HomeMy WebLinkAbout2022-088ffimml
Contractor:
COR Originator:
Address:
Email Address:
BOD Change - Add Dehydration to High Pressure Skid Design
BIOGAS ENGINEERING
Ryan Rueve
2321 E. 28TH STREET, SIGNAL HILL, CA -90755
rrueve@biogaseng.com
COR No.: CO#1
COR Date: 4/28/2022
Poject #: USH2126.100
PO: TBD
Change Request Definition
Change
Recommended by: Indian River County
n
Description of Change/SOW Description:
Biogas Engineering (BGE) was recently awarded by Indian River County (Client) to provide a high pressure blower skid. The amount awarded
was $789,000 ($771,000 for equipment and $18,000 as an estimate for transportation). Client has since requested that BGE includes
equipment to dehydrate the landfill gas (LFG) prior to it being sent into the pipeline. This change -order covers the cost of providing the
necessary equipment to achieve this request, including the cost to engineer, size, and integrate this equipment into the high pressure blower
skid. The design and equipment provided will dehydrate the LFG by cooling it so that condensate will not be generated in the pipeline. This
change will allow the condensate sumps to be removed along the pipeline.
Reason for Change:
Client has changed the basis of design by requiring the gas to be dehydrated prior to being sent into the pipeline.
Change Reqest Impact
Cost Impact: ❑ No Change ❑� Cost Increase ❑ Cost Decreasae
Cost is Lump Sum of $292,570 and is additional to the original approved amount as mentioned above. The revised total will be $1,081,570
(including $18k estimate for shipping). Upon approval, BGE will invoice for 15% of the change order amount. The remaining payments will be
included in the payment schedule that was provided for the high pressure blower skid.
Schedule Impact: ❑� No Change ❑ Delay ❑ No Delay
Authorized Signature.
Date Signed:
Name
Title:
Schedule impact is not anticipated at this time.
A ril 8, 2022
Ryan Rueve
Operations Manger
Company Review
Recommendation: ❑ Approve ❑ Reject ❑ Hold
Reviewer Signature: see signature block on following page
Date Signed:
Name:
Title:
BOD Change - Add Dehydration to High Pressure Skid Design
ATTEST: Jeffrey R. Smith, Clerk
By:�
I% Deputy Clerk
APPROVED AS TO LEGAL
FORM AND SUFFICIENCY:
By:
Dylan Reingold
County Attorney
INDIAN RIVER COUNTY SOLID
WASTE DISPOSAL DISTRICT
By: �lal 12-! C/P\1 l i
Peter D. O'Bryan, Chaif
District Approved: May 10, 202
APPROVED:
By:
. Brown
Administrator
'�G5.. M......
APPROVED ASTO FORM
Ae ski L. EE (-:AL SUFFiCIENV'Z"Y
BY