HomeMy WebLinkAbout2022-106CCNA2018 WORK ORDER 3 — AMENDMENT 2
West Wabasso Septic to Sewer Phase 3113
This Work Order Number 3 - Amendment 2 is entered into as of this 7th day of June , 2022,
pursuant to that certain Continuing Consulting Engineering Services Agreement for Professional Services entered
into as of this 17th day of April, 2018 (collectively referred to as the "Agreement"), by and between INDIAN
RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and Bowman Consulting
Group, Ltd. ("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The
professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B
(Fee Schedule), attached to this Work Order and made a part hereof by this reference. The Consultant
will perform the professional services within the timeframe more particularly set forth in Exhibit C
(Time Schedule), attached to this Work Order and made a part hereof by this reference all in
accgrdance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of
the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement
and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as
if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first
written above.
CONSULTANT:
Bowman Consulting Grou , d.
By:
Print Name: Erik Juliano, P.E.
Title:
BOARD OF COUNTY COMMISSIO,I�I • S���rF OF INDIAN RIVER COUNTY •�` 9s.`
By: PxL
- � � o
Peter D. O'Bryan-.,:
' Cm ff.'♦•
Branch Manager BCC Approved Date: June 7, 2022
Attest: Jeffrey R. Smith, Clerk of Court and Comptroller
By:�,�'
Deputy Clerk _
Approved:
Jason E/ Brown, County-Al-ministrator
Approved as to form and legal sufficiency:
Dy an T. Reingold, County Attorney
SCOPE OF SERVICES
We propose to provide the following services:
Task 1 - Civil Design Services (Bowman Consulting)
System Re-evaluation and Design
1. Phase 313 has been re -designed to remove the future development/improvements from
the properties to the south of the neighborhood. This resulted in raising the sanitary
elevations on the gravity sewer system and lift station wet well for a cost savings on
construction. The lift station was redesigned for the reduced flows.
2. Phase 3A lift station has been relocated to address 8596 as directed by the County
Utility Department. The gravity sewer main has been redesigned to accommodate the
relocation of the lift station.
EXHIBIT B — FEE SCHEDULE
COMPENSATION
We will provide the requested services on a Lump Sum Cost, with estimated task breakdown below:
Design Services:
Task Design Services Fee
1. Civil Design Services Bowman $7,500
Grand Total $7,540
Bowman
5/4/22
Estimated Staff Loading For:
Indian River Co. Utilities - West Wabasso Septic to sewer Amendment 2
TASK Sr Proj Mgr Sr Engr Proj Engr Engr Sr Dsgnr Clerical TOTAL
Task 1 - Design Services 0
1. Phase 3B Redesign 4 4 10 4 10 2 34
2. Phase 3A Redesign 4 4 8 4 6 2 28
0
0
Staff By Category Totals 8 8 18 8 16 4 62
Billing Rate ($/hr) $165 $150 $130
$100 $105 $50
Total Personnel Cost ($) $1,320 $1,200 $2,340
$800 $1,680 $200 $7,540
Staffing Ratio (% of total hrs 12.9 12.9 29.0
12.9 25.8 6.5
Average Personnel Cost ($/hr)
121.61
Description of Other Project Costs VALUE ($)
Total of other costs ($) $0
Total Estimated Project Cost () $7,540
West Wabasso Fee Est 20220504.xls