HomeMy WebLinkAbout2022-089FIRST EXTENSION AND SECOND AMENDMENT TO AGREEMENT
FOR LIFT STATION REHABILITATION SERVICES
This First Extension and Second Amendment to that certain Agreement to provide Lift
Station Rehabilitation Services is entered into effective as of June 4, 2022 by and between Indian River
County, a political subdivision of the State of Florida ("County") and Hinterland Group, Inc.
("Contractor").
BACKGROUND RECITALS
WHEREAS, the County and the Contractor entered into an Agreement for Lift Station Rehabilitation
Services effective June 4, 2019; and
WHEREAS, the Term; Duration of Agreement Paragraph contains the term and renewal provisions;
and
WHEREAS, the first term commenced effective as of June 4, 2019 and will end on June 3,2022; and
WHEREAS, pursuant to the Agreement, the parties desire to extend the Agreement for an additional
two-year period; and
WHEREAS, the parties desire to amend the Responsibilities of the Contractor section to include E -
Verify and Scrutinized Companies requirements; and
WHEREAS, the parties desire to update requirements to the Federal Clauses section, in accordance
with 2 C.F.R.; and
WHEREAS, the parties have agreed to updated pricing, based on the U.S. Department of Labor's
Consumer Pricing Index.
NOW, THEREFORE, in consideration of the foregoing, and other good and valuable consideration,
the receipt and sufficiency of which are hereby acknowledged, the County and the Contractor agree as
follows:
1. The background recitals are true and correct and form a material part of this First Extension and
Second Amendment.
2. The first renewal term shall commence effective June 4, 2022 and shall end on June 3, 2024. There
are no additional renewals available.
3. The following information was added to the Responsibilities of the Contractor Section of the
agreement:
Contractor is registered with and will use the Department of Homeland Security's E -Verify system
(www.e-verifgov) to confirm the employment eligibility of all newly hired employees for the duration
of this agreement, as required by Section 448.095, F. S. Contractor is also responsible for obtaining proof
of E -Verify registration and utilization for all subcontractors.
The contractor certifies that it and those related entities of respondent as defined by Florida law are not
on the Scrutinized Companies that Boycott Israel List, created pursuant to s. 215.4725 of the Florida
Statutes, and are not engaged in a boycott of Israel. In addition, if this agreement is for goods or services
of one million dollars or more, Contractor certifies that it and those related entities of respondent as
defined by Florida law are not on the Scrutinized Companies with Activities in Sudan List or the
Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, created pursuant to
Section 215.473 of the Florida Statutes and are not engaged in business operations in Cuba or Syria. The
County may terminate this Contract if Company is found to have submitted a false certification as
provided under section 287.135(5), Florida Statutes, been placed on the Scrutinized Companies with
Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy
Sector List, or been engaged in business operations in Cuba or Syria, as defined by section 287.135,
Florida Statutes. County may terminate this Contract if Company, including all wholly owned
subsidiaries, majority-owned subsidiaries, and parent companies that exist for the purpose of making
profit, is found to have been placed on the Scrutinized Companies that Boycott Israel List or is engaged
in a boycott of Israel as set forth in section 215.4725, Florida Statutes.
4. The Federal Clauses section is modified as follows:
A. Equal Employment Opportunity. During the performance of this contract, the contractor agrees as
follows:
(1) The contractor will not discriminate against any employee or applicant for employment
because of race, color, religion, sex, or national origin. The contractor will take affirmative action to
ensure that applicants are employed, and that employees are treated during employment without regard
to their race, color, religion, sex, sexual orientation. gender identity1or national origin. Such action shall
include, but not be limited to the following: Employment, upgrading, demotion, or transfer; recruitment
or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and
selection for training, including apprenticeship. The contractor agrees to post in conspicuous places,
available to employees and applicants for employment, notices to be provided setting forth the provisions
of this nondiscrimination clause.
(2) The contractor will, in all solicitations or advertisements for employees placed by or on
behalf of the contractor, state that all qualified applicants will receive considerations for employment
without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin.
O. Prohibition on Contracting for Covered Telecommunications Equipment or Services:
(a) Definitions As used in this clause the terms backhaul; covered foreign country; covered
telecommunications equipment or services,• interconnection arrangements: roaming, substantial or
essential component,• and telecommunications gguipment or services have the meaning as defined in
FEMA Policy 405-143-1 Prohibitions on Expending FEMA Award Funds for Covered
Telecommunications Equipment or Services (Interim), as used in this clause—
Prohibitions.
(1) Section 889(b) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019,
Pub L No 115-232 and 2 C.F.R. § 200.216 prohibit the head of an executive agency on or after
Aug 13 2020 from obligating or enending_€ rant cooperative agreement loan or loan guarantee
funds on certain telecommunications products or from certain entities for national security reasons.
(2) Unless an exception in paragraph (cc) of this clause applies the contractor and its subcontractors may
not use grant cooperative agreement loan or loan guarantee funds from the Federal Emergency
Management Agencyto:
FA
(i) Procure or obtain any equipment system, or service that uses covered telecommunications equipment
or services as a substantial or essential component of any system or as critical technologyof
f any
system;
(ii) Enter into extend or renew a contract to procure or obtain any equipment, system, or service that
uses covered telecommunications equipment or services as a substantial or essential component of any
system, or as critical technology of any system;
(iii) Enter into extend or renew contracts with entities that use covered telecommunications equment
or services as a substantial or essential component of any system or as critical technology as part of
M system; or
(iv) Provide as part of its performance of this contract subcontract or other contractual instrument, any
equipment system, or service that uses covered telecommunications equipment or services as a
substantial or essential component of ggy Wtem or as critical technology as part of any system
(c) Exceptions.
(1) This clause does not prohibit contractors from providing=
(i) A service that connects to the facilities of a third -party such as backhaul, roaming, or interconnection
arrangements; or
(ii) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into
any user data or packets that such equipment transmits or otherwise handles.
