HomeMy WebLinkAbout1974-041RESOLUTION No. 74-41
WHEREAS, the Board of County Commissioners of Indian River
County, Florida, has adopted with modification the Southern Standard
®M Plumbing Code, and
WHEREAS, said ordinance provides for a fee schedule to be
established for permits by this Board by Resolution.
NOW, THEREFORE, BE IT RESOLVED By the Board of
County Commissioners of Indian River County, Florida, the following
schedule of Permit Fees for the Plumbing Code is hereby adopted.
PLUMBING PERMIT FEES
(a)
For each fixture roughed in and installed on new
or reconstructed plumbing, or each fixture outlet
roughed in
$2. 50
(b)
For each water heater
2.50
(c)
For each septic tank to 1, 200 gallons
4.00
For each septic tank over 1, 200 gallons
5. 00
(d)
For each grease trap
2. 00
(e)
For each sewer connection
4.00
(£)
For inspection of remodeling or repairs
on waste, soil, vent, drain or sewer pipes
4.00
(g)
For each lawn sprinkler system, air con-
ditioning, refrigeration, or cooling unit,
connected to the city water andsewer
3.00
(h)
For each re -inspection made due to the
work being condemned or not being ready
at the time specified
5. 00
(i)
For each roof drain
2. 25
(j)
For each area drain
2.25
(k)
For each water service connection to a
municipal or private multiple water supply
system:
First meter on each lot (within
municipality)
1. 00
First meter on each lot (outside
municipality to city water system)
4. 00
For each additional meter on same
lot
. 50
(1) Water connection to or outlets for an
appliance or installation not covered by
fixture permit 1.00
(m) Water connection to outlets for hose or
lawn faucets:
First connection 1. 00
Each additional . 50
FIRE CONTROL SYSTEM
Each hose cabinet 1.00
FIRE SPRINKLER SYSTEM
Minimum permit fee for each installation
not to exceed $100. 00 4.00
Each $500. 00 or fraction thereafter 1.00
0
PLUMBING PERMIT FEES continued:
SWIMMING POOL CONNECTIONS TO CITY
WATER
5.00
® GAS (The following shall include bottle gas)
For the first outlet and/or appliance
3.00
For each additional outlet and/or appliance
1.00
For change from a master to an individual
meter
2.00
For multiple meters at one location:
For first meter
2.00
For each additional meter
1.00
For major repairs to gas pipe where no
2. 00
fixture or appliance installation is
involved
2.00
BOILERS
Minimum permit fee for installations not to
exceed $100. 00
5. 00
Each $500. 00 or fraction thereafter
2. 00
FURNACES AND HEATING EQUIPMENT
PER UNIT INSTALLED
For the first 200, 000 BTU per hour or
fractional part
4. 00
For each additional 100, 000 BTU per hour
or fractional part
2. 00
Note: The rating of furnace and heating
equipment shall be based on the BTU
input of fuel used per hour.
WELLS (Drilling or Digging)
5. 00
Sprinkler Systems
4. 00
WATER STORAGE TANKS (up to 1, 000 gallons)
3. 00
Each additional 1, 000 gallons or fraction
thereof
1.00