HomeMy WebLinkAbout2022-0850
FPL. NOTIFICATION OF FPL FACILITIES
Customer/Agency Indian River Co. Solid Waste Disposal District Date of Meeting/Contact: 3/23/2022
Developer/Contractor Name Heartland Water Technology, LLC Project Number/Name: HWT Skid
Location of Project 1325 74th Ave SW
FPL Representative Ally Riley
Developer/Contractor Representative Miguel Matos
City: Vero Beach
Phone: 772-489-6212
FPL Work Request #/Work Order #: WR'S 11285797 & 11285799
FPL calls your attention to the fact that there may be energized, high voltage electric lines, both overhead and underground, located in the area of this project. It is
imperative that you visually survey the area and that you also take the necessary steps to identify all overhead and underground facilities prior to commencing
construction to determine whether the construction of any proposed improvements will bring any person, tool, machinery, equipment or object closer to FPL's
power lines than the OSHA -prescribed limits. If it will, you must either re -design your project to allow it to be built safely given the pre-existing power line location,
or make arrangements with FPL to either deenergize and ground our facilities, or relocate them, possibly at your expense. You must do this before allowing any
construction near the power lines. It is impossible for FPL to know or predict whether or not the contractors or subcontractors, and their employees, will operate
or use cranes, digging apparatus or other mobile equipment, or handle materials or tools, in dangerous proximity to such power lines during the course of
construction, and, if so, when and where. Therefore, if it becomes necessary for any contractor or subcontractor, or their employees, to operate or handle cranes,
digging apparatus, draglines, mobile equipment, or any other equipment, tools or materials in such a manner that they might come closer to underground or
overhead power lines than is permitted by local, state or federal regulations, you and any such contractor or subcontractor must notify FPL in writing of such
planned operation prior to the commencement thereof and make all necessary arrangements with FPL in order to carry out the work in a safe manner. Any work
in the vicinity of the electric lines should be suspended until these arrangements are finalized and implemented.
The National Electrical Safety Code ("NESC") prescribes minimum clearances that must be maintained. If you build your structure so that those clearances cannot
be maintained, you may be required to compensate FPL for the relocation of our facilities to comply with those clearances. As such, you should contact FPL prior
to commencing construction near pre-existing underground or overhead power lines to make sure that your proposed improvement does not impinge upon the
NESC clearances.
It is your responsibility and the responsibility of your contractors and subcontractors on this project to diligently fulfill the following obligations:
1. Make absolutely certain that all persons responsible for operating or handling cranes, digging apparatus, draglines, mobile equipment or any
equipment, tool, or material capable of contacting a power line, are in compliance with all applicable state and federal regulations, including but
not limited to U.S. Department of Labor OSHA Regulations, while performing their work.
2. Make sure that all cranes, digging apparatus, draglines, mobile equipment, and all other equipment or materials capable of contacting a
power line have attached to them any warning signs required by U.S. Department of Labor OSHA Regulations.
3. Post and maintain proper warning signs and advise all employees, new and old alike, of their obligation to keep themselves, their tools,
materials and equipment away from power lines per the following OSHA minimum approach distances (refer to OSHA regulations for restrictions):
'Power Line Voltages "Personnel and Egupment Cranes and Derricks
(29 CFR 1910.333 and 1926.600) (29 CFR 1926.1407,1408)
0 - 750 volts 10 Feet 10 Feet
751- 50,000 volts 10 Feet 10 Feet
Travel under or near Power Lines (on construction sites, no load)
(29 CFR 1926.600- Equipment) (1926.1411- Cranes and Derricks)
4 Feet
4 Feet
4 Feet
6 Feet
69,000 volts 11 Feet 15 Feet 10 Feet 10 Feet
115,000 volts 13 Feet 15 Feet 10 Feet 10 Feet
138,000 volts 13 Feet 15 Feet 10 Feet 10 Feet
230,000 volts 16 Feet 20 Feet 10 Feet 10 Feet
500,000 volts 25 Feet 25 Feet 16 Feet 16 Feet
'When uncertain of the voltage, maintain a distance of 20 feet for voltages up to 350,000 volts and 50 feet for voltages greater than 350,000 volts.
