Loading...
HomeMy WebLinkAbout2022-112AFIRST EXTENSION AND AMENDMENT TO CONTINUING CONTRACT AGREEMENT BETWEEN COUNTY AND CONTRACTIOR FOR CONSTRUCTION OF WATER, SEWER AND RECLAIMED WATER LINE REPLACEMENTS/EXTENSIONS AND MISCELLANEOUS ANNUAL REQUIREMENTS LABOR CONTRACT This First Extension and Amendment to that certain Continuing Contract Agreement Between County and Contractor - Construction of Water, Sewer and Reclaimed Water Line Replacements/Extensions and Miscellaneous Annual Requirements Labor Contract is entered into effective as of July 7, 2022 by and between Indian River County, a political subdivision of the State of Florida ("County") and CK Contractors and Development, LLC ("Contractor"). BACKGROUND RECITALS WHEREAS, the County and the Contractor entered into a Continuing Contract Agreement Between County and Contractor - Construction of Water, Sewer and Reclaimed Water Line Replacements/Extensions and Miscellaneous Annual Requirements Labor Contract effective July 7, 2020 ("Agreement"); and WHEREAS, Paragraph 4 of the Agreement contains the term and renewal provisions; and WHEREAS, the first term commenced effective as of July 7, 2020 and will end on July 6, 2022; and WHEREAS, pursuant to the Agreement, the parties desire to extend the Agreement for an additional one year; and WHEREAS, the parties desire to amend Paragraph 3 — Responsibilities of the Contractor to include E - Verify requirements; WHERAS, the parties desire to amend 8.10 Notices; and WHEREAS, the parties desire to update the Federal Clauses section, in accordance with 2 C.F.R.; and WHEREAS, the parties desire to amend the contract pricing provided in Exhibit 1. NOW, THEREFORE, in consideration of the foregoing, and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the County and the Contractor agree as follows: 1. The background recitals are true and correct and form a material part of this First Extension and Amendment. 2. The First renewal term shall commence effective July 7, 2022 and shall end on July 6, 2023. There is a one additional one-year renewal available on the contract. 3. Section 3 is modified as follows: 3.14 Contractor is registered with and will use the Department of Homeland Security's E -Verify system (www. e-verify.gov) to confirm the employment eligibility of all newly hired employees for the duration of this agreement, as required by Section 448.095, F.S. Contractor is also responsible for obtaining proof of E - Verify registration and utilization for all subcontractors. 4. Paragraph 8.10 is modified to update the party for Indian River County to Duke Hawkins. 5. Article 9 - Federal Clauses is modified as follows: 9.2 Equal Employment Opportunity. During the performance of this contract, the contractor agrees as follows: 9.2.1 The contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, sexual orientation, gender identity, or national origin.. Such action shall include, but not be limited to the following: Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. 9.2.2 The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive considerations for employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin. 9.18 Prohibition on Contractiny, for Covered Telecommunications Equipment or Services: 9.18.1 Definitions. As used in this clause the terms backhaul, covered foreign country' covered telecommunications equipment or services; interconnection arrangements roaming; substantial or essential component, and telecommunications equipment or services have the meaning as defined in FEMA Policy 405-143-1, Prohibitions on Expending FEMA Award Funds for Covered Telecommunications Equipment or Services (Interim) as used in this clause - 9.18.2 Prohibitions. (i) Section 889(b) of the John S McCain National Defense Authorization Act for Fiscal Year 2019, Pub. L. No. 115-232 and 2 C.F.R. § 200.216 prohibit the head of an executive agency on or after Aug. 13 2020 from obligating or expending grant cooperative agreement, loan, or loan izuarantee funds on certain telecommunications products or from certain entities for national security reasons. (ii) Unless an exception in paragraph..(c) of this clause applies, the contractor and its subcontractors may not use grant cooperative agreement loan or loan guarantee funds from the Federal Emergency Management Agency to (A) Procure or obtain any equipment system or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology of any system; (B) Enter into, extend, or renew a contract to procure or obtain any equipment, system or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology of any system; (C) Enter into, extend, or renew contracts with entities that use covered telecommunications equipment or services as a substantial or essential component of any system. or as critical technology as part of any system; or (D) Provide, as part of its performance of this contract, subcontract, or other contractual instrument, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of anyystem, or as critical technology as part of any system. 9.18.2 Exceptions. (i) This clause does not prohibit contractors from providing= (A) A service that connects to the facilities of a third -party. such as backhaul, roaming, or interconnection arrangements, or (B) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles. (ii) By necessM implication and regulation, ation the prohibitions also do not apples (A) Covered telecommunications equipment or services that: i. Are not used as a substantial or essential component of anysystem, and ii. Are not used as critical technology of any system. (B) Other telecommunications equipment or services that are not considered covered telecommunications equipment or services. 9.18.3 Reporting requirement. (i) In the event the contractor identifies covered telecommunications equipment or services used as a substantial or essential component of anystem, or as critical technology as part of any system, during contract performance, or the contractor is notified of such by a subcontractor at M tier or by other source, the contractor shall report the information in paragraph 9.18.3(ii) of this clause to the recipient or subrecipient, unless elsewhere in this contract are established procedures for reporting the information. (ii) The Contractor shall report the following information pursuant to paragraph 9 18 3(i) ofthis clause: (A) Within one business day from the date of such identification or notification: The contract number, the order number( if applicable, supplier name, supplier unique entity identifier (if known), supplier Commercial and Government Entity (CAGE) code (if known); brand, model number (original equipment manufacturer number manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended (B) Within 10 business days of submitting the information in paragraph 9 18 3ii)(A)o this clause: AU further available information about mitigation actions undertaken or recommended In addition, the contractor shall describe the efforts it undertook to prevent use or submission of covered telecommunications equipment or services and any additional efforts that will be incorporated to prevent future use or submission of covered telecommunications equipment or services 9.18.4 Subcontracts. The Contractor shall insert the substance of this clause including this paragraph 9.18.4, in all subcontracts and other contractual instruments 9.19. Domestic Preference for Procurements construction materials composed in whole or in part of non-ferrous metals such as aluminum,• plastics and polymer -based products such as polyvinyl chloride pipe; aggregates such as concrete glass, including optical fiber; and lumber. 6. Exhibit 1 to the agreement is replaced with Exhibit 1 — First Amendment. 7. All other terms and provisions of the Agreement shall be unchanged and remain in full force and effect. IN WITNESS WHEREOF, the parties have caused this First Extension and Amendment to be executed effective the day and year first set forth above. CK Contractors and Development, LLC. By: _ /V. t J. Q , Printed name: Ly t t&i A -,A& d Title: WV j&NAC,, J r_ (Corporate Seal) Date: Designated Representative: Name: rA LC 4,6,c9. Citi. r— ,J Title: G sr -c_ AAy ham• Address: 1ioc7—�c-4tJoLvGc�,��,stj 6v%rs l Phone: 6 . 3 z- I'D -7 0 t o t INDIAN RIVER COUNTY, FLORIDA. BOARD OF COUNTY COMMISSION ........ 