Loading...
HomeMy WebLinkAbout2023-007ARCHITECTURAL SERVICES WORK ORDER NO. 7 Fran B Adams (North County) Regional Park - Soccer Fields Restroom Architectural Services This Work Order Number 7 is entered into as of this 17th day of January, 2023, pursuant to that certain Continuing Architectural Services Agreement for Professional Services entered into as of the 13th day of November, 2018 and renewed and amended as of November 2, 2021 (collectively referred to as the "Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and Edlund, Dritenbas, Binkley Architects and Associates, P.A ("ARCHITECT"). The COUNTY has selected the ARCHITECT to perform the professional services set forth on Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The ARCHITECT will perform the professional services within the timeframe and for the fees detailed in Exhibit A, all in accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first written above. ARCHITECT: EDLUND, DRITENBAS, BINKLEY ARCHITECTS AO ASSOCIATES, P.A By: Print Name: Title: M I N o i PAI_._ BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY By: Approved Date: January 17, 2023 Attest: Jeffrey R. Smith, Clerk of Court and Comptroller By: d".U..tt,�.9&n4zai Deputy Clerk Approved: • Mi el C. Zito, Interim County Administrator Approved as to form and legal sufficiency: Dylan T. Reingold, County Attorney EOLUNO - ORITENBAS • BINKLEY ARCHITECTS AND ASSOCIATES$ P.A. 65 Royal Palm Pointe, Ste D Vero Beach, FL 32960 Ph. (772) 569-4320 Fax (772) 569-9208 December 15, 2022 TO: Indian River County Parks & Recreation Attn: Joseph Tilton RE: Proposal for Architectural Services Fran B Adams Park Restroom Architects Comm. #100322VB Dear Sir: This letter shall serve as our proposal and agreement for the preparation of documents necessary for building construction of the above referenced project. I. SCOPE The scope of work will consist of providing design and construction documents for a men and women's public restroom approximately 645 S.F. The previously completed Hallstrom House/Hobart Restrooms plans will be reused with minor modifications if needed for code compliance and or Owner revisions. II. ARCHITECTS BASIC SERVICES The Architect shall provide full permit documents for construction to be constructed by subcontractors or general contractor of the Owner's choice. Documents and services provided by the Architect and his employed Structural, Mechanical, Electrical and Plumbing Engineering sub -consultants will include the following: 1) Data collection, additional field verifications, and meetings with Owner, if needed. 2) Construction documents, including all necessary plans for building permit submission. 3) Address plan review comments and make revisions as required. 4) Assist in obtaining construction bids, bidding administration, and addendums as needed. 5) Construction administration shall include a preconstruction meeting periodic construction observations twice monthly, construction meeting with Owner and G.C., RF1 responses, submittals review, review of pay applications and any changes in the work. A punch list and final inspection will also be done. II1. FEES FOR BASIC SERVICES Our fees will be a lump sum amount of $13,500, plus reimbursable expenses. Construction Documents $12,000 Bidding/Permitting $500 Construction Administration $1,000 Total $13,500 Reimbursable Expenses (estimated) $500 IV. PAYMENTS TO THE ARCHITECT The architect shall invoice monthly for completed work of the design team as they are incurred. Payments due the architect under this agreement shall bear interest at the rate of 1.5 percent per month commencing 30 days after the date of billing. if payments due the Architect are not received within the 45 days of invoice, the Owner agrees to assume responsibility for the cost of all required collection services, legal fees, mediation services, and court costs, incurred in the interest of collecting these fees. Venue shall lie in Indian River County. V. ASSUMPTIONS A. Utilities are readily available (water, sewer, electric). No offsite modifications will be required. B. A civil engineer will be hired directly by Owner for site plan design and approval documents, all site permitting. stormwater permits, site utility plans and permitting as needed. VI. OWNER'S RESPONSIBILITIES A. Your office, by way of the management office, must furnish all available documents and systems data to assist the Architect in familiarizing himsell'with the existing site infrastructure, including, but not limited to: surveys including tree locations environmental studies, soils reports. B. Your office must pay all applicable fees to agencies having jurisdiction over this project. C. Owner shall be responsible for all reprographic services for construction documents. VII. ARCHITECT'S HOURLY RATE SCHEDULE Principals: John Binkley, Gregory Edlund $165.00 per hour Registered Project Architects $125.00 per hour Intern Architects $105.00 per hour Page 2 of 5 Technical level one - Senior CADD Designer $ 85.00 per hour Technical level two — CADD Designer $ 75.00 per hour Technical level three — CADD Technician $ 65.00 per hour Clerical and Accounting $ 50.00 per hour VIII. ADDITIONAL SERVICES The following services may be provided when authorized by the Owner. The Owner will compensate the Architect at the rates stipulated in Article VII. I ) Interior decorating. 2) Consultation concerning replacements of any work damaged by fire or other cause during construction. 3) Making revisions in drawings, specifications or other documents when such revisions are inconsistent with instruction previously given by the Owner or any agent authorized by the Owner. 