"For personnel approaching insulated secondary conductors less than 750 volts, avoid contact (Maintain 10 Feet to bare energized conductors less than 750 volts). For
qualified personnel and insulated aerial lift equipment meeting requirements of 29 CFR 1910.333, distances may be reduced to those shown in 29 CFR 1910.333 Table S-5.
4. All excavators are required to contact the Sunshine State One Call of Florida, phone number 1-800-4324770 or 811 a minimum of two working days
(excluding weekends) in advance of commencement of excavation to ensure facilities are located accurately.
5. Conduct all locations and excavations in accordance with the Florida Statute 556 of the Underground Facilities Damage Prevention & Safety Act and all
local city and county ordinances that may apply.
6. When an excavation is to take place within a tolerance zone, an excavator shall use increased caution to protect underground facilities.
The protection requires hand digging, pot holing, soft digging, vacuum methods, or similar procedures to identify underground facilities.
A copy of this notification must be provided by you to each contractor and subcontractor on this project, to be shared with their supervision and employees prior to
commencing work on this project.
EMAIL mmatos(aheartlandtech.com
Means Dy which this r1otification was provided to customer and/or contractor Address
FPL
Signature
Form 360 Rev.
3/23/2022
Date APPROVED
Attest: Jeffrey R. Smith, Cle 7/AND LEGAL
—C-i=it Court and Comptrol
a
B
DYLAN F16iJN0:4 i_._
��
Deputy Clerk TYm- oRNC(
AS TO FORM
SUFFICIENCY
A T RUE COPY
,ERTIFICATION ON LAST PAGE
R SMITH. CLERK
UNDERGROUND DISTRIBUTION FACILITIES INSTALLATION AGREEMENT
This Agreement, made this 25 day of March, 2022 by and between Indian River County Solid Waste Disposal District (hereinafter called the Customer) and
Florida Power & Light Company, a corporation organized and existing under the laws of the State of Florida (hereinafter called FPL).
WITNESSETH:
Whereas, the Customer has applied to FPL for underground distribution facilities to be installed on Customer's property known as 1325 74'" Ave SW
located in Vero Beach/Indian River Co, Florida.
(City/County)
That for and in consideration of the covenants and agreements herein set forth, the parties hereto covenant and agree as follows:
1. The Customer shall pay FPL a Contribution in Aid of Construction of $0.00 (the total Contribution) to cover the differential cost between an
underground and an overhead system This is based on the currently effective tariff filed with the Florida Public Service Commission by FPL and is
more particularly described on Exhibit A attached hereto.
2. That a credit of $0.00 shall be provided to the Customer for trenching, backfilling, installation of Company provided conduit and other work, as shown
on Exhibit B, if applicable, and approved by FPL. If such credit applies, the resulting Contribution cash payment shall be $
3. The contribution and credit are subject to adjustment when FPL's tariff is revised by the Florida Public Service Commission and the Customer has
requested FPL to delay FPL's scheduled date of installation. Any additional costs caused by a Customer's change in the Customer's plans submitted
to FPL on which the contribution was based shall be paid for by the Customer. The contribution does not include the cost of conversion of any
existing overhead lines to underground or the relocation of any existing overhead or underground facilities to serve the property identified above.
4. That the Contribution provides for 277/480 volt, 3 phase (120/240 volt, single phase for URD Subdivisions) underground electrical service with
facilities located on private property in easements as required by FPL. The Contribution is based on employment of rapid production techniques and
cooperation to eliminate conflicts with other utilities. Underground service, secondary, and primary conductors are to be of standard FPL design, in
conduit, and with above -grade appurtenances.
5. That the payment of the Contribution does not waive any provisions of FPL's Electric Tariff.
If the property is subject to an underground ordinance, FPL shall notify the appropriate governmental agency that satisfactory arrangements have
been made with the Customer as specified by FPL.
