Loading...
HomeMy WebLinkAbout1974-039RESOLUTION No.Z,4iQ WHEREAS, this Board has adopted a Mechanical Code for Indian River County, Florida; and, WHEREAS. said Ordinance provides that this Board establish a schedule of Fees for Permits issued under said Ordinance, NOW, THEREFORE, BE IT RESOLVED By the Board of County Commissioners of Indian River County, Florida, 'that the following schedule of Fees is hereby established for the issuing of Mechanical Permits: MECHANICAL PERMIT FEES (a) For issuing each Permit $3.00 (b) (1) Fee for Heating, Ventilating, Duct, Air Conditioning and Refreigeration Systems shall be ten ($10.00) Dollars PLUS two ($2.00) Dollars per each one thousand ($1, 000.00) Dollars or fraction thereof. (2) Repairs, alterations and additions to an existing system where cost is over five hundred ($500.00) dollars shall be two ($2. 00) Dollars or fraction thereof in valuation plus five ($5. 00) dollars. (c) Fee for Re -Inspection. In case it becomes necessary to make a re -inspection of a Heating, Ventilating, Air Conditioning or Refrigeration System, the installer of such equipment shall pay a Re-Inspectioh Fee of Five ($5. 00) Dollars. t (d) Temporary Operation Inspection Fee; For inspecting a Heating, Ventilating, Refrigeration, or Air Conditioning System, a fee of Five ($5.00) Dollars shall be paid by the Contractor requesting such inspection. If the system is not approved for temporary operation on the first inspection, for each subsequent inspection for such purpose, the usual Re -inspection Fee will be charged. (e) In all buildings except one and two family dwellings using self-contained Air Conditioning Units less than two tons, the fee charged shall be that for the total tonnage of all units combined (see Paragraph (a) above for rate). Minimum fee shall be ten ($10. 00) Dollars. (f) Boilers based on BTU Input: 33, 000 BTU (1 BHP) to 165, 000 (5 BHP) $ 5. 00 165, 001 BTU (5BHP) to 330, 000 (10 BHP)$] 0. 00 GAS PERMIT FEES: (cont'(1) 330, 001 BTU (10 BHP) to 1, 165, 000 (52 BHP) $15.00 1, 165, 001 BTU (52 BHP) to 3, 300, 000 BTU (98BHP) $25.00 Over 3, 300, 000 BTU $35.00 (g) Re -Inspection Fee. In case it becomes necessary to make a re -inspection of the installation of a Boiler, the Person, Firm, Corporation or Owner to whom a permit is issued shall pay for each re -inspection a fee of Five ($5. 00) Dollars.