0;••. By: PLA 1 0' J Peter D. O'Bryan, Chairman Attest: Jeffrey R. Smith, Clerk of Circuit Court And Comptroller Deputy Clerk Approved: Jason inistrator Email: M 6dL1FF-t.4 FG«I7L-i-C► Cvot& Approved as to form and legal sufficiency: Dylan Reingold County Attorney Exhibit 1 -Amendment 1 (CK Contractors & Development) Item No. I Description Quantity Unit I Material Unit Price Bid Revised Unit Price Material Installed Unit Price Bid Revised Unit Price Install Total Unit Price (Material + Installation) Revised total unit Price (Material + Installation) SECTION A - UNIT COST/PRICES Al Mobilization (a) Emergency Event 1 EA $ - $ 2,500.00 $ 2,841.25 $ 2,500.00 $2,841.25 (b) INon - Emergency Event 1 EA $ $ 1,500.00 $ 1,704.75 $ 1,500.00 $1,704.75 A2 Temporary Traffic Control (a) Residential Street 1 L.F. $ - $ 0.75 $ 0.85 $ 0.75 $0.85 (b) Arterial Roadway 1 L.F. $ - $ 1.15 $ 1.31 $ 1.15 $1.31 (c) FDOTRoadway 1 L.F. $ - $ 1.15 $ 1.31 $ 1.15 $1.31 A3 Video Documentation (a) Pre -Construction 1 L.F. $ - $ 0.60 $ 0.68 $ 0.60 $0.68 (b) Post -Construction Video 1 L.F. $ $ 0.60 $ 0.68 $ 0.60 $0.68 A4 Water Main - PVC (a) 2 -inch 1 L.F. $ 1.01 $ 1.15 $ 14.46 $ 16.43 $ 15.47 $17.58 (b) 44nch 1 L.F. $ 2.87 $ 3.27 $ 15.79 $ 17.95 $ 18.67 $21.21 (c) 6 -inch 1 L.F. $ 5.42 $ 6.16 $ 19.47 $ 22.12 $ 24.88 $28.28 (d) 8 -inch 1 L.F. $ 9.27 $ 10.54 $ 22.08 $ 25.09 $ 31.35 $35.62 (e) 10 inch 1 L.F. $ 13.73 $ 15.60 $ 25.57 $ 29.06 $ 39.30 $44.66 (f) 12 inch 1 L.F. $ 1930 $ 21.94 $ 30.46 $ 34.62 $ 49.77 $56.56 (g) 16 -inch 1 L.F. $ 27.71 $ 31.49 $ 47.51 $ 53.99 $ 75.21 $85.48 (h) 18 -inch 1 L.F. $ 40.90 $ 46.48 $ 50.03 $ 56.86 $ 90.93 $103.3 (i) 20 -inch 1 L.F. $ 49.06 $ 55.76 $ 59.81 $ 67.97 $ 108.87 $123.73 (j) 24 -inch 1 L.F. $ 70.66 $ 80.30 $ 74.48 $ 84.65 $ 145.14 $164.95 AS Water Main - DIP Cement Lined Interior for Water Mains (a) 4 -inch 1 L.F. $ 22.55 $ 25.62 $ 15.79 $ 17.95 5 38.34 $43.57 (b) 6inch 1 L.F. $ 16.82 $ 19.12 $ 19.47 $ 22.12 $ 36.29 $41.2 (c) 8 -inch 1 L.F. $ 22.99 $ 26.13 $ 22.08 $ 25.09 $ 45.06 $51.22 (d) 10 -inch 1 L.F. $ 25.91 $ 29.45 $ 25.57 $ 29.06 S 51.48 $58.51 (e) 12 -inch 1 L.F. $ 33.19 $ 37.72 $ 30.46 $ 34.62 $ 63.65 $72.34 (f) 16 -inch 1 L.F. $ 59.85 $ 68.02 $ 47.52 $ 54.01 $ 10737 $122.03 {g) 18 -inch 1 L.F. $ 70.77 $ 80.43 $ 51.40 $ 58.41 $ 122.17 $138.8 (h) 20 -inch 1 L.F. $ 83.00 $ 94.33 $ 61.44 $ 69.83 $ 144.44 $164.16 A6 Sewer Pipe - DIP Epoxy Lined Interior for Sewer Force Mains (a) 4 -inch 1 L.F. $ 34.83 $ 39.59 $ 18.09 $ 2056 $ 52.92 $60.15 (b) 16inch 1 L.F. $ 31.43 $ 35.71 $ 22.33 $ 25.38 $ 53.76 $61.10 (c) 8 -inch 1 L.F. $ 36.33 $ 41.29 $ 25.37 $ 28.83 $ 61.70 $70.12 (d) 10 -inch 1 L.F. $ 45.31 $ 51.49 $ 29.41 $ 33.43 $ 74.72 $84.92 (e) 12 -inch 1 L.F. $ 55.01 $ 62.52 $ 35.07 $ 39.85 $ 90.08 $102.38 (f) 16 -inch 1 L.F. $ 80.74 $ 91.76 $ 53.35 $ 60.63 $ 134.09 $152.39 (g) 18 -inch 1 L.F. $ 110.28 $ 125.34 $ 57.69 $ 65.57 $ 167.97 $190.90 (h) 20 -inch 1 L.F. $ 122.51 $ 139.23 $ 69.01 $ 78.43 $ 191.52 $217.67 (i) 24 -inch 1 L.F. $ 161.14 $ 183.14 $ 85.98 $ 97.72 $ 247.13 $280.86 A7 PVC Gravity Sewer - 8 inch (a) 0'-6' 1 L.F. $ 5.51 $ 6.26 $ 18.65 $ 21.19 $ 24.16 $27.46 (b) 6-8' 1 L.F. $ 5.51 $ 6.26 $ 20.20 $ 22.96 $ 25.72 $29.23 (c) 8'-10' 1 L.F. $ 5.51 $ 6.26 $ 22.04 $ 25.05 $ 27.55 $31.31 (d) 10'-12' 1 L.F. $ 5.51 $ 6.26 $ 26.94 $ 30.61 $ 32.45 $36.88 (e) 12'-14' 1 L.F. $ 5.51 $ 6.26 $ 38.24 $ 43.461 $ 43.75 $49.72 (f) lCost Credit 1 L.F. NA $ 0.10 $ 0.11 $0.10 $0.11 AS PVC Gravity Sewer - 10 inch (a) 0'-6' 1 L.F. $ 8.91 $ 10.13 $ 18.65 $ 21.19 $ 27.56 $31.32 6-8 1 L.F. $ 8.91 $ 10.13 $ 20.20 $ 22.96 $ 29.11 $33.09 (c) 8'-10' 1 L.F. $ 8.91 $ 10.13 $ 22.04 $ 25.05 $ 30.95 $35.18 [(b) (d) 10'-12' 1 L.F. $ 8.91 $ 10.13 $ 26.94 $ 30.61 $ 35.85 $40.7 (e) 12'-14' 1 L.F. $ 8.91 $ 10.13 $ 38.24 $ 43.46 $ 47.15 $53.58 (f) Cost Credit 1 L.F. NA $ 0.10 $ 0.11 $ 0.10 $0.11 A9 Connect to Existing Pipe (<12") 1 EA EA $ 385.74 $ 1,30038 $ 438.39 $1,477.88 $ 5 1,467.20 1,508.17 $ $ 1,667.47 1,714.03 $ $ 1,852.941 2,808.54 $2,105.86 $3,191.91 1 of 17 Exhibit 1 . Amendment 1(CK Contractors & Development) Item No. Description Quantity Unit Material Unit Price Bid Revised Unit Price Material Installed Unit Price Bid Revised Unit Price Install Total Unit Price (Material + Installation) Revised total unit Price (Material + Installation) A10 Precast Concrete Manhole -Lined (a) 0'-6' 1 EA. $ 4,876.79 $ 5,542.47 $ 848.61 $ 964.45 $ 5,725.41 $6,506.92 (b) 6'-8' 1 EA. $ 5,675.82 $ 6,450.56 S 1,120.18 $ 1,273.08 $ 6,795.99 $7,723.65 (c) 8'-10' 1 EA. $ 6,640.15 $ 7,546.53 $ 1,697.24 $ 1,928.91 $ 8,337.39 $9,475.44 (d) 10'-12' 1 EA. $ 7,437.12 $ 8,452.28 $ 3,394.47 $ 3,857.82 $ 10,831.59 $12,310.10 (e) 12'-14' 1 EA. $ 8,431.07 $ 9,581.91 $ 3,747.27 $ 4,258.78 S 12,178.34 $13,840.68 All Precast Concrete Manhole -Unlined (a) 0'-6' 1 EA. $ 2,427.93 $ 2,759.34 $ 848.61 $ 964.45 $ 3,276.54 $3,723.79 (b) 6'-8' 1 EA. $ 2,811.46 $ 3,195.22 $ 1,120.18 $ 1,273.08 5 3,931.64 $4,468.30 (c) 8'-10' 1 EA. $ 3,360.30 $ 3,818.98 $ 1,697.24 $ 1,928.91 $ 5,057.54 $5,747.89 (d) 10'-12' 1 EA. $ 3,798.94 $ 4,317.49 $ 3,394.47 $ 3,857.82 $ 7,193.41 $8,175.31 (e) 12'-14' 1 EA. $ 4,375.34 $ 4,972.57 $ 3,747.27 $ 4,258.78 $ 8,122.61 $9,231.35 Al2 Mechanical Joint Bell Restraints -PVC (a) 2 -inch EA. $ 35.27 $ 40.08 $ 31.36 $ 35.64 $ 66.63 $75.72 (b) 4 -inch 1 EA. $ 41.88 $ 47.60 $ 62.72 $ 71.28 $ 104.60 $118.88 (c) 6 -inch 1EA. $ 52.90 $ 60.12 $ 62.72 $ 71.28 $ 115.62 $131.40 (d) 8 -inch EA. $ 88.17 $ 100.20 $ 62.72 $ 71.28 $ 150.89 $171.48 (e) 10 -inch i EA. S 154.29 $ 175.36 $ 94.08 $ 106.92 $ 248.37 $282.28 (f) 12 -inch 1 EA. $ 165.32 $ 187.88 $ 125.44 $ 142.56 $ 290.76 $330.44 (g) 16 -inch 1 EA. $ 385.74 $ 438.39 $ 240.80 $ 273.67 $ 626.54 $712.06 (h) 18 -inch 1 EA. S 440.84 $ 501.01 $ 213.92 $ 243.12 $ 654.76 $744.13 (i) 20 -inch 1 EA. $ 606.16 $ 688.90 $ 213.92 $ 243.12 $ 820.08 $932.02 (j) 24 -inch 1 EA. $ 881.68 $ 1,002.03 $ 213.92 $ 243.12 $ 1,095.60 $1,245.15 A13 Mechanical Joint Bell Restraints -Ductile Iron (a) 2 -inch 1 EA. $ 39.35 $ 44.72 $ 31.36 $ 35.64 $ 70.71 $8036 (b) 4 -inch 1 EA. $ 137.76 $ 156.57 $ 62.72 $ 71.28 $ 200.48 $227.85 (c) 6 -inch 1 EA. $ 192.87 $ 219.19 $ 62.72 $ 71.28 $ 255.59 $290.48 (d) 8 -inch 1 EA. $ 231.44 $ 263.03 $ 62.72 $1 71.28 $ 294.16 $334.31 (e) 10 -inch 1 EA. $ 341.65 $ 388.29 S 94.08 $ 106.92 $ 435.73 $495.21 (f) 12 -inch 1 EA. $ 407.78 $ 463.44 $ 125.44 $ 142.56 $ 533.22 $606.00 (g) 16 -inch 1 EA. $ 677.79 $ 770.31 $ 240.80 $ 273.67 $ 918.59 $1,043.98 (h) 18 -inch 1 EA. $ 837.60 $ 951.93 $ 213.92 $ 243.12 $ 1,051.52 $1,195.05 (i) 20 -inch 1 EA. $ 1,035.97 $ 1,177.38 $ 213.92 $ 243.12 $ 1,249.89 $1,420.50 (j) 24 -inch 1 EA. $ 1,190.83 $ 1,353.38 $ 213.92 $ 243.12 $ 1,404.75 $1,596.50 A14 Ductile Iron Fittings 1 TONS $ 8.91 $ 10.13 $ 4,401.60 $ 5,002.42 $ 4,410.51 $5,012.54 (C-lS3 Compact Fittings) (Interior Cement Lined) A15 IDuctile Iron Fittings 1 TONS $ 8.91 $ 10.13 $ 5,091.52 $ 5,786.51 $ 5,100.43 $5,796.64 (C-153 Compact Fittings) (Interior Cement Lined and Exterior Fusion Bonded Epoxy Coated) A16 Ductile Iron Fittings 1 TONS $ 8.91 $ 10.13 $ 5,091.52 $ 5,786.51 $ 5,100.43 $5,79&64 (C-153 Compact Fittings) (Interior Epoxy Coated) A17 lFitting Restraint (Per one (1) unit) (b) 4 -inch 1 EA. $ 30.86 $ 35.07 $ 54.88 $ 62.37 $ 85.74 $97.4 (c) 6 -inch 1 EA. $ 33.06 $ 37.58 $ 54.88 $ 62.37 $ 87.94 $99.95 (d) 8 -inch 1 EA. $ 46.29 $ 52.61 $ 54.88 $ 62.37 $ 101.17 $114.98 (e) 10 -inch 1 EA. $ 88.17 $ 100.20 5 81.76 $ 92.92 $ 169.93 $193.12 (f) 12 -inch 1 EA. $ 99.19 $ 112.73 S 108.64 $ 123.47 $ 207.83 $236.20 (g) 16 -inch 1 EA. $ 209.40 $ 237.98 $ 188.16 $ 213.84 $ 397.56 $451.83 (h) 18 -inch 1 EA. $ 242.46 $ 275.56 S 188.16 $ 213.84 $ 430.62 $489.40 (i) 20 -inch 1 EA. $ 292.06 $ 331.92 5 168.00 $ 190.93 $ 460.06 $522.85 (j) 24 -inch 1 EA. $ 347.16 S 394.55 5 168.00 $ 190.93 $ 515.16 $585.48 A18 IFitting Restraint (Per one (1) per unit) (Stainless Steel Hardware) (b) 4 -inch 1 EA. $ 102.38 $ 116.36 $ 70.56 $ 80.19 $ 172.94 $196.55 (c) 6 -inch 1 EA. $ 137.95 $ 156.78 $ 80.64 $ 91.65 $ 218.59 $248.43 (d) 8 -inch 1 EA. S 16532 $ 187.88 $ 106.40 $ 120.92 $ 271.72 $308.80 (e) 10 -inch (f) 12 -inch 1 1 EA. EA. $ 251.94 $ 259.78 $ $ 286.33 295.24 $ 141.12 $ 212.80 $ 160.38 $ 241.85 $ 393.06 $ 472.58 $446.71 $537.08 (g) 116 -inch 1 EA. $ 459.7L L$ 522.48 1 $ 385.28 1 $ 437.87 $ 845.01 $960.35 2 of 17 Exhibit 1 - Amendment 1 ICK Contractors & Develoomentl Item Description Quantity No. Unit Material Unit Price Bid Revised Unit Price Material Installed Unit Price Bid Revised Unit Price Install Total Unit Price (Material + Installation) Revised total unit Price (Material + Installation) (h) 18 -inch 1 EA. $ 527.43 $ 599.43 $ 427.84 $ 486.24 $ 955.27 $1,085.67 (i) 20 -inch 1 EA. $ 629.86 $ 715.83 $ 427.84 $ 486.24 $ 1,057.70 $1,202.07 (j) 24 -inch 1 EA. $ 727.39 $ 826.67 $ 549.92 $ 624.98 $ 1,277.31 $1,451.66 A19 ITappingSleeve and Valve (pressure test & tap included) (a) 6"x6" 1 EA. $ 1,778.79 $ 2,021.59 $ 1,467.20 $ 1,667.47 $ 3,245.99 $3,689.07 (b) 8"x6" 1 EA. $ 1,864.75 $ 2,119.29 $ 1,467.20 $ 1,667.47 $ 3,331.95 $3,786.76 (c) 8"x8" 1 EA. $ 2,457.68 $ 2,793.16 $ 1,467.20 $ 1,667.47 $ 3,924.88 $4,460.63 (d) 10" x ti' 1 EA. $ 2,025.66 $ 2,302.16 $ 1,467.20 $ 1,667.47 $ 3,492.86 $3,969.64 (e) 10" x 8" 1 EA. $ 2,524.96 $ 2,869.62 $ 1,467.20 $ 1,667.47 $ 3,992.16 $4,537.09 (f) 12"x6" 1 EA. $ 2,195.38 $ 2,495.05 $ 1,508.64 $ 1,714.57 $ 3,704.02 $4,209.62 (g) 12"x8" 1 EA. $ 2,800.44 $ 3,182.70 $ 1,508.64 $ 1,714.57 $ 4,309.08 $4,897.26 (h) 12"x12" 1 EA. $ 4,608.26 $ 5,237.29 $ 1,508.64 $ 1,714.57 $ 6,116.90 $6,951.86 (i) 16" x 6" 1 EA. $ 2,360.70 $ 2,682.93 $ 1,508.64 $ 1,714.57 $ 3,869.34 $4,397.50 A20 Resilient Seat Gate Valve Assemblies (a) 2 -inch 1 EA. $ 355.16 $ 403.64 $ 244.16 $ 277.49 $ 599.32 $681.13 (b) 4 -inch 1 EA. $ 577.50 $ 656.33 $ 366.24 $ 416.23 $ 