This Amendment to Agreement No. LPA0018 (Agreement) is made by and between the Department of
Environmental Protection (Department), an agency of the State of Florida, and Indian River County (Grantee), on
the date last signed below.
WHEREAS, the Department entered into the Agreement with the Grantee for Indian River County North Relief
Canal Aquatic Plant Project (Project), effective February 3, 2020; and,
WHEREAS, the Grantee has requested an extension of the Agreement, which is needed due to supply delays; and,
WHEREAS, certain provisions of the Agreement need revision.
NOW THEREFORE, the parties agree as follows:
The Agreement is effective until December 31, 2023. The reimbursement period for this Agreement
begins on July 1, 2019 and ends at the expiration of the Agreement. The Department and the Grantee shall
continue to perform their respective duties during this extension period pursuant to the same terms and
conditions provided in the Agreement.
2. Attachment 3-1, Grant Work Plan, is hereby deleted in its entirety and replaced with Attachment 3-2,
Revised Grant Work Plan, as attached to this Amendment and hereby incorporated into the Agreement.
All references in the Agreement to Attachment 3-1 shall hereinafter refer to Attachment 3-2, Revised
Grant Work Plan.
All other terms and conditions of the Agreement remain in effect. If and to the extent that any
inconsistency may appear between the Agreement and this Amendment, the provisions of this Amendment
shall control.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
DEP Agreement No. LPA0018 Amendment No. 1, Page 1 of 2
The parties agree to the terms and conditions of this Amendment and have duly authorized their respective
representatives to sign it on the dates indicated below.
''•Vmis
INDIAN RIVER COUNTY o�0y. ....... /D,y•., STAT£ OF FLORIDA DEPARTMENT OF
' F'PJ;-FNVIRONMENTAL PROTECTION
.�`
Digitally signed by Angela
*Angela Knecht Knecht
By;: Date: 2022.04.1415:35:59-04'00'
Peter O'Bryan, Chairman IZ5: Angela Knecht, Director
Peter D. O'Bryan COd
Print Name of Authorized Representative
Date: April 12, 2022
By
DY L.:.
COON. a ;"
Print Name and Title of Authorized Person
Date:
Evan Beitseh Date: 022.0 ed 10:00:6-y Evan 06'h
Date: 2022.04.1410:00:36 -06'00'
Evan Beitsch, DEP Grant Manager
Digitally signed by Michael Barr
Michael Barr Date: 2022.04.1413:56:56
-04'00'
Michael Barr, DEP QC Reviewer
List of anachm enWexh i bits included as part of this Amendment:
Letter/
Specify Type Number Description (include number of pages)
Attachment 3-2 Revised Grant Work Plan (1 Pages)
Attest: Jeffrey R. Smith, Clerk of
Circuit Court and Comptroller
DEP Agreement No. LPA0018 Amendment No. 1, Page 2 of 2
ATTACHMENT 3-2
REVISED GRANT WORK PLAN
PROJECT TITLE: Indian River County North Relief Canal Aquatic Plant Project
PROJECT LOCATION: The Project will be located on Indian River County property within Indian River
County; Lat/Long (27.6916, -80.4614).
PROJECT BACKGROUND: The Indian River Lagoon (IRL) is an impaired water body that has been
impacted by large discharges of nitrogen and phosphorus into the watershed. The increased nutrient loading
can contribute to algal blooms and reductions to the IRL's water quality, impacting aquatic flora and fauna.
Indian River County (Grantee) has identified that the construction of a Regional Pollutant Removal Facility
for the North Relief Canal would mitigate further nutrient loading impacts on the IRL. Approximately 6,300
acres contribute stormwater runoff and groundwater seepage into the North Relief Canal. The Project will
reduce nitrogen pollution to the IRL by approximately 7,614 lbs. of total nitrogen and reduce phosphorous
pollution by approximately 1,251 lbs. of total phosphorous. The captured nutrients will be stored in
harvested plant tissue and composted, and/or be used as cover material for the Grantee's landfill.
PROJECT DESCRIPTION: The Grantee will construct a Regional Pollutant Removal Facility that will
use naturally occurring aquatic plants to absorb and remove dissolved nutrients from the North Relief Canal.
The initial projected flow rate from the North Relief Canal into the RPRF will be an estimated 10 million
gallons per day. The Project's main treatment module will be water lettuce scrubbers that will remove the
majority of the nutrients and settleable suspended solids from the water. The water lettuce system will be
followed by an algal treatment unit for reoxygenation and additional nutrient polishing of the water, and
then followed by a final settling and wetland formation to offer additional detention time and further nutrient
reduction.
The Grantee does not anticipate that the funding under this Agreement will result in a fully completed
project, so this Agreement will cover a portion of the work.
TASKS:
All documentation should be submitted electronically unless otherwise indicated.
Task 1: Construction
Deliverables: The Grantee will construct a Regional Pollutant Removal Facility in accordance with the
construction contract documents.
Documentation: The Grantee will submit 1) a copy of the final design; 2) a signed acceptance of the
completed work to date, as provided in the Grantee's Certification of Payment Request; and 3) a signed
Engineer's Certification of Payment Request.
Performance Standard: The Department's Grant Manager will review the documentation to verify that
the deliverables have been completed as described above. Upon review and written acceptance by the
Department's Grant Manager, the Grantee may proceed with payment request submittal.
Payment Request Schedule: The Grantee may submit a payment request for cost reimbursement no more
frequently than monthly.
DEP Agreement No. LPA0018, Attachment 3-2, Page 1 of 2
PROJECT TIMELINE & BUDGET DETAIL: The tasks must be completed by, and all documentation
received by, the corresponding task end date.
Task
Budget
Budget
Task Start
Task End
No.
Task Title
Category
Amount
Date
Date
I
Construction
Contractual
$650,000
07/01/2019
6/30/2023
Services
Total:
$650,000
Note that, per Attachment 2, Section 8.h. of the Agreement, authorization for continuation and completion
of work and any associated payments may be rescinded, with proper notice, at the discretion of the
Department if the Legislature reduces or eliminates appropriations. Extending the contract end date carries
the risk that funds for this project may become unavailable in the future. This should be a consideration for
the Grantee with this and future requests for extension