(2) By necessary implication and regulation, the prohibitions also do not apply to:
(i) Covered telecommunications equipment or services that:
i. Are not used as a substantial or essential component of any system; and
ii. Are not used as critical technology of any system.
(ii) Other telecommunications equipment or services that are not considered covered
telecommunications equipment or services.
(d) Reporting requirement.
(1) In the event the contractor identifies covered telecommunications equipment or services used as a
substantial or essential component of any system, or as critical technology as part of any system
during_ contract performance or the contractor is notified of such by a subcontractor at any tier or by
M other source the contractor shall report the information in paragraph (d)(2) of this clause to the
recipient or subrecipient unless elsewhere in this contract are established procedures for reporting the
information.
(2) The Contractor shall report the following information pursuant to paragraph (d)(1) of this clause:
Li) Within one business day from the date of such identification or notification: The contract number;the
order numbers) if applicable; supplier name; supplier unique entity identifier (if known), supplier
Commercial and Government Entity (CAGE) code (if known); brand; model number (original
equipment manufacturer number manufacturer part number or wholesaler number)• item Lc
and any readily available information about mitigation actions undertaken or recommended.
Within 10 business days of submitting the information in paragraph (d)(2)(i) of this clause: Any
further available information about mitigation actions undertaken or recommended. In addition, the
contractor shall descnbe the efforts it undertook to prevent use or submission of covered
telecommunications equipment or services, and any additional efforts that will be incorporated to
prevent fixture use or submission of covered telecommunications equipment or services.
(e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e), in
A subcontracts and other contractual instruments.
P. Domestic Preference for Procurements
As appropriate and to the extent consistent with law, the contractor should, to the greatest extent
practicable, provide a preference for the purchase acquisition, or use ofog_ ods products or materials
produced in the United States This includes but is not limited to iron, aluminum steel, cement, and
other manufactured products.
For purposes of this clause:
Produced in the United States means for iron and steel products, that all manufacturing processes,
from the initial melting stage through the application of coatings occurred in the United States.
Manufactured products mean items and construction materials composed in whole or in part of non-
ferrous metals such as aluminum; plastics andpolymer-based products such aspolyvinyl chloride pie•
aggregates such as concrete, glass, including optical fiber: and lumber.
5. Exhibit 1 to the agreement is replaced with Exhibit 1 — First Extension.
6. All other terms and provisions of the Agreement shall be unchanged and remain in full force and
effect.
IN WITNESS WHEREOF, the parties have caused this First Extension to be executed effective the day
and year first set forth above.
Hinterland Group, Inc.
By:
Print e: E s
Title: ke,-jr:r_-r Z=eez7arc
(Corporate Seal)
Date: tp /3 /2 Z
�••``,p,ND GRp''•,
�(v�. GO(tPORgIF 2
:SEAL ="=
-.June 26, 2006:
'' '�<ORIOF:•'
4
INDIAN RIVER COUNTY, FLORIDA
BOARD OF COUNTY COMMISSIV
By:
Peter D. O'Bryan, Cha'U i; y
Attest: Jeffrey R. Smith, Clerk of Circuit
And Comptroller
By:
Deputy Clerk
Jason E. I)rovk County
to form and legal sufficiency.
DArKReingold, County Attorney
0
Exhibit 1- First Extension
Item
No.
Item Install Furnish and Description
p )
Unit
Per Unit Price
Bid
Updated Per
Unit Price
1
MOBILIZATION & GENERAL CONDITIONS- ORDERS UNDER $15,000 (per site)
LS
$2,500.00
$2,836.50
2
MOBILIZATION & GENERAL CONDITIONS- ORDERS $15,000-$40,000 (per site)
LS
$2,000.00
$2,269.20
3
MOBILIZATION & GENERAL CONDITIONS- ORDERS GREATER THAN $40,001 (per site)
LS
$1,500.00
$1,701.90
4
INSURANCE PER CONTRACT (One time pay item each year of contract)
LS
$100.00
$113.46
5
PUBLIC CONSTRUCTION BOND (UP TO $250,000) IF REQUIRED (per year)
LS
$5,000.00
$5,673.00
6
VIDEO RECORDING, PRE -CONSTRUCTION (per site, up to 500 feet of roadway)
LS
$600.00
$680.76
7
VIDEO RECORDING, POST -CONSTRUCTION (per site, up to 500 feet of roadway)
LS
$600.00
$680.76
8
TRENCH SAFETY AND CONFINED SPACE ENTRY COMPLIANCE (per site)
LS
$100.00
$113.46
9
MINOR MOT DESIGN & SETUP (per site, no lane closure, County right of way)
DAY
$50.00
$56.73
10
INTERMEDIATE MOT DESIGN & SETUP (per site, single lane closure, County right of way)
DAY
$250.00
$283.65
11
BARRICADE TYPE I or II w/ WARNING LIGHT
DAY
$5.00
$5.67
12
BARRICADE TYPE III w/ WARNING LIGHT
DAY
$5.00
$5.67
13
IMOT WARNING SIGNS
DAY
$5.00
$5.67
14
STATIC ARROW BOARDS, DETOUR SIGNS
DAY
$5.00
$5.67
15
DYNAMIC ARROW FLASHING SIGN
DAY
$35.00
$39.71
16
VARIABLE MESSAGE TRAILER
DAY
$65.00
$73.75
17
TRAFFIC CONES
DAY
$3.00
$3.40
18
IFLAGMAN
HR
$40.00
$45.38
19
CONSTRUCTION WARNING FENCE (includes up to 100 lineal feet)
DAY
$50.00
$56.73
20
CONSTRUCTION WARNING FENCE (per lineal foot in excess of 100 feet)
LFDA
$5.00
$5.67
21
TEMPORARY CHAIN LINK SECURITY FENCE, 6' HEIGHT (includes up to 100 lineal feet)
DAY
$150.00
$170.19
22
TEMPORARY CHAIN LINK SECURITY FENCE, 6' HEIGHT (per lineal feet beyond 100 ft)
LFDA
$15.00
$17.02
23
ITRAFFIC BARRIER, WATER OR SAND FILLED (includes up to 100 feet)
DAY
$50.00
$56.73
24
TRAFFIC SAFETY BARRIER, WATER OR SAND FILLED (per lineal feet beyond 100 ft)
LFDA
$20.00
$22.69
25
STAKED EROSION CONTROL FABRIC (includes up to 100 lineal feet)
DAY
$50.00
$56.73
26
STAKED EROSION CONTROL FABRIC (per lineal foot in excess of 100 feet)
LFDA
$10.00
$11.35
27
HAY BALES OR WATILES
LF
$5.00
$5.67
28
STEEL PLATE (32 sq. ft per plate)
DAY
$25.00
$28.37
29
LIGHT TOWER w/ GENERATOR
DAY
$50.00
$56.73
30
4" BY-PASS PUMPING INITIAL SETUP (includes 100 feet of temporary piping)
EA
$300.00
$340.38
31
4" BY-PASS PUMPING OPERATION
DAY
$500.00
$567.30
32
4" BYPASS PUMPING BEYOND THE INTIAL 100 FEET
LF
$5.00
$5.67
33
6" BY-PASS PUMPING INITIAL SETUP (includes 100 feet of temporary piping)
EA
$300.00
$340.38
34
6" BY-PASS PUMPING OPERATION
DAY
$700.00
$794.22
Exhibit 1- First Extension
Item
No.