943.74 $1,072.56 (c) 6 -inch 1 EA. $ 704.24 $ 800.37 $ 489.44 $ 556.25 $ 1,193.68 $1,356.62 (d) 8 -inch 1 EA. $ 1,018.34 $ 1,157.34 $ 586.88 $ 666.99 $ 1,605.22 $1,824.33 (e) 10 -inch 1 EA. $ 1,578.14 $ 1,793.55 $ 651.84 $ 740.82 $ 2,229.98 $2,534.37 (f) 12 -inch 1 EA. $ 2,011.82 $ 2,286.43 $ 1,005.76 $ 1,143.05 $ 3,017.58 $3,429.48 (g) 16 -inch 1 EA. $ 7,076.74 $ 8,042.71 $ 1,508.64 $ 1,714.57 S 8,585.38 $9,757.28 A21 Eccentric Plug Valve Assemblies (a) 6 -inch 1 EA. $ 1,416.73 $ 1,610.12 $ 489.44 $ 556.25 $ 1,906.17 $2,166.37 (b) 8 -inch 1 EA. 5 1,907.27 $ 2,167.61 $ 586.88 $ 666.99 $ 2,494.15 $2,834.60 (c) 12 -inch 1 EA. $ 3,218.66 $ 3,658.00 $ 1,005.76 $ 1,143.05 $ 4,224.42 $4,801.05 (d) 16 -inch 1 EA. $ 6,430.75 $ 7,308.55 $ 1,508.64 $ 1,714.57 $ 7,939.39 $9,023.12 (e) 18 -inch 1 EA. $ 8,815.67 $ 10,019.01 $ 1,508.64 $ 1,714.57 $ 10,324.31 $11,733.57 (f) 24 -inch 1 EA. $ 30,633.97 $ 34,815.51 $ 3,016.16 $ 3,427.87 $ 33,650.13 $38,243.37 A22 IButterfly Valve Assemblies 12 -inch 1 EA. $ 1,498.86 $ 1,703.45 $ 1,005.76 $ 1,143.05 $ 2,504.62 $2,846.50 (b) 16 -inch 1 EA. $ 3,359.20 $ 3,817.73 $ 1,508.64 $ 1,714.57 $ 4,867.84 $5,532.30 r(a) (c) 18 -inch 1 EA. $ 3,750.45 $ 4,262.38 $ 1,508.64 $ 1,714.57 $ 5,259.09 $5,976.95 (d) 20 -inch 1 EA. $ 4,766.58 $ 5,417.22 $ 1,884.96 $ 2,142.26 $ 6,651.54 $7,559.48 A23 Ball Valve Assemblies (a) 3/4 -inch 1 EA. $ 6.61 $ 7.52 $ 81.76 $ 92.92 $ 88.37 $100.44 (b) 1 -inch 1 EA. $ 11.02 $ 12.53 $ 81.76 $ 92.92 $ 92.78 $105.45 (c) 1 1/4 -inch 1 EA. $ 16.53 $ 18.79 $ 81.76 $ 92.92 $ 98.29 $111.71 (b) 1 1/2 -inch 1 EA. $ 22.04 $ 25.05 $ 81.76 $ 92.92 $ 103.80 $117.97 (a) 13/4 -inch 1 EA. $ 33.06 $ 37.58 $ 108.64 $ 123.47 $ 141.70 $161.05 (b) 2 -inch 1 EA. $ 38.57 $ 43.84 $ 108.64 $ 123.47 $ 147.21 $167.31 A24 ICheck Valve Assemblies (a) 2 -inch 1 EA. $ 716.37 $ 814.15 $ 244.16 $ 277.49 $ 960.53 $1,091.64 (b) 4 -inch 1 EA. $ 1,148.97 $ 1,305.80 $ 366.24 $ 416.23 $ 1,515.21 $1,722.03 (c) 6 -inch 1 EA. $ 1,575.28 $ 1,790.31 $ 489.44 $ 55625 $ 2,064.72 $2,346.56 (d) 8 -inch 1 EA. $ 1,984.81 $ 2,255.74 $ 586.88 $ 666.99 $ 2,571.69 $2,922.73 (e) 12 -inch 1 EA. $ 5,506.38 $ 6,258.00 $ 1,005.76 $ 1,143.05 $ 6,512.14 $7,401.05 (f) 16 -inch 1 EA. $ 11,922.25 $ 13,549.64 $ 1,508.64 $ 1,714.57 $ 13,430.89 $15,264.21 (g) 18 -inch 1 EA. $ 11,690.50 $ 13,286.25 5 1,508.64 $ 1,714.57 $ 13,199.14 $15,000.82 (h) 2O -inch 1 EA. $ 13,783.46 $ 15,664.90 $ 1,508.64 $ 1,714.57 $ 15,292.10 $17,379.47 A25 I Sa n ita ry S ewer Se rvice s (constructed with new gravity sewer) o'-6'(single) 1 1 EA. $ 249.26 $ 283.28 $ 565.60 $ 642.80 $ 814.86 $926.09 (b) 0' -6 -(double) 1 1 EA. $ 283.25 $ 321.91 $ 678.72 $ 771.37 $ 961.97 $1,093.28 Lla) (c) 6' -Over (single) 1 EA. $ 667.44 $ 758.55 $ 565.60 $ 642.80 5 1,233.04 $1,401.35 (d) 6' -Over (double) 1 EA. $ 624.18 $ 709.38 $ 678.72 $ 771.37 $ 1,302.90 $1,480.75 A26" Sanitary Sewer Services -Additional Footage (a)o' - 6' 1 L. F. $ 3.09 $ 3.51 $ 16.97 $ 19.28 $ 20.06 $22.80 (b) -Or 6' ve 1 L. F. $ 3.09 $ 3.51 $ 22.64 $ 25.72 S 25.73 $29.2 A27 Sanitary Sewer Services (constructed on existing sewer lines - unlined) 1 EA. $ 322.39 $ 366.40 $ 848.961 $ 964.841 $ 1,171.35 $1,331.24 3 of 17 Exhibit 1 -Amendment 1 (CK Contractors & Dove looment) Item No. Description Quantity Unit Material Unit Price Bid Revised Unit Price Material Installed Unit Price Bid Revised Unit Price Install Total Unit Price (Material + Installatior) Revised total unit Price (Material + Installation) (b) 0'-6' (double) 1 EA. $ 348.14 $ 395.66 $ 848.96 $ 964.84 $ 1,197.10 $1,360.50 (c) 6' -Over (single) 1 EA. $ 322.39 $ 366.40 $ 904.96 $ 1,028.49 $ 1,227.35 $1,394.88 (d) 6' -Over (double) 1 EA. $ 455.26 $ 517.40 $ 969.92 $ 1,102.31 $ 1,425.18 $1,619.72 A28 ISanitarySewer Services (constructed on existing sewer lines - lined) (single) 1 EA. $ 396.55 $ 450.68 $ 904.96 $ 1,028.49 $ 1,301.51 $1,479.17 6' (double) 1 EA. $ 422.30 $ 479.94 $ 969.92 $ 1,102.31 5 1,392.22 $1,582.26 j6' -Over(single) 1 EA. $ 396.55 $ 450.68 $ 1,044.96 $ 1,187.60 $ 1,441.51 $1,638.28 Over(double) 1 EA. $ 422.30 $ 479.94 $ 1,131.20 $ 1,285.61 $ 1,553.50 $1,765.55 A29 Sanitary Sewer Cleanouts (to existing sanitary sewer laterals) (a) 0'-6'(4") 1 EA. $ 266.77 $ 303.18 5 754.88 $ 857.92 $ 1,021.65 $1,161.11 (b) 6' -Over (4") 1 EA. $ 266.77 $ 303.18 $ 969.92 $ 1,102.31 $ 1,236.69 $1,405.50 (c) 0'-6' (6") 1 EA. $ 317.24 $ 360.54 $ 757.12 $ 860.47 $ 1,074.36 $1,221.01 (d) 6' -Over (6") 1 EA. $ 317.24 $ 360,54 $ 969.92 $ 1,102.31 $ 1,287.16 $1,462.86 A30 Cleanout Ring and Cover 1 EA. $ 105.06 $ 119.40 $ 283.36 $ 322.04 $ 388.42 $441.44 (constructed on new or existing cleanouts) A31 Water Services (on 6" or smaller main) (constructed in conjunction with water main) (a) 1" (single short) 1 EA. $ 603.58 $ 685.97 $ 489.44 $ 556.25 $ 1,093.02 $1,242.22 (b) 1" (single long) 1 EA. $ 650.96 $ 739.82 $ 489.44 S 556.25 $ 1,140.40 $1,296.06 (c) 1" (double short) 1 EA. $ 772.50 5 877.95 $ 489.44 $ 556.25 $ 1,261.94 $1,434.19 (d) 1" (double long) 1 EA. $ 785.89 $ 893.16 $ 489.44 $ 556.25 $ 1,275.33 $1,449.41 (e) 2" (single short) 1 EA. $ 2,279.39 $ 2,590.53 $ 489.44 $ 556.25 $ 2,768.83 $3,146.78 (f) 2" (single long) 1 EA. $ 2,521.44 $ 2,865.62 $ 489.44 $ 556.25 $ 3,010.88 $3,421.87 (g) 2" (double short) 1 EA. $ 3,926.36 $ 4,462.31 $ 489.44 $ 556.25 $ 4,415.80 $5,018.56 (h) 2" (double long) 1 EA. $ 4,169.44 $ 4,738.57 $ 489.44 $ 556,25 $ 4,658.88 $5,294.82 A32 Water Services- Horizontally Drilled (constructed in conjunction with 6" or smaller water main) (a) 1" (single short) 1 EA. $ 603.58 $ 685.97 $ 1,307.04 $ 1,485.45 $ 1,910.62 $2,171.42 (b) 1" (single long) 1 EA. $ 603.58 $ 685.97 $ 1,307.04 $ 1,485.45 $ 1,910.62 $2,171.42 (c) 1" (double short) 1 EA. $ 772.50 $ 877.95 $ 1,307.04 $ 1,485.45 $ 2,079.54 $2,363.40 (d) 1" (double long) 1 EA. $ 785.89 $ 893.16 $ 1,307.04 $ 1,485.45 $ 2,092.93 $2,378.61 (e) 2" (single short) 1 EA. $ 2,279.39 $ 2,590.53 $ 1,480.64 $ 1,682.75 $ 3,760.03 $4,273.27 (f) 2" (single long) 1 EA. $ 2,315.44 $ 2,631.50 $ 1,480.64 $ 1,682.75 $ 3,796.08 $4,314.24 (g) 2" (double short) 1 EA. $ 3,926.36 $ 4,462,31 $ 1,480.64 $ 1,682.75 $ 5,407.00 $6,145.06 (h) 2" (double long) 1 EA. $ 4,169.44 $ 4,738.57 $ 1,480.64 $ 1,682.75 $ 5,650.08 $6,421.32 A33 lWater Services (on 6" or smaller main) (constructed on existing water main) (a) 1" (single short) 1 EA. $ 603.58 $ 685.97 $ 489.44 $ 556.25 $ 1,093.02 $1,242.22 (b) 1" (single long) 1 EA. $ 603.58 $ 685.97 $ 489.44 $ 556.25 $ 1,093.02 $1,242.22 (c) 1" (double short) 1 EA. $ 772.50 $ 877.95 $ 489.44 $ 556.25 $ 1,261.94 $1,434.19 (d) 1" (double long) 1 EA. $ 785.89 $ 893.16 $ 489.44 $ 556.25 $ 1,275.33 $1,449.41 (e) 2" (single short) 1 EA. $ 2,279.39 $ 2,590.53 $ 533.12 $ 605.89 $ 2,812.51 $3,196.42 (f) 2" (single long) 1 EA. $ 2,315.44 $ 2,631.50 $ 533.12 $ 605.89 $ 2,848.56 $3,237.39 (g) 2" (double short) 1 EA. $ 3,926.36 $ 4,462.31 $ 533.12 $ 605.89 $ 4,459.48 $5,068.20 (h) 2" (double long) 1 EA. $ 4,169.44 $ 4,738.57 $ 533.12 $ 605.89 $ 4,702.56 $5,344.46 A34 lWater Services- Horizontally Drilled (constructed on existing 6" or smaller water main) (a) 1" (single short) 1 EA. $ 603.58 $ 685.97 $ 1,307,04 $ 1,485,45 $ 1,910.62 $2,171.42 (b) 1" (single long) 1 EA. $ 603.58 $ 685.97 $ 1,307.04 $ 1,485.45 $ 1,910.62 $2,171.42 (c) 1" (double short) 1 EA. $ 772.50 $ 877.95 $ 1,307.04 $ 1,485.45 $ 2,079.54 $2,363,40 (d) 1" (double long) 1 EA. $ 785.89 $ 893.16 $ 1,307.04 $ 1,485.45 $ 2,092.93 $2,378.61 (e) 2" (single short) 1 EA. $ 27279.39 $ 2,590.53 $ 1,480.64 $ 1,682.75 $ 3,760.03 $4,273.27 (f) 2" (single long) 1 EA. $ 2,315.44 $ 2,631.50 5 1,480.64 $ 1,682.75 $ 3,796.08 $4,314.24 (g) 2" (double short) 1 EA. $ 3,926.36 $ 4,462.31 $ 1,480.64 $ 1,682.75 $ 5,407.00 $6,145.06 (h) 2" (double long) 1 I EA. $ 4,169.4-41 $ 4,738.57 1 $ 1,480.64 $ 1,682.75 $ 5,6SO.081 $6,421.32 4 of 17 Exhibit 1 - Amendment 1 ICK Contractors & Develoomentl Item No. Description Quantity Unit Material Unit Price Bid Revised Unit Price Material Installed Unit Price Bid Revised Unit Price Install Total Unit Price (Material + Installation) Revised total unit Price (Material + Installation) A35 Water Services Additional Footage (a) 1" HDPE Water Service 1 L. F. $ 1.99 $ 2.26 $ 9.78 $ 11.11 $ 11.77 $13.37 (b) 2" HDPE Water Service 1 L. F. $ 7.73 $ 8.78 5 9.78 $ 11.11 $ 17.50 $19.89 A36 lWater Services saddle size adjustments (constructed on water main 6" or larger) (a) 6" 1 EA. $ 95.79 $ 108.87 $ 162.40 $ 184.57 $ 258.19 $293.43 (b) 8" 1 EA. $ 109.18 $ 124.08 $ 162.40 $ 184.57 $ 271.58 $308.65 (c) 10" 1 EA. $ 132.87 $ 151.01 $ 162.40 $ 184.57 $ 295.27 $335.57 (d) 12" 1 EA. $ 154.50 $ 175.59 $ 162.40 $ 184.57 $ 316.90 $360.16 (e) 16" 1 EA. $ 211.15 $ 239.97 $ 162.40 $ 184.57 $ 373.55 $424.5 A37 Blow -off Assembly 1 EA. $ 745.72 $ 847.51 $ 162.40 $ 184.57 $ 908.12 $1,032.08 A38 Fire Hydrant Assembly (includes tee) (constructed with new water main) 1 EA. $ 3,195.06 $ 3,631.19 $ 1,428.00 $ 1,622.92 $ 4,623.06 $5,254.11 A39 Fire Hydrant Assembly (constructed on existing water main) 1 EA. $ 4,751.39 $ 5,399.95 $ 1,428.00 $ 1,622.92 $ 6,179.39 $7,022.88 