HomeMy WebLinkAbout2022-247BCCNA2018 WORK ORDER 12
ArcNLET Model
This Work Order Number 11 is entered into as of this 6 day of Dec. , 2022, pursuant to
that certain Continuing Consulting Engineering Services Agreement for Professional Services entered
into as of this 1711 day of April, 2018 (collectively referred to as the "Agreement"), by and between
INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and Tetra Tech, Inc.
("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The
professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B
(Fee Schedule), attached to this Work Order and made a part hereof by this reference. The Consultant
will perform the professional services within the timeframe more particularly set forth in Exhibit C
(Time Schedule), attached to this Work Order and made a part hereof by this reference all in
accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of
the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement
and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as
if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first
written above. "h1M�5s"
CONSULTANT:
By:
Matthew Shelton
Print Name:
BOARD OF COUNTY COMMISSIONERS
OF INDIAN RIVER COUNTY:
Josep arman , Chairrn . /*..
Title: Project Manager BCC Approved Date:
December 6_} 222
Attest: Jeffrey R. Smith, Clerk of Court and Comptroller
BY:
tkk4,--,�
Deputy Clerk
Approved:
Approved as to form and legal sufficiency:
Jason . Bro n, County Administrator
Dylan T. Reingold, County Attorney
"icl
n: tv irv:
I Iu:) ni" c), j
Z16 19�)10 Alow I S:Jlbivil.31 dt ftv) 1 311 1J
Oiloi ��Iltul
-C, ;i 'jW W A
gvrjdG n'.'2 rt` t11t
Nivl0.le2lWM0:)'n AU;'j:) V� ORAOS
YT14(JO:) RW�,i VA1614t 40
;qmrslA, Mill!
:916C,
bila nuo:) lc- Ala.12, jlli vs rljL -,;Z, 11A
19!3 ii as til-joi Q1 RG k.tk-,4,,r6r:,qA
f., ;-.� 1?. "i"
b9.;tit
4"
"yl I I VVI. 3k sj fl , J., f'j
ae,-V. 1.:Id V.1
j
�,ril Ylvuo—i ,`—vll
"IfIlUll
"icl
n: tv irv:
I Iu:) ni" c), j
Z16 19�)10 Alow I S:Jlbivil.31 dt ftv) 1 311 1J
Oiloi ��Iltul
-C, ;i 'jW W A
gvrjdG n'.'2 rt` t11t
Nivl0.le2lWM0:)'n AU;'j:) V� ORAOS
YT14(JO:) RW�,i VA1614t 40
;qmrslA, Mill!
:916C,
bila nuo:) lc- Ala.12, jlli vs rljL -,;Z, 11A
19!3 ii as til-joi Q1 RG k.tk-,4,,r6r:,qA
OTETRA TECH
November 8, 2022
Eric Charest
Indian River County Public Works — Coastal Division
1801 27th Street
Vero Beach, FL 32960-3388
Email: echarest ,ircgov.com
Subject: Proposal to Indian River County for Development of ArcNLET Model
Dear Mr. Charest:
Tetra Tech, Inc. (Tetra Tech) is pleased to provide Indian River County (IRC) with this proposal
for services to provide an ArcGIS Nitrogen Load Estimation Tool (ArcNLET) model for the
unincorporated area of the Indian River Lagoon (IRL) basin in IRC.
BACKGROUND
IRC is located along the IRL, which is one of the nation's most ecologically diverse estuaries
and an important ecosystem in the state of Florida. The local governments and state agencies
have been working together to restore this system, which has been impaired by excessive
nutrient inputs that are causing algal blooms and low dissolved oxygen conditions.
One restoration element for the IRL is the basin management action plan (BMAP) that outlines
projects that have been or will be implemented in the near future. In February 2021, the Central
IRL BMAP was finalized and outlined requirements for IRC to fulfill nutrient reductions. Septic -
to -sewer projects account for a significant reduction in nitrogen load to the IRL. The Florida
Department of Environmental Protection (DEP) uses the ArcNLET model to quantify nitrogen
load reductions to the IRL from septic -to -sewer conversion projects.
