Loading...
HomeMy WebLinkAbout2022-089FIRST EXTENSION AND SECOND AMENDMENT TO AGREEMENT FOR LIFT STATION REHABILITATION SERVICES This First Extension and Second Amendment to that certain Agreement to provide Lift Station Rehabilitation Services is entered into effective as of June 4, 2022 by and between Indian River County, a political subdivision of the State of Florida ("County") and Hinterland Group, Inc. ("Contractor"). BACKGROUND RECITALS WHEREAS, the County and the Contractor entered into an Agreement for Lift Station Rehabilitation Services effective June 4, 2019; and WHEREAS, the Term; Duration of Agreement Paragraph contains the term and renewal provisions; and WHEREAS, the first term commenced effective as of June 4, 2019 and will end on June 3,2022; and WHEREAS, pursuant to the Agreement, the parties desire to extend the Agreement for an additional two-year period; and WHEREAS, the parties desire to amend the Responsibilities of the Contractor section to include E - Verify and Scrutinized Companies requirements; and WHEREAS, the parties desire to update requirements to the Federal Clauses section, in accordance with 2 C.F.R.; and WHEREAS, the parties have agreed to updated pricing, based on the U.S. Department of Labor's Consumer Pricing Index. NOW, THEREFORE, in consideration of the foregoing, and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the County and the Contractor agree as follows: 1. The background recitals are true and correct and form a material part of this First Extension and Second Amendment. 2. The first renewal term shall commence effective June 4, 2022 and shall end on June 3, 2024. There are no additional renewals available. 3. The following information was added to the Responsibilities of the Contractor Section of the agreement: Contractor is registered with and will use the Department of Homeland Security's E -Verify system (www.e-verifgov) to confirm the employment eligibility of all newly hired employees for the duration of this agreement, as required by Section 448.095, F. S. Contractor is also responsible for obtaining proof of E -Verify registration and utilization for all subcontractors. The contractor certifies that it and those related entities of respondent as defined by Florida law are not on the Scrutinized Companies that Boycott Israel List, created pursuant to s. 215.4725 of the Florida Statutes, and are not engaged in a boycott of Israel. In addition, if this agreement is for goods or services of one million dollars or more, Contractor certifies that it and those related entities of respondent as defined by Florida law are not on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, created pursuant to Section 215.473 of the Florida Statutes and are not engaged in business operations in Cuba or Syria. The County may terminate this Contract if Company is found to have submitted a false certification as provided under section 287.135(5), Florida Statutes, been placed on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, or been engaged in business operations in Cuba or Syria, as defined by section 287.135, Florida Statutes. County may terminate this Contract if Company, including all wholly owned subsidiaries, majority-owned subsidiaries, and parent companies that exist for the purpose of making profit, is found to have been placed on the Scrutinized Companies that Boycott Israel List or is engaged in a boycott of Israel as set forth in section 215.4725, Florida Statutes. 4. The Federal Clauses section is modified as follows: A. Equal Employment Opportunity. During the performance of this contract, the contractor agrees as follows: (1) The contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, sexual orientation. gender identity1or national origin. Such action shall include, but not be limited to the following: Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. (2) The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive considerations for employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin. O. Prohibition on Contracting for Covered Telecommunications Equipment or Services: (a) Definitions As used in this clause the terms backhaul; covered foreign country; covered