HomeMy WebLinkAbout1982-139RESOLUTION No. 82- 139
A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS
OF INDIAN RIVER COUNTY, FLORIDA, REVISING THE
SCHEDULE OF BUILDING PERMIT FEES AND CHARGES.
WHEREAS, Indian River County currently shares with the
City of Vero Beach a joint Building Department, and
WHEREAS, the Department is established to operate as an
enterprise fund to distribute the cost of operation to those
individuals that use the services instead of imposing the burden
of such costs upon the general taxpayers, and
WHEREAS, it has now been determined that fees and
charges must be increased to provide sufficient revenue for the
continuation of the Department as an enterprise fund, and
WHEREAS, the adoption of a fee schedule that parallels
the City's will eliminate confusion and reduce administrative
overhead expenses.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA, that;
1. The County Commission finds and determines that
adoption of the following schedule of rates and charges is
necessary and in the best interest of the residents of Indian
River County, and
2. The following schedule is hereby adopted and shall
become effective for all construction occurring in the
unincorporated areas of Indian River County on
T
1982.
BUILDING FEES
The following fees are based on total valuation (New
construction, repairs or alterations). All references to
"Standard Building Code" mean the Standard Building Code as
modified and adopted by Indian River County which appears in
Indian River County Code of Laws and Ordinances.
Appendix A is the Southern Standard Building Code
Congress Data used to establish the minimum value associated with
the construction cost for which a permit is being requested. The
actual valuation used in determining the building fee will be the
valuation submitted by the requestor of the permit or the Southern
Standard Building Code Congress calculation, whichever is higher.
This valuation will be adjusted to reflect seventy-five percent
(75%) of the total valuation of the building and improvements for
purposes of assessing the fee outlined below:
$1000.00 or less:
Minimum Fee - $5.00
-1-
-2-
$101.00 - $2,000.00:
$5.00/$1,000 or fraction thereof.
$2,001.00 - $15,000.00:
$10.00 for the first $2,000 plus $3.00 for each
additional $1,000 or fraction thereof, to and
including $15,000.00.
$15,001.00 - $50,000.00:
$49.00 for the first $15,000 plus $2.50 for
each
additional $1,000 or fraction thereof to and
including $50,000.00.
$50,001.00 - $100,000.00:
$136.50 for the first $50,000.00 plus $2.00
for
each additional $1,000 or fraction thereof,
to
and including $100,000.00.
$100,001.00 - $500,000.00:
$236.50 for the first $100,000.00 plus $1.50
for
each additional $1,000 or fraction thereof,
to
and including $500,000.00.
$500,001.00 and up:
$836.50 for the first $500,000.00 plus $1.00
for each additional $1,000 or fraction thereof.
FEE
GAS TANKS:
0 - 550 gallons $
5.00
550 - 1,000 gallons
7.00
Each additional $1,000 or fraction
thereof
7.00
SEA WALLS:
First 50 feet
15.00
Over 50 feet/foot
.20
DOCKS:
First 20 feet
10.00
Each additional 10 feet
3.00
DEMOLITION•
500 - 1,000 square feet
12.00
Each additional 1,000 sq. ft. or fraction
thereof
8.00
UP TO $60.00 MAXIMUM
FENCES:
1 - 150 linear feet
6.00
Each additional 100 linear feet or
fraction thereof.
2.00
ELEVATORS:
Each (three stories or less)
12.00
Each additional floor
4.00
SWIMMING POOLS:
Up to 20,000 gallons
25.00
Each additional 1,000 gallons or
fraction thereof
1.00
SCREEN ENCLOSURES:
.03 /square foot/minimum $3.00
3.00
ROOFS:
0 - 1,000 square feet
10.00
1,000 - 2,000 square feet
12.00
Over 2,000 square feet each 1,000
square feet or fraction thereof
3.00
-2-
0
ALL PAVING:
First 1,000 square feet 7.00
Each 1,000 square feet or fraction
thereof to 10,000 square feet 2.50
Each 1,000 square feet or fraction
thereof 1.50
MOVING BUILDINGS OR STRUCTURES:
Each alteration thereto/Building Permit
Fees 50.00
PLAN CHECKING FEES:
When the vnlnatinn of the N �d construction exu eels $i,000.00
rv pv - sc_
and a plan is required to be submitted by Section 105.3 of the
Standard Building Code, a plan checking fee shall be paid to the
building official at the time of submitting plans and
specifications for checking. Said plan checking fee shall be
one-half of the building permit fee as set forth in this
resolution.
