Loading...
HomeMy WebLinkAbout1976-063• 40 I RESOLUTION NO. 76-63 WHEREAS, The City- County Building Department has recommended to Indian River County a revised Fee Schedule for the Building Department; and WHEREAS, it is in the best interest of Indian River County to periodically review the Fee Schedule and upgrade said Schedule in areas where the need arises; and WHEREAS, the new Fee Schedule as presented appears to be reasonable and fair; and WHEREAS, said Fee Schedule is attached to this Resolution and made a part thereof, marked as Exhibit "A"; NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS, that the revised Fee Schedule attached hereto and made a part hereof as Exhibit "A" is hereby adopted as the Fee Schedule for the Building Department of Indian River County, Florida. Such Resolution shall become effective as of the 8th day of September 1976. BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVED. COUNT /Z Ze,,,,7� ".`.',�f" f✓ ''• By Willard iebeet, Jr., Cfftlirffian i1 Aftest� !` aI IW is, Clerk l:a EXHIBIT A ® BUILDING PERMIT FEFS When application for permit is approved and before a permit ts-tssued, a fee therefor shall be paid based on the following schedule of rates: Present Bldg. Dir. County Ads ® RESIDENTIAL BUILDINGS (New Construction) Fees Recom'd Up to 1,000 cubic feet , $ $ 7.50 1,000 to 2,000 cubic feet 15.00 2,000 to 5,000 cubic feet 24.00 ® 5,000 to 10,000 cubic feet 35.00 10,000 to 20,000 cubic feet 50.00 20,000 cubic feet. -or over - per ea add'1 1,000 cu. ft. 2.00 COMMERCIAL BUILDINGS (New Construction 2,000 cubic feet or less 15.00 2,000 to 5,000 cubic feet 30.00 5,000 to 25,000 cubic feet 75.00 ?.5,000 to 50,000 cubic feet 125.00 50,000 to 100,000 cubic feet 175.00' 100,000 cu. ft. or over - per ea. add'l 1, 000 cu. f t. 2.00 REPAIR AND ALTERATIONS, COMMERCIAL & RESIDENTIAL Minimum Permit for Minor Repairs not to exceed $100.00 7.50 Each $ .500. or fraction thereafter 2.00 HOUSEMOVING Up to 5,000 cubic ,deet 20.00 5,000.cubtc feet or over 40,00 Rouse moved on same lot 10.00 PIUS REPAIRS ON HOUSES MOVED Up to 2,000 cubic feet 5.00 2,000 to 5,000 cubic feet 10.00 5,000 to 10,000 cubic feet 20.00 10,000 cubic feet or over - per ea. add 11 1, 000 cu. ft.. 2.00 GAS TANKS 285 gallons 2.00 550 gallons 4.50 1,000 gallons 6.00 Each 1,000 gallons thereafter •6.00 . All wholesale storage tanks based on cubic contents at Commercial Building prices. SCHOOLS AND CHURCHES Based on cubic contents at Residential prices. AWNINGS* Minimum for 15 feet 3.00 Lineal foot thereafter over public property .20 " private property .10 STORM SHUTTERS First 100 square feet 3.00 100-400 5.00 400-1,000.square feet 8.00 Over 1,000 sq. ft. - ea. add'1'500 sq.. ft. 2.00 SEA WALLS First 50 feet 10.00 Over 50 feet - per foot .10 DOCKS 20 feet 7.50 Over 20 feet - each add'1 10 feet 2.00 DEMOLITION 500 square feet minimum 4.00 500 to 1,000 square feet 10.00 Over 1,000 square fart per thousand sq. ft. 2.00 BUILDING PERMIT FEES (Continued) Present Bldg. bir. County Adm. 5 FENCES Fees 5.00 d Recom'd ® .00 ELEVATORS -- (For each elevator) - three stories or less 10.00 Each add'1 floor over 3-stys. per floor 3.00 SYIMMING POOLS Up to 20,000 gallons 20.00 Each 1,000 gallons in excess 1or10 ROOFS First 100 square feet exempt 100 to 1,000 square feet 7.50 1,000 to 2,000 square feet 10.00 Over 2,000 square feet-per 1,000 thereafter 3.00 ALL PAVING IN CONNECTION WITH RESIDENTIAL OR COMMERCIAL WORK First 1,000 square feet 6.00 Each 1,000 square feet or fraction thereof up to 10,000 square feet 2.00 Each 1,000 square feet over 10,000 sq.ft. 1.00 For any other building or structural work not mentioned above, the fees required by this chapter or.ony other ordinance of the city shall be paid, and all requirements of this chapter and any other ordinance shall be enforced by the inspectors specifically charged with such enforcement, or by the Building Inspector if not otherwise specifically provided for. The said fees shall include payment for the permit and for inspection of the work, after the same shall have been completed. If the Building Inspector shall, upon his inspection after completion of the work or apparatus, find that the same does not conform to and comply/ with the provisions of this chapter, he shall notify the Contractor or Owner, indicating the corrections required; and when he shall be