Item Description (Furnish and Install)
Unit
Per Unit Price
Bid
Updated Per
Unit Price
35
6" BYPASS PUMPING BEYOND THE INTIAL 100 FEET
LF
$10.00
$11.35
36
12" BY-PASS PUMPING INITIAL SETUP (includes 100 feet of temporary piping)
EA
$500.00
$567.30
37
12" BY-PASS PUMPING OPERATION
DAY
$1,200.00
$1,361.52
38
12" BYPASS PUMPING BEYOND THE INTIAL 100 FEET
LF
$15.00
$17.02
39
BYPASS PUMPING VIA 3,500 GALLON PUMPER TRUCK
HR
$300.00
$340.38
40
BYPASS PUMPING VIA VAC -CON PUMPER
HR
$250.00
$283.65
41
Force Main Installation -4" DIP, EPDXY LINED, CLASS 52, 0'-6' DEPTH (includes excavation, backfill &
compaction)
LF
$60.00
$68.08
42
Force Main Installation - 6" DIP, EPDXY LINED, CLASS 52, 0'-6' DEPTH (includes excavation, backfill &
compaction)
LF
$65.00
$73.75
43
Force Main Installation -8" DIP, EPDXY LINED, CLASS 52, 0'-6' DEPTH (includes excavation, backfill &
compaction)
LF
$75.00
$85.10
44
Force Main Installation -10" DIP, EPDXY LINED, CLASS 52, 0'-6' DEPTH (includes excavation, backfill &
compaction)
LF
$80.00
$90.77
45
Force Main Installation -12" DIP, EPDXY LINED, CLASS 52, 0'-6' DEPTH (includes excavation, backfill &
compaction)
LF
$90.00
$102.11
46
Force Main Installation -16" DIP, EPDXY LINED, CLASS 52, 0'-6' DEPTH (includes excavation, backfill &
compaction)
LF
$110.00
$124.81
47
1ADDITIONAL EXCAVATION 6'-8' DEPTH
LF
$35.00
$39.71
48
ADDITIONAL EXCAVATION 8'-10' DEPTH
LF
$45.00
$51.06
49
ADDITIONAL EXCAVATION 10'-12' DEPTH
LF
$85.00
$96.44
50
4" MEGA -LUG JOINT RESTRAINTS
EA
$100.00
$113.46
51
6" MEGA -LUG JOINT RESTRAINTS
EA
$120.00
$136.15
52
8" MEGA -LUG JOINT RESTRAINTS
EA
$120.00
$136.15
53
10" MEGA -LUG JOINT RESTRAINTS
EA
$130.00
$147.50
54
12" MEGA -LUG JOINT RESTRAINTS
EA
$180.00
$204.23
55
16" MEGA -LUG JOINT RESTRAINTS
EA
$300.00
$340.38
56
4" PLUG VALVE & VALVE BOX
EA
$850.00
$964.41
57
6" PLUG VALVE & VALVE BOX
EA
$1,200.00
$1,361.52
58
8" PLUG VALVE & VALVE BOX
EA
$1,400.00
$1,588.44
59
10" PLUG VALVE & VALVE BOX
EA
$2,200.00
$2,496.12
60
12" PLUG VALVE & VALVE BOX
EA
$2,800.00
$3,176.88
61
16" PLUG VALVE & VALVE BOX
EA
$4,800.00
$5,446.08
62
1EXCAVATION & DISPOSAL OF ASPHALT PAVEMENT
SY
$5.00
$5.67
Exhibit 1- First Extension
Item
Item Description (Furnish and Install)
No.
