HomeMy WebLinkAbout2022-251ACHANGE ORDER
DATE OF ISSUANCE: November 30, 2022 EFFECTIVE DATE:
OWNER: Indian River County
OWNER's Contract No.: 2021026
No. 2
Project No.: 044572102
CONTRACTOR: TLC Diversified, Inc ENGINEER: Kimley-Horn & Associates, Inc.
You are directed to make the following changes in the Contract Documents:
Description: This change order instructs the Contractor to furnish/install the following for the lump sum of
$150,020.17:
1. 14" and 30" line stops on existing high service pump suction line. Replacement of three (3)
existing 14" gate valves on the high service pump suction line that do not hold.
2. Emergency repair of the leak in the existing 18" transfer piping.
3. Removal of buried concrete vault based on unforeseen conditions in the field.
Attachments: Quotations
CHANGE IN CONTRACT PRICE
CHANGE IN CONTRACT TIME
Original Contract Price
Original Contract Times:
$ 10,665,515.65
Substantial Completion: 760
Ready for final payment: 820
Net changes from previous Change Orders
Net change from previous Change Orders:
No. 1 $483,563.83
No. to No.
Contract Price prior to this Change Order
Contract Time prior to this Change Order
$ 11,149,079.48
Substantial Completion: 760
Ready for final payment: 820
Days or dates
Net Increase (decrease) in this Change Order
Net Increase in this Change Order
$ 150,020.17
0
days
Contract Price with all approved Change
Contract Time with all approved Change
Orders
Orders
$ 11,299,099.65
Substantial Completion: 760
Ready for.fippl payment: 820
,.�y on�rT�ss�•,. ays or a es
REC N /YIelt A4fA" #.A P V
By: K, MUY, /&A By:
Engineer (Authorized Signature) Owner (Authors Signa
Date: ���� 2 Date: 12-06-2022 `' %%:� GL
�E�EPTED:
cu6tractor (Authorized Signature)
`�,-Date: O
EJCDC No. C-700 (2002 Edition) eff a R -S it , Clerk of
Prepared by the Engineers Joint Contract Documents Committee and endorsea i�C&w ptroller
General Contractors of America.
00800-24
�s..ut
Kimley-Horn 20 -November --2022
1920 Wekiva Way, Suite 200
West Palm Beach, FI 33411
Attn: Mr. Nick Black, P.E. Nick.BlackCcDKimley-Horn.com
Reference: Request for 14" Valve Replacement, Repair of 18" Pipe and Removal of Vault, 30"
and 30" and 14" Line Stops.
Dear Mr. Black,
Please find a quotation for the changes requested as reference above.
Labor =
Material =
Subcontract =
Equipment =
Other=
Labor Burden =
Tax =
OH&Psubs 5%=
OH & P @ Self Perform 15% _
Subtotal =
Bond =
Total ADD =
$
9,450.00
BOND HAS BEEN
$
42,747.45
ADDED AS THIS
$
65,797.56
WILL RESULT IN
$
8,907.00
CHANGE IN
$
200.00
CONTRACT PRICE.
$
3,307.50
$
3,206.45
$
3,289.88
$
10,172.76
$ 147,078.60
$96-
1 lc*-
''
$2,941.57
d
$.60
$150,020.17
With the current supply chain delays that have been discussed in the project meetings it is
difficult to quantify the additional time required to quote this change. TLC is therefore reserving
our rights to additional time for the project that will be determined at a later date. Please provide
your acceptance of this additional work and issue a change order so that TLC can release the
required items for production.
Sincerely Yours,
"g, Fe'd,
John P. Elder (Project Manager)
PALMETTO WEST PALM BEACH TAMPA
Corporate Office 7233 Southern Blvd 12814 Dupont Circle
2719 17th St. East Suite B-1 Building 8, Suite 4-A
Palmetto, FL 34221 West Palm Beach, FL 33413 Tampa, FL 33626
�. 941.722.0621
f'1 941.722.1382
CG C041816 CU C053963
14" VALVE, PIPE, RESTRAINTS
FIELD REPAIR OF 18h PIPE WITH SS SLEEVE
REMOVAL OF CONCRETE VAULT
ADDED LINE STOPS 30" AND 14"
Ls s
==f=Zl =11—=
—ToTZ,
T-1 1— 1� Al— IlAl 1— —1 T.lAlEE I ITI
TI.
PPE 010' HO P
RRro. 1D- HDPE rsc PIPING ro CROSS
EAST. If- TRENCH
EA51. CONGE ENCASED EIEC. DUCT RFMOYE LINK SEAL AND REFUGE GRADE - 2].94'3
BANK TO BE PROTECTED PER/G-J. ROT OF NEP PIPING EL - 21.18*
i COORDINATE SHUTDOWN W OWNER TOP OF CHEW. TRFNOI d - 11.78*
7 CONST. 14' HOPE WII (NEAP. - COINFLCT, DEFLECT DEH. PIPING AS
6i GRAPH, SCMF N PFET I REOro
PIPE CROSSING /I
3 ® PHASE N£51 PROP 10' NOPE 2 MENf
i �E. N: 1184706.7) TANKNSERVICE TO CROSS OMP EAST. CONGA. ENCASED DUCT BANK
S 24.]6 SHEET SIP 1'- 20' I ' E: BSN1805 GRADE
21.