telecommunications equipment or services,• interconnection arrangements: roaming, substantial or essential component,• and telecommunications gguipment or services have the meaning as defined in FEMA Policy 405-143-1 Prohibitions on Expending FEMA Award Funds for Covered Telecommunications Equipment or Services (Interim), as used in this clause— Prohibitions. (1) Section 889(b) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019, Pub L No 115-232 and 2 C.F.R. § 200.216 prohibit the head of an executive agency on or after Aug 13 2020 from obligating or enending_€ rant cooperative agreement loan or loan guarantee funds on certain telecommunications products or from certain entities for national security reasons. (2) Unless an exception in paragraph (cc) of this clause applies the contractor and its subcontractors may not use grant cooperative agreement loan or loan guarantee funds from the Federal Emergency Management Agencyto: FA (i) Procure or obtain any equipment system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system or as critical technologyof f any system; (ii) Enter into extend or renew a contract to procure or obtain any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology of any system; (iii) Enter into extend or renew contracts with entities that use covered telecommunications equment or services as a substantial or essential component of any system or as critical technology as part of M system; or (iv) Provide as part of its performance of this contract subcontract or other contractual instrument, any equipment system, or service that uses covered telecommunications equipment or services as a substantial or essential component of ggy Wtem or as critical technology as part of any system (c) Exceptions. (1) This clause does not prohibit contractors from providing= (i) A service that connects to the facilities of a third -party such as backhaul, roaming, or interconnection arrangements; or (ii) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles. (2) By necessary implication and regulation, the prohibitions also do not apply to: (i) Covered telecommunications equipment or services that: i. Are not used as a substantial or essential component of any system; and ii. Are not used as critical technology of any system. (ii) Other telecommunications equipment or services that are not considered covered telecommunications equipment or services. (d) Reporting requirement. (1) In the event the contractor identifies covered telecommunications equipment or services used as a substantial or essential component of any system, or as critical technology as part of any system during_ contract performance or the contractor is notified of such by a subcontractor at any tier or by M other source the contractor shall report the information in paragraph (d)(2) of this clause to the recipient or subrecipient unless elsewhere in this contract are established procedures for reporting the information. (2) The Contractor shall report the following information pursuant to paragraph (d)(1) of this clause: Li) Within one business day from the date of such identification or notification: The contract number;the order numbers) if applicable; supplier name; supplier unique entity identifier (if known), supplier Commercial and Government Entity (CAGE) code (if known); brand; model number (original equipment manufacturer number manufacturer part number or wholesaler number)• item Lc and any readily available information about mitigation actions undertaken or recommended. Within 10 business days of submitting the information in paragraph (d)(2)(i) of this clause: Any further available information about mitigation actions undertaken or recommended. In addition, the contractor shall descnbe the efforts it undertook to prevent use or submission of covered telecommunications equipment or services, and any additional efforts that will be incorporated to prevent fixture use or submission of covered telecommunications equipment or services. (e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e), in A subcontracts and other contractual instruments. P. Domestic Preference for Procurements As appropriate and to the extent consistent with