HomeMy WebLinkAbout1977-095196785
RESOLUTION NO. 77-95
WHEREAS, this Board heretofore did grant a water and sewer
franchise to General Development Utilities, Inc., said franchise being
known as General Development Utilities, Inc., Water and Sewer Franchise,
and,
WHEREAS, this Board did receive a request in writing from
General Development Utilities, Inc. for an increase in water and sewer
extension charges and,
WHEREAS, after public notice of public hearing, the Board of
County Commissioners finds that an increase of water and sewer exten-
sion charges are justified and in the public interest and that Section
14 of General Development Utilities, Inc., Water and Sewer Franchise
should be amended accordingly and,
THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS
OF INDIAN RIVER COUNTY, FLORIDA, that
1. SECTION 14 of General Development Utilities, Inc., Water
and Sewer Franchise is hereby amended as follows:
SECTION 14
The rates charged by the Owner for its service
hereunder shall be fair and reasonable and designed
to meet all necessary costs of the service, including
a fair rate of return on the net valuation of its
properties devoted thereto under efficient and econo-
mical management. The Owner agrees that it shall be
subject to all authority now or thereafter possessed
by the County or any other regulatory body having com-
petent jurisdiction to fix just, reasonable and
compensatory rates. The Owner shall have authority
to charge and collect, but not to exceed the following
schedule of rates, which shall remain effective until
changed or modified as herein provided, to -wit:
C.1Page 1 of 2
_ y _'i r!(rtl
CA
ooicU5�2f�+GE28bl
WATER
1. Main Extension Charge $2.19 times footage fronting
on main.
2. Plant Capacity Charge $.36/gallon of demand*
3. Water Meter Connection Charge
5/8" x 3/4" meter $ 75.00
1" meter $11.5.00
1•-1/2" meter $190.00
2" meter $265.00
*Meters over 2" in size are charged upon the estimated actual cost of
installation. Where actual charges differ from estimates, the difference
=- will be refunded by the utility if the total cost is less than the
estimate, or paid by the contributor prior to the initiation of water
service if the actual cost exceeded the estimated cost.
SEWER
1. Main Extension Charge $6.54 times footage fronting
on main.
2. Plant Capacity Charge $.36/gallon of demand*
*Plant Capacity Charges are computed by multiplying the daily rates of
demand by the above rates for the specified service. The daily rated
gallonage demand varies depending upon type of usage, for example,
apartments = 250 gpd; single family residence 3/4" x 5/8" meter = 350
gpd; commercial units based upon projected actual demand.
Dated this 21st day of septemher —, 1977
BOARD OF COUNTY COMMISSIONERS
OF INDIAN RIVER COUNTY, FLORIDA
By:
Attest: -Q-1c, d_
AppZaBy:-�-��/\
C6bnty Attorney
Page 2 of 2
oR0bu1PALIE28b8