Unit
Per Unit Price
Bid
Updated Per
Unit Price
63 EXCAVATION & DISPOSAL OF CONCRETE SIDWALKS, DRIVEWAYS & FLATWORK
SY
$8.00
$9.08
64 EXCAVATION & DISPOSAL OF CONCRETE CURB
LF
$10.00
$11.35
65 1 EXCAVATION & DISPOSAL OF UNSUITABLE SOIL
CY
$20.00
$22.69
66 CLEAN IMPORT SAND BACKFILL
CY
$25.00
$28.37
67 FLOWABLE FILL- EXCAVATABLE (per Section 121 FDOT spec)
CY
$180.00
$204.23
66 LIMEROCK STABILIZED BASE MATERIAL
CY
$35.00
$39.71
69 IN PLACE MATERIAL TESTING - LIMEROCK BEARING RATIO - ASTM
EA
$125.00
$141.83
70 IN PLACE MATERIAL TESTING- MODIFIED PROCTOR TEST, AASHTO T-180
EA
$100.00
$113.46
Gravity Main Installation - 6" DIP, EPDXY LINED, 0'-6' DEPTH (includes excavation, backfill &
71
compaction)
LF
$75.00
$85.10
Gravity Main Installation - 8" DIP EPDXY LINED, 0'-6' DEPTH (includes excavation, backfill &
72
compaction)
LF
$80.00
$90.77
Gravity Main Installation -10" DIP EPDXY LINED 0'-6' DEPTH (includes excavation, backfill &
73
compaction)
LF
$85.00
$96.44
Gravity Main Installation -12" DIP, EPDXY LINED, 0'-6' DEPTH (includes excavation, backfill &
74
compaction)
LF
$85.00
$96.44
Gravity Main Installation -16" DIP, EPDXY LINED, 0'-6' DEPTH (includes excavation, backfill &
75
compaction)
LF
$100.00
$113.46
76 6" PVC, DR 26, 0'-6' DEPTH (includes excavation, backfill & compaction)
LF
$65.00
$73.75
77 8" PVC, DR 26, 0'-6' DEPTH (includes excavation, backfill & compaction)
LF
$70.00
$79.42
78 10" PVC, DR 26, 0'-6' DEPTH (includes excavation, backfill & compaction)
LF
$75.00
$85.10
79 12" PVC, DR 26, 0'-6' DEPTH (includes excavation, backfill & compaction)
LF
$80.00
$90.77
80 15" PVC, DR 26, 0'-6' DEPTH (includes excavation, backfill & compaction)
LF
$85.00
$96.44
81 8" PVC, DR 18, 0'-6' DEPTH (includes excavation, backfill & compaction)
LF
$75.00
$85.10
82 10" PVC, DR 18, 0'-6' DEPTH (includes excavation, backfill & compaction)
LF
$80.00
$90.77
83 12" PVC, DR 18, 0'-6' DEPTH (includes excavation, backfill & compaction)
LF
$85.00
$96.44
84 16" PVC, DR 18, 0'-6' DEPTH (includes excavation, backfill & compaction)
LF
$90.00
$102.11
85 4" FERNCO COUPLING w/ SHEAR RINGS
EA
$45.00
$51.06
86 6" FERNCO COUPLING w/ SHEAR RINGS
EA
$65.00
$73.75
87 8" FERNCO COUPLING w/ SHEAR RINGS
EA
$75.00
$85.10
88 10" FERNCO COUPLING w/ SHEAR RINGS
EA
$85.00
$96.44
89 12" FERNCO COUPLING w/ SHEAR RINGS
EA
$100.00
$113.46
90 16" FERNCO COUPLING w/ SHEAR RINGS
EA
$200.00
$226.92
91 IADDITIONAL EXCAVATION 6'-8' DEPTH
LF
$50.00
$56.73
Exhibit 1- First Extension
Item
No.
Item Description (Furnish and Install)
Unit
Per Unit Price
Bid
Updated Per
Unit Price
92
ADDITIONAL EXCAVATION 8'-10' DEPTH
LF
$65.00
$73.75
93
ADDITIONAL EXCAVATION 10'-12' DEPTH
LF
$100.00
$113.46
94
1ADDITIONAL EXCAVATION 12'-15' DEPTH
LF
$200.00
$226.92
95
ADDITIONAL EXCAVATION 15'-18' DEPTH
LF
$250.00
$283.65
96
ADDITIONAL EXCAVATION 18'-24' DEPTH
LF
$300.00
$340.38
97
PIPE BEDDING - #57 STONE
CY
$30.00
$34.04
98
Duplex Remote Terminal Unit, Complete
EA
$18,500.00
$20,990.10
99
Duplex Remote Terminal Unit, Complete, Installed Only
EA
$6,000.00
$6,807.60
100
Duplex Motor Control Panel, 3 - 5 HP, Single Phase, 240 Volts
EA
$30,000.00
$34,038.00
101
Duplex Motor Control Panel, 3 -10 HP, Three Phase, 240 Volts
EA
$26,000.00
$29,499.60
102
Duplex Motor Control Panel, 5 -10 HP, Three Phase, 480 Volts
EA
$28,000.00
$31,768.80
103
Duplex Motor Control Panel, 15 - 25 hp, Three Phase, 480 Volts w/ Soft Starts
EA
$32,000.00
$36,307.20
104
Duplex Motor Control Panel, 30 -100 hp, Three Phase, 480 Volts w/Soft Starts
EA
$62,000.00
$70,345.20
105
12" CHECK VALVE, OUTSIDE WEIGHT, FLANGED JOINT
EA
$7,500.00
$8,509.50
106
4" DIP FITTINGS, EPDXY LINED CLASS 52, FLANGED JOINT
EA
$500.00
$567.30
107
6" DIP FITTINGS, EPDXY LINED CLASS 52, FLANGED JOINT
EA
$600.00
$680.76
108
8" DIP FITTINGS, EPDXY LINED CLASS 52, FLANGED JOINT
EA
$750.00
$850.95
109
10" DIP FITTINGS, EPDXY LINED CLASS 52, FLANGED JOINT
EA
$1,000.00
$1,134.60
110
12" DIP FITTINGS, EPDXY LINED CLASS 52, FLANGED JOINT
EA
$1,500.00
$1,701.90
111
4" PLUG VALVE, LEVER OPERATED, FLANGED JOINT
EA
$1,100.00
$1,248.06
112
6" PLUG VALVE, HAND WHEEL, FLANGED JOINT
EA
$1,400.00
$1,588.44
113
8" PLUG VALVE, HAND WHEEL, FLANGED JOINT
EA
$1,500.00
$1,701.90
114
10" PLUG VALVE, HAND WHEEL, FLANGED JOINT
EA
$2,100.00
$2,382.66
115
12" PLUG VALVE, HAND WHEEL, FLANGED JOINT
EA
$2,400.00
$2,723.04
119
2" DIA H.D. ALUM PIPE SUPPORT STANDS w/ ST STL ANCHORS (max 36" height)
EA
$350.00
$397.11
120
3" DIA H.D. ALUM PIPE SUPPORT STANDS w/ ST STL ANCHORS (max 36" height)
EA
$400.00
$453.84
121
4" DIA H.D. ALUM PIPE SUPPORT STANDS w/ ST STL ANCHORS (max 36" height)
EA
$450.00
$510.57
122
6" CAMLOCK EMERGENCY PUMP CONNECTION & CAP
EA
$500.00
$567.30
123
8" CAMLOCK EMERGENCY PUMP CONNECTION & CAP
EA
$500.00
$567.30
124
4" HDPE VERTICAL DISCHARGE PIPING (up to 15 lineal feet)
EA
$3,500.00
$3,971.10
125
4" HDPE DISCHARGE PIPING (per foot in excess of 15 lineal feet)
LF
$150.00
$170.19
127
316 STAINLESS-STEEL HORIZ SUPPORT BRACKET FOR 4" DISCHARGE PIPING
EA
$800.00
$907.68
128
6" HDPE VERTICAL DISCHARGE PIPING (up to 15 lineal feet)
EA
$3,800.00
$4,311.48
129
6" HDPE DISCHARGE PIPING (per foot in excess of 15 lineal feet)
LF
$200.00
$226.92
Exhibit 1- First Extension
Item
No.
