Loading...
HomeMy WebLinkAbout1974-062RC] [40 RESOLUTION No. 74- 62 WHEREAS, this Board has adopted a Mechanical Code for Indian River County, Florida; and, WHEREAS, said Ordinance provides that this Board estab- lish a schedule of Fees for Permits issued under said Ordinance, NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Indian River County, Florida, that the following schedule of Fees is hereby established for the issuing of Mechanical Permits: MECHANICAL PERMIT FEES (a) For issuing each Permit $3.00 (b) AIR CONDITIONING AND REFRIGERATION For the purpose of charging fees, 1 ton of refrigeration will equal 12,000 BTU's per hour or 1 H.P. total connected loan The first 5 tons or fractional part 5.00 The next 5 tons up to and including 10 tons - per ton 1.00 Over 10 tons - per ton additional 2.00 All major repairs or replacements, same fees as above. WINDOW UNITS OR WALL UNITS(Where no construction work is involved in the building or duct work attached) For the first 5 units - each 3.00 For the next 50 units - each 2.00 For the next 100units - each 1.50 All others - each 1.00 11 -i (c) Fee for Re -Inspection. In case it becomes necessary to make a re -inspec- tion of a Heating, Ventilating, Air Conditioning or Refrigeration System, the installer of such equipment shall pay a Re -Inspection Fee of Five ($5.00) Dollars. (d) Temporary Operation Inspection Fee; For inspecting a Heating, Ventilating, Re- frigeration, or Air Conditioning System, a fee of Five ($5.00) Dollars shall be paid by the Contractor requesting such inspection. If the system is not approved for temporary operation on the first inspection, for each subsequent inspection for such pur- pose, the usual Re -inspection Fee will be charged. (e) In all buildings except one and two family dwellings using self-contained Air Conditioning Units less than two tons, the fee charged shall be that for the total tonnage of all units combined (see Paragraph (a) above for rate). Minimum fee shall be Five ($5.00) Dollars. (f) Boilers based on BTU Input: 33,000 BTU (1 BHP) to 165,000 (5 BHP) $5.00 165,001 BTU (5 BHP) to 330,000 (10 BHP) 10.00 FEES: (cont'd) 330,001 BTU ( 10 BHP) to 1,165,000(52 BHP) $15.00 1,165,001 BTU (52 BHP)to 3,300,000 BTU (98 BHP) 25.00 Over 3,300,000 BTU 35.00 (g) Re -inspection Fee, in aase it becomes necessary to make a re -inspection of the installation of a Boiler, the person, firm, corporation or owner to whom a permit is issued shall pay for each re -inspection a fee of Five ($5.00) Dollars. This Resolution will become effective on July 10, 1974.