Title to and ownership of the facilities installed as a result of this agreement shall at all times remain the property of FPL.
6. That good and sufficient easements, including legal descriptions and survey work to produce such easements, and mortgage subordinations required
by FPL for the installation and maintenance of its electric distribution facilities must be granted or obtained, and recorded, at no cost to FPL, prior to
trenching, installation and/or construction of FPL facilities. FPL may require mortgage subordinations when the Customer's property, on which FPL
will install its facilities, is mortgaged and (1) there are no provisions in the mortgage that the lien of the mortgage will be subordinate to utility
easements, (2) FPL's easement has not been recorded prior to the recordation of the mortgage, (3) FPL's facilities are or will be used to serve other
parcels of property, or (4) other circumstances exist which FPL determines would make such a subordination necessary.
a) The Customer shall furnish FPL a copy of the deed or other suitable document which contains a full legal description and exact name of the legal
owner to be used when an easement is prepared, as required by FPL.
b) The Customer shall furnish drawings, satisfactory to FPL, showing the location of existing and proposed structures on the Customer's
construction site, as required by FPL.
c) Should for any reason, except for the sole error of FPL, FPL's facilities not be constructed within the easement, FPL may require the Customer to
grant new easements and obtain any necessary mortgage subordinations to cover FPL's installed facilities, and FPL will release the existing
easement. Mortgage subordinations will be necessary in this context when 1) the Customer's property on which FPL will install its facilities is
mortgaged, 2) there are no provisions in the mortgage for subordination of the lien of the mortgage to utility easements, or 3) FPL's facilities are
or will be used to serve other parcels of property.
7. Before FPL can begin its engineering work on the underground electric distribution facilities, the Customer shall provide FPL with the following:
a) Paving, grading, and drainage plans showing all surface and sub -surface drainage satisfactory to FPL,
b) A construction schedule,
c) An estimate of when electric service will be required, and
d) Copies of the Customer's final construction plans as well as other construction drawings (plot, site, sewage, electrical, etc.) requested by FPL.
Plats provided by the Customer must be either recorded by the circuit clerk or other recording officer or prepared and certified as meeting the
requirements for recording (except approval by the governing body) by a registered land surveyor.
8. Prior to FPL construction pursuant to this agreement, the Customer shall:
a) Clear the FPL easement on the Customer's property of tree stumps, all trees, and other obstructions that conflict with construction, including the
drainage of all flooded areas. The Customer shall be responsible for clearing, compacting, boulder and large rock removal, stump removal,
paving and addressing other special conditions. The easement shall be graded to within six inches of final grade with soil stabilized.
b) Provide property line and comer stakes, designated by a licensed surveyor, to establish a reference for locating the underground cable trench
route in the easement and additional reference points when required by FPL. Also, the Customer shall provide stakes identifying the location,
depth, size and type facility of all non -FPL underground facilities within or near the easement where FPL distribution facilities will be installed.
The Customer shall maintain these stakes, and if any of these stakes are lost, destroyed or moved and FPL requires their use, the Customer
shall replace the stakes at no cost to FPL, unless the stakes are lost, destroyed or moved by an agent, employee, contractor or subcontractor of
FPL, in which case FPL will pay the Customer the cost of replacing the stakes.
1 OF 2
A TRUE COPY
CERTIFICATION ON LAST PAGE
J R. SMITH, CLERK
c) It is further understood and agreed that subsequent relocation or repair of the FPL system, once installed, will be paid by the Customer if said
relocation or repair is a result of a change in the grading by the Customer or any of the Customer's contractors or subcontractors from the time
the underground facilities were installed; and, that subsequent repair to FPL's system, once installed, will be paid by the Customer if said repair is
a result of damage caused by the Customer or any of the Customers contractors or subcontractors.