Item Description (Furnish and Install)
Unit
Per Unit Price
Bid
Updated Per
Unit Price
130
316 STAINLESS-STEEL HORIZ SUPPORT BRACKET FOR 6" DISCHARGE PIPING
EA
$800.00
$907.68
131
8" HDPE VERTICAL DISCHARGE PIPING (up to 15 lineal feet)
EA
$4,500.00
$5,105.70
132
8" HDPE DISCHARGE PIPING (per foot in excess of 15 lineal feet)
LF
$225.00
$255.29
133
316 STAINLESS STEEL HORIZ SUPPORT BRACKET FOR 8" DISCHARGE PIPING
EA
$1,000.00
$1,134.60
134
10" HDPE VERTICAL DISCHARGE PIPING (up to 15 lineal feet)
EA
$5,200.00
$5,899.92
135
10" HDPE DISCHARGE PIPING (per foot in excess of 15 lineal feet)
LF
$300.00
$340.38
136
316 STAINLESS STEEL HORIZ SUPPORT BRACKET FOR 10" DISCHARGE PIPING
EA
$1,200.00
$1,361.52
137
12" HDPE VERTICAL DISCHARGE PIPING (up to 15 lineal feet)
EA
$6,000.00
$6,807.60
138
12"HDPE DISCHARGE PIPING (per foot in excess of 15 lineal feet)
LF
$350.00
$397.11
139
316 STAINLESS STEEL HORIZ SUPPORT BRACKET FOR 12" DISCHARGE PIPING
EA
$1,200.00
$1,361.52
140
4" HDPE DISCHARGE FITTINGS & FLANGE ADAPTERS
EA
$500.00
$567.30
141
6" HDPE DISCHARGE FITTINGS & FLANGE ADAPTERS
EA
$500.00
$567.30
142
8" HDPE DISCHARGE FITTINGS & FLANGE ADAPTERS
EA
$600.00
$680.76
143
10" HDPE DISCHARGE FITTINGS & FLANGE ADAPTERS
EA
$750.00
$850.95
144
12" HDPE DISCHARGE FITTINGS & FLANGE ADAPTERS
EA
$1,000.00
$1,134.60
145
4" PUMP DISCHARGE BASE, INCLUDING ANCHORS
EA
$2,800.00
$3,176.88
146
6" PUMP DISCHARGE BASE, INCLUDING ANCHORS
EA
$3,200.00
$3,630.72
147
8" PUMP DISCHARGE BASE, INCLUDING ANCHORS
EA
$4,500.00
$5,105.70
148
10" PUMP DISCHARGE BASE, INCLUDING ANCHORS
EA
$7,800.00
$8,849.88
149
4" X 6" EPDXY COATED & LINED ECCENTRIC REDUCER
EA
$500.00
$567.30
150
6" X 8" EPDXY COATED & LINED ECCENTRIC REDUCER
EA
$650.00
$737.49
151
2" - 316 STAINLESS STEEL SCH 40 PUMP GUIDE RAILS
VF
$45.00
$51.06
152
3" - 316 STAINLESS STEEL SCH 40 PUMP GUIDE RAILS
VF
$75.00
$85.10
153
2" - 316 STAINLESS STEEL GUIDE RAIL UPPER SUPPORT BRACKETS w/ HOOK
EA
$350.00
$397.11
154
3" - 316 STAINLESS STEEL GUIDE RAIL UPPER SUPPORT BRACKETS w/ HOOK
EA
$450.00
$510.57
155
2" - 316 STAINLESS STEEL GUIDE RAIL INTERMEDIATE SUPPORT BRACKETS
EA
$600.00
$680.76
156
3" - 316 STAINLESS STEEL GUIDE RAIL INTERMEDIATE SUPPORT BRACKETS
EA
$750.00
$850.95
157
3/8" - 316 STAINLESS STEEL LIFTING CHAIN
LF
$35.00
$39.71
158
1/2" - 316 STAINLESS STEEL LIFTING CHAIN
LF
$40.00
$45.38
159
5/8" - 316 STAINLESS STEEL LIFTING CHAIN
LF
$55.00
$62.40
160
3/4" - 316 STAINLESS STEEL LIFTING CHAIN
LF
$65.00
$73.75
161
4 HOOK- 316 STAINLESS STEEL CABLE HANGER BRACKETS
EA
$400.00
$453.84
162
16 HOOK- 316 STAINLESS STEEL CABLE HANGER BRACKETS
EA
$600.00
$680.76
163
14'- 5' DIA MANHOLE, HYDROBLAST INTERIOR SURFACES (pervert foot)
VF
$25.00
$28.37
Exhibit 1- First Extension
Item
No.
