Loading...
HomeMy WebLinkAbout1982-139RESOLUTION No. 82- 139 A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA, REVISING THE SCHEDULE OF BUILDING PERMIT FEES AND CHARGES. WHEREAS, Indian River County currently shares with the City of Vero Beach a joint Building Department, and WHEREAS, the Department is established to operate as an enterprise fund to distribute the cost of operation to those individuals that use the services instead of imposing the burden of such costs upon the general taxpayers, and WHEREAS, it has now been determined that fees and charges must be increased to provide sufficient revenue for the continuation of the Department as an enterprise fund, and WHEREAS, the adoption of a fee schedule that parallels the City's will eliminate confusion and reduce administrative overhead expenses. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA, that; 1. The County Commission finds and determines that adoption of the following schedule of rates and charges is necessary and in the best interest of the residents of Indian River County, and 2. The following schedule is hereby adopted and shall become effective for all construction occurring in the unincorporated areas of Indian River County on T 1982. BUILDING FEES The following fees are based on total valuation (New construction, repairs or alterations). All references to "Standard Building Code" mean the Standard Building Code as modified and adopted by Indian River County which appears in Indian River County Code of Laws and Ordinances. Appendix A is the Southern Standard Building Code Congress Data used to establish the minimum value associated with the construction cost for which a permit is being requested. The actual valuation used in determining the building fee will be the valuation submitted by the requestor of the permit or the Southern Standard Building Code Congress calculation, whichever is higher. This valuation will be adjusted to reflect seventy-five percent (75%) of the total valuation of the building and improvements for purposes of assessing the fee outlined below: $1000.00 or less: Minimum Fee - $5.00 -1- -2- $101.00 - $2,000.00: $5.00/$1,000 or fraction thereof. $2,001.00 - $15,000.00: $10.00 for the first $2,000 plus $3.00 for each additional $1,000 or fraction thereof, to and including $15,000.00. $15,001.00 - $50,000.00: $49.00 for the first $15,000 plus $2.50 for each additional $1,000 or fraction thereof to and including $50,000.00. $50,001.00 - $100,000.00: $136.50 for the first $50,000.00 plus $2.00 for each additional $1,000 or fraction thereof, to and including $100,000.00. $100,001.00 - $500,000.00: $236.50 for the first $100,000.00 plus $1.50 for each additional $1,000 or fraction thereof, to and including $500,000.00. $500,001.00 and up: $836.50 for the first $500,000.00 plus $1.00 for each additional $1,000 or fraction thereof. FEE GAS TANKS: 0 - 550 gallons $ 5.00 550 - 1,000 gallons 7.00 Each additional $1,000 or fraction thereof 7.00 SEA WALLS: First 50 feet 15.00 Over 50 feet/foot .20 DOCKS: First 20 feet 10.00 Each additional 10 feet 3.00 DEMOLITION• 500 - 1,000 square feet 12.00 Each additional 1,000 sq. ft. or fraction thereof 8.00 UP TO $60.00 MAXIMUM FENCES: 1 - 150 linear feet 6.00 Each additional 100 linear feet or fraction thereof. 2.00 ELEVATORS: Each (three stories or less) 12.00 Each additional floor 4.00 SWIMMING POOLS: Up to 20,000 gallons 25.00 Each additional 1,000 gallons or fraction thereof 1.00 SCREEN ENCLOSURES: .03 /square foot/minimum $3.00 3.00 ROOFS: 0 - 1,000 square feet 10.00 1,000 - 2,000 square feet 12.00 Over 2,000 square feet each 1,000 square feet or fraction thereof 3.00 -2- 0 ALL PAVING: First 1,000 square feet 7.00 Each 1,000 square feet or fraction thereof to 10,000 square feet 2.50 Each 1,000 square feet or fraction thereof 1.50 MOVING BUILDINGS OR STRUCTURES: Each alteration thereto/Building Permit Fees 50.00 PLAN CHECKING FEES: When the vnlnatinn of the N �d construction exu eels $i,000.00 rv pv - sc_ and a plan is required to be submitted by Section 105.3 of the Standard Building Code, a plan checking fee shall be paid to the building official at the