Loading...
HomeMy WebLinkAbout1962-056NUIQDAY, OCTOBER 1, 1962 The Board of County Commissioners of Indian River County, met <at the Caurthouae, Vero Beach, Florida, in a spe=cial meetiai;; held at 8;45 A. M., Monday, October 1, 1962 Present were Robert 14. faxaves, Chairman, B. t�, Waddell and J. J. p. Hamilton. Abscnt.wef*c oonal.d Mac- donald and 0. B. McCullers. A180 present was Al 4etbbc-r, Deputy Cleric. Motion ta,aa +n -Ade by ColwAssioner Waddell, seconded by Cottunissiotx: er Lamilton and una+iln.uus;ly carried, that the contract with L" Al. Motto for construction of new j,.ail additiau be approved and S4 geed and the fOl.l.owinU Resolution 'adopted, I&SOLi1TI ON WHEREAS, the. Board of County Conunissione+rs of Indian Rivor County, FiorliL, did udva.rtise and call for bids for tl.e Cuarstruction <<, certain additions to the County jail of Indian River County, Floridi, and WhE&EA4.,bi.d;a were oubmiteed by several persons, firms and cor- porations of which Netto Construction, Incorporat=ed, wets they l.uwest res- ponsible bidder, and WHEREFQt , sari Board finds uaxd determines that Ncatto Ccanst:ra;t.- rii;n Incorporated, tazas and is .a. responsible bidder and that its bid the lowest re;;ponsible bid, No t4, T13E tElY)itE, Bti IT RE E�L1eEt}, by the. Board of County Conmlissi.oners of Indian River County, Florida, that Indian River Cuullq, a pc;ii.tical subdivision of the State of. Florida, enter into a contract with Nctto Constxuction, Incorporated, a Florida corporation, for tie construction of: an addition to the C.,unty jail of Indian River County, Florida, in words, phrases and figures as follows: BUILDING CONTRACT THIS AGREEMENT made the 1st day of October , 1961, by and between NETTO CONSTRUCTION, INCORPORATED, hereinafter called the Contractor, and INDIAN RIVER COUNTY, a political subdivision of the State of Florida, hereinafter called the Owner, WITNESSETH, that the Contractor and the Owner for the con- i siderations hereinafter named agree as follows ARTICLE 1. SCOPE OF THE WORK. Tho Contractor shall furnish all of the materials and per- form all of the work shown on the Drawings and described in the Specifications entitled Indian River County Sheriff Department and Jail, Vero Beach, Florida, prepared by Nelson A. Faerber, AIA, Naples, Florida, acting as and in these Contract Documents entitled the Architect; and shall do everything required by this Agreement, the General Conditions of the Contract, the Specifica- tions and the Drawings. ARTICLE 2. TIME OF COMPLETION. The work to be performed under this Contract -shall be com- menced October 1, 1962, and shall be substantially completed April 1, 1963, and liquidated damages for delay in substantially completing the work shall be as set forth in Section 3-11 of the Specifications. ARTICLE 3. THE CONTRACT SUM. The Owner shall pay the Contractor for the performance of the Contract, subject to additions and deductions provided therein, e in current funds as follows; One Hundred Twenty-one Thousand Sixty Dollars ($121,060.00), composed of One Hundred Twenty Thousand Sixt Dollars ($120,060.00) for the base bid and One Thousand Dollars ($1,000.00) for Alternate Bid No. 1. ARTICLE 4. PROGRESS PAYMENTS. The Owner shall' make payments on account of the Contract LAW OFFICE JOHN R. Q)ULO VERA SEACII. FLORIDA as provided therein, as follows: F On or about the first day of each month ninety per cent ,(90%) of the value, based on the Contract prices of labor and. (materials incorporated in the work and of materials s4itably stored at the site thereof or at some other location agreed upon in writing by the parties up to the previous day of that month, as estimated by the Architect, less the aggregate of previous pay- ments; and upon substantial completion of the entire work, a sum sufficient to increase the total payments to ninety per cent (90%) of the Contract price. ARTICLE 5. ACCEPTANCE AND FINAL PAYMENT. Upon receipt of written notice from the Contractor that the work is ready for final inspection