d) Provide sufficient and timely advance notice (30 days) as required by FPL, for FPL to install its underground distribution facilities prior to the
installation of paving, landscaping, sodding, sprinkler systems, or other surface obstructions. In the absence of sufficient coordination, as
determined by FPL, by the Customer, all additional costs for trenching and backfilling shall be paid by the Customer, and none of the costs of
restoring paving, landscaping, grass, sprinkler systems and all other surface obstructions to their original condition, should they be installed prior
to FPL's facilities, shall be bome by FPL.
e) Pay for all additional costs incurred by FPL which may include, but are not limited to, engineering design, administration and relocation expenses,
due to changes made subsequent to this agreement on the subdivision or development layout or grade.
f) Provide applicable trenching, backfilling, installation of Company provided conduit and other work in accordance with FPL specifications more
particularly described on Exhibit B attached hereto. At the discretion of FPL, either correct any discrepancies, within two (2) working days, found
in the installation that are inconsistent with the instructions and specifications attached to this agreement or pay the associated cost to correct the
installation within thirty (30) days of receiving the associated bill, and in either case, reimburse FPL for costs associated with lost crew time due to
such discrepancies.
9. FPL shall:
Provide the Customer with a plan showing the location of all FPL underground facilities, point of delivery, and transformer locations and
specifications required by FPL and to be adhered to by the Customer.
b) Install, own, and maintain the electric distribution facilities up to the designated point of delivery except when otherwise noted.
Request the Customer to participate in a pre -construction conference with the Customers contractors, the FPL representatives and other utilities
within six (6) weeks of the start of construction. At the pre -construction conference, FPL shall provide the Customer with an estimate of the date
when service may be provided.
10. This Agreement is subject to FPL's Electric Tariff, including but not limited to the General Rules and Regulations for Electric Service and the Rules of
the Florida Public Service Commission, as they are now written, or as they may be revised, amended or supplemented.
11. This agreement shall inure to the benefit of, and be binding upon, the successors and assigns of the Customer and FPL.
OAtM! S
The Customer and FPL will coordinate closely in fulfilling obligations in order to avoid delays in providing permanent electric service at th@ ,of the' S •�0.+"•
Customers receipt of a certificate of occupancy. ; �J,• ' �F9••
Accepted:
For FPL (Date)
%(P
Accepted:
Customer `J (Date)
Witness
�• E�O�
Witness (Date)
� M'4111t
Zz-
Witn (Date
2 of 2 Attest: Jeffrey R. Smith, Clerk of
Cir Court and Comptroller
Deputy Clerk
RUE COPY
CERTIFICATION ON LAST PAGE
Sketch and Legal Description for: INDIAN RIVER
Legal Description
BEING A STRIP OF LAND LYING IN TRACT 9, ACCORDING TO THE LAST GENERAL PLAT OF THE INDIAN RIVER FARMS COMPANY
SUBDIVISION, AS RECORDED IN PLAT BOOK 2, PAGE 25, OF THE PUBLIC RECORDS OF ST. LUCIE COUNTY (NOW INDIAN RIVER)
COUNTY, FLORIDA. SAID STRIP ALSO LYING AND BEING IN SECTION 25, TOWNSHIP 33 SOUTH, RANGE 38 EAST, INDIAN RIVER COUNTY,
FLORIDA. SAID STRIP BEING 10.00 FEET IN WIDTH AND LYING 5.00 FEET EACH SIDE OF THE FOLLOWING DESCRIBED CENTERLINE.