Item Description (Furnish and Install)
Unit
Per Unit Price
Bid
Updated Per
Unit Price
164
6' DIA WET WELL, HYDROBLAST INTERIOR SURFACES (per square foot)
SF
$5.00
$5.67
165
8' DIA WET WELL, HYDROBLAST INTERIOR SURFACES (per square foot)
SF
$5.00
$5.67
166
10' DIA WET WELL, HYDROBLAST INTERIOR SURFACES (per square foot)
SF
$5.00
$5.67
167
12' DIA WET WELL, HYDROBLAST INTERIOR SURFACES (per square foot)
SF
$5.00
$5.67
168
VALVE VAULT, HYDROBLAST INTERIOR SURFACES (per square foot)
SF
$5.00
$5.67
169
4'- 5' DIA MANHOLE, COAL SLAG BLAST INTERIOR SURFACES (pervert foot)
VF
$50.00
$56.73
170
6' DIA WET WELL, COAL SLAG BLAST INTERIOR SURFACES (per square foot)
SF
$5.00
$5.67
171
8' DIA WET WELL, COAL SLAG BLAST INTERIOR SURFACES (per square foot)
SF
$5.00
$5.67
172
10' DIA WET WELL, COAL SLAG BLAST INTERIOR SURFACES (per square foot)
SF
$5.00
$5.67
173
12' DIA WET WELL, COAL SLAG BLAST INTERIOR SURFACES (per square foot)
SF
$5.00
$5.67
174
VALVE VAULT, COAL SLAG BLAST INTERIOR SURFACES (per square foot)
SF
$5.00
$5.67
175
VALVE VAULT, BITUMASTIC COATING (2 layers Carboline 300M or equal, per square foot)
SF
$10.00
$11.35
176
14'- 5' DIA MANHOLE, CALCIUM ALUMINA TE COATING (Sewper-Coat or equal,per square foot)
SF
$20.00
$22.69
177
6' DIA WET WELL, CALCIUM ALUMINATE COATING (Sewper-Coat or equal, per square foot)
SF
$20.00
$22.69
178
8' DIA WET WELL, CALCIUM ALUMINATE COATING (Sewper-Coat or equal, per square foot)
SF
$20.00
$22.69
179
10' DIA WET WELL, CALCIUM ALUMINATE COATING (Sewper-Coat or equal, per square foot)
SF
$20.00
$22.69
180
12' DIA WET WELL, CALCIUM ALUMINATE COATING (Sewper-Coat or equal, per square foot)
SF
$20.00
$22.69
181
IVALVE VAULT, CALCIUM ALUMINA TE COATING (Sewper-Coat or equal, per square foot)
SF
$20.00
$22.69
182
4'- 5' DIA MANHOLE, SPECTRA SHIELD COATING 14 -layer system, per sq. ft)
SF
$30.00
$34.04
183
6' DIA WET WELL, SPECTRA SHIELD COATING (4 -layer system, per sq. ft)
SF
$35.00
$39.71
184
8' DIA WET WELL, SPECTRA SHIELD COATING (4 -layer system, per sq. ft)
SF
$35.00
$39.71
185
10' DIA WET WELL, SPECTRA SHIELD COATING (4 -layer system, per sq. ft)
SF
$40.00
$45.38
186
12' DIA WET WELL, SPECTRA SHIELD COATING (4 -layer system, per sq. ft)
SF
$40.00
$45.38
187
4'- 5' DIA MANHOLE, IET SYSTEM 3 COATING (prime, intermediate & finish, per square foot)
SF
$30.00
$34.04
188
6' DIA WET WELL, IET SYSTEM 3 COATING (prime, intermediate & finish, per square foot)
SF
$35.00
$39.71
189
8' DIA WET WELL, IET SYSTEM 3 COATING (prime, intermediate & finish, per square foot)
SF
$35.00
$39.71
190
10' DIA WET WELL, IET SYSTEM 3 COATING (prime, intermediate & finish, per square foot)
SF
$40.00
$45.38
191
12' DIA WET WELL, IET SYSTEM 3 COATING (prime, intermediate & finish, per square foot)
SF
$40.00
$45.38
192
CAST IN PLACE CONCRETE -REPAIR EXIST STRUCTURE EXTERIOR (max 6' depth)
CF
$30.00
$34.04
193
CAST IN PLACE CONCRETE -REPAIR EXIST STRUCTURE INTERIOR (max 25' depth)
CF
$50.00
$56.73
193
FORM WORK FOR CAST IN PLACE CONCRETE REPAIR
SF
$50.00
$56.73
194
REINFORCING STEEL FOR CAST IN PLACE CONCRETE REPAIR
LB
$10.00
$11.35
195
1HYDRAULIC CEMENT GROUTING & REPAIR - EXISTING STRUCTURE
LB
$30.00
$34.04
196
36" x 46" ALUMINIUM HATCH COVER & FRAME, H2O LOAD w/ 316 ST STL HARDWARE
EA
$2,800.00
$3,176.88
Exhibit 1- First Extension
Item
No.
