HomeMy WebLinkAbout1974-080of
R ES01,IT'rI0N
No. 74-= a o
S' BE IT RESOLVED BY THE BOARD Ole COUNTY COMMrSSIONERS OF INDIAN
RIVER COUNTY, FLORIDA, That applications for Mining & Excavation Permits
A!A and Mining and Excavation Site Plans shall contain the following minimum
information:
The following information shall be considered necessary to comply
with the requirements of an application and shall be attached to the required
Site Plan.
I. Mining Site Plan Submission
The required Mining Site Plan shall be accurately drawn to scale
and shall contain at least the following information:
1. Name, address and telephone number of the operator or
agent.
2. The legal description of the tract, proposed to be included
in the mining site and contiguous tracts.
3. For the proposed development, indicate:
a. Type of Mining Operation.
b. Yearly schedule of operation
c. Estimated area in acres of land surface mined
d. Estimated area in acres of surface mined land reclaimed.
e. Proximity of the mining operation to urban areas.
f. What chemical processes, if any, are involved in
the mining operation.
4. Describe the condition of the land prior to any mining including:
a. The existing uses at the time of application.
b. Any previous mining uses of the area.
c. Capability of the site prior to any mining to support
a variety of uses giving consideration to soil and
foundation characteristics, topography and vegetative
cover.
5. What will be the amount of removal or disturbance of solid
minerals or overburden?
6 What considerations have been given to insuring the maximum
effective recovery of the mineral resource?
7 Will the operation require/or are: these plans to intersect or
transfer water from one watershed to another?
Il. What. effect will the proposed mining have on water resource
areas?
a. liccharg(- areas.
b. Water retention areas
c. Withdrawals from ground water and the result
d. Withdrawals from surface• water.
9 How many cubic yards of material will be rrmoved by
® dredging and what will be the disposition of the dredged
soil?
J
10. Reclamation:
a. What are the plans for reclamation and rehabilitation
of the area after completion of each phase of opera-
tion?
b. Give a time schedule for the completion of all
stages or reclamation.
11. Is the developer leasing the land for the mining operation?
If so, give every legal owner of the property surface and
mineral to be mined.
12. What provisions, if any, have been considered fo^ a program
for periodic inspection and maintenance of retaining dikes?
After the said Mining Site Plan has been completed by the operator
or agent of the said mining or excavation , it shall then be submitted to the
Indian River County Administrator's office for review; for the purpose of making
recommendations to the Indian River County Zoning Commission.
This Resolution shall take effect on November 1, 1974.