COMMENCE AT THE NORTHEAST CORNER OF THE SOUTHEAST ONE QUARTER OF SAID SECTION 25; THENCE SOUTH 00°15'03" WEST,
ALONG THE WEST LINE OF SAID SOUTHEAST ONE QUARTER, A DISTANCE OF 706.37 FEET; THENCE DEPARTING SAID WEST LINE,
NORTH 89°44'57" WEST, PERPENDICULAR TO THE LAST DESCRIBED LINE, A DISTANCE OF 130.00 FEET TO THE WEST RIGHT OF WAY
LINE OF 74th AVENUE, AS RECORDED IN OFFICIAL RECORD BOOK 1310, PAGE 1368, PUBLIC RECORDS OF INDIAN RIVER COUNTY,
FLORIDA AND THE POINT OF BEGINNING OF THE FOLLOWING DESCRIBED CENTERLINE:
THENCE ALONG SAID CENTERLINE; NORTH 89"57'14" WEST, A DISTANCE OF 182.20 FEET: THENCE SOUTH 00°00'00" WEST, A DISTANCE
OF 11.50 FEET, MORE OR LESS TO THE NORTH FACE OF A 480 VOLT POWER PANEL AND THE POINT OF TERMINATION OF SAID
CENTERLINE.
THE SIDELINES OF SAID STRIP SHALL BE SHORTENED OR LENGTHENED TO INTERSECT AT ANGLE POINTS.
Surveyor's Notes
1). THIS SKETCH AND LEGAL DESCRIPTION WAS PREPARED WITH THE BENEFIT OF A RIGHT OF WAY EXHIBIT FOR 74th
AVENUE PREPARED BY INDIAN RIVER COUNTY, SURVEY SECTION, PROJECT NO. 1417, DATED AUGUST 22, 2018.
TOGETHER WITH A TOPOGRAPHIC ROUTE SURVEY FOR 74th AVENUE, PREPARED BY CARTER ASSOCIATES, INC.,
INDIAN RIVER COUNTY PROJECT NO. 1417, DATED JUNE 2015.
2). THIS LEGAL DESCRIPTION SHALL NOT BE VALID UNLESS:
(A) PROVIDED IN ITS ENTIRETY CONSISTING OF 2 SHEETS, WITH SHEET 2 SHOWING THE
SKETCH OF DESCRIPTION.
(B) REPRODUCTIONS OF THE DESCRIPTION AND SKETCH ARE SIGNED AND SEALED WITH
AN EMBOSSED SURVEYOR'S SEAL.
3). THE BEARINGS SHOWN HEREON ARE BASED UPON THE NORTH AMERICAN DATUM OF 1983, 2011 ADJUSTMENT, AND
PROJECTED IN THE FLORIDA STATE PLANE COORDINATE SYSTEM, FLORIDA EAST ZONE. DERIVING A GRID BEARING OF
SOUTH 00°15'03" WEST ALONG THE WEST LINE OF THE SOUTHEAST 114 SECTION 25, TOWNSHIP 33 SOUTH, RANGE 38 EAST.
AND ALL OTHERS ARE RELATIVE THERETO.
4.) THE POSITION OF THE PROPOSED BURIED ELECTRIC CABLE AND 480 VOLT POWER PANEL WAS TAKEN FROM AN AUTOCAD
DRAWING ENTITLED "INDIAN RIVER COUNTY EVAPORATOR SITE DESIGN", PROJECT No. 208.04.02, PREPARED BY CARLSON
ENVIRONMENTAL CONSULTANTS, INCORPORATED.
Legend and Abbreviations
C.B.
= CHORD BEARING
I.R.F.W.C.D.
= INDIAN RIVER FARMS
WATER CONTROL DISTRICT
L
= LENGTH OF ARC
O.R.B.
= OFFICIAL RECORD BOOK
(P)
= PLAT
P.B.
= PLAT BOOK
P.C.
= POINT OF CURVATURE
PGE
=PAGE
PBS
= PLAT BOOK ST. LUCIE
P.T.
= POINT OF TANGENCY
A
=DELTA ANGLE
SQ. FT.
= SQUARE FEET
R
= RADIUS
R/W
= RIGHT-OF-WAY
T
= TOWNSHIP
This is not a Boundary Su
Certification
(NOT VALID WITHOUT THE SIGNATURE AND ORIGINAL
RAISED SEAL OF A FLORIDA LICENSED SURVEYOR AND MAPPER)
I HEREBY CERTIFY THAT THE SKETCH AND LEGAL DESCRIPTION OF THE PROPERTY
SHOWN AND DESCRIBED HEREON WAS COMPLETED UNDER MY DIRECTION AND SAID
SKETCH AND LEGAL IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE AND
BELIEF.