SCOPE OF WORK
Task 1. Collect Data Needed for ArcNLET Modeling
Tetra Tech will work with IRC to gather the data needed for the ArcNLET model. The model is
an ArcGIS extension that is dependent on good, local data to provide the best estimates of the
nitrogen loading from each septic system within the County. These data include geographic
information system (GIS) coverages with the exact location (or parcel) of the septic systems;
detailed local waterbodies with streams, ditches, creeks, canals, and lakes; topography; and soils.
In addition, water quality data for IRC, specifically groundwater data, are helpful to adjust the
default model parameters to match local conditions. Tetra Tech will gather available water
quality data from IRC as well as the St. Johns River Water Management District (SJRWMD).
Tetra Tech, Inc.
1353 N Courtenay Pkwy, Suite S I Merritt Island, FL 32953
Tel 321.636.6470 Fax 321.636.6473 www tca atech.com
Mr. Eric Charest
November 8, 2022
Page 2 of 4
Tetra Tech will review the available data and provide input to IRC on any data gaps that could
affect the model results.
Task 2. Develop ArcNLET Model and Conduct Modeling
Using the data gathered in Task 1, Tetra Tech will develop an ArcNLET model that encompasses
the entire IRL Basin within unincorporated IRC. The ArcGIS files will be incorporated into the
model and the available water quality data will be used to adjust the model parameters. The
model will then be run to determine the nitrogen loading impacts from the septic system to the
surface waterbodies within IRC.
Task 3. Conduct Sensitivity Analysis for Nitrogen Load Estimate
Tetra Tech will investigate the sensitivity in the nitrogen load estimates from the ArcNLET
model by providing probability density functions of the load estimates. This information will
help IRC to understand the minimum, maximum, and average nitrogen load estimates to help
with identification of future septic to sewer projects.
Task 4. Prepare Draft Report
Tetra Tech will prepare a draft report that summarizes the nitrogen loading from septic systems
to surface waterbodies for each arealbasin of IRC and include a spreadsheet/database that shows
pollutant loading estimates per parcel. The report will also include the results of the sensitivity
analysis to help IRC understand the range of loading estimates. The draft report will be provided
as a Word document to IRC for review.
Task 5. Prepare Final Report
Tetra Tech will prepare a final report that incorporates the comments received from IRC on the
draft report in Task 4. The final report will be provided to IRC as both a Word document and
PDF.
Task 6. Communication and Meetings
Throughout the project, Tetra Tech will communicate with IRC to ensure the best data are
incorporated into the ArcNLET model and to keep IRC updated on the project status. An in-
person meeting will be held to review the draft report and model results with IRC to obtain input
for the final report.
PROJECT SCHEDULE
The approximate duration noted for each task is based on our current understanding and best
estimates of time required to perform the basic services and may be subject to change upon
agreement between IRC and Tetra Tech.
Task Timeline
Notice to Proceed NTP November 10, 2022
IRC Provides All Data November 18, 2022
TETRA TECH
Mr. Eric Charest
November 8, 2022
Page 3 of 4
Task
Timeline
Submit Draft ArcNLET Model Report
December 28, 2022
Comments Returned from IRC
January 3, 2023
Submit Final ArcNLET Model Report
January 6, 2023
ASSUMPTIONS
Tetra Tech's scope of services and project costs developed with the following assumptions:
• IRC will provide the available GIS files and water quality data needed to develop the
ArcNLET model.
• To meet IRC's January 9, 2023, deadline, an expedited review schedule is required. IRC
will provide input on the draft report within three days of receiving the report from Tetra
Tech.
• Additional restrictions or limitations as a result of COVID-19, weather, or other
unforeseen circumstances will not inhibit Tetra Techs level of effort or schedule.
PROJECT COST
The estimated costs are based on our current understanding of the project requirements and best
estimates of level of effort required to perform the basic services and may be subject to change
upon agreement between IRC and Tetra Tech. Our Time and Materials price proposal includes
labor hours and travel costs in the amount of $45,867, as outlined in Table 1. Project budgets
may be moved from one task to another to accommodate IRC needs.