Where work for which a permit is required by the Standard Building
Code is started, or proceeded with prior to obtaining said permit,
the fee herein shall be doubled, but payment of said double fee
shall not relieve any persons from fully complying with the
requirements of applicable County ordinances in the execution of
the work. Nor shall the payment of a double fee relieve any
persons from penalties as defined elsewhere in the ordinances of
Indian River County.
A re -infection fee, in the amount of $6.00, shall be charged for
each trip in cases where:
(a) Previous repairs or corrections were not satisfactorily and
properly made prior to such inspection.
(b) The work was not ready when the inspector was requested.
(c) Wrong address or improper directions were given for
location
of the property.
Before additional permits will be issued, payment must be
made for
re -inspection.
INSULATION:
See Building Permit Fees on valuation (New construction,
repairs
and alterations).
PLUMBING FEES
When an application for permit is approved and
before a
permit is issued, a fee therefore shall be paid based on
the
following schedule of rates:
FEE
(a) For each fixture roughed in and
installed on new or reconstructed
plumbing, or each fixture outlet
roughed in $ 2.75
(b) For each water heater 2.75
(c) For each septic tank to 1,200 gallons 5.00
For each septic tank over 1,200 gallons 6.00
(d) For each grease trap 4.00
(e) For each sewer connection 6.00
(f) For inspection of remodeling or repairs
on waste „o-1 , vent, drain or s ewor
pipes 6.00
-3-
11
(g)
For each lawn sprinkler system, air
Each hose cabinet assembly
5.00
conditioning, refrigeration, or cooling
each installation
unit, connected to the city water and
Plus .25t/sprinkler
sewer
3.50
(h)
For each re -inspection made due to the
GAS: (The following shall include
work being condemned or not being ready
For the first outlet and/or
at the time specified
8.00
(i)
For each roof drain
2.50
(j)
For each area drain
2.50
(k)
For each water service connection to a
2.00
For multiple meters at one location:
municipal or private multiple water
For first meter
2.50
supply system:
1.00
For major repairs to gas pipe where
First meter on each lot (within
no fixture or appliance
municipality)
$ 2.00
BOILERS: Minimum permit fee for installations
First meter on each lot (outside
not to exceed $100
5.00
municipality to City water system)
4.00
FURNACES AND HEATING EQUIPMENT/UNIT
For each additional meter on same lot
1.00
(1)
Water Connection to or outlets for an
fractional part
appliance or installation not covered
Each additional 100,000 B.T.U./hour
by fixture permit
1.00
(m)
Water Connection to outlets for hose or
lawn faucets:
First Connection
1.00
Each additional
.50
FIRE CONTROL SYSTEM: (Dry Chemical S',stem)
Each hose cabinet assembly
5.00
FIRE SPRINKLER SYSTEM: Minimum permit fee for
each installation
5.00
Plus .25t/sprinkler
head
.25
SWIMMING POOL CONNECTIONS TO WATER SYSTEM
6.00
GAS: (The following shall include
bottle gas)
For the first outlet and/or
appliance
4.50
For each additional outlet and/or
appliance
1.50
For change from a master to an
individual meter
2.00
For multiple meters at one location:
For first meter
2.50
For each additional meter
1.00
For major repairs to gas pipe where
no fixture or appliance
installation is involved
3.00
BOILERS: Minimum permit fee for installations
not to exceed $100
5.00
Each $500 or fraction thereafter
3.00
FURNACES AND HEATING EQUIPMENT/UNIT
INSTALLED:
For the first 100,000 B.T.U./hour or
fractional part
7.00
Each additional 100,000 B.T.U./hour
or fractional part
3.00
-4-
I
Note: The rating of furnace and heating
equipment shall be based on the
B.T.U. input of fuel used/hour.