law, the contractor should, to the greatest extent practicable, provide a preference for the purchase acquisition, or use ofog_ ods products or materials produced in the United States This includes but is not limited to iron, aluminum steel, cement, and other manufactured products. For purposes of this clause: Produced in the United States means for iron and steel products, that all manufacturing processes, from the initial melting stage through the application of coatings occurred in the United States. Manufactured products mean items and construction materials composed in whole or in part of non- ferrous metals such as aluminum; plastics andpolymer-based products such aspolyvinyl chloride pie• aggregates such as concrete, glass, including optical fiber: and lumber. 5. Exhibit 1 to the agreement is replaced with Exhibit 1 — First Extension. 6. All other terms and provisions of the Agreement shall be unchanged and remain in full force and effect. IN WITNESS WHEREOF, the parties have caused this First Extension to be executed effective the day and year first set forth above. Hinterland Group, Inc. By: Print e: E s Title: ke,-jr:r_-r Z=eez7arc (Corporate Seal) Date: tp /3 /2 Z �••``,p,ND GRp''•, �(v�. GO(tPORgIF 2 :SEAL ="= -.June 26, 2006: '' '�<ORIOF:•' 4 INDIAN RIVER COUNTY, FLORIDA BOARD OF COUNTY COMMISSIV By: Peter D. O'Bryan, Cha'U i; y Attest: Jeffrey R. Smith, Clerk of Circuit And Comptroller By: Deputy Clerk Jason E. I)rovk County to form and legal sufficiency. DArKReingold, County Attorney 0 Exhibit 1- First Extension Item No. Item Install Furnish and Description p ) Unit Per Unit Price Bid Updated Per Unit Price 1 MOBILIZATION & GENERAL CONDITIONS- ORDERS UNDER $15,000 (per site) LS $2,500.00 $2,836.50 2 MOBILIZATION & GENERAL CONDITIONS- ORDERS $15,000-$40,000 (per site) LS $2,000.00 $2,269.20 3 MOBILIZATION & GENERAL CONDITIONS- ORDERS GREATER THAN $40,001 (per site) LS $1,500.00 $1,701.90 4 INSURANCE PER CONTRACT (One time pay item each year of contract) LS $100.00 $113.46 5 PUBLIC CONSTRUCTION BOND (UP TO $250,000) IF REQUIRED (per year) LS $5,000.00 $5,673.00 6 VIDEO RECORDING, PRE -CONSTRUCTION (per site, up to 500 feet of roadway) LS $600.00 $680.76 7 VIDEO RECORDING, POST -CONSTRUCTION (per site, up to 500 feet of roadway) LS $600.00 $680.76 8 TRENCH SAFETY AND CONFINED SPACE ENTRY COMPLIANCE (per site) LS $100.00 $113.46 9 MINOR MOT DESIGN & SETUP (per site, no lane closure, County right of way) DAY $50.00 $56.73 10 INTERMEDIATE MOT DESIGN & SETUP (per site, single lane closure, County right of way) DAY $250.00 $283.65 11 BARRICADE TYPE I or II w/ WARNING LIGHT DAY $5.00 $5.67 12 BARRICADE TYPE III w/ WARNING LIGHT DAY $5.00 $5.67 13 IMOT WARNING SIGNS DAY $5.00 $5.67 14 STATIC ARROW BOARDS, DETOUR SIGNS DAY $5.00 $5.67 15 DYNAMIC ARROW FLASHING SIGN DAY $35.00 $39.71 16 VARIABLE MESSAGE TRAILER DAY $65.00 $73.75 17 TRAFFIC CONES DAY $3.00 $3.40 18 IFLAGMAN HR $40.00 $45.38 19 CONSTRUCTION WARNING FENCE (includes up to 100 lineal feet) DAY $50.00 $56.73 20 CONSTRUCTION WARNING FENCE (per lineal foot in excess of 100 feet) LFDA $5.00 $5.67 21 TEMPORARY CHAIN LINK SECURITY FENCE, 6' HEIGHT (includes up to 100 lineal feet) DAY $150.00 $170.19 22 TEMPORARY CHAIN LINK SECURITY FENCE, 6' HEIGHT (per lineal feet beyond 100 ft) LFDA $15.00 $17.02 23 ITRAFFIC BARRIER, WATER OR SAND FILLED (includes up to 100 feet) DAY $50.00 $56.73 24 TRAFFIC SAFETY BARRIER, WATER OR SAND FILLED (per lineal feet beyond 100 ft) LFDA $20.00 $22.69 25 STAKED EROSION CONTROL FABRIC (includes up to 100 lineal feet) DAY $50.00 $56.73 26 STAKED EROSION CONTROL FABRIC (per lineal foot in excess of 100 feet) LFDA $10.00 $11.35 27 HAY BALES OR WATILES LF $5.00 $5.67 28 STEEL PLATE (32 sq. ft per plate) DAY $25.00 $28.37 29 LIGHT TOWER w/ GENERATOR DAY $50.00 $56.73 30 4" BY-PASS PUMPING INITIAL SETUP (includes 100 feet of temporary piping) EA $300.00 $340.38 31 4" BY-PASS PUMPING OPERATION DAY $500.00 $567.30 32 4" BYPASS PUMPING BEYOND THE INTIAL 100 FEET LF $5.00 $5.67 33 6" BY-PASS PUMPING INITIAL SETUP (includes 100 feet of temporary piping) EA $300.00 $340.38 34 6" BY-PASS PUMPING OPERATION DAY $700.00 $794.22 Exhibit 1- First Extension Item No. Item