I.t7 SHEET g2E: 1' - b' 'J/11� EL W. BOT OF HFC NNW 8- - 11.10'*
' I PHASE 3 -DRAIN TLP OF DNCT BANK EL - 21.00'*
N: 11p1J58JJ CUE - 0.10'*
/ E 8301X05 NEST LANK CONST. NEW gOEWALN IN BETWEEN uNBRAINE BLDG
i EL 21.64 AND SA BURN STORAGE
{ R IB AND REPAIR ROAD 'I
PIER RW DTNL Y -2/D-6 I .�1 - GRIST. STA DETAIL
ROCX PPE CROSSING BJ
AREA PEA DETAIL S/D-4PROP. 14• HDPE HEP PIPING TO CPOSS
CONST. IO- CST PENT ON
Q I� SEE DETAND AJL ON SHEY PIPINGET E -5R I) OOR 11REINCH
CONST. SID. PARKING MP OF CHEM. TRENCH 8 -ROT OF HER PIPING El- -
2-121.]5*
L STALLS PER DETAIL 6/D-5 I I ME E 1�3,6.'T REAR. - CONELCT. DEFLECT DIEM. PIPING AS
3_ El M.Y. �
R iS PPE CROSSING B4
PROP. t4' HOPE REP PIPING To CROSS ONOR
i GRIST. HSPS .:...- ` ,... EAST. CONCR. ENCAA:D DICT BANK
A SEE SHEET C -t4 ORAOE - 2J.9J'E P
T OF REP
E P OF DUCTBANNN EI- . 11.100
W.
TD4
EAST. 11' GV TD REUAw _
q I 9-7
LRIST. 24' I LECd7f0.:CONS .. NEW SIDEWAY IN IIETWEEN MEMBRANE
MOPE Si. 24 . 10 I DG AND SA BUND STORAGE
HSP SIICDOIN PNNG N: 1181902.9 y PHASE3-REMOVE -
BL
C I I ONST. 24 RSG IB EXIST 11' GV ND PINE WASSONG fS
f Y INSTALL NEW W/
1181676.82 REPLACE EAST. ST. RSG II DP MID SLEEVE I� PHASE 1 PROP, 14' SU TC OI PINING OMR
gDEWAUI PER
L I CONST. (T) 24' MOPE 45' - pETNL 3/D -S N: 1121 81898.1 I I O PRAGRADE - EP INE
PIP*
R BENDS MU DE ELCT UNOEN Y 2 BOT OF NR PIPING EL. - 18.77*
EAST. AND PROP. NFP CLEAR. HSP 054'*FRN PINING EL - I&OE*
�=-- - - - - - -�-- - - - - - - -�'- CONST. 20' HDPE O PHAY J
YE SHEET C -B.7 AND C -B PC N B6
$ I NE RC ANO REPAIR ROAD NSP AICTON PIPING PIPE CROSSING
PER NCV DETAIL Y-1v
D FGR NEP ENT* NEAOFA PHASE 1 - 11 -INCH SHO'M1 IN CQRt PROP. GRACET NOPE NFP PIPING
TO
- J INPROYENENTS CVT IN JO'A8 TEE ON EAST. 6123 CORRIDRI i0 CA055 OVFA
- - - - W/ m- PSOM Eo SOUM ANO LINE STOP ROT Ol' NEP 7NPING FL - UL77*
Y SNDPE BEN p l0'%TO' lEE ro NRN1N EAST. TOP 6 DIEL. CONRpOR d -X10'*
IIBAS31, Yn PHASE 2 NBTALL C EAR. - COINCT. OFiLECT CHOM. PPNG AS
• y f✓ KIST. 24 158 - _.-
C[ I : 6167056 NIERCOWECT CRI CA ()
! CRUST. 14' HDPE NEP PNNG 5P/t I I _ __ P/MSE2-14'IINE PROP 24' HSP SU PROP. 14' WK 7011 PING PINING M CROSS OMIt
��Pc N / I
DEFLECT EAST. CHEM. RPIHG AS RE00 8TOP AND CUTIN CYST. 18 RSGV W/ S GRADE - 12.62'3
• I DEMO AND
RENOT£ 1B' IS' BEN VK� FUSED YJ ADAPTERS BOT OF NEP PIPING EL. - I8.7S*
$ E%Si. R/C SLAB AS I I r 1184874.e PC /10 PC /II - :SP�iT0F1 PIPING d. - 16]3'*
MEMBRANE; -b
SEE SHEET C-6 FOR �/L7 /L _
R i P SHOwn I ■ O ,.I xPFERRNCPINPROYEMENTS /N �� - - - COILBT. li ICPE IOER PIPING OMA N� CONST. 18' HOPE m X67 Z. 1�1' X�6P g1CTON PIPING. GRADE . 1Z79'*
CONST. 4,000 I I �� A PHASE2- m1RLxTs l^1 EAST. 1C HWEI NFP PINING TO CROSS UNDER
GM "BOH T- I OLi
RE pQ I IIYNNV TROT OF REP OP OF HSP PIPING - 1 El. - le.Js'*
YE C-letW'CATE VKVESUCI EAST. CHEM. PPNC TO BE DHECIED AS✓V SIDEW�(A�(�-b'REO'D TO CROSS NEW MEP PPNC PC /] 5T. 11 N I_- PER DETAK / '](/ :1181876. EAS.