WELLS: (Drilling or Digging) 5.00
Sprinkler Systems 4.00
WATER STORAGE TANKS: (Up to 1,000 gal.) 6.00
Each additional
1,000 gal. or
fraction 1.50
SOLAR WATER HEATER SYSTEM 7.50
ELECTRIC FEES
When application for permit is approved and before a
permit is issued, a fee therefore shall be paid on the following
schedule or rates:
SWITCHBOARDS OR PANELS: By amperes, same
as "Services"
FEE
LIGHT OUTLETS: 1-8 outlets, inclusive
(minimum)
$ 5.00
Over 8 outlets, the
2.50
minimum charge of $5.00 for
1.50
the first 8 outlets plus -
1.50
each additional outlet
.10
SERVICES: Temporary for construction
6.00
400 ampere or less
8.00
For each additional 100 ampere
(over 400)
4.00
SERVICE CHANGES: 400 ampere or less
8.00
Over 400 ampere - each
1.50
additional 100 ampere
4.00
SWITCHBOARDS OR PANELS: By amperes, same
as "Services"
(Not exceeding
400 amp) each panel
4.00
EQUIPMENT: Drop in range
2.50
Range Top
1.50
Oven
1.50
Sign Outlet
1.00
and all other appliance
outlets inspected in
conjunction with rough wiring,
including room space heaters,
ceiling heat, etc. (each)
1.00
MOTORS: Up to 1 H.P.
1.50
1-3 H.P.
3.00
3-5 H.P.
4.00
Over 5 H.P. up to 10 H.P.
(per additional H.P.)
1.00
10 H.P.
9.00
Over 10 H.P. (per additional H.P.)
.50
MACHINES: X -Ray - Portable - dentist
3.00
X -Ray - Stationary - doctor
5.50
Diathermic and Electronic Outlet
3.00
GENERATORS & TRANSFORMERS: Each up to 5 KVA
2.50
Each generator or transformer over 5 KVA
thru 10 KVA
5.00
Each qenerator nr transformer over 10 KVA
thru 15 KVA
7.00
Each generator or transformer over 15 KVA
thru 20 KVA
8.50
-5-
All other equipment same fees as set forth in all other items.
SPECIAL PURPOSE OUTLETS: (Commercial)
Popcorn, doughnut, drink machines, coin
music machines, toaster, coffee urn,
deep fryer, refrigerator, display cases,
and other electrical coin operated machines:
Fee each time installed 1.50
Permit No. to be displayed on each machine.
AUTO PAINTING: Bake Ovens
AIR CONDITIONING HEAT STRIPS:
1-5 K.W.
Each additional 5 K.W. thereafter
HANGING OF FIXTURES: (Not included in
original permit)
Lights - 1-10 bulbs of fluorescent tubes
Each additional fixture
COMBINATION: Light fixtures and outlets
up thru 10
One inspection
Streamers or festoon lights:
First 10 lights
Each additional 10 or fraction
PLUGMOLD: First 25 feet
Each 5 feet thereafter
MISCELLANEOUS PERMITS: Temporary work or
general repairs to radio or television,
transmitting or receiving stations, picture
shows, carnivals, circuses, road shows, or
similar organizations; a permit fee from
$8.00 to $50.00 shall be paid dpending upon the
complexity of the work, said fee to be
determined by the electrical inspector, and
approved by the director.
No permit will be issued for a fee of less
than $5.00. The said fees shall include
payment for the permit and for inspection
of work, after the same shall have been
completed. If the electrical inspector
shall, upon his inspection after completion
of the work or apparatus, find that the same
-6-
8.00
2.50
2.00
2.00
.20
2.00
2.00
.50
1.50
.25
8.00
5.00
k
Each generator or transformer over 20 KVA
thru 25 KVA
10.00
Each generator or transformer over 25 KVA
thru 30 KVA
15.00
Each generator or transformer over. 30 KVA
17.50
Generators and transformers, where located
on same floor, fee for largest, plus $1.00
for each additional.
WELDING MACHINES: Up to 25 amperes
3.00
Over 25-50 amperes
5.00
Over 50 amperes - plus
$2.00 for each additional
25 amperes or fractional
part thereof
TRAILER PARKS: Main Service and
Sub -Services as per "Services"
$ 8.00
All other equipment same fees as set forth in all other items.