Description (Furnish and Install) Unit Per Unit Price Bid Updated Per Unit Price 35 6" BYPASS PUMPING BEYOND THE INTIAL 100 FEET LF $10.00 $11.35 36 12" BY-PASS PUMPING INITIAL SETUP (includes 100 feet of temporary piping) EA $500.00 $567.30 37 12" BY-PASS PUMPING OPERATION DAY $1,200.00 $1,361.52 38 12" BYPASS PUMPING BEYOND THE INTIAL 100 FEET LF $15.00 $17.02 39 BYPASS PUMPING VIA 3,500 GALLON PUMPER TRUCK HR $300.00 $340.38 40 BYPASS PUMPING VIA VAC -CON PUMPER HR $250.00 $283.65 41 Force Main Installation -4" DIP, EPDXY LINED, CLASS 52, 0'-6' DEPTH (includes excavation, backfill & compaction) LF $60.00 $68.08 42 Force Main Installation - 6" DIP, EPDXY LINED, CLASS 52, 0'-6' DEPTH (includes excavation, backfill & compaction) LF $65.00 $73.75 43 Force Main Installation -8" DIP, EPDXY LINED, CLASS 52, 0'-6' DEPTH (includes excavation, backfill & compaction) LF $75.00 $85.10 44 Force Main Installation -10" DIP, EPDXY LINED, CLASS 52, 0'-6' DEPTH (includes excavation, backfill & compaction) LF $80.00 $90.77 45 Force Main Installation -12" DIP, EPDXY LINED, CLASS 52, 0'-6' DEPTH (includes excavation, backfill & compaction) LF $90.00 $102.11 46 Force Main Installation -16" DIP, EPDXY LINED, CLASS 52, 0'-6' DEPTH (includes excavation, backfill & compaction) LF $110.00 $124.81 47 1ADDITIONAL EXCAVATION 6'-8' DEPTH LF $35.00 $39.71 48 ADDITIONAL EXCAVATION 8'-10' DEPTH LF $45.00 $51.06 49 ADDITIONAL EXCAVATION 10'-12' DEPTH LF $85.00 $96.44 50 4" MEGA -LUG JOINT RESTRAINTS EA $100.00 $113.46 51 6" MEGA -LUG JOINT RESTRAINTS EA $120.00 $136.15 52 8" MEGA -LUG JOINT RESTRAINTS EA $120.00 $136.15 53 10" MEGA -LUG JOINT RESTRAINTS EA $130.00 $147.50 54 12" MEGA -LUG JOINT RESTRAINTS EA $180.00 $204.23 55 16" MEGA -LUG JOINT RESTRAINTS EA $300.00 $340.38 56 4" PLUG VALVE & VALVE BOX EA $850.00 $964.41 57 6" PLUG VALVE & VALVE BOX EA $1,200.00 $1,361.52 58 8" PLUG VALVE & VALVE BOX EA $1,400.00 $1,588.44 59 10" PLUG VALVE & VALVE BOX EA $2,200.00 $2,496.12 60 12" PLUG VALVE & VALVE BOX EA $2,800.00 $3,176.88 61 16" PLUG VALVE & VALVE BOX EA $4,800.00 $5,446.08 62 1EXCAVATION & DISPOSAL OF ASPHALT PAVEMENT SY $5.00 $5.67 Exhibit 1- First Extension Item Item Description (Furnish and Install) No. Unit Per Unit Price Bid Updated Per Unit Price 63 EXCAVATION & DISPOSAL OF CONCRETE SIDWALKS, DRIVEWAYS & FLATWORK SY $8.00 $9.08 64 EXCAVATION & DISPOSAL OF CONCRETE CURB LF $10.00 $11.35 65 1 EXCAVATION & DISPOSAL OF UNSUITABLE SOIL CY $20.00 $22.69 66 CLEAN IMPORT SAND BACKFILL CY $25.00 $28.37 67 FLOWABLE FILL- EXCAVATABLE (per Section 121 FDOT spec) CY $180.00 $204.23 66 LIMEROCK STABILIZED BASE MATERIAL CY $35.00 $39.71 69 IN PLACE MATERIAL TESTING - LIMEROCK BEARING RATIO - ASTM EA $125.00 $141.83 70 IN PLACE MATERIAL TESTING- MODIFIED PROCTOR TEST, AASHTO T-180 EA $100.00 $113.46 Gravity Main Installation - 6" DIP, EPDXY LINED, 0'-6' DEPTH (includes excavation, backfill & 71 compaction) LF $75.00 $85.10 Gravity Main Installation - 8" DIP EPDXY LINED, 0'-6' DEPTH (includes excavation, backfill & 72 compaction) LF $80.00 $90.77 Gravity Main Installation -10" DIP EPDXY LINED 0'-6' DEPTH (includes excavation, backfill & 73 compaction) LF $85.00 $96.44 Gravity Main Installation -12" DIP, EPDXY LINED, 0'-6' DEPTH (includes excavation, backfill & 74 compaction) LF $85.00 $96.44 Gravity Main Installation -16" DIP, EPDXY LINED, 0'-6' DEPTH (includes excavation, backfill & 75 compaction) LF $100.00 $113.46 76 6" PVC, DR 26, 0'-6' DEPTH (includes excavation, backfill & compaction) LF $65.00 $73.75 77 8" PVC, DR 26, 0'-6' DEPTH (includes excavation, backfill & compaction) LF $70.00 $79.42 78 10" PVC, DR 26, 0'-6' DEPTH (includes excavation, backfill & compaction) LF $75.00 $85.10 79 12" PVC, DR 26, 0'-6' DEPTH (includes excavation, backfill & compaction) LF $80.00 $90.77 80 15" PVC, DR 26, 0'-6' DEPTH (includes excavation, backfill & compaction) LF $85.00 $96.44 81 8" PVC, DR 18, 0'-6' DEPTH (includes excavation, backfill & compaction) LF $75.00 $85.10 82 10" PVC, DR 18, 0'-6' DEPTH (includes excavation, backfill & compaction) LF $80.00 $90.77 83 12" PVC, DR 18, 0'-6' DEPTH (includes excavation, backfill & compaction) LF $85.00 $96.44 84 16" PVC, DR 18, 