activities upon receipt of a task order authorization
from IRC. This project is anticipated to be completed by July 31, 2022.
Tetra Tech looks forward to working with you on this project. We are available to discuss our
approach with you in detail at your convenience. Should you have any questions regarding this
proposal, please contact me at (321) 636-6470.
Sincerely,
Matthew D. Shelton
Project Manager
Cc: Marcy Frick, Tetra Tech
Erin Lincoln, Tetra Tech
TETRA TECH
Table 1
TETRA TECH, INC.
DESCRIPTION
Task 1
Plan Support
TOTAL
Units $
Units $
Tetra Tech, Inc.
Labor
Category
Project Manager
Project Manager
Senior Analyst
Senior Project Administrator
Rate
$173.86
$177.30
$122.00
$105.00
100-00$ 17,386.00
100.00 $ 17,730.00
30.00 $ 3,660.00
12.00 $ 1,260.00
100.00
100.00
30.00
12.00
$
$
$
$
17,386.00
17,730.00
3,660.00
1,260.00
Total Labor
242.00 $40,036.00
242.00
$
40,036.00
Tetra Tech, Inc. Travel
Travel ($130) Jacksonville to IRC and return
Travel ($70) Cocoa to IRC and return
$ 260.00
$ 280.00
$
$
260.00
280.00
G&A to Travel
0.00%
$ -
$
-
Fee to Travel
0%
$ -
$
-
Total Travel
$ 540.00
$
540.00
TOTAL
$40,576.00
$40,576.00
So 8$88888 181,�.{00. 88S �Sn$8vv8�� 8,888 8
N
rl N N N N N N-- N N N N N N-- N N N N- N N N N N N N N N N N N
NNN NNNN
Q
88 888$8$08 888885 SBSSS SBSo SSoo 8000 8S8 S000 Lu
3 E
3 0 N N N N N N N-- N N N N N N N N--- N N N N N N--- N N N N N N N N N N N V
Q� p
i IY
to m n O O �O,I O O O m O m 0 0 0 0 0 0 0 0 q O m m 0 O O T O 0 0 0 0 q 0 0 o O O O l
y M M m m m fr1 Al M M T Irl T M Irl M Irl Irl T Iry T rrj r.l rtj m 111 11i Irl Irj T III Irl E
LL .O
889.8 8888 mm cS000S� TmrmoIm
p) O b'a �inlaa�n rvry Hari laO.Imn� 1+Nia mNn 9.T nu�rinM
qu
NV N N N N N N N N N N N N N N N N N N N N N— N- N N N- N— N N N N N N N N N N-
N a 3 S 8 $ p$p
111 P N IA ITrI 1n•1 n h N N Q 1�r. O N N N YNl T n N N Iri N
'u
NN N NNNNNNN NNNNNN NNN IAN NNNN NNNN NNNN N N 1/1
N
L W E
0
O
4? E V w r � � $ � 7 _® ✓11
10 m$}�
6< E v 3 cz.4
i� cc aav>>� eoo.5 m� e'.�Zi
S nli> IS o. 1 1c.15 �LSISIS = c c1...1..1.N a
EXHIBIT C
PROJECT SCHEDULE
The approximate duration noted for each task is based on our current understanding and best estimates of time
required to perform the basic services and may be subject to change upon agreement between Indian River County
and Tetra Tech.
Task
Timeline
Notice to Proceed (NTP)
November 1, 2021
Draft IRL• Management Plan
July 2022