A40 Bacteriological Sample Point (constructed on new water main) 1 EA. $ 164.80 $ 187.30 $ 293.44 $ 333.49 $ 458.24 $520.79 A41 lBacterialogical Sample Point (using a water service or fire hydrant) 1 EA. $ 164.80 $ 187.30 $ 293.44 $ 333.49 $ 458.24 $520.79 A42 2" Manual Air Release Valve 1 EA. $ 4,284.80 $ 4,869.68 $ 651.84 $ 740.82 $ 4,936.64 $5,610.49 A43 2" Automatic Air Release Valve 1 EA. $ 4,605.13 $ 5,233.73 $ 574.56 $ 652.99 $ 5,179.69 $5,886.72 A44 Dewatering (a) 0'4 1 L. F. NA $ 18.91 $ 21.49 $ 18.91 $21.49 (b) 6'-12' 1 L. F. NA $ 22.16 $ 25.19 $ 22.16 $25.19 (c) 12'-18' 1 L. F. NA $ 28.27 $ 32.13 $ 28.27 $32.13 A45 Remove Pressure Pipe $ - $0,00 (a) 3" 1 L. F. NA $ 7.34 $ 8.34 $ 7.34 $8.34 (b) 4" 1 L.F. NA $ 9.78 $ 11.11 $ 9.78 $11.11 (c) 6" 1 L. F. NA $ 9.78 $ 11.11 $ 9.78 $11.11 (d) 8" 1 L. F. NA $ 9.78 $ 11.11 $ 9.78 $11.11 (e) 10" 1 L. F. NA $ 12.06 $ 13.71 $ 12.06 $13.71 (f) 12" 1 L.F. NA $ 15.09 $ 17.15 S 15.09 $17.15 (g) 16" 1 L. F. NA $ 17.24 $ 19.59 $ 17.24 $19.59 (h) ICost Credit 1 L. F. NA $ 0.10 $ 0.11 $ 0.10 $0.11 A46 Grout and Abandon Pressure Pipe (a) 13" 1 L. F. $ 1.15 $ 1.31 $ 2.87 $ 3.26 $ 4.02 $4.57 (b) 4" 1 L.F. $ 1.15 $ 1.31 $ 2.87 $ 3.26 $ 4.02 $4.57 (c) 6" 1 L. F. $ 2.48 $ 2.82 $ 3.83 $ 4.35 $ 6.31 $7.17 (d) 8" 1 L. F. $ 2.98 $ 3.38 $ 3.83 $ 4.35 $ 6.81 $7.74 (e) 10" 1 L. F. $ 3.97 $ 4.51 $ 4.59 $ 5.22 $ 8.56 $9.73 (f) 12" 1 L. F. $ 4.79 $ 5.44 $ 4.59 $ 5.22 $ 9.38 $10.66 (g) 14" 1 L. F. $ 5.62 $ 6.39 $ 5.75 $ 6.53 $ 11.37 $12.92 (h) 16" 1 L. F. $ 6.45 $ 7.33 $ 5.75 $ 6.53 $ 12.19 $13.86 (i) 18" 1 L. F. $ 7.27 $ 8.26 $ 5.75 $ 6.53 $ 13.02 $14.79 (j) 20" 1 L. F. $ 8.10 $ 9.20 $ 5.75 $ 6.53 $ 13.84 $15.73 (k) 22" 1 L, F. $ 8.93 $ 10.15 $ 5.75 $ 6.53 $ 14.68 $16.68 (I) 24" 1 L. F. $ 9.59 $ 10.90 $ 7.66 $ 8.71 $ 17.25 $19.60 A47 lRemove Sanitary Sewer Main (a) 8„ 1 L. F. NA $ 9.63 $ 10.95 $ 9.63 $10.95 (b) 10" 1 L. F. NA $ 11.D1 $ 12.51 $ 11.01 $12.51 (b) 12" 1 L. F. NA $ 12.85 $ 14.60 $ 12.85 $14.60 (c) 118., 1 L. F. NA $ 19.26 $ 21.89 $ 19.26 $21.89 (d) 24" 1 L. F. NA $ 22.01 $ 25.01 $ 22.01 $25.01 (e) lCost Credit 1 L. F. NA $ 0.10 $ 0.11 $ 0.10 $0.11 A48 lGrout and Abandon Sanitary Sewer Main (a) 8,. 1 1 L. F. $ 2.98 $ 3.38 $ 4.S9 $ 5.22 $ 7.57 $8.60 (b) 10" 1 L. F. $ 3.97 $ 4.51 $ 5.11 $ 5.80 $ 9.07 $10.31 (b) 12" 1 L. F. $ 4.79 $ 5.44 $ S.33 $ 6.06 $ 10.12 $11.50 (c) 18" 1 L. F. $ 7.27 $ 8.26 $ 6.56 $ 7.46 $ 13.84 $15.72 (d) 24" 1 L. F. $ 9.5?_L$ 10.90 $ 11.49 $23.96 5 of 17 Exhibit 1 • Amendment 1 (CK Contractors & Develooment) Item No. Description Quantity Unit Material Unit Price Bid Revised Unit Price Material Installed Unit Price Bid Revised Unit Price Install Total Unit Price (Material + Installation) Revised total unit Price (Material + Installation) A49 Remove Sanitary Sewer Manhole (a) 0'-6' 1 EA. $ 316.21 $ 359.37 $ 848.96 $ 964.84 $ 1,165.17 $1,324.22 (b) 6'-8' 1 EA. $ 316.21 $ 359.37 $ 848.96 $ 964.84 $ 1,165.17 $1,324.22 (c) S'-10' 1 EA. $ 474.83 $ 539.64 $ 1,234.24 $ 1,402.71 $ 1,709.07 $1,942.36 (d) 10'-12' 1 EA. $ 474.83 $ 539.64 $ 1,281.28 $ 1,456.17 $ 1,756.11 $1,995.82 (e) 12'-14' 1 EA. $ 592.25 $ 673.09 $ 1,498.56 $ 1,703.11 $ 2,090.81 $2,376.21 A50 Outside drop on Manhole (a) 6'-S' 1 EA. $ 644.78 $ 732.79 $ 1,105.44 $ 1,256.33 $ 1,750.22 $1,989.13 (b) 8'-10' 1 EA. $ 747.78 $ 849.85 $ 1,105.44 $ 1,256.33 $ 1,853.22 $2,106.18 (c) 10'-12' 1 EA. $ 1,056.78 $ 1,201.03 $ 1,284.64 $ 1,459.99 $ 2,341.42 $2,661.02 A51 Relocate Fire Hydrant 1 EA. $ 242.05 $ 275.09 $ 1,428.00 $ 1,622.92 $ 1,670.05 $1,898.01 A52 2" Jumper Connection 1 EA. $ 1,478.05 $ 1,679.80 $ 873.60 $ 992.85 $ 2,351.65 $2,672.65 A53 Asbestos Pipe Abatment (a) 6" 1 L. F. NA $ 73.92 $ 84.01 $ 73.92 $84.01 (b) 8" 1 L. F. NA $ 75.04 $ 85.28 $ 75.04 $85.28 (c) 10" 1 L. F. NA $ 76.16 $ 86.56 $ 76.16 $86.56 (d) 12" 1 L. F. NA $ 77.44 $ 88.01 $ 77.44 $88.01 (e) 16" 1 L.F. NA $ 79.07 $ 89.87 $ 79.07 $89.87 A54 Root Barrier 1 L. F. $ 16.53 $ 18.79 5 11.20 $ 12.73 5 27.73 $31.52 ASS Utility Pole Support 1 EA $ 10.30 $ 11.71 $ 1,484.00 $ 1,686.57 $ 1,494.30 $1,698.27 A56 Remove and Reinstall Trees 1 EA $ 463.50 $ 526.77 $ 280.00 $ 318.22 $ 743.50 $844.99 AS7 Schedule 40 PVC Casing Pipe (a) 4" 1 L. F. NA $ 9.78 $ 11.11 $ 9.78 $11.11 (b) 6" 1 L.F. NA $ 9.78 $ 11.11 $ 9.78 $11.11 (c) 8" 1 L. F. NA $ 9.78 $ 11.11 $ 9.78 $11.11 (d) 10" 1 L. F. NA $ 9.78 $ 11.11 $ 9.78 $11.11 (e) 12" 1 L. F. NA $ 12.06 $ 13.71 5 12.06 $13.71 (f) 14" 1 L. F. NA $ 12.06 $ 13.71 $ 12.06 $13.71 (g) 16" 1 L. F. NA $ 12.06 $ 13.71 $ 12.06 $13.71 (h) 18" 1 L. F. NA $ 12.06 $ 13.71 $ 12.06 $13.71 (i) 20" 1 L. F. NA $ 12.06 $ 13.71 $ 12.06 $13.71 (j) 22" 1 L. F. NA $ 12.06 $ 13.71 $ 12.06 $13.71 (k) 24" 1 L. F. NA $ 12.06 $ 13.71 $ 12.06 $13.71 A58 Steel casing (a) 4" 1 L. F. NA $ 9.78 $ 11.11 $ 9.78 $11.11 (b) 6" 1 L, F. NA $ 9.78 $ 11.11 $ 9.78 $11.11 (c) 8" 1 1 L. F. NA $ 9.78 $ 11.11 $ 9.78 $11.11 (d) 10" 1 L. F. NA $ 9.78 $ 11.11 $ 9.78 $11.11 (e) 12" 1 L. F. NA $ 12.06 $ 13.71 $ 12.06 $13.71 (f) 14" 1 L. F. NA $ 12.06 $ 13.71 $ 12.06 $13.71 (g) 16" 1 L. F. NA $ 12.06 $ 13.71 $ 12.06 $13.71 (h) 18" 1 L. F. NA $ 12.06 $ 13.71 $ 12.06 $13.71 (i) 20" 1 L. F. NA $ 12.06 $ 13.71 $ 12.06 $13.71 (j) 22" 1 L.F. NA $ 12.06 $ 13.71 $ 12.06 $13.71 (k) 24" 1 L. F. NA $ 12.06 $ 13.71 $ 12.06 $13.71 SECTION B - Restoration B1 Pavement Repair and Replacement a As halt Road b As halt Driveway 1 1 S.Y. S.Y. $ $ 19.57 20.60 $ $ 22.24 23.41 $ 24.64 $ 24.64 $ $ 28.00 28.00 $ 44.21 $ 45.24 $50.2 $51.42 (c) jAsph.It Millings 1 S.Y. $ 6.18 $ 7.02 $ 24.64 $ 28.00 $ 30.82 $35.03 (d) jAs halt overlay 1 S.Y. $ 4.64 $ 5.27 $ 14.00 $ 15.91 $ 18.64 $21.18 (e) jAdd. S-3 Asphalt 1 Ton $ 108.15 $ 122.91 $ 72.80 $ 82.74 $ 180.95 $205.65 (f) Cold Mix Asphalt 1 Ton $ 77.25 $ 87.79 1 $ 22.40 $ 25.46 $ 99.65 $113.25 (g) Concrete Driveway (6") 1 S.Y. $ 46.35 $ 52.68 $ 11.20 $ 12.73 $ 57.55 $65.41 (h) Concrete Sidewalk (4") 1 1 S.Y. $ 36.05 $ 40.97 $ 11.20 $ 12.73 $ 47.25 $53.70 (i) Concrete Curb 1. Curb and Gutter 2.'D'Curb (j) Concrete Driveway Paver Block (k) Lime rock Driveway 1 ---L.F. 1 1 1 L. F. S.Y. S.Y. $ $ $ $ 17.51 16.48 43.26 18.03 $ $ $ $ 19.90 18.73 49.16 20.49 $ 7.54 $ 3.36 $ 8.96 $ 8.40 $ $ $ $ 8.91 3.82 10.18 9.55 1 $ 25.35 $ 19.84 $ 52.22 $ 26.43 $28.81 $22.55 $59.35 $30.03 6 of 17 Exhibit 1 - Amendment 1 (CK Contractors & Development) Item No. Description Quantity Unit Material Unit Price Bid Revised Unit Price Material Installed Unit Price Bid Revised Unit Price Install Total Unit Price (Material + Installation) Revised total unit Price (Material + Installation) (I) lAsphalt sidewalk 1 S.Y. $ 18.54 $ 21.07 $ 28.00 $ 31.82 5 46.54 $52.89 B2 Milling Asphalt 1 S.Y. $ 5.15 $ 5.85 $ 16.80 $ 19.09 $ 21.95 $24.95 B3 Coquina Rock Base 1 C.Y. $ 14.94 $ 16.97 $ 8.96 $ 10.18 $ 23.90 $27.16 B4 lFlowable Fill (2)JO - 4 cy (include short load fees) 1 C. Y. $ 169.95 $ 193.15 $ 22.40 $ 25.46 $ 192.35 $218.61 (b) 14 - 8 cy (include short load fees) 1 C. Y. $ 159.65 $ 181.44 $ 20.16 $ 22.91 $ 179.81 $204.35 (c) 1> 8cy 1 C. Y. $ 139.05 $ 158.03 $ 17.92 $ 20.37 $ 156.97 $178.40 BS Miscellaneous Materials (a) Sand 1 C. Y. $ 7.21 $ 8.19 $ 28.00 $ 31.82 S 35.21 $40.02 (b) Fill 1 C. Y. $ 5.67 $ 6.44 $ 39.20 $ 44.55 $ 44.87 $50.99 (c) #57 Rock 1 C. Y. $ 30.90 $ 35.12 $ 35.84 $ 40.73 $ 66.74 $75.85 (d) Shell Rock 1 C. Y. $ 28.84 $ 32.78 $ 35.84 $ 40.73 $ 64.68 $73.51 (e) Suremix Concrete 80# 1 Bag $ 11.02 $ 12.53 $ 13.44 $ 15.27 $ 24.46 $27.80 B6 Sod Replacement (a) Bahia 1 S.Y. $ 1.08 $ 1.23 $ 1.18 $ 1.34 $ 2.26 $2.57 (b) IFloratam 1 S.Y. $ 2.16 $ 2.46 $ 2.30 $ 2.61 $ 4.46 $5.07 B7 Seed and Mulch 1 S.Y. $ 1.60 $ 1.81 $ 1.74 $ 1.97 $ 3.33 $3.79 B8 Mailbox Removal and Reinstallation 1 EA $ 10.30 $ 11.71 $ 140.00 $ 159.11 $ 150.30 $170.82 B9 Sprinkler System Repair per Yard 1 EA $ 103.00 $ 117.06 $ 140.00 $ 159.11 $ 243.00 $276.17 B10 Handicap Ramp Restoration 1 EA $ 901.25 $ 1,024.27 $ 1,512.00 $ 1,718.39 $ 2,413.25 $2,742.66 SECTION C - High Density Polyethylene Piping & Horizontal Directional Boring C1 High Density Polyethylene Pipe (HDPE) -Trench (a) 2 -inch 1 L. F. $ 1.24 $ 1.40 $ 7.34 $ 8.34 $ 8.57 $9.74 (b) 4 -inch 1 L. F. $ 4.96 $ 5.64 $ 8.40 $ 9.55 $ 13.36 $15.19 (c) 6 -inch 1 L. F. $ 9.92 $ 11.27 $ 9.80 $ 11.14 $ 19.72 $22.41 (d) 8 -inch 1 L. F. $ 14.33 $ 16.28 $ 10.64 $ 12.09 $ 24.97 $28.38 (e) 12 inch 1 L. F. $ 35.27 $ 40.08 $ 9.80 $ 11.14 $ 45.07 $51.22 (f) 16 -inch 1 L. F. $ 60.62 $ 68.89 $ 9.80 $ 11.14 $ 70.42 $80.03 (g) 18 -inch 1 L. F. $ 94.78 $ 107.72 $ 9.80 $ 11.14 $ 104.58 $118.86 (h) 20 -inch 1 L. F. 5 99.19 $ 112.73 $ 9.80 $ 11.14 $ 108.99 $123.87 (i) 24 -inch 1 L. F. $ 110.21 $ 125.25 $ 9.80 $ 11.14 $ 120.01 $136.39 C2 Horizontal Directional Boring (HDPE) -HDD (b) 4 -inch 1 L. F. $ 4.96 $ 5.64 $ 178.08 $ 202.39 $ 183.04 $208.03 (c) 6 -inch 1 L. F. $ 9.92 $ 11.27 $ 328.16 $ 372.95 $ 338.08 $384.23 (d) 8 -inch 1 L. F. $ 14.33 $ 16.28 $ 338.24 $ 384.41 $ 352.57 $400.69 (e) 12 inch 1 L. F. $ 35.27 $ 40.08 $ 836.64 $ 950.84 5 871.91 $990.92 (f) 16 -inch 1 L. F. $ 60.62 $ 68.89 $ 875.84 $ 995.39 $ 936.46 $1,064.28 (g) 18 -inch 1 L. F. $ 94.78 $ 107.72 $ 898.24 $ 1,020.85 $ 993.02 $1,128.57 (h) 120 -inch 1 L. F. $ 99.19 $ 112.73 $ 985.60 $ 1,120.13 $ 1,084.79 $1,232.86 (i) 24-7ch 1 L. F. $ 110.21 $ 125.25 $ 1,052.80 $ 1,196.51 $ 1,163.01 $1,321.76 C3 Horizontally Directional Drilled -PVC Driveway Bores 20 -foot length a 4 -inch 1 EA. S 98.88 $ 112.38 $ 1,083.04 $ 1,230.87 $ 1,181.92 $1,343.25 (b) 6 -inch 1 EA. $ 198.79 $ 225.92 $ 1,618.40 $ 1,839.31 $ 1,817.19 $2,065.24 (c) 18 -inch 1 EA. $ 295.61 $ 335.96 $ 1,898.40 $ 2,157.53 $ 2,194.01 $2,493.49 (d) 112 -inch 1 EA. $ 705.55 $ 801.86 $ 3,186.40 $ 3,621.34 $ 3,891.95 $4,423.20 40 -foot length Ila) 4 -inch (b) 6 -inch 1 1 1 EA. EA. $ $ 198.79 396.55 $ 225.92 $ 450.68 $ $ 1,472.80 1,898.40 $ 1,673.84 $ 2,157.53 $ 1,671.59 $ 2,294.95 $1,899.76 $2,608.21 IN 8 -inch (d) 112 -inch 60 -foot length 1 1 1 EA. EA. $ $ 590.19 1,411.10 $ 670.75 $ 1,603.72 $ $ 2,738.40 6,546.40 $ 3,112.19 $ 7,439.98 $ 3,328.59 5 7,957.50 $3,782.94 $9,043.70 a 4 -inch 1 EA. $ 297.67 b 6 -inch 1 EA. $ 595.34 (c 8 -inch 1 EA. $ 885.80 (d)..1.12 -inch 1 EA. $ 2,116.65 SECTION D: Time and Materials Rates (TO BE USED ON T&M ORDERS ONLY) $ 338.30 $ 676.60 $ 11,006.71 $ 2,405.57 $ $ $ $ 1,864.80 2,850.40 S,034.40 8,898.401 $ 2,119.35 $ 3,239.48 $ 5,721.60 $ 10,113.03 $ 2,162.47 $ 3,445.74 $ 5,920.20 $ 11,015.05 $2,457.65 $3,916.08 $6,728.31 $12,518.60 D1 JEquipment Hourly Rates (a) Trackhoe (specify model) (medium) (large) lb) lCombination Backhoe 1 1 1 Hr. Hr. Hr. NA NA NA $ $ $ 115.00 115.00 50.00 $ 130.70 $ 130.70 $ 56.83 $ 115.00 $ 115.00 $ 50.00 $130.70 $130.70 $56.83 7 of 17 Exhibit 1 -Amendment 11CK Contractors & Develoo me M) Item No. Description Quantity Unit Material Unit Price Bid Revised Unit Installed Unit Price Material Price Bid Revised Unit Price Install Total Unit Price (Material + Installation) Revised total unit Price (Material + Installation) (c) Front end Loader 1 Hr. NA $ 105.00 $ 119.33 $ 105.00 $119.33 (d) Grader 1 Hr. NA $ 98.00 $ 111.38 $ 98.00 $111.38 (e) Dump Truck (9 C.Y.) 1 Hr. NA $ 45.00 $ 51.14 $ 45.00 $51.1 (f) ITandern Dump Truck (18 C.Y.) 1 Hr. NA $ 55.00 $ 62.51 $ 55.00 $62.51 (g) Forklift 1 Hr. NA $ 1.00 $ 1.14 $ 1.00 $1.14 (h) Crew Truck with hand tools 1 Hr. NA $ 25.00 $ 28.41 $ 25.00 $28.41 (i) Trash Pump 3" 1 Hr. NA $ 10.00 $ 11.37 $ 10.00 $11.37 (j) Trash Pump 2" 1 Hr. NA $ 1.00 $ 1.14 $ 1.00 $1.14 (k) Walk behind Vibrating Roller 1 Hr. NA $ 10.00 $ 11.37 $ 10.00 $11.37 (I) Rev. Plate Compactor 1 Hr. NA $ 8.00 $ 9.09 $ 8.00 $9.09 (m) I.Jumping Jack 1 Hr. I NA $ 1.00 $ 1.14 $ 1.00 $1.14 (n) Cut off saw (14") 1 Hr. NA $ 6.00 $ 6.82 $ 6.00 $6.82 o) Street saw 14" 1 Hr. NA $ 6.00 $ 6.82 $ 6.00 $6.82 Gradall 1 Hr. NA $ 107.00 $ 121.61 $ 107.00 $121.61 (q) Roller 1 Hr. NA $ 10.00 $ 11.37 $ 10.00 $11.37 (r) Welding Truck 1 Hr. NA $ Io.00 $ 11.37 $ 10.00 $11.37 (s) Welder 1 Hr. NA $ 7.00 $ 7.96 $ 7.00 $7.96 (t) lCement Mixer 1 Hr. NA $ 3.00 $ 3.41 $ 3.00 $3.41 (u) Box Blade 1 Hr. NA $ 35.00 $ 39.78 $ 35.00 $39.78 (v) lWater Truck 1 Hr. NA $ 15.00 $ 17.05 $ 15.00 $17.05 (w) 11000 gpm sump pump 1 Hr. NA $ 7.00 $ 7.96 $ 7.00 $7.96 D2 Crew Hourly Rates (a) Crew Man 1 Hr. NA $ 45.00 $ 51.14 $ 45.00 $51.1 (b) Foreman 1 Hr. NA $ 80.00 $ 90.92 $ 80.00 $90.92 (c) Supervisor 1 Hr. NA $ 95.00 $ 107.97 $ 95.00 $107.97 (d) 3man crew includes I supervisor 1 Hr. NA $ 215.00 $ 244.35 $ 215.00 $244.35 (e) 4 man crew includes 1 supervisor 1 Hr. NA $ 260.00 $ 295.49 $ 260.00 $295.49 (f) 5mancrewincludes Isupervisor 1 Hr. NA $ 305.00 $ 346.63 $ 305.00 $346.63 D3 10vertime Crew Hourly Rates (a) Crew Man 1 Hr. NA $ 67.50 $ 76.71 $ 67.50 $76.71 (b) Foreman 1 Hr. NA $ 120.00 $ 136.38 $ 120.00 $136.38 (c) Supervisor 1 Hr. NA $ 135.00 $ 153.43 $ 135.00 $153.43 (d) 3 man crew includes I supervisor 1 Hr. NA $ 322.50 $ 366.52 $ 322.50 $366.52 (e) 4man cre-cludesisupe-sor 1 Hr. NA $ 390.00 $ 443.24 $ 390.00 $443.2 (f) 5 man crew includes 1 supervisor 1 Hr. NA $ 457.50 $ 519.95 $ 457.50 $519.95 D4 INightime Crew Hourly Rates (a) Crew Man 1 Hr. NA $ 69.00 $ 78.42 $ 69.00 $78.42 (b) Foreman 1 Hr. NA $ 120.00 $ 136.38 $ 120.00 $136.38 (c) Supervisor 1 Hr. NA $ 135.00 $ 153.43 $ 135.00 $153.43 (d) 3 man crew includes 1 supervisor 1 Hr. NA $ 322.50 $ 366.52 $ 322.50 $366.52 (e) 4 mancrew includes l supervisor 1 Hr. NA $ 390.00 $ 443.24 $ 390.00 1 $443.2 (f) 5 man crew includes 1 supervisor 1 Hr. I NA $ 457.50 $ 519.95 1 $ 457.50 $519.95 SECTION E: Miscellaneous Materials & Sub -Contractors E1 Materials Actual Cost+ 10% E2 Sub -Contractor Actual Cost+ 10% Total (CK Contractors and Development): $ 526,624.27 $598,508.48 9 of 17 Exhibit 1- Amendment 1(Hinterland Grounl Item No. Description Quantity Unit Material Price Unit Bid Revised Unit Price Material Installed Unit Price Bid Revised Unit Price Install Total Unit Price (Material + Installation) Revised total Unit Price (Material+ Installation) SECTION A - UNIT COST/PRICES Al Mobilization (a) Emergency Event 1 EA $ $ 2,500.00 $ 2,841.25 $ 2,500.001 $2,841.25 (b) Non - Emergency Event 1 EA $ $ 1,500.00 $ 1,704.75 $ 1,500.00 $1,704.75 A2 Temporary Traffic Control (a) Residential Street 1 L.F. $ 1.00 $ 1.14 $ 0.50 $ 0.57 $ 1.50 $1.70 (b) Arterial Roadway 1 L, F. $ 2.00 $ 2.27 $ 1.00 $ 1.14 $ 3.00 $3.41 (c) FDOT Roadway 1 L. F. $ 3.00 $ 3.41 $ 1.00 $ 1.14 $ 4.00 $4.55 A3 Video Documentation (a) Pre -Construction 1 L. F, $ 1.00 $ 1.14 $ - $ 1.00 $1.14 (b) Post -Construction Video 1 L. F. $ 1.00 $ 1.14 $ - $ 1.00 $1.14 A4 Water Main - PVC (a) 2 -inch 1 L. F. $ 2.00 $ 2.27 $ 10.00 $ 11.37 $ 12.00 $13.64 (b) 4 -inch 1 L. P. $ 3.00 $ 3.41 $ 10.00 $ 11.37 $ 13.00 $14.77 (c) 6 -inch 1 L. F. $ 5.00 $ 5.68 $ 12.00 $ 13.64 $ 17.00 $19.32 (d) 8 -inch 1 L. F. $ 9.00 $ 10.23 $ 14.00 $ 15.91 $ 23.00 $26.14 (e) 10 inch 1 L.F. $ 13.00 $ 14.77 $ 15.00 $ 17.05 $ 28.00 $31.82 (f) 12 inch 1 L. F. $ 18.00 $ 20.46 $ 18.00 $ 20.46 $ 36.00 $40.91 16 -inch 1 L. F. $ 34.00 $ 38.64 $ 22.00 $ 25.00 $ 56.00 $63.64 (h) 18 -inch 1 L. F. $ 41.00 $ 46.60 $ 26.00 $ 29.55 $ 67.00 $76.15 k(g) (i) 20 -inch 1 L. F. $ 50.00 $ 56.83 $ 30.00 $ 34.10 $ 80.00 $90.92 (j) 24 -inch 1 L. F. $ 70.00 $ 79.56 $ 35.00 $ 39.78 $ 105.00 $119.33 A5Water Main- DIP Cement Lined Interior for Water Mains (a) 4 -inch 1 L.F. $ 20.00 $ 22.73 $ 12.00 $ 13.64 $ 32.00 $36.37 (b) 6inch 1 L.F. $ 16.00 $ 18.18 $ 13.00 $ 14.77 $ 29.00 $32.96 (c) 8 -inch 1 L. F. $ 22.00 $ 25.00 $ 14.00 $ 15.91 $ 36.00 $40.91 (d) 10 -inch 1 L. F. $ 30.00 $ 34.10 $ 16.00 $ 18,18 $ 46.00 $52.28 (e) 12 -inch 1 L. F. $ 38.00 $ 43.19 $ 18.00 $ 20.46 $ 56.00 $63.64 (f) 16 -inch i L. F. $ 55.00 $ 62.51 $ 25.00 $ 28.41 $ 80.00 $90.92 (g) 18 -inch 1 L. F. $ 62.00 $ 70.46 $ 32.00 $ 36.37 $ 94.00 $106.83 (h) 20 -inch 1 L.F. $ 72.00 $ 81.83 $ 35.00 $ 39.78 $ 107.00 $121.61 A6 Sewer Pipe - DIP Epoxy Lined Interior for Sewer Force Mains (a) 4 -inch 1 L. F. $ 32.00 $ 36.37 $ 14.00 $ 15.91 $ 46.00 $52.28 (b) 16inch 1 L. F. $ 28.00 $ 31.82 $ 14.00 $ 15.91 $ 42.00 $47.73 (c) 8 -inch 1 L. F. $ 30.00 $ 34.10 $ 15.00 $ 17.05 $ 45.00 $51.14 (d) 10 -inch 1 L. F. $ 38.00 $ 43.19 $ 18.00 $ 20.46 $ 56.00 $63.64 (e) 12 -inch 1 L.F. $ 58.00 $ 65.92 $ 20.00 $ 22.73 $ 78.00 $88.65 (f) 16 -inch 1 L. F. $ 80.00 $ 90.92 $ 28.00 $ 31.82 $ 108.00 $122.74 (g) 18 -inch 1 L.F. $ 94.00 $ 106.83 $ 34.00 $ 38.64 $ 128.00 $145.47 (h) 20 -inch 1 L. P. $ 102.00 $ 115.92 $ 38.00 $ 43.19 $ 140.00 $159.11 (i) 24 -inch 1 L. F. $ 130.00 $ 147.75 $ 45.00 $ 51.14 $ 175.00 $198.89 A7 JPVC Gravity Sewer - 8 inch (a) 0'-6' 1 L. F. $ 6.00 $ 6.82 $ 35.00 $ 39.78 $ 41.00 $46.60 (b) 6'-8' 1 L.F. $ 6.00 $ 6.82 $ 40.00 $ 45.46 $ 46.00 $52.28 (c) 8'-10' 1 L. F. $ 6.00 $ 6.82 $ 50.00 $ 56.83 $ 56.00 $63.64 (d) 101-12' 1 L. F. $ 6.00 $ 6.82 $ 75.00 $ 85.24 $ 81.00 $92.06 (e) 12'-14' 1 L. F. $ 6.00 $ 6.82 $ 100.00 $ 113.65 $ 106.00 $120.47 (f) ICost Credit 1 L. P. NA $ AS PVC Gravity Sewer - 10 inch (a) 0'-6' (b) 6'-8' (c) 8'40' 1 1 1 L. F. L. P. L.F. $ $ $ 8.00 8.00 8.00 $ $ $ 9.09 9.09 9.09 $ $ $ 35.00 40.00 50.00 $ $ $ 39.78 45.46 56.83 $ $ $ 43.00 48.00 58.00 $48.87 $54.55 $65.92 (d) 10'-12' (e) 12'-14' 1 1 L. F. L. P. $ $ 8.00 8.00 $ $ 9.09 9.09 $ $ 75.00 100.00 $ $ 85.24 113.65 $ 5 83.00 108.00 j $94.33 $122.74 9of17 Exhibit 1 -Amendment 1(Hinterland Group) Item No. Description quantity Unit Material Unit Price Bid Revised Unit Price Material Installed Unit Price Bid Revised Unit Price Install Total Unit Price (Material + Installation) Revised total Unit Price (Material a Installation) (f) Cost Credit 1 L. F. NA $ - A9 Connect to Existing Pipe (<12") (a) 1 (<12") 1 EA $ 250.00 $ 284.13 $ 500.00 $ 568.25 $ 750.00 $852.38 (b) (>=12") 1 EA $ 450.00 $ 511.43 $ 800.00 $ 909.20 $ 1,250.00 $1,420,63 A10 Precast Concrete Manhole -Lined (a) 0'-6' 1 EA. $ 4,000.00 $ 4,546.00 $ 3,500.00 $ 3,977.75 $ 7,500.00 $8,523.75 (b) 6'-8' 1 EA. $ 5,000.00 $ 5,682.50 $ 3,500.00 $ 3,977.75 $ 8,500.00 $9,660.25 (c) 8'-10' 1 EA. $ 6,000.00 $ 6,819.00 $ 5,000.00 $ 5,682.50 $ 11,000.00 $12,501.50 (d) 10'-12' 1 EA. $ 7,000.00 $ 7,955.50 $ 7,000.00 $ 7,955.50 $ 14,000.00 $15,911.00 (e) 12'-14' 1 EA. $ 8,000.00 $ 9,092.00 $ 10,000.00 $ 11,365.00 $ 18,000.00 $20,457.00 All Precast Concrete Manhole -Unlined (a) 0'-6' 1 