time of submitting plans and specifications for checking. Said plan checking fee shall be one-half of the building permit fee as set forth in this resolution. Where work for which a permit is required by the Standard Building Code is started, or proceeded with prior to obtaining said permit, the fee herein shall be doubled, but payment of said double fee shall not relieve any persons from fully complying with the requirements of applicable County ordinances in the execution of the work. Nor shall the payment of a double fee relieve any persons from penalties as defined elsewhere in the ordinances of Indian River County. A re -infection fee, in the amount of $6.00, shall be charged for each trip in cases where: (a) Previous repairs or corrections were not satisfactorily and properly made prior to such inspection. (b) The work was not ready when the inspector was requested. (c) Wrong address or improper directions were given for location of the property. Before additional permits will be issued, payment must be made for re -inspection. INSULATION: See Building Permit Fees on valuation (New construction, repairs and alterations). PLUMBING FEES When an application for permit is approved and before a permit is issued, a fee therefore shall be paid based on the following schedule of rates: FEE (a) For each fixture roughed in and installed on new or reconstructed plumbing, or each fixture outlet roughed in $ 2.75 (b) For each water heater 2.75 (c) For each septic tank to 1,200 gallons 5.00 For each septic tank over 1,200 gallons 6.00 (d) For each grease trap 4.00 (e) For each sewer connection 6.00 (f) For inspection of remodeling or repairs on waste „o-1 , vent, drain or s ewor pipes 6.00 -3- 11 (g) For each lawn sprinkler system, air Each hose cabinet assembly 5.00 conditioning, refrigeration, or cooling each installation unit, connected to the city water and Plus .25t/sprinkler sewer 3.50 (h) For each re -inspection made due to the GAS: (The following shall include work being condemned or not being ready For the first outlet and/or at the time specified 8.00 (i) For each roof drain 2.50 (j) For each area drain 2.50 (k) For each water service connection to a 2.00 For multiple meters at one location: municipal or private multiple water For first meter 2.50 supply system: 1.00 For major repairs to gas pipe where First meter on each lot (within no fixture or appliance municipality) $ 2.00 BOILERS: Minimum permit fee for installations First meter on each lot (outside not to exceed $100 5.00 municipality to City water system) 4.00 FURNACES AND HEATING EQUIPMENT/UNIT For each additional meter on same lot 1.00 (1) Water Connection to or outlets for an fractional part appliance or installation not covered Each additional 100,000 B.T.U./hour by fixture permit 1.00 (m) Water Connection to outlets for hose or lawn faucets: First Connection 1.00 Each additional .50 FIRE CONTROL SYSTEM: (Dry Chemical S',stem) Each hose cabinet assembly 5.00 FIRE SPRINKLER SYSTEM: Minimum permit fee for each installation 5.00 Plus .25t/sprinkler head .25 SWIMMING POOL CONNECTIONS TO WATER SYSTEM 6.00 GAS: (The following shall include bottle gas) For the first outlet and/or appliance 4.50 For each additional outlet and/or appliance 1.50 For change from a master to an individual meter 2.00 For multiple meters at one location: For first meter 2.50 For each additional meter 1.00 For major repairs to gas pipe where no fixture or appliance installation is involved 3.00 BOILERS: Minimum permit fee for installations not to exceed $100 5.00 Each $500 or fraction thereafter 3.00 FURNACES AND HEATING EQUIPMENT/UNIT INSTALLED: For the first 100,000 B.T.U./hour or fractional part 7.00 Each additional 100,000 B.T.U./hour or fractional part 3.00 -4- I Note: The rating of furnace and heating equipment shall be based on the B.T.U. input of fuel used/hour. WELLS: (Drilling or Digging) 5.00 Sprinkler Systems 4.00 WATER STORAGE TANKS: (Up to 1,000 gal.) 6.00 Each additional 1,000 gal. or fraction 1.50 SOLAR WATER HEATER SYSTEM 7.50 ELECTRIC FEES When application for permit is approved and before a permit is issued, a fee therefore shall be