and acceptance, the Archi- tect shall promptly make such inspection and, if he finds the work acceptable under the Contract and the Contract fully performed, he shall promptly issue a final certificate, over his signature, stating that the work provided for in this Contract has been com- pleted and is accepted by him under the terms and conditions there of and that the entire balance found to be due the Contractor, and noted in said final certificate, is due and payable. However, the entire balance found to be due the Contractor, and noted in said final certificate, shall not be paid until the work shall have inspected and accepted by the Board of County Commissioners of Indian River County, Florida, and, anything herein to the contrary notwithstanding, not less than ten per cent (10%) of the contract sum shall remain unpaid until such inspection and acceptance of the work by the Board of County Commissioners of Indian River County, Florida, PROVIDED, HOWEVER, that such inspection by said Board shall be completed within thirty (30) days after the Archi- tect delivers said final certificate to said Board and, PROVIDED, 2. LAW OFFICE JOHN R. COULD VERO BEACH. FLORIDA Ids t(b Mr. Graves Chairman of the Board of JJ County Commissioners of Indian River County, Florida OWNER NETTO CONSTRUCTION, INCORPORATED . --LLv ICONTRACTOR 4. 11C.F,1 a LAW OFFICE JOHN R. GOVLD VERO BEACH, FLORIDA Section #9 Excavating & Grading Section #10 Concrete Work Section #11 Structural Concrete Forms Section #12 Masonry Section #13 Resilient Flodiing Section #14 Waterproofing & Caulking Section #15 Structural Steel & Miscellaneous Iron Section #16 Aluminum Doors & Trim J Section #17 Aluminum Windows Section #18 Roofing & Sheet Metal Section #19 Carpentry & Millwork Section #20 Glass & Glazing Section #21 Plastering Section #22 Ceramic & quarry Tile Section #23 Painting Section #24 Cement Enamel Section #25 Elevator Section #26 Miscellaneous Specialties Section #27 Hardware Section #28 Electrical Work Section #29 Intercom -Paging & Monitor System Section #30 Air Conditioning & Heating Section #31 Plumbing Section #32 Refrigeration ADDENDUM: Addendum #1 Dated August 24, 1962 Addendum #2 Dated September 10, 1962 Addendum #3 Dated September 14, 1962 IN WITNESS WHEREOF the parties hereto have executed this (Contract Agreement, in triplicate, the day and year first above written. Signed in the presence of: INDIAN RIVER COUNTY, a political subdivision of the State of hLFlorida, By J/, -D t ' Ids t(b Mr. Graves Chairman of the Board of JJ County Commissioners of Indian River County, Florida OWNER NETTO CONSTRUCTION, INCORPORATED . --LLv ICONTRACTOR 4. 11C.F,1 a LAW OFFICE JOHN R. GOVLD VERO BEACH, FLORIDA r'..t J FURTHER, that any unpaid amount of the contract sum shall become due and payable on the 31st day after such final certification if inspection by said Board shall not reveal sufficient cause to pre- vent acceptance by said Board. Before issuance of final certificate the Contractor shall submit evidence satisfactory to the Architect that all payrolls, material bills, and other indebtedness connected with the work have been paid. ARTICLE 6. THE CONTRACT DOCUMENTS. The General Conditions of the Contract, the Supplementary General Conditions, the Specifications and the Drawings, together with this Agreement, form the Contract, and they are as fully a part of the Contract as if hereto attached or herein repeated. The following is an enumeration of the Specifications and Drawings; WORKING DRAWINGS: Sheet #P-1 First Floor Plan Plumbing & Details Sheet #P-2 _ Second Floor Plan Plumbing & Details -SPECIFICATIONS; Section #0-1 Section #0-2 Section #0-3 Section #1 Section #2 Section #3 Section #5 Section #S Section #7 Section #& 3. ! .1.uwrar�k Wage Determination Schedule Certificate of Contract Completion Alternates Advertisement for Bids Form of Proposal Instructions to Bidders AlA General Conditions & Supplementary, Special Conditions for Jail Constructipn List of Drawings Work & Equipment by Owner IM B. CEBR VERO BEACH, FLORIDA Sheet #A-1 Foundation, Site Plan & Schedule Sheet #A-2 First Floor Plan & Schedule Sheet #A-3 Second Floor Plan & Schedule Sheet #A-4 Elevations- Section Sheet #A-5 Sections & Interior Details - Sheet #A-6 Wall Section - Kitchen &. Miscellaneous Details Sheet #A-7 Jail Equipment Details Sheet #A-8 Jail Equipment Details Sheet #S-1 Structural Plans & Schedules Sheet #HVAC -1 First Floor Plan Sheet #HVAC -2 Second Floor Plan Sheet #P-1 First Floor Plan Plumbing & Details Sheet #P-2 _ Second Floor Plan Plumbing & Details -SPECIFICATIONS; Section #0-1 Section #0-2 Section #0-3 Section #1 Section #2 Section #3 Section #5 Section #S Section #7 Section #& 3. ! .1.uwrar�k Wage Determination Schedule Certificate of Contract Completion Alternates Advertisement for Bids Form of Proposal Instructions to Bidders AlA General Conditions & Supplementary, Special Conditions for Jail Constructipn List of Drawings Work & Equipment by Owner IM B. CEBR VERO BEACH, FLORIDA August 24, 1962 TO: General Contractors FRCK; Nelson A. Faerber, A.I.A. RR: Indian River County Sheriff Dept., Vero Beach, Fla. SUBJ: Addendum #1 to Plans A Specifications Item #1: Amend Sheet #S-1 and new sheet #S-2 will be forwarded under separate cover. Item #2: Due to the fact that electrical service at site is a 180 volt to ground and high leg system, electrical service to building as indicated on drawings shall be altered as follows: A) Connect old building service to new service installing 400 amp entrance to replace existing 100 amp. B) 42 circuit panel indicated on drawings shall be changed from 3 phase to single phase panel. Three phase panel indicated on drawings as air conditioning shall be enlarged to accommodate elevator power plant. Main switch gear to be located in storage ; room area 103. Item #3: Water service as indicated on drawings shall be 411 meter with 2" service to building. Item #4: Bid date shall be changed to Friday, Sept•. 21, 9:00 a.m. . uwowa.a Ia+N k wUtD VERO BEACH, nORIDA �.. TO: General Contractors Kitchen Equipment Contractors J+ Jail Equipment Contractors - FROM. Nelson A. Faerber, A.I.A. (IRE:, Indian River County Sheriffs Dept, & Jail Vero Beach, Florida SUBJ. Addendum #2 to Plans and Specifications for General Contract, Kitchen Equipment Contract, and Jail Equipment Contract. The following completion dates shall be substituted in the respective specifications in lieu of original dates: General Contractor completion date shall be April 1, 1963. I Kitchen Equipment completion date shall be March 15, 1963. Jail Equipment completion date shall be March 1, 1963. LAW OFFICE JOHN R. COULD VERO BEACH, FLORIDA 1 I! September 14, 1962 TO: General Contractors FROM: Nelson A. Faerber, A,1,A. HE: Indian River County Sheriff's Dept. & Jail Vero Beach, Florida SUBJ: Addendum #3 to Plans and Specifications I I Item #l: (a) The fire hose and reel, as indicated on drawings, shall be specified as Hose Reel Unit #2210 as manufactured by the Standard Fire Hose Company, Santa Monica, California, and distributed by Norman Ascher and Associates, 46 N.E. 6th St., Miami, Florida, (b) 11" fire line as specified shall be separate from other plumbing and connect directly to water main at entrance to building. Item #2: Specifications for tile work shall be modified as follows: (a) Tile Wainscot at toilet shall be 4'0" with the base in lieu of quarry as specified. (b) One round column at Administration area shall be tile finished. Item #3: Flooring shall be homogenous vinyl as per specifications. Finish schedule shall be changed to read homogenous vinyl. Item #4: Revised structural sheet S-1 shall have the following information added to the column schedule: Omit designation for Column Df1-4 Vert.Stl. Ties Footing Size Footing Steel E-4 4#7 #2@12" 415"x415"xl3" 9#4 ea. way D-4 4#7 #2@12" 415"x415"xIX1 9#4 ea, way B-4 4#7 #2012" 415"x415"xI3" 9#,4 ea. way There tieing no further business, on motion made, seconded and ,arriied, the Board then adjourned,