Tetra Tech will invoice IRC each month for services rendered during the previous calendar
month based on work completed for each task. Tetra Tech shall be paid for all invoices within 30
days of an approved submittal.
PERIOD OF PERFORMANCE
Tetra Tech anticipates commencing project activities upon receipt of a task order authorization
from IRC. This project is anticipated to be completed by January 6, 2023 but may be extended to
accommodate additional report edits after the January 9, 2023 deadline.
Tetra Tech looks forward to working with you on this project. We are available to discuss our
approach with you in detail at your convenience. Should you have any questions regarding this
proposal, please contact me at (321) 636-6470.
Sincerely,
Matthew D. Shelton
Project Manager
Cc: Marcy Frick, Tetra Tech
Erin Lincoln, Tetra Tech
TETRA TECH
Table 1
Task 1
Task 2
Task
Task 4
Task 5
Task 6
O TETRA
TEC H,INC.
Organize Data Needed
Develop ArcNLET
Conduct Sensitivity
for Arc NLET
Model and Conduct
Analysis for Nitrogen
Communication and
Modeling
Modelin
Load Estimate
Prepare Draft Report
Pre are Final Re ort
Meetings
TOTAL
DESCRIPTION
Units $
Units $
Units $
Units
$
Units
$
Units $
Units
$
Tetra Tech Inc. Labor
Employee Name
Category
Rate
Shelton, Matthew
Project Manager
$194.00
4.0 $ 776.00
8.0 $ 1,552.00
2.0 $ 388.00
5.0
$ 970.00
r 5.0
$ 970.00
12.0 $ 2,328.00
36.0
$ 6,984.00
Frick Marcy
Scientist VI
$200.00
- $ -
2.0 $ 400.00
2.0 $ 400.00
10.0
$ 2,000.00
5.0
$ 1,000.00
12.0 $ 2,400.00
31.0
$ 6,200.00
Plis, Mykhaylo
Sr, GISAnalyst
$139.00
10.0 $ 1,390.00
45.0 $ 6,255.00
25.0 $ 3.475.00
20.0
$ 2,780.00
10.0
$ 1,390.00
12.0 $ 1,668.00
122.0
$ 16,958.00
Rinne, Andrea
GIS Project Analyst
$110.00
10.0 $ 1,100.00
55.0 $ 6,050.00
15.0 $ 1,650.00
30.0
$3,300.00
10.0
$ 1,100.00
- $ -
120.0
$ 13,200.00
Leonard, Morgan
Engineer Ii
$93.00
5.0 $ 465.00
- $ -
- $ -
5.0
$ 46500
5.0
$ 465.00
- $ -
15.0
$ 1,395.00
Keller, Francis
Sr. Project Administrator
$105.00
1.0 $ 105.00
1.0 $ 105.00
1.0 $ 105.00
1.0
$ 105.00
1.0
$ 10500
1.0 $ 105.00
6.0
$ 630.00
Total Labor
r 30.0 $3,836.00 r
111.0 $14,362.00
r 45.0 $6,018.00
r 71.0
$9,620.00
36.0
$5,030.00
37.0 $6,501.00
330.0
' 45,367.00
Fee to Subs
0.0%
Total Subcontractor
$
$
$
$
$
$
$
Tetra Tech Inc.Travel
Travel to IRC
$ -
$ -
$ -
$ -
$ -
$ 500.00
$ 500.00
G&A to Tra%el
0.00%
$
$
$
$
$
$
$
Fee to Trawl
091,
$
$
$
$
$
$
$
Total Travel
$ -
$ -
$ -
$ -
$ -
$ 500.00
$ 500.00
Total Tetra Tech Inc. Expenses Travel and ODCs
$
$
$
$
$
$ 500.00
500.00
TOTAL Mr
$3,836.00
$14,362.00
$6 oi8.o
$9,620.00
$5,030-00
001.00
$45,867.00