notified that the . corrections have been made, he shall again inspect the work or apparatus without further charge; but when extra inspection trips are necessary, due to any one of the following reasons, a charge of $5.00 shall be made for each trip: (a) Wrong Address. (bJ Condemned work, resulting from faulty construction. (c) Repairs or corrections not made when inspection is called. (d) York not ready for inspection when called. The payment for re-Inspection fees shall be made before any further Permits will be issued to the person owing some. WORK STARTED BEFORE A PERMIT IS ISSUED - THE FEE SHALL BE DOUBLED. TRAISIR PARK FEE SCIIZDULE INDIVIDUAL TRAILERS - OTIIER ALUMINUM WORK Present Bldn. nin n..,...... A.I. Tie -down permit $ Carport Roof -Screen Room (To be charged by cubic area -Residential) Utility Storage tsA tnc.luded in carport roof permit Patio slab (No cover) Up to 1,000 sq. ft. Over 1,000 - ea add'1 1,000 sq. ft. With Cover - Cubic area -Residential Electrical: See Electrical Permit Fee Schedule Septic Tank Permit: See Plumbing Permit. Fee Schedule ab 40 ELECTRICAL PERMIT FEES When application for permit is approved and before a permit is issued, a fee therefor shall be paid on the following schedule of rates: ` Present Bldg. Dtr. County Adm. LIGHT OUTLETS 1 to 8 outlets, inclusive - minimum Over 8 outlets, the minimum charge of $4.00 for the first 8 outlets plus each addtttonal outlet SERVICES Temporary for construction 100 ampere and under Over 100 ampere to 200 ampere Over 200 ampere to 400 ampere Over 400 ampere to 600 ampere Over 600 ampere to 800 ampere For each additional 100 ampere (over 800) SERVICE CHANGES 100 ampere and under Over 100 ampere to 200 ampere Over 200 ampere to 400 ampere Over 400 ampere - each add'l 100 ampere SWITCHBOARDS OR PANELS By amperes, same as"Services" EQUIPMENT Drop in range Range Top Oven Sign outlet and all other appliance. outlets inspected in conjunction with rough wiring, including room space heaters, ceiling heat, etc. !ach HO.TORS Up to 1 H.P. 1 to 3 H.P.- 3 .P.-3 to 5 H.P. Over 5 H.P. up to 10 H.P.(per add'1 H.P.) 10 H.P. -,,Over 10 H.P. (per add'.1 H.P.) BACHINES X -Ray - Portable, dentist 'I -Ray - Stationary, doctor Dtathermtc and Electronic outlet GENERATORS & TRANSFORMERS Each up to 5 KVA . Each generator or transformer over 5 KVA thru 10 KVA Each generator or transformer over 10 KVA thru 15 KVA Each generator or transformer over 15 KVA thru 20 KVA Eaph generator or transformer over 20 KVA thru 25 KVA Each generator or transformer over 25 KVA thru. 30 KVA Each generator or transformer over 30 KVA . Generators and transformers, where located on same floor, fee for largest, plus $1.00 for each additional WELDING MACHINES Up to 25 amperes Over 25 amperes to 50 amperes Over 50 amperes - plus $2.00 for each additional 25 amperes or fraction part thereof 4.00 . 10 5.00 2.00 3.00 4.00 5.00 6. oo 1.00 5.00 5.00 6.00 1.00 1.50 1.00 1.00 1.00 1.00 1.00 2.00 3.00 1.00 8.00 .25 2.50 5.00 2.50 k�i; 4.00 6.00 8.00 10.00 15.00 15.00 2.00 3.00 El ELECTRICAL PERMIT FEES (Continued) i.4 TRAILER PARKS Nain Service and Sub—Soruteea as per "Services"A11 other equipment same fees as set forth in all other items SPECIAL PURPOSE OUTLETS (Commercial) Popcorn, doughnut, drink machines, coin music machines, toaster, coffee urn, deep fryer, refrigerator, display cases or any other electrical coin operated machine Fee each time installed Permit No. to be displayed on each machine Auto painting — Bake ovens Atr Conditioning Neat Strips 1 to 5 A.W. Each add'l 5 R.W. thereafter HANGING OF FIXTURES (Not included in original permit) Lights — 1 through 10 bulb of fluorescent tubes Each additional fixture COMBINATION Light fixtures and outlets up through 10 — One Inspection Streamers or festoon lights: First 10 lights Each add'l 10 or fraction PLUGMOLD First 25 feet Each 5 feet thereafter NI'SCELLANEOUS'PERMITS Giving permission to do temporary work or to do general repairs to radio or television, transmitting or receiving stations, picture shows, carnivals, circuses, road shows, or similar organizations, a permit fee from $4,00 to $50.00 shall be paid, said :fee to be determined by the electrical inspector, and approved by director. No permit will be issued for a jce of less than $4.00. The said fees shall include payment for the permit and for inspection of