SENOJD-3 H RPE CROS&AS P9
CONST. 5' WIDE SOIDINAN BETWEEN PC N 11BbJ9.IJ I�/ - - PROP.10• CST FJRUENT UNE, GRADE - 2260'3
NEMB-EBLDGMIDNAI(STORAGE w PHA -SE 2 -INSTALL EAST. 24'INFERroCA055OWERCRITANYENT MEAM'PI E A SLEEVE BOT K MEER d - 1647'*SEE SHEET W-1 i0R NFP AND NFC M-SO.S7A'*��T LINE EL - 17.9'*
CRINECTION ro BLDG TRENCH I CDIST. (4) 2- HDPE 'I BENDS AS REOD. CONST. 20' GST PENEIRATMPC /1 ------ ST. t0 HDP TO DEF ECT EAST. N OWER RR UNDER AND SUPPLY NNNG (TYP. OF 2) PIPE CR089NG 0
5' BEND WEND V`ER PPING SEE DETAIL B/C-5 PROP 18' HOPE CST INFLUENT UNE TO CROSS
PC Q - - llbb60.45 //�� PEIAGE3. INSTALL PROP. *CST FERVENT U„E
b \� N O FlEM(2PROP. (REX PIPINGE'WND C',IJ ALL IP AHD JP
. 6 ST. 1 MOPE 98 {{NNN TOP OF GST EFRUENIT URE* EL - I8.J1'*
6 N: ttBbb.t \` EAST. CARRIER WA101 PUMPS
MANfIWTWEST
9 GENERATOR J/� )U AAA TSL QEM.. 0.693
11
AND FPI CONST. 1- HOPE II CONST. ]FTiN C01 iAlit PPF CROSSING 41
S W. 1 HOPE 9O' BEN VAULT AIR PPING TO CTE p $ SHEET C-9 FOR DTARS PROP. 16' HOPE %EEA 10 81055
X: 1181640.7 /� PHASE 1 36NCH OYER EAST. 11' GST EPIUENT UNE
CONST. R/C ACCESS *IAB 347FXI�T LINE STOP GRADE - 2106'*
SAWRR ANO MPAR ROAD PER ��411 YV BOT OF I6ER EL - 19.OD'*
i IKLI DET. SHEET N -2/D-6 `\\' N I TOP 01` CLEAR. ce0.7JETTLUEENT UNE EL - 16.26'*
CONST. 10' HOPE NEC APING. E / PNA.SE 1 -RNR/
RPE SNAIL CROSS UNDER EAST. CHUI. APES
{ SEE SHEET C-9 AND C -I0 '
ONST, t0 HD \ FOR NEC 1100R1CAlI0N5. iMABE J - FLL REYOYE UNN YM AND
REPLACE
j 45' BE EAST TANK. PLACE GST FILL CONNECTION PER DETAIL J/D-J.
} //LL N' 1181731.♦ 11 d N SENVICE COORDINATE TANK SHUMOWN W/ OWNER
IIEYS
V �7pp101E5 NTEDWS ONLY NIENDD FOR AODTYE B••Q t
S 4 (.NJ MIERNAIF
Kimley>»Horn �45�21� SOUTH OSLO ROAD WfP IMPROVEMENTSSHEET NUMBER
DATE
NAR 2021 PREPARED FOR N61QAS P.O. &i4A
0202, AMLEY_NCRN AND ASSOCIATES,,XC. As SNO N INDIAN RIVER COUNTY UTILITIES PROPOSED YARD PIPING PLAN
1920 WDA_ WAY ARTS 200. WEST PAW BEACH, R JJ411 "`RINGS
PHONE: 961-6/5-0885 FA%: 561 -663 -ens ,m, DEPARTMENT 8
49
oo
= WMW.NIMU-NORN.RN CA ODDD06M BRAWN"' INDIAN RIPER
No. RENgOHS GATE BY OKP®67 MDI COUNTY, FLORIDA 0A