paid on the following schedule or rates: SWITCHBOARDS OR PANELS: By amperes, same as "Services" FEE LIGHT OUTLETS: 1-8 outlets, inclusive (minimum) $ 5.00 Over 8 outlets, the 2.50 minimum charge of $5.00 for 1.50 the first 8 outlets plus - 1.50 each additional outlet .10 SERVICES: Temporary for construction 6.00 400 ampere or less 8.00 For each additional 100 ampere (over 400) 4.00 SERVICE CHANGES: 400 ampere or less 8.00 Over 400 ampere - each 1.50 additional 100 ampere 4.00 SWITCHBOARDS OR PANELS: By amperes, same as "Services" (Not exceeding 400 amp) each panel 4.00 EQUIPMENT: Drop in range 2.50 Range Top 1.50 Oven 1.50 Sign Outlet 1.00 and all other appliance outlets inspected in conjunction with rough wiring, including room space heaters, ceiling heat, etc. (each) 1.00 MOTORS: Up to 1 H.P. 1.50 1-3 H.P. 3.00 3-5 H.P. 4.00 Over 5 H.P. up to 10 H.P. (per additional H.P.) 1.00 10 H.P. 9.00 Over 10 H.P. (per additional H.P.) .50 MACHINES: X -Ray - Portable - dentist 3.00 X -Ray - Stationary - doctor 5.50 Diathermic and Electronic Outlet 3.00 GENERATORS & TRANSFORMERS: Each up to 5 KVA 2.50 Each generator or transformer over 5 KVA thru 10 KVA 5.00 Each qenerator nr transformer over 10 KVA thru 15 KVA 7.00 Each generator or transformer over 15 KVA thru 20 KVA 8.50 -5- All other equipment same fees as set forth in all other items. SPECIAL PURPOSE OUTLETS: (Commercial) Popcorn, doughnut, drink machines, coin music machines, toaster, coffee urn, deep fryer, refrigerator, display cases, and other electrical coin operated machines: Fee each time installed 1.50 Permit No. to be displayed on each machine. AUTO PAINTING: Bake Ovens AIR CONDITIONING HEAT STRIPS: 1-5 K.W. Each additional 5 K.W. thereafter HANGING OF FIXTURES: (Not included in original permit) Lights - 1-10 bulbs of fluorescent tubes Each additional fixture COMBINATION: Light fixtures and outlets up thru 10 One inspection Streamers or festoon lights: First 10 lights Each additional 10 or fraction PLUGMOLD: First 25 feet Each 5 feet thereafter MISCELLANEOUS PERMITS: Temporary work or general repairs to radio or television, transmitting or receiving stations, picture shows, carnivals, circuses, road shows, or similar organizations; a permit fee from $8.00 to $50.00 shall be paid dpending upon the complexity of the work, said fee to be determined by the electrical inspector, and approved by the director. No permit will be issued for a fee of less than $5.00. The said fees shall include payment for the permit and for inspection of work, after the same shall have been completed. If the electrical inspector shall, upon his inspection after completion of the work or apparatus, find that the same -6- 8.00 2.50 2.00 2.00 .20 2.00 2.00 .50 1.50 .25 8.00 5.00 k Each generator or transformer over 20 KVA thru 25 KVA 10.00 Each generator or transformer over 25 KVA thru 30 KVA 15.00 Each generator or transformer over. 30 KVA 17.50 Generators and transformers, where located on same floor, fee for largest, plus $1.00 for each additional. WELDING MACHINES: Up to 25 amperes 3.00 Over 25-50 amperes 5.00 Over 50 amperes - plus $2.00 for each additional 25 amperes or fractional part thereof TRAILER PARKS: Main Service and Sub -Services as per "Services" $ 8.00 All other equipment same fees as set forth in all other items. SPECIAL PURPOSE OUTLETS: (Commercial) Popcorn, doughnut, drink machines, coin music machines, toaster, coffee urn, deep fryer, refrigerator, display cases, and other electrical coin operated machines: Fee each time installed 1.50 Permit No. to be displayed on each machine. AUTO PAINTING: Bake Ovens AIR CONDITIONING HEAT STRIPS: 1-5 K.W. Each additional 5 K.W. thereafter HANGING OF FIXTURES: (Not included in original permit) Lights - 1-10 bulbs of fluorescent tubes Each additional fixture COMBINATION: Light fixtures and outlets up thru 10 One inspection Streamers or festoon lights: First 10 lights Each additional 10 or fraction PLUGMOLD: First 25 feet Each 5 feet thereafter MISCELLANEOUS PERMITS: Temporary work or general repairs to radio or television, transmitting or receiving stations, picture shows, carnivals, circuses, road shows, or