work, after the same shall have been completed. If the electrical inspector shall, upon his inspection after completion of the work or apparatus, find that the same does not conform to and comply with the provisions of this chapter, he shall notify the master electrician, indicating the corrections required; and when he shall be notified that the corrections have been made, he shall again inspect the work or apparatus without further charge; but, when extra inspection trips are necessary, due to any of the following reasons, a charge of $5.00 shall be made for each trip: (aa) Wrong address r (bb) Condemned work, resulting from faulty construction. (cc) Repairs or corrections not made when inspection is called. (dd) Work not ready for inspection when called. The -payment of re—inspection fee shall be made before any further permits will be issued to the person owing same. Present B1do. Dir. Cnrenfu eri� WORK STARTED BEFORE PERMIT IS ISSUED — THE FEE SHALZ BE DOUBLED. El 40 LUNGING PER FEES When application for permit is approved and before a permit is issued, a fee therefor shall be paid based on the following schedule of rates: Present Bldg. Dir. County Adm. -Fees Recom art o,, ---,A (a) For each fixture roughed in and installed on new or reconstructed plumbing, or each fixture outlet roughed in $ (b) For each water heater (o).For each septic tank to 1,200 gallons For each septic tank over 1,200 gals. (d) For each grease trap (e) For each sewer connection (f) For inspection of remodeling or repairs on waste, soil, vent, drain or sewer pipes (g) For each lawn sprinkler system, air conditioning, refrigeration, or cooling unit, connected to the city water and sewer (h) For each re -Inspection made due to the' work being condemned or not being ready at the time specified (i) For each roof drain (j) For each area drain (k) For each water servtce connection to a municipal or private multiple water supply system: First meter on each lot(wtthtn municipality) First meter on each lot(outstde municipality to City water system) For each add'1 meter on same lot (1) Water connection to or outlets for an appliance or installation not covered by fixture permit (m) Water connection to outlets for hose or lawn faucets: First Connection Each additional connection FIRE CONTROL SYSTEM - (Dry Chemical System) Each hose cabinet FIRE SPRINKLER SYSTEM Minimum permit fee for each installation not to exceed $100 Pach $500 or fraction thereafter SWIMMING POOL CONNECTIONS TO CITP WATER GAS (The following shall include bottle gas) For the first outlet and/or appliance For each add'1 outlet and/or appliance For change from a master to an individual meter For multiple meters at one location: -For first meter — For each add'1 meter For major repairs to gas pipe where no fixture or appliance installation is involved BOILERS Mtntmum permit fee for installations not to exceed $100 Each $500 or fraction thereafter 8 2.50 2.50 5.00 5.00 3.00 5.00 5.00 3.00 5.00 2.25 2.25 M 4.00 { .50 1.00 1.00 .50 2.00 4.00 1.00 5.00 4.00 1.00 2.00 2.00 1.00 2.00 5.00 2.00 m PLUMBING PERMIT FEES (Continued) FURNACES AND HEATING EQDIPHENT PER UNIT INSTALLED For the first 100,000 B.T.U. per hour 0 or fractional part For each additional 100,000 B.T.U. per hour or frac 'I part Note: The rating of furnace and heating equipment shall be based on the BTU input of fuel used per hour. WELLS (Drilling or Digging) Sprinkler Systems WATER STORAGE TANKS (up to 1,000 gallons) Each add'l 1,000 gallons or fraction ' SOLAR NATER HEATER SYSTEM B1 dg. Dir. Countu Ac NECHANICAL PERMIT FEES jj When application for permit is approved and before a permit is issued, a fee therefor shall be paid based on the following schedule of rates: AIR CONDITIONING AND REFRIGERATION .For the purpose of charging fees, 1ton of refrigeration will equal 12,000 B.T.U's per hour or i H.P. total connected load The first 5 tons or fractional part 7.50 The next 5 tons up to and including 10 tons - per ton 1.00 Over 10 tons - per ton add'1 2.00 A11 major repairs or replacements, same fees as above. WINDOW UNITS OR WALL UNITS (Where no construction work is involved in the building or duct work attached) For the first 5 units - each 3.00 For the next 50 units - each 2.00 For the next 100 units - each A11 others - each .1.50 1.00 ' 'CORK STARTED BEFORE A PERMIT IS ISSUED THE FEE SHALL BE DOUBLED