I FURTHER CERTIFY THAT THIS SKETCH AND DESCRIPTION MEETS THE STANDARDS OF
PRACTICE FOR SURVEYS SET FORTH BY THE FLORIDA PROFESSIONAL BOARD OF
SURVEYORS AND MAPPERS IN CHAPTER 5J-17.052 FLORIDA ADMINISTRATIVE CODE,
PURSUANT TO SECTION 472.027 FLORIDA STATE STATUTES.
ley -11 ologeff rill:
INDIAN RIVER COUNTY, FL
PUBLIC WORKS DEPT. ENGINEERING DIV.
DATE: DRAWN BY:
3/31/2022 R. INGLETT
SCALE: APPROVED BY:
N A D. SCHRYVER
SHEET: OB NO:
1 OF 2 2022-003
DAVID M. SIL N
PROFESSIONAL SURVEYOR AND MAPPER
FLORIDA CERTIFICATE NO. 6139
Sketch and Legal Description
for:
INDIAN RIVER COUNTY
Sketch and Legal Description for: INDIAN RIVER COUNTY
Rn' PANAI_ 1 I I
Y
13th Street S.W.
Y
I.R.F.W.C.D. Sub—Lateral "B-8" Canal �l
N
Not to Scale
S00900'00"W
1 1.50--__�
NORTH FACE
POWER PANEL.
480V
POWER
PANEL
RIGHT OF WAY LINE
Point of
Commemcement
NORTHEAST CORNER OF THE
SOUTHEAST 1/4 SECTION 25.
TOWNSHIP 33 SOUTH, RANGE 38 EAST
50' ADDITIONAL
RIGHT OF WAY PER -
O.R.S. 1310, PG. 1388
Solid Waste Disposal District
33-38-25-00001-0090-00001.0
INDIAN RIVER COUNTY
1325 74th AVENUE
Indian River Farms
Company Subdivision
(P.B.S. 2, PG.25)
TRACT 9
Section 25
Township 33 South
Range 38 East
CENTERLINE 10'
WIDE EASEMENT &
PROPOSED BURIED
Point of
LECTRIC CABLE
Beginning
10'
10' WIDE EASEMEi
to
N89'57' 14"W —
182.20'
LO
._Point of
Termination
10' WIDE EASEMENT
v� v INDIAN RIVER COUNTY, FL
PUBUC WORKS DEPT. ENGINEERING
AT DRAWN BY:
3731 /2022 R. INGLETT
CALE: APPROVED BY:
V A I D. SCHRYVER
OF 2 OB NO: 2022-003
.4
50' 1
50'
N89'44'57"W
130.00' -
is not a Bbundard Su
Sketch and Legal Description
for:
INDIAN RJ,V µ, „COUNTY
NUTAN RIVER COUNTY
HIS IS TO CERTIFYTHAT THIS IS A TRUE AND CORRECT
OPV OF THE ORIGINAL ON FILE IN THIS OFFICE.
BY // I/
DATE ��/, '7
AI
Ir
v
z46
M1
�
?
o (n
M
<
0
al
3
C
-NI
�
�
I
L
--I
(n"J
z
O
n
00)
o�:U
M
tD
z
X
N
D
n
0
r
C
_=
�
�
CL
L4
a,
-,
0
N
_
�u
0
Cs
cD
n
o
_n
70
ID
d
O
-C
� r
w
0
r''
Co
rn
w
m1
DI
1
N89'44'57"W
130.00' -
is not a Bbundard Su
Sketch and Legal Description
for:
INDIAN RJ,V µ, „COUNTY
NUTAN RIVER COUNTY
HIS IS TO CERTIFYTHAT THIS IS A TRUE AND CORRECT
OPV OF THE ORIGINAL ON FILE IN THIS OFFICE.
BY // I/
DATE ��/, '7