Item Description (Furnish and Install)
Unit
Per Unit Price
gid
Updated Per
Unit Price
197
48" x 60" ALUMINIUM HATCH COVER & FRAME, H2O LOAD w/ 316 ST STL HARDWARE
EA
$3,500.00
$3,971.10
198
48" x 72" ALUMINIUM HATCH COVER & FRAME, H2O LOAD w/ 316 ST STL HARDWARE
EA
$3,800.00
$4,311.48
199
54" x 60" ALUMINIUM HATCH COVER & FRAME, H2O LOAD w/ 316 ST STL HARDWARE
EA
$3,900.00
$4,424.94
200
64" x 72" ALUMINIUM HATCH COVER & FRAME, H2O LOAD w/ 316 ST STL HARDWARE
EA
$4,700.00
$5,332.62
201
60" x 72" ALUMINIUM HATCH COVER & FRAME, H2O LOAD w/ 316 ST STL HARDWARE
EA
$4,500.00
$5,105.70
202
72" x 84" ALUMINIUM HATCH COVER & FRAME, H2O LOAD w/ 316 ST STL HARDWARE
EA
$5,500.00
$6,240.30
203
4" DIP J- VENT w/ RISER & ST STL BUG SCREEN
EA
$500.00
$567.30
204
4" PVC 1- VENT w/ RISER & ST STL BUG SCREEN
EA
$550.00
$624.03
205
JOSAM 26700 VENT HOOD w/ DIP RISER
EA
$700.00
$794.22
206
FURNISH & INSTALL 4' INSIDE DIA MANHOLE, 0-6' DEEP
EA
$4,500.00
$5,105.70
207
ADDITIONAL 4'1.0. MANHOLE & EXCAVATION 6'-10' DEPTH
LF
$1,000.00
$1,134.60
208
ADDITIONAL 4' 1.0. EXCAVATION 10'-14' DEPTH
LF
$1,000.00
$1,134.60
209
1ADDITIONAL 4' 1.0. EXCAVATION 14'-18' DEPTH
LF
$1,800.00
$2,042.28
210
FURNISH & INSTALL 5' INSIDE DIA MANHOLE, 0-6' DEEP
EA
$5,000.00
$5,673.00
211
ADDITIONAL 5' I.D. MANHOLE & EXCAVATION 6'-10' DEPTH
LF
$1,000.00
$1,134.60
212
ADDITIONAL 5'1.D. EXCAVATION 10'-14' DEPTH
LF
$1,000.00
$1,134.60
213
ADDITIONAL 5' 1.D. EXCAVATION 14'-18' DEPTH
LF
$1,800.00
$2,042.28
214
4" - 8" RELINER INSIDE DROP CONNECTION w/ 316 ST STL MOUNTING HARDWARE
EA
$850.00
$964.41
215
10" - 16" RELINER INSIDE DROP CONNECTION w/ 316 ST STL MOUNTING HARDWARE
EA
$1,000.00
$1,134.60
216
32" DIA USF 240 MANHOLE RING, FRAME & LID
EA
$900.00
$1,021.14
217
36" DIA USF 420 MANHOLE RING, FRAME & LID
EA
$1,000.00
$1,134.60
218
50" DIA USF 690 -AH -M MANHOLE RING, FRAME & LID
EA
$1,800.00
$2,042.28
219
IJETTER, PUMPER OR VACUUM TRUCK
HR
$225.00
$255.29
220
SEWER VIDEO CCTV
HR
$250.00
$283.65
221
150 CFM COMPRESSOR & ACCESSORIES
DAY
$75.00
$85.10
222
DEWATERING PUMP & WELLPOINT INITIAL SETUP (up to 20 points)
EA
$2,500.00
$2,836.50
223
ADDITIONAL WELLPOINT & HEADER (per point in excess of initial 20 -point header)
EA
$100.00
$113.46
224
DEWATERING PUMP & WELLPOINT OPERATION & MAINTENANCE
DAY
$500.00
$567.30
225
ADDITIONAL WELLPOINT OPERATION & MAINTENANCE (per foot per day)
DAY
$50.00
$56.73
226
DIAPHRAGM PUMP & PIPING (up to 30 feet suction hose and 60 feet discharge hose)
DAY
$500.00
$567.30
227
ADDED DIAPHRAGM PUMP PIPING (per foot beyond 30 -foot suction or 60 -foot discharge)
DAY
$20.00
$22.69
228
DRIVEN METAL SHEET PILING (up to 10' depth)
LF
$200.00
$226.92
229
IDRIVEN METAL SHEET PILING (up to 20' depth)
LF
$300.00
$340.38
230
ITRENCH SHORING BOX (min 4'x 12')
DAY
$250.00
$283.65
Exhibit 1- First Extension
Item
No.
Item Description (Furnish and Install)
Unit
Per Unit Price
Bid
Updated Per
Unit Price
231
TRENCH SHORING BOX (min 6'x 12')
DAY
$300.00
$340.38
232
TRENCH SHORING BOX (min 8'x 12')
DAY
$450.00
$510.57
233
TWO MAN LANDSCAPE CLEARING CREW
HR
$100.00
$113.46
234
TWO MAN HAND EXCAVATION CREW
HR
$160.00
$181.54
235
THREE MAN PIPE EXCAVATION & REPAIR CREW
HR
$320.00
$363.07
236
DUMP TRUCK & DRIVER, 8-12 CU YD
HR
$65.00
$73.75
237
DUMP TRUCK & DRIVER 15-18 CU YD
HR
$120.00
$136.15
238
120 CU YD CLEARING & DEMOLITION DUMPSTER
PULL
$450.00
$510.57
239
8 CU YD CLEARING & DEMOLITION DUMPSTER
PULL
$300.00
$340.38
240
SKID STEER LOADER & OPERATOR
HR
$85.00
$96.44
241
WHEEL LOADER & OPERATOR (Cat Class 057-006)
HR
$125.00
$141.83
242
RUBBER TIRE TRACTOR & OPERATOR (Cat Class 053-0210)
HR
$125.00
$141.83
243
HYDRAULIC EXCAVATOR & OPERATOR (Cat 304 or equivalent)
HR
$150.00
$170.19
244
4" ON 6" OR 8" TAPPING SLEEVE & VALVE, UP TO S' DEPTH
EA
$3,500.00