0'-6' DEPTH (includes excavation, backfill & compaction) LF $90.00 $102.11 85 4" FERNCO COUPLING w/ SHEAR RINGS EA $45.00 $51.06 86 6" FERNCO COUPLING w/ SHEAR RINGS EA $65.00 $73.75 87 8" FERNCO COUPLING w/ SHEAR RINGS EA $75.00 $85.10 88 10" FERNCO COUPLING w/ SHEAR RINGS EA $85.00 $96.44 89 12" FERNCO COUPLING w/ SHEAR RINGS EA $100.00 $113.46 90 16" FERNCO COUPLING w/ SHEAR RINGS EA $200.00 $226.92 91 IADDITIONAL EXCAVATION 6'-8' DEPTH LF $50.00 $56.73 Exhibit 1- First Extension Item No. Item Description (Furnish and Install) Unit Per Unit Price Bid Updated Per Unit Price 92 ADDITIONAL EXCAVATION 8'-10' DEPTH LF $65.00 $73.75 93 ADDITIONAL EXCAVATION 10'-12' DEPTH LF $100.00 $113.46 94 1ADDITIONAL EXCAVATION 12'-15' DEPTH LF $200.00 $226.92 95 ADDITIONAL EXCAVATION 15'-18' DEPTH LF $250.00 $283.65 96 ADDITIONAL EXCAVATION 18'-24' DEPTH LF $300.00 $340.38 97 PIPE BEDDING - #57 STONE CY $30.00 $34.04 98 Duplex Remote Terminal Unit, Complete EA $18,500.00 $20,990.10 99 Duplex Remote Terminal Unit, Complete, Installed Only EA $6,000.00 $6,807.60 100 Duplex Motor Control Panel, 3 - 5 HP, Single Phase, 240 Volts EA $30,000.00 $34,038.00 101 Duplex Motor Control Panel, 3 -10 HP, Three Phase, 240 Volts EA $26,000.00 $29,499.60 102 Duplex Motor Control Panel, 5 -10 HP, Three Phase, 480 Volts EA $28,000.00 $31,768.80 103 Duplex Motor Control Panel, 15 - 25 hp, Three Phase, 480 Volts w/ Soft Starts EA $32,000.00 $36,307.20 104 Duplex Motor Control Panel, 30 -100 hp, Three Phase, 480 Volts w/Soft Starts EA $62,000.00 $70,345.20 105 12" CHECK VALVE, OUTSIDE WEIGHT, FLANGED JOINT EA $7,500.00 $8,509.50 106 4" DIP FITTINGS, EPDXY LINED CLASS 52, FLANGED JOINT EA $500.00 $567.30 107 6" DIP FITTINGS, EPDXY LINED CLASS 52, FLANGED JOINT EA $600.00 $680.76 108 8" DIP FITTINGS, EPDXY LINED CLASS 52, FLANGED JOINT EA $750.00 $850.95 109 10" DIP FITTINGS, EPDXY LINED CLASS 52, FLANGED JOINT EA $1,000.00 $1,134.60 110 12" DIP FITTINGS, EPDXY LINED CLASS 52, FLANGED JOINT EA $1,500.00 $1,701.90 111 4" PLUG VALVE, LEVER OPERATED, FLANGED JOINT EA $1,100.00 $1,248.06 112 6" PLUG VALVE, HAND WHEEL, FLANGED JOINT EA $1,400.00 $1,588.44 113 8" PLUG VALVE, HAND WHEEL, FLANGED JOINT EA $1,500.00 $1,701.90 114 10" PLUG VALVE, HAND WHEEL, FLANGED JOINT EA $2,100.00 $2,382.66 115 12" PLUG VALVE, HAND WHEEL, FLANGED JOINT EA $2,400.00 $2,723.04 119 2" DIA H.D. ALUM PIPE SUPPORT STANDS w/ ST STL ANCHORS (max 36" height) EA $350.00 $397.11 120 3" DIA H.D. ALUM PIPE SUPPORT STANDS w/ ST STL ANCHORS (max 36" height) EA $400.00 $453.84 121 4" DIA H.D. ALUM PIPE SUPPORT STANDS w/ ST STL ANCHORS (max 36" height) EA $450.00 $510.57 122 6" CAMLOCK EMERGENCY PUMP CONNECTION & CAP EA $500.00 $567.30 123 8" CAMLOCK EMERGENCY PUMP CONNECTION & CAP EA $500.00 $567.30 124 4" HDPE VERTICAL DISCHARGE PIPING (up to 15 lineal feet) EA $3,500.00 $3,971.10 125 4" HDPE DISCHARGE PIPING (per foot in excess of 15 lineal feet) LF $150.00 $170.19 127 316 STAINLESS-STEEL HORIZ SUPPORT BRACKET FOR 4" DISCHARGE PIPING EA $800.00 $907.68 128 6" HDPE VERTICAL DISCHARGE PIPING (up to 15 lineal feet) EA $3,800.00 $4,311.48 129 6" HDPE DISCHARGE PIPING (per foot in excess of 15 lineal feet) LF $200.00 $226.92 Exhibit 1- First Extension Item No. Item Description (Furnish and Install) Unit Per Unit Price Bid Updated Per Unit Price 130 316 STAINLESS-STEEL HORIZ SUPPORT BRACKET FOR 6" DISCHARGE PIPING EA $800.00 $907.68 131 8" HDPE VERTICAL DISCHARGE PIPING (up to 15 lineal feet) EA $4,500.00 $5,105.70 132 8" HDPE DISCHARGE PIPING (per foot in excess of 15 lineal feet) LF $225.00 $255.29 133 316 STAINLESS STEEL HORIZ SUPPORT BRACKET FOR 8" DISCHARGE PIPING EA $1,000.00 $1,134.60 134 10" HDPE VERTICAL DISCHARGE PIPING (up to 15 lineal feet) EA $5,200.00 $5,899.92 135 10" HDPE DISCHARGE PIPING (per foot in excess of 15 lineal feet) LF $300.00 $340.38 136 316 STAINLESS STEEL HORIZ SUPPORT BRACKET FOR 10" DISCHARGE PIPING EA $1,200.00 $1,361.52 137 12" HDPE VERTICAL DISCHARGE PIPING (up to 15 lineal feet) EA $6,000.00 $6,807.60 138 12"HDPE DISCHARGE PIPING (per foot in excess of 15 lineal feet) LF $350.00 $397.11 139 316 STAINLESS STEEL HORIZ SUPPORT BRACKET FOR 12" DISCHARGE PIPING EA $1,200.00 $1,361.52 