EA. $ 3,000.00 $ 3,409.50 $ 3,500.00 $ 3,977.75 $ 6,500.00 $7,387.25 (b) 6'-8' 1 EA. $ 4,000.00 $ 4,546.00 $ 3,500.00 $ 3,977.75 $ 7,500.00 $8,523.75 (c) 8'40' 1 EA. $ 5,000.00 $ 5,682.50 $ 5,000.00 $ 5,682.50 $ 10,000.00 $11,365.00 (d) 10'-12' 1 EA. $ 6,000.00 $ 6,819.00 $ 7,000.00 $ 7,955.50 $ 13,000.00 $14,774.50 (e) 12'-14' 1 EA. $ 7,000.00 5 7,955.50 $ 10,000.00 $ 11,365.00 $ 17,000.00 $19,320.50 Al2 Mechanical Joint Bell Restraints -PVC (a) 2 -inch 1 EA. $ 35.00 $ 39.78 $ 50.00 $ 56.83 $ 85.00 $96.60 (b) 4 -inch 1 EA. $ 35.00 $ 39.78 $ 50.00 $ 56.83 $ 85.00 $96.60 (c) 6 -inch 1 EA. $ 50.00 $ 56.83 $ 50.00 $ 56.83 $ 100.00 $113.65 (d) 8 -inch 1 EA. $ 75.00 $ 85.24 $ 60.00 $ 68.19 $ 135.00 $153.43 (e) 10 -inch 1 EA. $ 132.00 $ 150.02 $ 100.00 $ 113.65 $ 232.00 $263.67 (f) 12 -inch 1 EA. $ 145.00 $ 164.79 $ 150.00 $ 170.48 $ 295.00 $335.27 (g) 16 -inch 1 EA. $ 350.00 $ 397.78 $ 150.00 $ 170.48 $ 500.00 $568.25 (h) 18 -inch 1 EA. $ 430.00 $ 488.70 $ 200.00 $ 227.30 $ 630.00 $716.00 (i) 20 -inch 1 EA. $ 590.00 $ 670.54 $ 220.00 $ 250.03 $ 810.00 $920.57 (j) 24 -inch 1 EA. $ 690.00 $ 784.19 $ 300.00 $ 340.95 $ 990.00 $1,125.14 A13 Mechanical Joint Bell Restraints -Ductile Iron (a) 2 -inch 1 EA. $ 35.00 $ 39.78 $ 50.00 $ 56.83 $ 85.00 $96.60 (b) 4 -inch 1 EA. $ 35.00 $ 39.78 $ 50.00 $ 56.83 $ 85.00 $96.60 (c) 6 -inch 1 EA. $ 48.00 $ 54.55 $ 50.00 $ 56.83 $ 98.00 $111.38 (d) 8 -inch 1 EA. $ 75.00 $ 85.24 $ 60.00 $ 68.19 $ 135.00 $153.43 (e) 10 -inch 1 EA. $ 132.00 $ 150.02 $ 100.00 $ 113.65 $ 232.00 $263.67 (f) 12 -inch 1 EA. $ 145.00 $ 164.79 $ 150.00 $ 170.48 $ 295.00 $335.27 (g) 16 -inch 1 EA. $ 350.00 $ 397.78 $ 150.00 $ 170.48 $ 500.00 $568.25 (h) 18 -inch 1 EA. $ 430.00 $ 488.70 $ 200.00 $ 227.30 $ 630.00 $716.00 (i) 20 -inch 1 EA. $ 590.00 $ 670.54 $ 220.00 $ 250.03 $ 810.00 $920.57 (j) 24 -inch 1 EA. $ 690.00 $ 784.19 $ 300.00 $ 340.95 $ 990.00 $1,125.14 A14 I Ductile Iron Fittings 1 TONS $ 3,400.00 $ 3,864.10 $ 5,000.00 $ 5,682.50 $ 8,400.00 $9,546.60 (C-153 Compact Fittings) (Interior Cement Lined) A15 Ductile Iron Fittings I TONS $ 3,600.00 $ 4,091.40 $ 5,000.00 $ 5,682.50 $ 8,600.00 $9,773.90 (C-153 Compact Fittings) (Interior Cement Lined and Exterior Fusion Bonded Epoxy Coated) A16 Ductile Iron Fittings 1 TONS $ 7,400.00 $ 8,410.10 $ 5,000.00 $ 5,682.50 $ 12,400.00 $14,092.60 (C-153 Compact Fittings) (Interior Epoxy Coated) A17 Fitting Restraint (Per one (1) unit) (b) 4 -inch 1 EA. $ 35.00 $ 39.78 $ 50.00 $ 56.83 $ 85.00 $96.60 (c) 6 -inch 1 EA. $ 45.00 $ 51.14 $ 50.00 $ 56.83 $ 95.00 $107.97 (d) 8 -inch 1 EA. $ 60.00 $ 68.19 $ 50.00 $ 56.83 $ 110.00 $125.02 (e) 10 -inch 1 EA. $ 105.00 $ 119.33 $ 100.00 $ 113.65 $ 205.00 $232.98 (f) 12 -inch 1 EA. $ 112.00 $ 127.29 $ 100.00 $ 113.65 $ 212.00 $240.94 (g) 16 -inch 1 EA. $ 232.00 $ 263.67 $ 120.00 $ 136.38 $ 352.00 $400.05 (h) 18 -inch 1 EA. $ 250.00 $ 284.13 $ 150.00 $ 170.48 $ 400.00 $454.60 (i) 20 -inch 1 EA. $ 305.00 $ 346.63 $ 150.00$ 170.48 $ 455.00 $517.11 (j) 24 -inch 1 EA. $ 365.00 $ 414.82 $ 200.00 565.00 $642.12 10 of 17 Exhihit 1 - Amendment 111-limerland Grouol Item No. Description Quantity Unit Material Unit Price Bid Revised Unit Price Material Installed Unit Price Bid Revised Unit Price Install Total Unit Price (Material + Installation) Revised total Unit Price (Material+ Installation) A18 Fitting Restraint (Per one (1) per unit) (Stainless Steel Hardware) (b) 4 -inch 1 EA. $ 60.00 $ 68.19 $ 65.00 $ 73.87 $ 125.00 $142.06 (c) 6 -inch 1 EA. $ 75.00 $ 85.24 $ 65.00 $ 73.87 $ 140.00 $159.11 (d) 8 -inch 1 EA. $ 90-00 $ 102.29 $ 65.00 $ 73.87 $ 155.00 $176.16 (e) 10 -inch 1 EA. $ 140.00 $ 159.11 $ 125.00 $ 142.06 5 265.00 $301.17 (f) 12 -inch 1 EA. $ 150.00 $ 170.48 $ 125.00 $ 142.06 $ 275.00 $312.54 (g) 16 -inch 1 EA. $ 300.00 $ 340.95 $ 125.00 $ 142.06 $ 425.00 $483.01 (h) 18 -inch 1 EA. $ 350.00 $ 397.78 $ 150.00 $ 170.48 $ 500.00 $568.25 (i) 20 -inch 1 EA. $ 420.00 $ 477.33 $ 200.00 $ 227.30 $ 620.00 $704.63 (j) 24 -inch 1 EA. $ 520.00 $ 590.98 $ 250.00 $ 284.13 $ 770.00 $875.11 A19 Tapping Sleeve and Valve (pressure test & tap included) (a) 6"x6" 1 EA. $ 1,800.00 $ 2,045.70 $ 2,000.00 $ 2,273.00 $ 3,800.00 $4,318.70 (b) 8'x6" 1 EA. $ 1,800.00 $ 2,045.70 $ 2,000.00 $ 2,273.00 $ 3,800.00 $4,318.70 (c) 8'x8" 1 EA. $ 2,200.00 $ 2,500.30 $ 2,000.00 $ 2,273.00 $ 4,200.00 $4,773.30 (d) 10" x 6" 1 EA. $ 1,800.00 $ 2,045.70 $ 2,500.00 $ 2,841.25 $ 4,300.00 $4,886.95 (e) 10" x 8" 1 EA. $ 2,200.00 $ 2,500.30 $ 3,000.00 $ 3,409.50 $ 5,200.00 $5,909.80 (f) 12'x6" 1 EA. $ 1,800.00 $ 2,045.70 $ 3,500.00 $ 3,977.75 $ 5,300.00 $6,023.45 (g) 12'x8" 1 EA. $ 2,400.00 $ 2,727.60 $ 3,500.00 $ 3,977.75 $ 5,900.00 $6,705.35 (h) 12'x12" 1 EA. $ 4,500.00 $ 5,114.25 $ 3,500.00 $ 3,977.75 $ 8,000.00 $9,092.00 (i) 16" x 6" 1 EA. $ 2,400.00 $ 2,727.60 $ 4,000.00 $ 4,546.00 $ 6,400.00 $7,273.60 A20 Resilient Seat Gate Valve Assemblies (a) 2 -inch 1 EA. $ 400.00 $ 454.60 $ 500.00 $ 568.25 $ 900.00 $1,022.85 (b) 4 -inch 1 EA. $ 650.00 $ 738.73 $ 600.00 $ 681.90 $ 1,250.00 $1,420.63 (c) 6 -inch 1 EA. $ 750.00 $ 852.38 $ 650.00 $ 738.73 $ 1,400.00 $1,591.10 (d) 8 -inch 1 EA. $ 1,050.00 $ 1,193,33 $ 800.00 $ 909.20 $ 1,850.00 $2,102.53 (e) 10 -inch 1 EA. $ 1,850.00 $ 2,102.53 $ 1,000.00 $ 1,136.50 $ 2,850.00 $3,239.03 (f) 12 -inch 1 EA. $ 2,350.00 $ 2,670.78 $ 1,200.00 $ 1,363.80 $ 3,550.00 $4,034.58 (g) 16 -inch 1 EA. $ 5,700.00 $ 6,478.05 $ 1,800.00 $ 2,045.70 $ 7,500.00 $8,523.75 A21 Eccentric Plug Valve Assemblies (a) 6 -inch 1 EA. $ 1,200.00 $ 1,363.80 $ 500.00 $ 568.25 $ 1,700.00 $1,932.05 (b) 8 -inch 1 EA. $ 1,500.00 $ 1,704.75 $ 600.00 $ 681.90 $ 2,100.00 $2,386.65 (c) 12 -inch I EA. $ 2,400.00 $ 2,727.60 $ 650.00 $ 738.73 $ 3,050.00 $3,466.33 (d) 16 -inch 1 EA. $ 5,300.00 $ 6,023.45 $ 750.00 $ 852.38 $ 6,050.00 $6,875.83 (e) 18 -inch 1 EA. $ 5,900.00 $ 6,705.35 $ 4,000.00 $ 4,546.00 $ 9,900.00 $11,251.35 (f) 24 -inch 1 EA. $ 16,600.00 $ 18,865.90 $ 4,500.00 $ 5,114.25 $ 21,100.00 $23,980.15 A22 lButterfly Valve Assemblies (a) 12 -inch 1 EA. $ 1,600.00 $ 1,818.40 $ 650.00 $ 738.73 $ 2,250.00 $2,557.13 (b) 16 -inch 1 EA. $ 2,600.00 $ 2,954.90 $ 750.00 $ 852.38 $ 3,350.00 $3,807.28 (c ) 18 -inch 1 EA. $ 2,850.00 $ 3,239.03 $ 1,000.00 $ 1,136.50 $ 3,850.00 $4,375.53 (d) 20 -inch 1 EA. $ 3,700.00 $ 4,205.05 $ 1,000.00 $ 1,136.50 $ 4,700.00 $5,341.55 A23 Ball Valve Assemblies (a) 3/4 -inch 1 EA. $ 55.00 $ 62.51 $ 25.00 $ 28.41 $ 80.00 $90.92 (b) 1 -inch 1 EA. $ 75.00 $ 85.24 $ 30.00 $ 34.10 $ 105.00 $119.33 (c) 1 1/4 -inch 1 EA. $ 150.00 $ 170.48 $ 35.00 $ 39.78 $ 185.00 $210.25 (b) 1 1/2 -inch I EA. $ 160.00 $ 181.84 $ 40.00 $ 45.46 $ 200.00 $227.30 (a) 13/4 -inch 1 EA. $ 230.00 $ 261.40 $ 50.00 $ 56.83 $ 280.00 $318.22 (b) 2 -inch I EA. $ 230.00 $ 261.40 $ 60.00 $ 68.19 $ 290.00 $329.59 A24 ICheck Valve Assemblies (a) 2 -inch 1 EA. $ 50.00 $ 56.83 $ 500.00 $ 568.25 $ 550.00 $625.08 (b) 4 -inch 1 EA. $ 700.00 $ 795.55 $ 500.00 $ 568.25 $ 1,200.00 $1,363.80 (c) 6 -inch 1 EA. $ 1,400.00 $ 1,591.10 $ 650.00 $ 738.73 $ 2,050.00 $2,329.83 (d) 8 -inch 1 EA. $ 1,550.00 $ 1,761.58 $ 750.00 $ 852.38 $ 2,300.00 $2,613.95 (e) 12 -inch 1 EA. $ 4,300.00 $ 41886.95 $ 1,200.00-F$ 1,363.80 $ 5,500.00 $6,250.75 (f) 16 -inch 1 EA. $ 8,400.00 $ 9,546.60 $ 1,400.00 1$ 1,591.10 $ 9,800.00 $11,137.70 (g) 18 -inch 1 EA. $ 8,700.00 $ 9,887.55 $ 1,500.00 $ 1,704.75 $ 10,200.001 $11,592.30 (h) 20 -inch 1 EA. $ 9,500.00 $ 10,796.75 $2,000.00 $ 2,273.00 $ 11,500.001 $13,069.75 11 of 17 Exhibit 1 -Amendment 1 (Hinterland GrouuI nem No. Description Unit Material Unit Price Bid Revised Unit Price Material Installed Unit Price Bid Revised Unit Price Install Total Unit Price (Material + Installation) Revised total Unit Price (Material+ Installation) A25 Sanitary Sewer Services (constructed with new gravity sewer) 6' il (a) 0'�(double) 1 EA. $ 650.00 $ 738.73 $ 800.00 $ 909.20 $ 1,450.00 $1,647.93 (b) 0' 1 EA. $ 700.00 $ 795.55 $ 800.00 $ 909.20 $ 1,500.00 $1,704.75 (c) 6' 1 EA. $ 650.00 $ 738.73 $ 800.00 $ 909.20 $ 1,450.00 $1,647.93 (d) 6' -Over (double) 1 EA. $ 700.00 $ 795.55 $ 800.00 $ 909.20 $ 1,500.00 $1,704.75 A26 6" Sanitary Sewer Services -Additional Footage (a) 10'- 6' 1 L. F. $ 5.00 $ 5.68 $ 15.00 $ 17.05 $ 20.00 $22.73 (b) 6'- Over 1 1 L.F $ 7,00 1 $ 7.96 $ 15.00 $ 17.05 $ 22.00 $25.00 A27 Sanitary Sewer Services (constructed on existing sewer lines - unlined) (a) 0'-6' (single) 1 EA. $ 650.00 $ 738.73 $ 1,000.00 $ 1,136.50 $ 1,650.00 $1,875.23 (b) 0'-6' (double) 1 EA. $ 700.00 $ 795.55 $ 1,000.00 $ 1,136.50 $ 1,700.00 $1,932.05 (c) 6' -Over (single) 1 EA. $ 650.00 $ 738.73 $ 1,000.00 $ 1,136.50 $ 1,650.00 $1,875.23 (d) 6' -Over (double) 1 EA. $ 700.00 $ 795.55 $ 1,000.00 $ 1,136.50 $ 1,700.00 $1,932.05 A28 Sanitary Sewer Services (constructed on existing sewer lines - lined) (a) 0'-6' (single) 1 EA. $ 800.00 $ 909.20 $ 1,200.00 $ 1,363.80 $ 2,000.00 $2,273.00 (b) 0'-6' (double) 1 EA. $ 1,000.00 $ 1,136.50 $ 1,400.00 $ 1,591.10 $ 2,400.00 $2,727.60 (c) 6' -Over (single) 1 EA. $ 800.00 $ 909.20 $ 1,200.00 $ 1,363.80 $ 2,000.00 $2,273.00 (d) 6' -Over (double) 1 EA. $ 1,000.00 $ 1,136.50 $ 1,400.00 $ 1,591.10 $ 2,400.00 $2,727.60 A29 Sanitary Sewer Cleanouts (to existing sanitary sewer laterals) (a) 0'-6' (4") 1 EA. $ 300.00 $ 340.95 $ 500.00 $ 568.25 $ 800.00 $909.2 (b) 6' -Over (4") 1 EA. $ 400.00 $ 454.60 $ 800.00 $ 909.20 $ 1,200.00 $1,363.80 (c) 10'-6'(6') 1 EA. $ 350.00 $ 397.78 $ 500.00 $ 568.25 $ 850.00 $966.03 (d) 6' -Over (6") 1 EA. $ 450.00 $ 511.43 $ 800.00 $ 909.20 $ 1,250.00 $1,420.63 A30 Cleanout Ring and Cover 1 EA. $ 200.00 $ 227.30 $ 150.00 $ 170.48 $ 350.00 $397.78 (constructed on new or existing cleanouts) A31 Water Services (on 6" or smaller main) (constructed in conjunction with water main) (a) 1" (single short) 1 EA. $ 250.00 $ 284.13 $ 400.00 $ 454.60 $ 650.00 $738.73 (b) 1" (single long) 1 EA. $ 290.00 $ 329.59 $ 500.00 $ 568.25 $ 790.00 $897.84 (c) 1" (double short) 1 EA. $ 310.00 $ 352.32 $ 500.00 $ 568.25 $ 810.00 $920.57 (d) 1" (double long) 1 EA. $ 350.00 $ 397.78 $ 700.00 $ 795.55 $ 1,050.00 $1,193.33 (e) 2" (single short) 1 EA. $ 790.00 $ 897.84 $ 600.00 $ 681.90 $ 1,390.00 $1,579.74 (f) 2" (single long) 1 EA. $ 875.00 $ 994.44 $ 700.001 $ 795.55 $ 1,575.00 $1,789.99 (g) 2" (double short) 1 EA. $ 1,600.00 $ 1,818.40 $ 700.00 $ 795.55 $ 2,300.00 $2,613.95 (h) 2" (double long) 1 EA. $ 1,600.00 $ 1,818.40 $ 900.00 $ 1,022.85 $ 2,500.00 $2,841.25 A32 lWater Services- Horizontally Drilled (constructed in conjunction with 6" or smaller water main) (a) 1" (single short) 1 EA. $ 275.00 $ 312.54 $ 1,200.00 $ 1,363.80 $ 1,475.00 $1,676.34 (b) 1" (single long) 1 EA. $ 290.00 $ 329.59 $ 1,200.00 $ 1,363.80 $ 1,490.00 $1,693.39 (c) 1" (double short) 1 EA. $ 550.00 $ 625.08 $ 1,200.00 $ 1,363.80 $ 1,750.00 $1,988.88 (d) 1" (double long) 1 EA. $ 550.00 $ 625.08 $ 1,200.00 $ 1,363.80 $ 1,750.00 $1,988.88 (e) 2" (single short) 1 EA. $ 2,400.00 $ 2,727.60 $ 1,200.00 $ 1,363.80 $ 3,600.00 $4,091.40 (f) 2" (single long) 1 EA. $ 2,400.00 $ 2,727.60 $ 1,200.00 $ 1,363.80 $ 3,600.00 $4,091.40 (g) 2" (double short) 1 EA. $ 2,000.00 $ 2,273.00 $ 1,200.00 $ 1,363.80 $ 3,200.00 $3,636.80 IN 2" (double long) 1 EA. $ 2,800.00 $ 3,182.201 $ 1,200.00 $ 1,363.80 $ 4,000.00 $4,546.00 A33 lWater Services (on 6" or smaller main) (constructed on existing water main) (a) 1" (single short) 1 EA. $ 250.00 $ 284.13 $ 1,400.00 $ 1,591.10 $ 1,650.00 $1,875.23 (b) 1" (single long) (c) 1" (double short) (d) 1" (double long) (e) 2" (single short) (f) 2" (single long) (g) 2" (double short) 1 I 1 1 1 1 EA. EA. EA. EA. EA. EA $ $ $ $ $ $ 275.00 500.00 600.00 1,200.00 1,300.00 1,700.00 $ $ $ $ $ $ 312.54 568.25 681.90 1,363.80 1,477.45 1,932.05 $ 1,800.00 $ 1,600.00 $ 1,800.001 $ 1,800.00 $ 1,800.00 $ 1,800.00 $ $ $ $ $ $ 2,045.70 1,818.40 2,045.70 2,045.70 2,045.70 2,045.70 $ 2,075.001 $ 2,100.00 $ 2,400.00 $ 3,000.00 $ 3,100.00 $ 3,500.00 $2,358.24 $2,386.65 $2,727.60 $3,409.50 $3,523.15 $3,977.75 12 of 17 Fxhibit 1 - Amendment 1 (Hinterland Grouni Item No. Description Quantity Unit Material Price Unit Bid Revised Unit Price Material Installed Unit Price Bid Revised Unit Price Install Total Unit Price (Material r Installation) Revised total Unit Price (Material+ Installation) (h) 2" (double long) 1 EA. $ 1,700.00 $ 1,932.05 $ 1,800.00 $ 2,045.70 $ 3,500.00 $3,977.75 A34 Water Services- Horizontally Drilled (constructed on existing 6" or smaller water main) (a) 1" (single short) 1 EA. $ 275.00 $ 312.54 $ 1,200.00 $ 1,363.80 $ 1,475.00 $1,676.34 (b) 1" (single long) I EA. $ 290.00 $ 329.59 $ 1,200.00 $ 1,363.80 $ 1,490.00 $1,693.39 (c) 1" (double short) 1 EA. $ 550.00 $ 625.08 $ 1,200.00 $ 1,363.80 $ 1,750.00 $1,988.88 (d) 1" (double long) 1 EA. $ 550.00 $ 625.08 $ 1,200.00 $ 1,363.80 $ 1,750.00 $1,988.88 (e) 2" (single short) 1 EA. $ 2,400.00 $ 2,727.60 $ 1,200.00 $ 1,363.80 $ 3,600.00 $4,091.40 (f) 2" (single long) 1 EA. $ 2,400.00 $ 2,727.60 $ 1,200.00 $ 1,363.80 $ 3,600.00 $4,091.40 2" (double short) 1 EA. $ 2,000.00 $ 2,273.00 $ 1,200.00 $ 1,363.80 $ 3,200.00 $3,636.80 (h) 2" (double long) 1 EA. $ 2,800.00 $ 3,182.20 $ 1,200.00 $ 1,363.80 $ 4,000.00 $4,546.00 H(g) A35 Water Services Additional Footage (a) 1" HDPE Water Service 1 L. P. $ 0.50 $ 0.57 $ 45.00 $ 51.14 $ 45.50 $51.71 (b) 2" HDPE Water Service 1 L.F $ 1.50 $ 1.70 $ 50.00 $ 56.83 $ 51.50 $58.53 A36 Water Services saddle size adjustments (constructed on water main 6" or larger) (a) 6" 1 EA. $ 150.00 $ 170.48 $ $ 150.00 $170.48 (b) 8" 1 EA. $ 150.00 $ 170.48 $ $ 150.00 $170.48 (c) 10" 1 EA. $ 210.00 $ 238.67 $ $ 210.00 $238.67 (d) 12" 1 EA. $ 185.00 $ 210.25 $ $ 185.00 $210.25 (e) 16" 1 EA. $ 320.00 $ 363.68 $ $ 320.00 $363.68 A37 Blow -off Assembly 1 EA. $ 1,000.00 $ 1,136.50 $ 800.00 $ 909.20 $ 1,800.00 $2,045.70 A38 Fire Hydrant Assembly (includes tee) (constructed with new water main) 1 EA. $ 2,700.00 $ 3,068.55 $ 1,500.00 $ 1,704.75 $ 4,200.00 $4,773.30 A39 Fire Hydrant Assembly (constructed on existing water main) 1 EA. $ 3,100.00 $ 3,523.15 $ 1,900.00 $ 2,159.35 $ 5,000.00 $5,682.50 A40 Bacteriological Sample Point (constructed on new water main) 1 EA. $ 300.00 $ 340.95 $ 700.00 $ 795.55 $ 1,000.00 $1,136.50 A41 Bacteriological Sample Point (using a water service or fire hydrant) 1 EA. $ 100.00 $ 113.65 $ 300.00 $ 340.95 $ 400.00 $454.60 A42 2" Manual Air Release Valve 1 EA. $ 1,400.00 $ 1,591.10 $ 600.00 $ 681.90 $ 2,000.00 $2,273.00 A43 2" Automatic Air Release Valve 1 EA. $ 2,300.00 $ 2,613.95 $ 700.00 $ 795.55 $ 3,000.00 $3,409.50 A44 Dewatering (a) 0'-6' 1 L. F. NA $ 10.00 $ 11.37 $ 10.00 $11.37 ( b ) 6'-12' 1 L. F. NA $ 20.00 $ 22.73 $ 20.00 $22.73 (c) 12'-18' 1 L. F. NA $ 30.00 $ 34.10 $ 30.00 $34.10 A45 Remove Pressure Pipe $ - $0.00 (a) 3" 1 L.F. NA $ 4.00 $ 4.55 $ 4.00 $4.55 (b) 4" 1 L. F. NA $ 4.00 $ 4.55 $ 4.00 $4.55 (c) 6" 1 L. F. NA $ 4.00 $ 4.55 $ 4.00 $4.55 (d) 8" 1 L. P. NA $ 4.00 $ 4.55 $ 4.00 $4.55 (e) 10" 1 L.F. NA $ 4.00 $ 4.55 $ 4.00 $4.55 (f) 12" 1 L. F. NA $ 5.00 $ 5.68 $ 5.00 $5.68 16" 1 L. F. NA $ 5.00 $ 5.68 $ 5.00 $5.68 (h) lCost Credit 1 L. F. NA r(g) A4Grout and Abandon Pressure Pipe (a) 3" 1 L. F. $ 1.00 $ 1.14 $ 5.00 $ 5.68 $ 6.00 $6.82 (b) 4" 1 L. F. $ 1.00 $ 1.14 $ 5.00 $ 5.68 $ 6.00 $6.82 (c) 6" 1 L. P. $ 1.00 $ 1.14 $ 5.00 $ 5.68 $ 6.00 $6.82 (d) 8" 1 L. F. $ 2.00 $ 2.27 $ 5.00 $ 5.68 $ 7.00 $7.96 10'. 1 L.F. $ 2.00 $ 2.27 $ 6.00 $ 6.82 $ 8.00 $9.09 12" 1 L.F. $ 2.00 $ 2.27 $ 6.00 $ 6.82 $ 8.00 $9.09 14" 1 L. F. $ 3.00 $ 3.41 $ 6.00 $ 6.82 $ 9.00 $10.23 16" 1 L. F. $ 3.00 $ 3.41 $ 6.00 $ 6.82 $ 9.00 $10.23 18" lRemove 1 L.F. $ 3.00 $ 3.41 $ 7.00 $ 7.96 $ 10.00 $11.37 20" 1 LF. $ 4.00 $ 4.55 $ 7.00 $ 7.96 $ 11.00 $12.50 22" 1 L. F. $ 4.00 $ 4.55 $ 7.00 $ 7.96 $ 11.00 $12.50 24" 1 L. F. $ 5.00 $ 5.68 $ 8.00 $ 9.09 $ 13.00 $14.77 Sanitary Sewer Main 13 of 17 Exhibit 1 -Amendment 1 (Hinterland Grouol Item Description No. Quantity Unit Material Unit Price Bid Revised Unit Price Material Installed Unit Price Bid Revised Unit Price Install Total Unit Price (Material + Installation) Revised total Unit Price (Material+ Installation) (a) 8" 1 L. F. NA $ 5.00 $ 5.68 $ 5.00 $5.68 (b) 10" 1 L. F. NA $ 5.00 $ 5.68 $ 5.00 $5.68 (b) 12" 1 L. F, NA $ 5.00 $ 5.68 $ 5.00 $5.68 (c) 18" 1 L. F. NA $ 10.00 $ 11.37 $ 10.00 $11.37 (d) 24" 1 L. F. NA $ 10.00 $ 11.37 $ 10.00 $11.37 (e) ICost Credit 1 L. F. NA A48 Grout and Abandon Sanitary Sewer Main (a) 8" 1 L. F. $ 2.00 $ 2.27 $ 6.00 $ 6.82 $ 8.00 $9.09 (b) 10" 1 L. P. $ 2.00 $ 2.27 $ 6.00 $ 6.82 $ 8.00 $9.09 (b) 12" 1 L. F. $ 2.00 $ 2.27 $ 6.00 $ 6.82 $ 8.00 $9.09 (c) 18" 1 LF. $ 3.00 $ 3.41 $ 7.00 $ 7.96 $ 10.00 $11.37 (d) 24" 1 L. F. $ 4.00 $ 4.55 $ 8.00 $ 9.09 $ 12.00 $13.64 A49 Remove Sanitary Sewer Manhole (a) 0'-6' 1 EA. $ 500.00 $ 568.25 $ 1,000.00 $ 1,136.50 $ 1,500.00 $1,704.75 (b) 6'-8' 1 EA. $ 500.00 $ 568.25 $ 2,000.00 $ 2,273.00 $ 2,500.00 $2,841.25 (c) 8'-10' 1 EA. $ 500.00 $ 568.25 $ 2,000.00 $ 2,273.00 $ 2,500.00 $2,841.25 (d) 10'-12' 1 EA. $ 500.00 $ 568.25 $ 2,500.00 $ 2,841.25 $ 3,000.00 $3,409.50 (e) 12'-14' 1 EA. $ 500.00 $ 568.25 $ 3,000.00 $ 3,409.50 $ 3,500.00 $3,977.75 A50 Outside drop on Manhole (a) 6'-8' 1 EA. $ 300.00 $ 340.95 $ 200.00 $ 227.30 $ 500.00 $568.25 8'-10' 1 EA. $ 400.00 $ 454.60 $ 300.00 $ 340.95 $ 700.00 $795.55 (c) 10'-12' 1 EA. $ 500.00 $ 568.25 $ 400.00 $ 454.60 $ 900.00 $1,022.85 r(b) A51 Relocate Fire Hydrant 1 EA. $ 1,700.00 $ 1,932.05 $ 1,200.00 $ 1,363.80 $ 2,900.00 $3,295.85 A52 2" Jumper Connection 1 EA. $ 1,600.00 $ 1,818.40 $ 750.00 $ 852.38 $ 2,350.00 $2,670.78 A53 Asbestos Pipe Abatment (a) 6" 1 L. F. NA $ 14.00 $ 15.91 $ 14.00 $15.91 (b) 8" 1 L. P. NA $ 18.00 $ 20.46 $ 18.00 $20.46 (c) 10" 1 L.F. NA $ 20.00 $ 22.73 $ 20.00 $22.73 (d) 12" 1 L. F. NA $ 22.00 $ 25.00 $ 22.00 $25.00 (e) 16" 1 L. F. NA $ 28.00 $ 31.82 $ 28.00 $31.82 A54 Root Barrier 1 L. F. $ 25.00 $ 28.41 $ 25.00 $28.41 A55 jUtility Pole Support 1 EA $ 2,500.00 $ 2,841.25 $ 2,500.00 $2,841.25 A56 IRemove and Reinstall Trees 1 EA $ 1,200.00 $ 1,363.80 $ 1,200.00 $1,363.80 A57 ISchedule 40 PVC Casing Pipe (a) 4" 1 L.F. NA $ 10.00 $ 11.37 $ 10.00 $11.37 (b) 6" 1 L. F. NA $ 12.00 $ 13.64 $ 12.00 $13.64 (c) 8" 1 L. F. NA $ 16.00 $ 18.18 $ 16.00 $18.18 (d) 10" 1 L. F. NA $ 20.00 $ 22.73 $ 20.00 $22.73 (e) 12" 1 L. F. NA $ 25.00 $ 28.41 $ 25.00 $28.41 (f) 14" 1 L. F. NA $ 34.00 $ 38.64 $ 34.00 $38.64 (g) 16" 1 L. F. NA $ 45.00 $ 51.14 $ 45.00 $51.14 (h) 18" 1 L. F, NA $ 90.00 $ 102.29 $ 90.00 $102.29 (i) 20" 1 L. P. NA $ 200.00 $ 227.30 $ 200.00 $227.30 (J) 22" 1 L.F. NA $ 250.00 $ 284.13 $ 250.00 $284.13 (k) 24" 1 LF. NA $ 300.00 $ 340.95 $ 300.00 $340.95 A58 Steel casing (a) 4" 1 L.F. NA $ 20.00 $ 22.73 $ 20.00 $22.73 (b) 6" 1 L. F. NA $ 25.00 $ 28.41 $ 25.00 $28.41 (c) 8„ 1 L. F. NA $ 40.00 $ 45.46 $ 40.00 $45.46 (d) 10" 1 L. F. NA $ 45.00 $ 51.14 $ 45.00 $51.14 (e) 12" 1 L. F. NA $ 50.00 $ 56.83 $ 50.00 $56.83 (f) 14" 1 L. F. NA $ 70.00 $ 79.56 $ 70.00 $79.56 (g) 16" 1 L.F. NA $ 80.00 $ 90.92 $ 80.00 $90.92 (h) 18" 1 L. F. NA $ 90.00 $ 102.29 $ 90.00 $102.29 (i) 20" 1 L.F. NA $ 120.00 $ 136.38 $ 120.00 $136.38 (1) 22" 1 L. F. NA $ 200.00 $ 227.30 $ 200.00 $227.30 (k) 24" 1 L. P. NA $ 300.00 $ 340.95 $ 300.00 $340.95 14 of 17 Exhibit 1 - Amendment 1(Hinterland Grouo) Item No. Description Quantity Unit Material Unit Price Bid Revised Unit Price Material Installed Unit Price Bid Revised Unit Price Install Total Unit Price (Material + Installation) Revised total Unit Price (Material+ Installation) SECTION B - Restoration B1 Pavement Repair and Replacement (a) Asphalt Road 1 S.Y. $ 65.00 $ 73.87 $ 65.00 $73.87 b Asphalt Driveway 1 S -Y. $ 50.00 $ 56.83 $ 50.00 $56.83 (c) Asphalt Millings 1 S.Y. $ 35.00 $ 39.78 $ 35.00 $39.78 d) As halt overlay 1 S.Y. $ 30.00 $ 34.10 $ 30.00 $34.10 (e) Add. S-3 Asphalt 1 Ton $ 350.00 $ 397.78 $ 350.00 $397.78 (f) Cold Mix Asphalt 1 Ton $ 200.00 $ 227.30 $ 200.00 $227.30 (g) Concrete Driveway (6") 1 S.Y. $ 65.00 $ 73.87 $ 65.00 $73.87 (h) Concrete Sidewalk (4") 1 S.Y. $ 50.00 $ 56.83 $ 50.00 $56.83 (i) Concrete Curb 1. Curb and Gutter 1 L.F. $ 50.00 $ 56.83 $ 50.00 $56.83 2.'D'Curb 1 L.F. $ 50.00 $ 56.83 $ 50.00 $56.83 (j) Concrete Driveway Paver Block 1 S.Y. $ 45.00 $ 51.14 $ 45.00 $51.14 (k) Lime rock Driveway 1 S.Y. $ 35.00 $ 39.78 $ 35.00 $39.78 (1) jAsphalt sidewalk 1 S.Y. $ 60.00 $ 68.19 $ 60.00 $68.19 B2 Milling Asphalt 1 S.Y. $ 25.00 $ 28.41 $ 25.00 $28.41 B3 Coquina Rock Base 1 C. Y. $ 30.00 $ 34.10 $ 30.00 $34.10 B4 Flowable Fill (a) 0 - 4 cy (include short load fees) 1 C, Y. $ 350.00 $ 397.78 $ 350.00 $397.78 (b) 4 - 8 cy (include short load fees) 1 C. Y. $ 275.00 $ 312.54 $ 275.00 $312.54 (c) > 8cy 1 C. Y. $ 200.00 $ 227.30 $ 200.00 $227.30 B5 Miscellaneous Materials (a) Sand 1 C. Y. $ 45.00 $ 51.14 $ 45.00 $51.14 (b) Fill 1 C. Y. $ 45.00 $ 51.14 $ 45.00 $51.14 (c) #57 Rock 1 C. Y. $ 45.00 $ 51.14 $ 45.00 $51.14 (d) Shell Rock 1 C, Y. $ 55.00 $ 62.51 $ 55.00 $62.51 (e) Suremix Concrete 80# 1 Bag $ 25.00 $ 28.41 $ 25.00 $28.41 B6 Sod Replacement (a) Bahia 1 S.Y. $ 4.00 $ 4.55 $ 4.00 $4.55 (b) I Floratam 1 S.Y. $ 6.00 $ 6.82 $ 6.00 $6.82 37 Seed and Mulch 1 S.Y. $ 5.00 $ 5.68 $ 5.00 $5.68 88 Mailbox Removal and Reinstallation 1 EA $ 800.00 $ 909.20 $ 800.00 $909.20 69 Sprinkler System Repair per Yard 1 EA $ 1,200.00 $ 1,363.80 $ 1,200.00 $1,363.80 B10 Handicap Ramp Restoration I EA $ 500.00 $ 568.25 $ 500.00 $568.25 SECTION C - High Density Polyethylene Piping & Horizontal Directional Boring C1 High Density Polyethylene Pipe (HDPE) -Trench (a) 2 -inch 1 L. P. $ 3.00 $ 3.41 $ 12.00 $ 13.64 $ 15.00 $17.05 (b) 4 -inch 1 L. F. $ 6.00 $ 6.82 $ 14.00 $ 15.91 $ 20.00 $22.73 (c) 6 -inch 1 L. F, $ 10.00 $ 11.37 $ 16.00 $ 18.18 $ 26.00 $29.55 (d) 8 -inch 1 L. P. $ 18.00 $ 20.46 $ 18.00 $ 20.46 $ 36.00 $40.91 (e) 12inch 1 L. F. $ 32-00 $ 36.37 $ 20.00 $ 22.73 $ 52.00 $59.10 (f) 16 -inch 1 L. F. $ 60.00 $ 68.19 $ 24.00 $ 27.28 $ 84.00 $95.47 (g) 18 -inch 1 L, F. $ 70.00 $ 79.56 $ 30.00 $ 34.10 $ 100.00 $113.65 (h) 20 -inch 1 L. F. $ 85.00 $ 96.60 $ 40.00 $ 45.46 $ 125.00 $142.06 (i) 24 -inch 1 L. F. $ 110.00 $ 125.02 $ 50.00 $ 56.83 $ 160.00 $181.84 C2 Horizontal Directional Boring (HDPE) -HDD (b) 4 -inch 1 L. F, $ 22.00 $ 25.00 $ 12.00 $ 13.64 $ 34.00 $38.64 (c) 6 -inch 1 L.F. $ 28.00 $ 31.82 $ 14.00 $ 15.91 $ 42.00 $47.73 (d) 8 -inch 1 L. F. $ 34.00 $ 38.64 $ 16.00 $ 18.18 $ 50.00 $56.83 (e) 12inch 1 L. P. $ 64.00 $ 72.74 $ 20.00 $ 22.73 $ 84.00 $95.47 (f) 16 -inch 1 L. F, $ 82.00 $ 93.19 $ 25.00 $ 28.41 $ 107.00 $121.61 (g) 18 -inch 1 L.F. $ 100.00 $ 113.65 $ 30.00 $ 34.10 $ 130.00 $147.75 h 20 -inch 1 L. P, $ 125.00 $ 142.06 $ 40.00 $ 45.46 $ 165.00 $187.52 (i) 24 -inch 1 L.F. $ 160.00 $ 181.84 $ 50.00 $ 56.83 1 $ 210.00 $238.67 15 of 17 Exhibit 1- Amendment 1 (Hinterland Grouol Item No. Description Quantity Unit Material Unit Price Bid Revised Unit Price Material Installed Unit Price Bid Revised Unit Price Install Total Unit Price (Material + Installation) Revised total Unit Price (Material+ Installation) C3 Horizontally Directional Drilled -PVC Driveway Bores 20 -foot length (a) 4 -inch 1 EA. $ 2,500.00 $ 2,841.25 $ 500.00 $ 568.25 $ 3,000.00 $3,409.50 (b) 6 -inch 1 EA. $ 3,500.00 $ 3,977.75 $ 500.00 $ 568.25 $ 4,000.00 $4,546.00 c) 8 -inch 1 EA. $ 4,500.00 $ 5,114.25 $ 500.00 $ 568.25 $ 5,000.00 $5,682.5 (d) 12 -inch 1 EA. $ 5,000.00 $ 5,682.50 $ 500.00 $ 568.25 $ 5,500.00 $6,250.75 40 -foot length (a) 4 -inch 1 EA. $ 3,500.00 $ 3,977.75 $ 500.00 $ 568.25 $ 4,000.00 $4,546.00 (b) 6 -inch 1 EA. $ 4,500.00 $ 5,114.25 $ 500.00 $ 568.25 $ 5,000.00 $5,682.50 (c) 8 -inch 1 EA. $ 5,000.00 $ 5,682.50 $ 500.00 $ 568,25 $ 5,500.00 $6,250.75 (d) 12 -inch 1 EA. $ 5,500.00 $ 6,250.75 $ 500.00 $ 568.25 $ 6,000.00 $6,819.00 60 -foot length (a) 4 -inch 1 EA. $ 4,000.00 $ 4,546.00 $ 750.00 $ 852.38 $ 4,750.00 $5,398.38 6-inch 1 EA. $ 5,000.00 $ 5,682.50 $ 750.00 $ 852.38 $ 5,750.00 $6,534.88 8 -inch rd) 1 EA. $ 5,500.00 $ 6,250.75 $ 750.00 $ 852.38 $ 6,250.00 $7,103.13 12 -inch 1 EA. $ 6,000.00 $ 6 819.00 $ 750.00 $ 852.38 $ 61750.00 $7,671.38 SECTION D: Time and Materials Rates (TO BE USED ON T&M ORDERS ONLY) Dl Equipment Hourly Rates (a) Trackhoe (specify model) (medium) 1 Hr. NA $ 75.00 $ 85.24 $ 75.00 $85.24 (large) 1 Hr. NA $ 125.00 $ 142.06 $ 125.00 $142.06 (b) Combination Backhoe 1 Hr. NA $ 65.00 $ 73.87 $ 65.00 $73.87 (c) Front end Loader 1 Hr. NA $ 85.00 $ 96.60 $ 85.00 $96.60 (d) Grader 1 Hr. NA $ 120.00 $ 136.38 $ 120.00 $136.38 (e) Dump Truck ( 9 C.Y.) 1 Hr. NA $ 85.00 $ 96.60 $ 85.00 $96.60 (f) Tandem Dump Truck (18 C.Y.) 1 Hr. NA $ 85.00 $ 96.60 $ 85.00 $96.60 (g) Forklift 1 Hr. NA $ 50.00 $ 56.83 $ 50.00 $56.83 (h) Crew Truck with hand tools 1 Hr. NA $ 25.00 $ 28.41 $ 25.00 $28.41 (i) Trash Pump 3" 1 Hr. NA $ 15.00 $ 17.05 $ 15.00 $17.05 (j) Trash Pump 2" 1 Hr. NA $ 10.00 $ 11,37 $ 10.00 $11.37 (k) Walk behind Vibrating Roiler 1 Hr. NA $ 20.00 $ 22.73 $ 20.00 $22.73 (1) Rev. Plate Compactor 1 Hr. NA $ 30.00 $ 34.10 $ 30.00 $34.10 (m) Jumping Jack 1 Hr, NA $ 10.00 $ 11.37 $ 10.00 $11.37 (n) Cut off saw (14") 1 Hr. NA $ 5.00 $ 5.68 $ 5.00 $5.68 (o) Street saw (14") 1 Hr. NA $ 5.00 $ 5.68 $ 5.00 $5.68 (p) Gradall 1 Hr. NA $ 120.00 $ 136.38 $ 120.00 $136.38 (q) Roller 1 Hr. NA $ 85.00 $ 96.60 $ 85.00 $96.60 (r) Welding Truck 1 Hr. NA $ 85.00 $ 96.60 $ 85.00 $96.60 (s) 1welder 1 Hr. NA $ 85.00 1 $ 96.60 $ 85.00 $96.60 (t) ICement Mixer 1 Hr. NA $ 15.00 $ 17.05 $ 15.00 $17.05 (u) jBox Blade 1 Hr. NA $ 50.00 $ 56.83 $ 50.00 $56.83 (v) Water Truck 1 Hr. NA $ 120.00 $ 136.38 $ 120.00 $136.38 (w) 11000 gpm sump pump 1 Hr. NA $ 25.00 $ 28.41 $ 25.00 $28.41 D2 Crew Hourly Rates (a) jCrew Man 1 Hr. NA $ 45.00 $ 51.14 $ 45.00 $51.14 (b) IForeman 1 Hr. NA $ 75.00 $ 85.24 $ 75.00 $85.24 (c) ISupervisor I Hr. NA $ 100.00 $ 113.65 $ 100.00 $113.65 (d) 3 man crewincludes 1 supervisor 1 Hr. NA $ 285.00 $ 323.90 $ 285.00 $323.90 (e) 4 man crew includes 1 supervisor 1 Hr. NA $ 325.00 $ 369.36 $ 325.00 $369.36 (f) 15 man crew includes 1 supervisor 1 Hr. NA $ 400.00 $ 454.60 $ 400.00 $454.60 D3 Overtime Crew Hourly Rates (a) lCrew Man 1 Hr. NA $ 67.50 $ 76.71 $ 67.50 $76.71 (b) IForeman 1 Hr. NA $ 112.50 $ 127.86 $ 112.50 $127.86 (c) ISupervisor 1 Hr. NA $ 150.00 $ 170.48 $ 150.00 $170,48 (d) 13 man crew includes 1 supervisor 1 Hr. NA $ 427.50 $ 485.85 $ 427.50 $485.85 (e) 14 man crew includes 1 supervisor 1 Hr. NA-$ 487.50 $ 554.04 $ 487.50 $554.04 (f) 5 man crew includes 1 supe;7--11 I Hr. NA $ 600.00 $ 681.90 $ 600.00 $681.90 D4 Nightime Crew Hourly Rates (a) Crew Man (b) IForeman (c) Supervisor 1 1 1 Hr. Hr. Hr. NA NA NA $ $ $ 90.00 150.00 200.00 $ $ $ 102,29 170.48 227.30 $ $ $ 90.00 150.00 200.00 $102.29 $170.48 T $227.30 16 of 17 Exhibit 1 - Amendment 1 Minterland Grouol .e Description quantity Unit Material Unit Revised Unit Price Installed Unit Revised Unit Total Unit Price Revised total Unit�- Price Bid Material Price Bid Price Install (Material + Price (Material+ Installation) Installation) (d) 3 man crew includes I supervise, i. Hr. %A j 570.00 $ 647.81 $ 570.00 $647.81 (e) 4 man crew includes 1 supervisor ? Hr %A } 650.00 $ 738.73 $ 650.00 $738.73 (f( 5 man crew includes 1 supervisor 1 Hr. NA 5 800.00 $ 909.20 $ 800.00 $909.20 SECTION E: Miscellaneous Materials & Sub -Contractors El IMaterials Actual Cost +10% E2 Sub -Contractor Actual Cost +10% Total (Hinterland Group): $ 552,364.50 $627,762.25 17 of 17