Loading...
HomeMy WebLinkAbout1974-080of R ES01,IT'rI0N No. 74-= a o S' BE IT RESOLVED BY THE BOARD Ole COUNTY COMMrSSIONERS OF INDIAN RIVER COUNTY, FLORIDA, That applications for Mining & Excavation Permits A!A and Mining and Excavation Site Plans shall contain the following minimum information: The following information shall be considered necessary to comply with the requirements of an application and shall be attached to the required Site Plan. I. Mining Site Plan Submission The required Mining Site Plan shall be accurately drawn to scale and shall contain at least the following information: 1. Name, address and telephone number of the operator or agent. 2. The legal description of the tract, proposed to be included in the mining site and contiguous tracts. 3. For the proposed development, indicate: a. Type of Mining Operation. b. Yearly schedule of operation c. Estimated area in acres of land surface mined d. Estimated area in acres of surface mined land reclaimed. e. Proximity of the mining operation to urban areas. f. What chemical processes, if any, are involved in the mining operation. 4. Describe the condition of the land prior to any mining including: a. The existing uses at the time of application. b. Any previous mining uses of the area. c. Capability of the site prior to any mining to support a variety of uses giving consideration to soil and foundation characteristics, topography and vegetative cover. 5. What will be the amount of removal or disturbance of solid minerals or overburden? 6 What considerations have been given to insuring the maximum effective recovery of the mineral resource? 7 Will the operation require/or are: these plans to intersect or transfer water from one watershed to another? Il. What. effect will the proposed mining have on water resource areas? a. liccharg(- areas. b. Water retention areas c. Withdrawals from ground water and the result d. Withdrawals from surface• water. 9 How many cubic yards of material will be rrmoved by ® dredging and what will be the disposition of the dredged soil? J 10. Reclamation: a. What are the plans for reclamation and rehabilitation of the area after completion of each phase of opera- tion? b. Give a time schedule for the completion of all stages or reclamation. 11. Is the developer leasing the land for the mining operation? If so, give every legal owner of the property surface and mineral to be mined. 12. What provisions, if any, have been considered fo^ a program for periodic inspection and maintenance of retaining dikes? After the said Mining Site Plan has been completed by the operator or agent of the said mining or excavation , it shall then be submitted to the Indian River County Administrator's office for review; for the purpose of making recommendations to the Indian River County Zoning Commission. This Resolution shall take effect on November 1, 1974.