140 4" HDPE DISCHARGE FITTINGS & FLANGE ADAPTERS EA $500.00 $567.30 141 6" HDPE DISCHARGE FITTINGS & FLANGE ADAPTERS EA $500.00 $567.30 142 8" HDPE DISCHARGE FITTINGS & FLANGE ADAPTERS EA $600.00 $680.76 143 10" HDPE DISCHARGE FITTINGS & FLANGE ADAPTERS EA $750.00 $850.95 144 12" HDPE DISCHARGE FITTINGS & FLANGE ADAPTERS EA $1,000.00 $1,134.60 145 4" PUMP DISCHARGE BASE, INCLUDING ANCHORS EA $2,800.00 $3,176.88 146 6" PUMP DISCHARGE BASE, INCLUDING ANCHORS EA $3,200.00 $3,630.72 147 8" PUMP DISCHARGE BASE, INCLUDING ANCHORS EA $4,500.00 $5,105.70 148 10" PUMP DISCHARGE BASE, INCLUDING ANCHORS EA $7,800.00 $8,849.88 149 4" X 6" EPDXY COATED & LINED ECCENTRIC REDUCER EA $500.00 $567.30 150 6" X 8" EPDXY COATED & LINED ECCENTRIC REDUCER EA $650.00 $737.49 151 2" - 316 STAINLESS STEEL SCH 40 PUMP GUIDE RAILS VF $45.00 $51.06 152 3" - 316 STAINLESS STEEL SCH 40 PUMP GUIDE RAILS VF $75.00 $85.10 153 2" - 316 STAINLESS STEEL GUIDE RAIL UPPER SUPPORT BRACKETS w/ HOOK EA $350.00 $397.11 154 3" - 316 STAINLESS STEEL GUIDE RAIL UPPER SUPPORT BRACKETS w/ HOOK EA $450.00 $510.57 155 2" - 316 STAINLESS STEEL GUIDE RAIL INTERMEDIATE SUPPORT BRACKETS EA $600.00 $680.76 156 3" - 316 STAINLESS STEEL GUIDE RAIL INTERMEDIATE SUPPORT BRACKETS EA $750.00 $850.95 157 3/8" - 316 STAINLESS STEEL LIFTING CHAIN LF $35.00 $39.71 158 1/2" - 316 STAINLESS STEEL LIFTING CHAIN LF $40.00 $45.38 159 5/8" - 316 STAINLESS STEEL LIFTING CHAIN LF $55.00 $62.40 160 3/4" - 316 STAINLESS STEEL LIFTING CHAIN LF $65.00 $73.75 161 4 HOOK- 316 STAINLESS STEEL CABLE HANGER BRACKETS EA $400.00 $453.84 162 16 HOOK- 316 STAINLESS STEEL CABLE HANGER BRACKETS EA $600.00 $680.76 163 14'- 5' DIA MANHOLE, HYDROBLAST INTERIOR SURFACES (pervert foot) VF $25.00 $28.37 Exhibit 1- First Extension Item No. Item Description (Furnish and Install) Unit Per Unit Price Bid Updated Per Unit Price 164 6' DIA WET WELL, HYDROBLAST INTERIOR SURFACES (per square foot) SF $5.00 $5.67 165 8' DIA WET WELL, HYDROBLAST INTERIOR SURFACES (per square foot) SF $5.00 $5.67 166 10' DIA WET WELL, HYDROBLAST INTERIOR SURFACES (per square foot) SF $5.00 $5.67 167 12' DIA WET WELL, HYDROBLAST INTERIOR SURFACES (per square foot) SF $5.00 $5.67 168 VALVE VAULT, HYDROBLAST INTERIOR SURFACES (per square foot) SF $5.00 $5.67 169 4'- 5' DIA MANHOLE, COAL SLAG BLAST INTERIOR SURFACES (pervert foot) VF $50.00 $56.73 170 6' DIA WET WELL, COAL SLAG BLAST INTERIOR SURFACES (per square foot) SF $5.00 $5.67 171 8' DIA WET WELL, COAL SLAG BLAST INTERIOR SURFACES (per square foot) SF $5.00 $5.67 172 10' DIA WET WELL, COAL SLAG BLAST INTERIOR SURFACES (per square foot) SF $5.00 $5.67 173 12' DIA WET WELL, COAL SLAG BLAST INTERIOR SURFACES (per square foot) SF $5.00 $5.67 174 VALVE VAULT, COAL SLAG BLAST INTERIOR SURFACES (per square foot) SF $5.00 $5.67 175 VALVE VAULT, BITUMASTIC COATING (2 layers Carboline 300M or equal, per square foot) SF $10.00 $11.35 176 14'- 5' DIA MANHOLE, CALCIUM ALUMINA TE COATING (Sewper-Coat or equal,per square foot) SF $20.00 $22.69 177 6' DIA WET WELL, CALCIUM ALUMINATE COATING (Sewper-Coat or equal, per square foot) SF $20.00 $22.69 178 8' DIA WET WELL, CALCIUM ALUMINATE COATING (Sewper-Coat or equal, per square foot) SF $20.00 $22.69 179 10' DIA WET WELL, CALCIUM ALUMINATE COATING (Sewper-Coat or equal, per square foot) SF $20.00 $22.69 180 12' DIA WET WELL, CALCIUM ALUMINATE COATING (Sewper-Coat or equal, per square foot) SF $20.00 $22.69 181 IVALVE VAULT, CALCIUM ALUMINA TE COATING (Sewper-Coat or equal, per square foot) SF $20.00 $22.69 182 4'- 5' DIA MANHOLE, SPECTRA SHIELD COATING 14 -layer system, per sq. ft) SF $30.00 $34.04 183 6' DIA WET WELL, SPECTRA SHIELD COATING (4 -layer system, per sq. ft) SF $35.00 $39.71 184 8' DIA WET WELL, SPECTRA SHIELD COATING (4 -layer system, per sq. ft) SF $35.00 $39.71 185 10' DIA WET WELL, SPECTRA SHIELD COATING (4 -layer system, per sq. ft) SF $40.00 $45.38 186 12' DIA WET WELL, SPECTRA SHIELD COATING (4 -layer system, per sq. ft) SF $40.00 $45.38 187 4'- 5' DIA MANHOLE, IET SYSTEM 3 COATING (prime, intermediate & finish, per square foot) SF $30.00 $34.04 188 6' DIA WET WELL, IET SYSTEM 3 COATING (prime, intermediate & finish, per square foot) SF $35.00 $39.71 189 8' DIA WET WELL, IET SYSTEM 3 COATING (prime, intermediate & finish, per square foot) SF $35.00 $39.71 190 10' DIA WET WELL, IET SYSTEM 3 COATING (prime, intermediate & finish, per square foot) SF $40.00 $45.38 191 12' DIA WET WELL, IET SYSTEM 3 COATING (prime, intermediate & finish, per square foot) SF $40.00 $45.38 192 CAST IN PLACE CONCRETE -REPAIR EXIST STRUCTURE EXTERIOR (max 6' depth) CF $30.00 $34.04 193 CAST IN PLACE CONCRETE -REPAIR EXIST STRUCTURE INTERIOR (max 25' depth) CF $50.00 $56.73 193 FORM WORK FOR CAST IN PLACE CONCRETE REPAIR SF $50.00 $56.73 194 REINFORCING STEEL FOR CAST IN PLACE CONCRETE REPAIR LB $10.00 $11.35 195 1HYDRAULIC CEMENT GROUTING & REPAIR - EXISTING STRUCTURE LB $30.00 $34.04 196 36" x 46" ALUMINIUM HATCH COVER & FRAME, H2O LOAD w/ 316 ST STL HARDWARE EA $2,800.00 $3,176.88 Exhibit 1- First Extension Item No. Item Description (Furnish and Install) Unit Per Unit Price gid Updated Per Unit Price 197 48" x 60" ALUMINIUM HATCH COVER & FRAME, H2O LOAD w/ 316 ST STL HARDWARE EA $3,500.00 $3,971.10 198 48" x 72" ALUMINIUM HATCH COVER & FRAME, H2O LOAD w/ 316 ST STL HARDWARE EA $3,800.00 $4,311.48 199 54" x 60" ALUMINIUM HATCH COVER & FRAME, H2O LOAD w/ 316 ST STL HARDWARE EA $3,900.00 $4,424.94 200 64" x 72" ALUMINIUM HATCH COVER & FRAME, H2O LOAD w/ 316 ST STL HARDWARE EA $4,700.00 $5,332.62 201 60" x 72" ALUMINIUM HATCH COVER & FRAME, H2O LOAD w/ 316 ST STL HARDWARE EA $4,500.00 $5,105.70 202 72" x 84" ALUMINIUM HATCH COVER & FRAME, H2O LOAD w/ 316 ST STL HARDWARE EA $5,500.00 $6,240.30 203 4" DIP J- VENT w/ RISER & ST STL BUG SCREEN EA $500.00 $567.30 204 4" PVC 1- VENT w/ RISER & ST STL BUG SCREEN EA $550.00 $624.03 205 JOSAM 26700 VENT HOOD w/ DIP RISER EA $700.00 $794.22 206 FURNISH & INSTALL 4' INSIDE DIA MANHOLE, 0-6' DEEP EA $4,500.00 $5,105.70 207 ADDITIONAL 4'1.0. MANHOLE & EXCAVATION 6'-10' DEPTH LF $1,000.00 $1,134.60 208 ADDITIONAL 4' 1.0. EXCAVATION 10'-14' DEPTH LF $1,000.00 $1,134.60 209 1ADDITIONAL 4' 1.0. EXCAVATION 14'-18' DEPTH LF $1,800.00 $2,042.28 210 FURNISH & INSTALL 5' INSIDE DIA MANHOLE, 0-6' DEEP EA $5,000.00 $5,673.00 211 ADDITIONAL 5' I.D. MANHOLE & EXCAVATION 6'-10' DEPTH LF $1,000.00 $1,134.60 212 ADDITIONAL 5'1.D. EXCAVATION 10'-14' DEPTH LF $1,000.00 $1,134.60 213 ADDITIONAL 5' 1.D. EXCAVATION 14'-18' DEPTH LF $1,800.00 $2,042.28 214 4" - 8" RELINER INSIDE DROP CONNECTION w/ 316 ST STL MOUNTING HARDWARE EA $850.00 $964.41 215 10" - 16" RELINER INSIDE DROP CONNECTION w/ 316 ST STL MOUNTING HARDWARE EA $1,000.00 $1,134.60 216 32" DIA USF 240 MANHOLE RING, FRAME & LID EA $900.00 $1,021.14 217 36" DIA USF 420 MANHOLE RING, FRAME & LID EA $1,000.00 $1,134.60 218 50" DIA USF 690 -AH -M MANHOLE RING, FRAME & LID EA $1,800.00 $2,042.28 219 IJETTER, PUMPER OR VACUUM TRUCK HR $225.00 $255.29 220 SEWER VIDEO CCTV HR $250.00 $283.65 221 150 CFM COMPRESSOR & ACCESSORIES DAY $75.00 $85.10 222 DEWATERING PUMP & WELLPOINT INITIAL SETUP (up to 20 points) EA $2,500.00 $2,836.50 223 ADDITIONAL WELLPOINT & HEADER (per point in excess of initial 20 -point header) EA $100.00 $113.46 224 DEWATERING PUMP & WELLPOINT OPERATION & MAINTENANCE DAY $500.00 $567.30 225 ADDITIONAL WELLPOINT OPERATION & MAINTENANCE (per foot per day) DAY $50.00 $56.73 226 DIAPHRAGM PUMP & PIPING (up to 30 feet suction hose and 60 feet discharge hose) DAY $500.00 $567.30 227 ADDED DIAPHRAGM PUMP PIPING (per foot beyond 30 -foot suction or 60 -foot discharge) DAY $20.00 $22.69 228 DRIVEN METAL SHEET PILING (up to 10' depth) LF $200.00 $226.92 229 IDRIVEN METAL SHEET PILING (up to 20' depth) LF $300.00 $340.38 230 ITRENCH SHORING BOX (min 4'x 12') DAY $250.00 $283.65 Exhibit 1- First Extension Item No. Item Description (Furnish and Install) Unit Per Unit Price Bid Updated Per Unit Price 231 TRENCH SHORING BOX (min 6'x 12') DAY $300.00 $340.38 232 TRENCH SHORING BOX (min 8'x 12') DAY $450.00 $510.57 233 TWO MAN LANDSCAPE CLEARING CREW HR $100.00 $113.46 234 TWO MAN HAND EXCAVATION CREW HR $160.00 $181.54 235 THREE MAN PIPE EXCAVATION & REPAIR CREW HR $320.00 $363.07 236 DUMP TRUCK & DRIVER, 8-12 CU YD HR $65.00 $73.75 237 DUMP TRUCK & DRIVER 15-18 CU YD HR $120.00 $136.15 238 120 CU YD CLEARING & DEMOLITION DUMPSTER