Loading...
HomeMy WebLinkAbout2023-001WORK ORDER 3 Victor Hart Sr. Complex Restroom and Concession Facility This Work Order Number 3 is entered into as of this 1 / day of-Tant4y-rq 3 pursuant to that certain Continuing Contract Agreement, dated April 17, 2018, renewed"and amended as of May 18, 2021 (collectively referred to as the "Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and Masteller & Moler, Inc. ("Consultant"). The COUNTY has selected the Consultant to perform the professional services set forth on Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B (Fee Schedule), attached to this Work Order and made a part hereof by this reference. The Consultant will perform the professional services within the timeframe more particularly set forth in Exhibit C (Time Schedule), attached to this Work Order and made a part hereof by this reference all in accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first written above. CONSULTANT: BOARD OF COUNTY COMMISSIONERS Masteller & Moler, INC -OF INDI*RIVERNTY By:_By:Micherim County Administrator Print Name: Sean C. Green. PE �t Lc � �T.3 4kc pp I Title: s 1ti Approved Date: 1 � -7 Approved as to form and legal sufficiency: ylan T. Reingold, County Attorney M j MASTELLER & MOLER, INC. M1 — CIVIL ENGINEERS — EXHIBIT A 1655 27" Ste. 2, Vero Beach, FL 32960 (772)567-5300 Masteller & Moler, Inc. is pleased to present you with Work Order Number 3 which provides Professional Engineering Services for performance of conceptual site planning services for the replacement of the existing restroom building and associated new wastewater facilities to be located east of the football field at Victor Hart Park. Project Description: The Indian River County Parks and Conservation Services Department (IRCPCSD) plans to replace the existing restroom building and septic system serving the football field and playground area located at the southeast corner of Victor Hart Park. The existing restroom building and septic system will need to remain active during construction of the new facilities, and the project will be phased such that the existing restroom building and septic system are demolished and removed following construction of the new restroom and concession building. The new facilities are intended to serve park visitors at the football field and playground area. Said project requires the design of a lift station, force main system, and connection to the existing Indian River County Department of Utility Services (IRCDUS) force main network and potable water main network, as well as a site, paving, and grading plan to support Administrative Approval for the new building. The existing building is served by a septic system including septic tank and drain field. The baseball fields located to the east are served by private, canned lift stations. It is understood that an existing underground force main system conveys flows from the baseball field lift stations east to the existing IRCDUS force main network along 43rd Avenue. In order to confirm the County will support the design of the Project, Masteller & Moler, Inc. proposes to perform the following scope of services: Scope of Work: Task A — Concept Planning: Masteller & Moler, Inc. shall prepare a Conceptual Site Plan (CSP) for the proposed new restroom building & wastewater facilities to serve the existing football field and playground area. It is our understanding that County will provide building footprints/ elevation views for our use in depicting the proposed restroom building replacement as well as the CAD file(s) for the As -Built Plan of the Parking Lot & Drainage Improvement Plans which were completed in 2018. Specifically, we shall develop a CSP that includes the layout of the new restroom building and wastewater facilities and the demolition of the existing building and removal of the existing septic system with necessary modifications to the existing improvements within the project limits to support the new facilities. Consultant shall provide County with copies of the initial planning effort and make reasonable revisions based on County's comments. Page 1 of 2 M M MASTELLER & MOLER, INC. — CIVIL ENGINEERS — Task B — Pre -Application Conference 1655 27" Ste. 2, Vero Beach, FL 32960 t//LJ JO/-J3VV Following County acceptance of the CSP, we shall make an application for scheduling a Pre - Application Conference with Indian River County. We shall attend the Pre -Application Conference on your behalf to obtain the Draft comments pertaining to the project. Upon receipt of the formal Pre -Application letter, we shall review its contents and advise you of specific issues of significant concern. Fee Schedule: TaskA—Concept Planning $ 2,500.00 Task B — Pre -Application Conference $ 800.00 Time Schedule: 1. Work Order Number 3 shall be completed as follows: A. Conceptual Planning & Pre -Application Request Submittal 10 Working Days 2. Deliverables —the ENGINEER shall provide the COUNTY: A. Conceptual Site Plan (digital copy, hard copies available upon request) File#2226 (Y:\mm\Projects\2022\2226- IRC Victor Hart Restroom & Sewer\ADMIN\Contracts\2226_WorkOrder3_23-0109.docx) Page 2 of 2