similar organizations; a permit fee from $8.00 to $50.00 shall be paid dpending upon the complexity of the work, said fee to be determined by the electrical inspector, and approved by the director. No permit will be issued for a fee of less than $5.00. The said fees shall include payment for the permit and for inspection of work, after the same shall have been completed. If the electrical inspector shall, upon his inspection after completion of the work or apparatus, find that the same -6- 8.00 2.50 2.00 2.00 .20 2.00 2.00 .50 1.50 .25 8.00 5.00 does not conform to and comply with the requirements established by the County, he shall notify the master electrician, indicating the corrections required; and when the inspector is notified that the corrections have been made, he will again inspect the work or apparatus without further charge; but, when extra inspection trips are necessary, due to any of the following reasons, a charge of. $8.00 shall be made for each trip - payable prior to reinspection. 8.00 (aa) Wrona address (bb) Condemned work, resulting from faulty construction (cc) Repairs or corrections not made when inspection is called (dd) Work not ready for inspection when called. The payment of re -inspection fee shall be made before any further permits will be issued to the person owing same. WORK STARTED BEFORE PERMIT IS ISSUED - THE FEE SHALL BE DOUBLED MECHANICAL FEES When applicant for permit is approved and before a permit is issued, a fee therefore shall be paid based on the following schedule of rates. FEE *AIR CONDITIONING AND REFRIGERATION: For the purpose of charging fees - 1 ton of refrigeration will equal 12,000 B.T.U.'s/hour or 1 H.P. total connected load. The first 5 tons or fractional part $ 8.00 The next 5 tons up to and including 10 tons - per ton 1.50 Over 10 tons - per ton additional 2.00 All major repairs or replacements, same fees as above. WINDOW UNITS OR WALL UNITS: (Where no construction work is involved in the building or duct work attached) For the first 5 units - each 3.50 For each additional unit 2.00 WORK STARTED BEFORE A PERMIT IS ISSUED - THE FEE SHALL BE DOUBLED * MECHANICAL PERMIT FEE - See Plumbing Permit Fees for Furnaces and Heating Equipment. TRAILER PARK FEE SCHEDULE - AUGUST, 1976 REVISION INDIVIDUAL TRAILERS - OTHER ALUMINUM WORK FEE Tie -down Permit $ 8.00 Carport Roof - Screen Room (To be charged by cubic area - Residential) Utility stnra__ge is included tided i n carport roof permit Patio Slab (No Cover) 7.00 -7- i Electrical: See Electrical Permit Fee Schedule Septic Tank Permit: See Plumbing Permit Fee Schedule PERMIT FEE SCHEDULE FOR MODULAR FEE Plans Examination $15.00 Footing Inspection 8.00 Inspectiun $ 8.00 Electricl Connection 8.00 Air Conditioning Connection 8.00 Sanitary Sewer (if applicable) 6.00 Septic Tank (if applicable) 5.00 3. BE IT FURTHER RESOLVED that the intent of the Board of County Commissioners is to revise the schedule of fees and charges to produce sufficient revenues that will allow the department after considering all expenses and administrative costs to break even; and to promote this goal, the County shall review the financial status of the department each year during the budget workshop sessions to determine whether further rate modifications are necessary. 4. BE IT FURTHER RESOLVED that this resolution shall be incorporated into the Code of Laws and Ordinances of Indian River County, Florida, and for this purpose section heads may be renumbered or relettered. The foregoing resolution was offered by Commissioner Wodtke who moved its adoption. The motion was seconded by Commissioner Bird and, upon being put to a vote, the vote was as follows: Chairman Don C. Scurlock, Jr. Aye Vice -Chairman A. Grover Fletcher Nay Commissioner Patrick B. Lyons Absent Commissioner William C. Wodtke, Jr. Aye Commissioner Dick Bird Aye The Chairman thereupon declared the resolution duly passed and adopted this 15th day of December , 1982. BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA Attest:j-By— FREDA WRIGHT, (gl erk DON C. SCUR OCK, JR. Chairman APPROVE AS92z AND L S By GA._ � BRAND_F.NRfTR,G;, rn��nty Attorney /`�✓/J -8-