PULL $450.00 $510.57 239 8 CU YD CLEARING & DEMOLITION DUMPSTER PULL $300.00 $340.38 240 SKID STEER LOADER & OPERATOR HR $85.00 $96.44 241 WHEEL LOADER & OPERATOR (Cat Class 057-006) HR $125.00 $141.83 242 RUBBER TIRE TRACTOR & OPERATOR (Cat Class 053-0210) HR $125.00 $141.83 243 HYDRAULIC EXCAVATOR & OPERATOR (Cat 304 or equivalent) HR $150.00 $170.19 244 4" ON 6" OR 8" TAPPING SLEEVE & VALVE, UP TO S' DEPTH EA $3,500.00 $3,971.10 245 4" ON 10" OR 12" TAPPING SLEEVE & VALVE, UP TO 5' DEPTH EA $4,000.00 $4,538.40 246 6" ON 8" OR 10" TAPPING SLEEVE & VALVE, UP TO 5' DEPTH EA $4,200.00 $4,765.32 247 6" ON 12" OR 16" TAPPING SLEEVE & VALVE, UP TO 5' DEPTH EA $4,800.00 $5,446.08 248 8" ON 10" OR 12" TAPPING SLEEVE & VALVE, UP TO 5' DEPTH EA $6,000.00 $6,807.60 249 8" ON 16" TAPPING SLEEVE & VALVE, UP TO 5' DEPTH EA $7,800.00 $8,849.88 251 TAP OR CONNECTION AT ADDITIONAL EXCAVATION 6'-8' DEPTH EA $500.00 $567.30 252 TAP OR CONNECTION AT ADDITIONAL EXCAVATION 8'-10' DEPTH EA $500.00 $567.30 253 TAP OR CONNECTION AT ADDITIONAL EXCAVATION 10'-12' DEPTH EA $500.00 $567.30 254 4" OR 6" DIA CORE BORE OF REINF CONC STRUCTURE, UP TO 5' DEPTH EA $350.00 $397.11 255 8' OR 10" DIA CORE BORE OF REINF CONC STRUCTURE, UP TO 5' DEPTH EA $800.00 $907.68 256 4" CONCRETE SIDEWALK OR SLAB w/ FIBER MESH (up to 150 sq. ft) EA $1,000.00 $1,134.60 257 4" CONCRETE SIDEWALK OR SLAB (per sq. ft in excess of 150 sq. ft at a site) SF $6.00 $6.81 258 6" CONCRETE SIDEWALK OR SLAB w/ FIBER MESH (up to 150 sq. ft) EA $1,200.00 $1,361.52 259 6" CONCRETE SIDEWALK OR SLAB (per sq. ft in excess of 150 sq. ft at a site) SF $8.00 $9.08 260 12" STABILIZED SUBGRADE AND 10' LIMEROCK BASE REPAIR SY $30.00 $34.04 261 2" ASPHALT SURFACE COURSE REPAIR SY $48.00 $54.46 262 CONCRETE CURB LF $50.00 $56.73 263 YARD GRADING #57 STONE w/ TYPAR GEOTEXTILE (up to 200 sq. ft) EA $800.00 $907.68 264 YARD GRADING #57 STONE w/ TYPAR GEOTEXTILE (per sq. ft in excess of 200 sq. ft) SF $5.00 $5.67 265 JBAHIASOD SY $5.00 $5.67 Exhibit 1- First Extension Item No. Item Description (Furnish and Install) Unit Per Unit Price Bid Updated Per Unit Price 266 STAUGUSTINE OR BERMUDA SOD SY $6.00 $6.81 267 PRESSURE WASHING SF $5.00 $5.67 268 IREMOVE & DISPOSE OF EXISTING MANHOLE, UP TO 6' DEPTH EA $2,500.00 $2,836.50 269 ADDITIONAL MANHOLE REMOVAL, 6'-10' DEPTH VF $300.00 $340.38 270 ADDITIONAL MANHOLE REMOVAL, 10'-14' DEPTH VF $400.00 $453.84 271 ADDITIONAL MANHOLE REMOVAL, 14'-18' DEPTH VF $1,500.00 $1,701.90 272 DUPLEX VALVE VAULT REMOVAL CF $300.00 $340.38 273 IREMOVE & DISPOSE OF EXIST PIPES, UP TO 48" DEEP & UP TO 4" DIA (non -hazardous) LF $10.00 $11.35 274 REMOVE & DISPOSE OF EXIST PIPES, UP TO 48" DEEP & 4.5" - 6" DIA (non -hazardous) LF $10.00 $11.35 275 REMOVE & DISPOSE OF EXIST PIPES, UP TO 60" DEEP & 6.5"-10" DIA (non -hazardous) LF $12.00 $13.62 276 REMOVE & DISPOSE OF EXIST PIPES, UP TO 60" DEEP & 10.5" -16" DIA (non -hazardous) LF $15.00 $17.02 Al -1 4" DIP Pipe, Epoxy lined Class 52, Flanged joint LF $230.00 $260.96 A1-2 6" DIP Pipe, Epoxy lined Class 52, Flanged joint LF $260.00 $295.00 A1-3 8" DIP Pipe, Epoxy Lined Class 52, Flanged joint LF $260.00 $295.00 A1-4 10" DIP Pipe, Epoxy lined Class 52, Flanged joint LF $275.00 $312.02 A1-5 4" Check Valve, Outside weight, Flanged joint EA $2,400.00 $2,723.04 A1-6 6" Check Valve, Outside weight, Flanged joint EA $3,200.00 $3,630.72 A1-7 8" Check Valve, Outside weight, Flanged joint EA $4,200.00 $4,765.32 A1-8 10" Check Valve, Outside weight, Flanged joint EA $6,800.00 $7,715.28 A1-9 4" DIP Fittings, Epoxy lined Class 52, Flanged Joint EA $600.00 $680.76 Al -10 6" DIP Fittings, Epoxy lined Class 52, Flanged Joint EA $700.00 $794.22 Al -11 8" DIP Fittings, Epoxy lined Class 52, Flanged Joint EA $1,000.00 $1,134.60 Al -12 10" DIP Fittings, Epoxy lined Class 52, Flanged Joint EA $1,400.00 $1,588.44 Al -13 4" Plug Valve, Hand Wheel, Flanged Joint EA $1,200.00 $1,361.52 Al -14 6" Plug Valve, Hand Wheel, Flanged Joint EA $1,450.00 $1,645.17 Al -15 8" Plug Valve, Hand Wheel, Flanged Joint EA $1,750.00 $1,985.55 Al -16 10" Plug Valve, Hand Wheel, Flanged Joint I EA 1 $2,500.001 $2,836.50 A1-17 Install Meter Can & Disconnect I EA 1 $6,400.001 $7,261.44