$3,971.10
245
4" ON 10" OR 12" TAPPING SLEEVE & VALVE, UP TO 5' DEPTH
EA
$4,000.00
$4,538.40
246
6" ON 8" OR 10" TAPPING SLEEVE & VALVE, UP TO 5' DEPTH
EA
$4,200.00
$4,765.32
247
6" ON 12" OR 16" TAPPING SLEEVE & VALVE, UP TO 5' DEPTH
EA
$4,800.00
$5,446.08
248
8" ON 10" OR 12" TAPPING SLEEVE & VALVE, UP TO 5' DEPTH
EA
$6,000.00
$6,807.60
249
8" ON 16" TAPPING SLEEVE & VALVE, UP TO 5' DEPTH
EA
$7,800.00
$8,849.88
251
TAP OR CONNECTION AT ADDITIONAL EXCAVATION 6'-8' DEPTH
EA
$500.00
$567.30
252
TAP OR CONNECTION AT ADDITIONAL EXCAVATION 8'-10' DEPTH
EA
$500.00
$567.30
253
TAP OR CONNECTION AT ADDITIONAL EXCAVATION 10'-12' DEPTH
EA
$500.00
$567.30
254
4" OR 6" DIA CORE BORE OF REINF CONC STRUCTURE, UP TO 5' DEPTH
EA
$350.00
$397.11
255
8' OR 10" DIA CORE BORE OF REINF CONC STRUCTURE, UP TO 5' DEPTH
EA
$800.00
$907.68
256
4" CONCRETE SIDEWALK OR SLAB w/ FIBER MESH (up to 150 sq. ft)
EA
$1,000.00
$1,134.60
257
4" CONCRETE SIDEWALK OR SLAB (per sq. ft in excess of 150 sq. ft at a site)
SF
$6.00
$6.81
258
6" CONCRETE SIDEWALK OR SLAB w/ FIBER MESH (up to 150 sq. ft)
EA
$1,200.00
$1,361.52
259
6" CONCRETE SIDEWALK OR SLAB (per sq. ft in excess of 150 sq. ft at a site)
SF
$8.00
$9.08
260
12" STABILIZED SUBGRADE AND 10' LIMEROCK BASE REPAIR
SY
$30.00
$34.04
261
2" ASPHALT SURFACE COURSE REPAIR
SY
$48.00
$54.46
262
CONCRETE CURB
LF
$50.00
$56.73
263
YARD GRADING #57 STONE w/ TYPAR GEOTEXTILE (up to 200 sq. ft)
EA
$800.00
$907.68
264
YARD GRADING #57 STONE w/ TYPAR GEOTEXTILE (per sq. ft in excess of 200 sq. ft)
SF
$5.00
$5.67
265
JBAHIASOD
SY
$5.00
$5.67
Exhibit 1- First Extension
Item
No.
Item Description (Furnish and Install)
Unit
Per Unit Price
Bid
Updated Per
Unit Price
266
STAUGUSTINE OR BERMUDA SOD
SY
$6.00
$6.81
267
PRESSURE WASHING
SF
$5.00
$5.67
268
IREMOVE & DISPOSE OF EXISTING MANHOLE, UP TO 6' DEPTH
EA
$2,500.00
$2,836.50
269
ADDITIONAL MANHOLE REMOVAL, 6'-10' DEPTH
VF
$300.00
$340.38
270
ADDITIONAL MANHOLE REMOVAL, 10'-14' DEPTH
VF
$400.00
$453.84
271
ADDITIONAL MANHOLE REMOVAL, 14'-18' DEPTH
VF
$1,500.00
$1,701.90
272
DUPLEX VALVE VAULT REMOVAL
CF
$300.00
$340.38
273
IREMOVE & DISPOSE OF EXIST PIPES, UP TO 48" DEEP & UP TO 4" DIA (non -hazardous)
LF
$10.00
$11.35
274
REMOVE & DISPOSE OF EXIST PIPES, UP TO 48" DEEP & 4.5" - 6" DIA (non -hazardous)
LF
$10.00
$11.35
275
REMOVE & DISPOSE OF EXIST PIPES, UP TO 60" DEEP & 6.5"-10" DIA (non -hazardous)
LF
$12.00
$13.62
276
REMOVE & DISPOSE OF EXIST PIPES, UP TO 60" DEEP & 10.5" -16" DIA (non -hazardous)
LF
$15.00
$17.02
Al -1
4" DIP Pipe, Epoxy lined Class 52, Flanged joint
LF
$230.00
$260.96
A1-2
6" DIP Pipe, Epoxy lined Class 52, Flanged joint
LF
$260.00
$295.00
A1-3
8" DIP Pipe, Epoxy Lined Class 52, Flanged joint
LF
$260.00
$295.00
A1-4
10" DIP Pipe, Epoxy lined Class 52, Flanged joint
LF
$275.00
$312.02
A1-5
4" Check Valve, Outside weight, Flanged joint
EA
$2,400.00
$2,723.04
A1-6
6" Check Valve, Outside weight, Flanged joint
EA
$3,200.00
$3,630.72
A1-7
8" Check Valve, Outside weight, Flanged joint
EA
$4,200.00
$4,765.32
A1-8
10" Check Valve, Outside weight, Flanged joint
EA
$6,800.00
$7,715.28
A1-9
4" DIP Fittings, Epoxy lined Class 52, Flanged Joint
EA
$600.00
$680.76
Al -10
6" DIP Fittings, Epoxy lined Class 52, Flanged Joint
EA
$700.00
$794.22
Al -11
8" DIP Fittings, Epoxy lined Class 52, Flanged Joint
EA
$1,000.00
$1,134.60
Al -12
10" DIP Fittings, Epoxy lined Class 52, Flanged Joint
EA
$1,400.00
$1,588.44
Al -13
4" Plug Valve, Hand Wheel, Flanged Joint
EA
$1,200.00
$1,361.52
Al -14
6" Plug Valve, Hand Wheel, Flanged Joint
EA
$1,450.00
$1,645.17
Al -15
8" Plug Valve, Hand Wheel, Flanged Joint
EA
$1,750.00
$1,985.55
Al -16
10" Plug Valve, Hand Wheel, Flanged Joint
I EA
1 $2,500.001
$2,836.50
A1-17
Install Meter Can & Disconnect
I EA
1 $6,400.001
$7,261.44