Loading...
HomeMy WebLinkAbout1974-040a 0 RESOLUTION No. -Z4---4a- WHEREAS, This Board passed an Electrical Code, and WHEREAS, said Code provides that this Board establish a Schedule of Fees for permits issued under said Code, NOW, THEREFORE, BE IT RESOLVED By the Board of County Commissioners of Indian River County, Florida, that when application for a permit is approved and before a permit is issued, a fee therefore shall be paid based on the following schedule of rates: ELECTRICAL PERMIT FEE SCHEDULE 1.00 LIGHT OUTLETS $ 3.00 1 to 8 outlets, inclusive - minimum 3.00 Over 8 outlets, the -minimum charge of $3.00 for the first 8 outlets plus 1.00 each additional outlet .10 SERVICES .25 Temporary for construction 2.50 100 ampere and under 2.00 Over 100 ampere to 200 ampere 3.00 Over 200 ampere to 400 ampere 4.00 Over 400 ampere to 600 ampere 5.00 Over 600 ampere to 800 ampere 6.00 For each additional 100 ampere (over 800 ampere) 1.00 SERVICE CHANGES 100 ampere and under 3.00 Over 100 ampere to 200 ampere 4.00 Over 200 ampere to -400 ampere 5.00 Over 400 ampere -each additional 100 ampere .50 SWITCHBOARDS OR PANELS By amperes, same•as "Services" EQUIPMENT Drop in range 1.50 Range top 1.00 Oven 1.00 Sign outlet 1.00 and all other appliance outlets inspected in conjunction with rough airing, inclu- ding room space heaters, ceiling heat, etc. - each 1.00 MOTORS Up to 1 H.P. 1.00 1 to 3 H.P. 2.00 3 to 5 N.P. 3.00 Over 5 H.P. up to 10 H.P. - per additional H.P. 1.00 10 H.P. 8.00 Over 10 H.P. - per additional H.P. .25 MACH I N- S X -Ray - Portable, dentist 1.00 X -Ray - Stationary, doctor 5.00 Diathermic and Electronic outlet 1.00 GENEP,i;TORS AND TRXIISFO'i-IERS Each up to 5 KVA 2.00 Each generator or transformer over 5 KVA through 10 KVA 4.00 -Each generator or transform over 10 KVA through 15 I'M 6.00 Each, garerator or transfonu!r oder 15 i'i'i+ thro' "01 ?0 KIM 15.07 ver —___ tach generator or transtormer over---------- ___•20 20KVA through 25 KVA 10.00 ' Each generator or transformer over 25 KVA through 30 KVA 15.(10 Each generator or transformer over 30 KVA 15.00 Generators and transformers, where located on same floor, fee for largest, plus $1.00 for each additional WELDING MACHINES Up to 25 amperes 2.00 In single family residences, where the contractor requests par- tial inspection, a fee of one dollar ($1.00) shall be paid for the partial inspection. Over 25 amperes to 50 amperes $ 3.00 Over 50 amperes - plus $1.00 for each additional 50 amperes or fractional part thereof 3.00 TRAILER PARKS Plain Service and Sub -Services - as per "Services" All other equipment same fees as -set forth in all other items. SPECIAL PURPOSE OUTLETS (Commercial) Popcorn, doughnut, drink machines, coin music machines, toaster, coffee urn, deep fryer, refrigerator -,-display cases or any other electrical -coin operated machine Fee each time installed 1.50 Permit No. to be displayed on each machine Auto painting - Bake ovens 5.00 Air conditioning heat strips 1 to 5 K.W. 1.50 Each additional 5 K.W.-thereafter 1.00 HANGING OF FIXTURES -(Not included in ori- ginal permit) Lights - 1 through 10 bulb -of fluorescent tubes 1.50 Each additional fixture .20 COr13INATION Light fixtures and outlets up through 10 -one inspection 1.50 Streamers or festoon lights: First 10 lights 1.50 Each additional 10 or fraction .50 PLUG -MOLD , First 25 feet 1.00 Each 5 feet thereafter .20 MISCELLANEOUS PERMITS Giving permission to do temporary work or to do general repairs to radio or television, transmitting or receiving stations, picture sho':is, carnivals, circuses, road shows, or similar organizations, a permit fee from $1.50 to $50.00 shall be paid, said fee to be determined by the electrical inspector, No permit wi11 be issued for a fee of less than $1.50. The said fees shall include payment for the permit and for inspection of work, alter the saine shall have bean complet- ed: If the eleci;rical inspector shall, upon his inspection after cor.pletion of the work or apparatus, find that the sar, does not conforim to and conply with the provisions of this chapter, he shall notify tiro person in charge of the work, indicatin-g; the corrections required; and when he Shall be notified that rh_ corrections have been made, hL, shall again ir.:pect the r'; or apparatus without further charge; extra inspection trips are necessary, due to any cne o ��^ fullcr.rin� r�!;rrns, a charge' of $5 00 shall be i' L:e for each tri;: (a) wrong address; (b) condemned work, resulting from faulty construction; ® (c) repairs or corrections not made when inspection is called; (d) work not ready for inspection when called. ® The payment of re -inspection fee shall be made before any further permits will be issued to the person owing same.