4) Preparing as built drawings showing significant changes in work during construction or inunediately after building completion. 5) Providing or attending any board or agency presentation or negotiation at City, County or any permitting agencies having jurisdiction over the project. 6) Providing detailed preliminary cost data prior to construction documents. 7) Specialized engineering studies and design. 8) Security and surveillance systems design, billed at cost plus 15%. 9) Special consultants outside the normal mechanical, electrical, and plumbing services, billed at cost plus 15%. 10) Additional site visits beyond those stipulated in Article lI. IX. REIMBURSABLE EXPENSES Any expenses related to additional services due to a change in scope or program will be invoiced, as incurred, to the Owner at the following rates: 1) Mileage at $0.58 per mile. 2) In House 24" x 36" prints at $1.50 each. 3) Outsourced printing services; a multiple of 15% direct cost. 4) Original computer plots at $10.00 each. 5) Special postage or mailing; a multiple of 15% direct cost. 6) Photocopies at $0.20 per sheet. 7) CD's with PDF files of drawings to Owner and Contractors at $5.00 each. 8) Digital Color Renderings at $2,500.00 each. X. GENERAL Page 3 of 5 A. As an instrument of service, all original documents remain the property of the Architect and may not be reproduced in any form or modified fashion, without the written consent of the Architect. B. The Architect shall invoice every two weeks. Invoices will be based on completed work for the services defined in Article I plus any additional services and reimbursable expenses accumulated during that period. Note: Architect's Reimbursable Expenses are listed in Article IX of this agreement. C. Regular invoicing will be at two-week intervals. Payments due the Architect under this agreement shall bear interest at the rate of 1.5 percent per month commencing 30 days after the date of billing. If payments due the Architect are not received within 45 days of the date on the invoice, the Owner agrees to assume responsibility for the cost of all required collection services, legal fees, mediation or court costs, incurred in the interest of collecting these fees. D. In the event of any delinquent or disputed invoices, the Owner agrees that the Architect and his Professional Consultants may cease all ongoing efforts on the project until the outstanding invoice is paid or legally adjudicated. E. Disputes regarding this agreement shall be settled in the following order of precedence: Party to Party, Mediation, and Legal Adjudication. This agreement can be terminated by either party with (7) seven calendar day's written notice. The Architect and his subcontractors shall be compensated for all work completed up to the date of termination notice, including any reimbursable expenses incurred to the date. Venue shall lie in Indian River County. F. The Architect shall provide architectural services for the Project as described in this Agreement in a manner consistent with locally accepted standards for professional skill and care. The Architect, Architect's employees and Architect's consultants make no representation or warranty that every and all conditions will be discovered. G. EDB maintains Professional Liability insurance. In recognition of the relative risks, rewards and benefits of the Project to both the Owner and EDB, the risks have been allocated such that the Owner agrees, to the fullest extent permitted by law, to limit the liability of EDB to the Owner for any and all claims, losses, costs, damages of any nature whatsoever or claims expenses from any cause or causes, including attorney's fees and costs and expert -witness fees and costs, so that the total aggregate limit of EDB to the Owner shall not exceed $5,000.00, or EDB's total fee for services rendered on this Project, whichever is greater. It is intended that this limitation apply to any liability or cause of action for professional liability however alleged or arising unless otherwise prohibited by the laws of the State of Florida. Please note: According to Florida Statute 558.0035 an individual employee or agent may not be held individually liable for negligence. If you have any questions regarding this agreement, please call. Please initiate this agreement and return o e copy to the architect to authorize commencement of the project. �" Sincerely, V Date John F. Bi le , A.I.A. Accepted Architect Owner Page 4 of 5 EDLUND • DRITENBAS • BINKLEY ARCHITECTS AND ASSOCIATES, P.A. 65 Royal Palm Pointe, Ste D Vero Beach. FL 32960 Ph. (772) 569-4320 Fax (772) 569-9208 Fran B Adams Park Restroom Opinion of Cost October 25, 2022 1. Site Cost A. Fill dirt/compaction (building pad) B. Electric services allowance to building transformer pad/lift station electric C. Sod/landscape/irrigation D. Water and sewer service E. Parking area/drives/pathways Building related site cost subtotal (not included in civil estimates) Subtotal I 11. Building Construction Costs A. Restroom Building Costs B. Covered Patio A. G.C. General Conditions/P&OH 480 SF x $350/SF = 165 SF x $200/SF = Subtotal II 25% of $246,000 = Project Grand Total $15,000 $30,000 (By owner) (See civil estimates) (See civil estimates) $45,000 $168,000 $33,000 $201,000 $61,500 $307,500 NOTE: Opinions expressed in this report represent the professional opinion of the firm of Edlund, Dritenbas, Binkley Architects and Associates, P.A. (EDB) who have used that degree of care and skill ordinarily exercised under similar conditions by reputable members of our profession practicing in the some or similar locality. EDB Architects, P.A. does not warrant that this opinion of probable construction cost will not varyfrom actual costs incurred by the client. Page 5 of 5