SPECIAL PURPOSE OUTLETS: (Commercial)
Popcorn, doughnut, drink machines, coin
music machines, toaster, coffee urn,
deep fryer, refrigerator, display cases,
and other electrical coin operated machines:
Fee each time installed 1.50
Permit No. to be displayed on each machine.
AUTO PAINTING: Bake Ovens
AIR CONDITIONING HEAT STRIPS:
1-5 K.W.
Each additional 5 K.W. thereafter
HANGING OF FIXTURES: (Not included in
original permit)
Lights - 1-10 bulbs of fluorescent tubes
Each additional fixture
COMBINATION: Light fixtures and outlets
up thru 10
One inspection
Streamers or festoon lights:
First 10 lights
Each additional 10 or fraction
PLUGMOLD: First 25 feet
Each 5 feet thereafter
MISCELLANEOUS PERMITS: Temporary work or
general repairs to radio or television,
transmitting or receiving stations, picture
shows, carnivals, circuses, road shows, or
similar organizations; a permit fee from
$8.00 to $50.00 shall be paid dpending upon the
complexity of the work, said fee to be
determined by the electrical inspector, and
approved by the director.
No permit will be issued for a fee of less
than $5.00. The said fees shall include
payment for the permit and for inspection
of work, after the same shall have been
completed. If the electrical inspector
shall, upon his inspection after completion
of the work or apparatus, find that the same
-6-
8.00
2.50
2.00
2.00
.20
2.00
2.00
.50
1.50
.25
8.00
5.00
does not conform to and comply with the
requirements established by the County,
he shall notify the master electrician, indicating
the corrections required; and when the inspector
is notified that the corrections have been made,
he will again inspect the work or apparatus
without further charge; but, when extra
inspection trips are necessary, due to any of
the following reasons, a charge of. $8.00 shall
be made for each trip - payable prior to
reinspection. 8.00
(aa) Wrona address
(bb) Condemned work, resulting from
faulty construction
(cc) Repairs or corrections not
made when inspection is called
(dd) Work not ready for inspection
when called.
The payment of re -inspection fee shall be made before
any further permits will be issued to the person owing same.
WORK STARTED BEFORE PERMIT IS ISSUED - THE FEE SHALL BE DOUBLED
MECHANICAL FEES
When applicant for permit is approved and before a
permit is issued, a fee therefore shall be paid based on the
following schedule of rates.
FEE
*AIR CONDITIONING AND REFRIGERATION:
For the purpose of charging fees - 1 ton
of refrigeration will equal 12,000
B.T.U.'s/hour or 1 H.P. total connected
load.
The first 5 tons or fractional part $ 8.00
The next 5 tons up to and including
10 tons - per ton 1.50
Over 10 tons - per ton additional 2.00
All major repairs or replacements,
same fees as above.
WINDOW UNITS OR WALL UNITS: (Where no
construction work is involved in the
building or duct work attached)
For the first 5 units - each 3.50
For each additional unit 2.00
WORK STARTED BEFORE A PERMIT IS ISSUED - THE FEE SHALL BE DOUBLED
* MECHANICAL PERMIT FEE - See Plumbing
Permit Fees for Furnaces and Heating Equipment.
TRAILER PARK FEE SCHEDULE - AUGUST, 1976 REVISION
INDIVIDUAL TRAILERS - OTHER ALUMINUM WORK
FEE
Tie -down Permit $ 8.00
Carport Roof - Screen Room
(To be charged by cubic area -
Residential)
Utility stnra__ge is included tided i n
carport roof permit
Patio Slab (No Cover) 7.00
-7-
i
Electrical: See Electrical Permit
Fee Schedule
Septic Tank Permit: See Plumbing Permit
Fee Schedule
PERMIT FEE SCHEDULE FOR MODULAR
FEE
Plans Examination $15.00
Footing Inspection 8.00
Inspectiun $ 8.00
Electricl Connection 8.00
Air Conditioning Connection 8.00
Sanitary Sewer (if applicable) 6.00
Septic Tank (if applicable) 5.00
3. BE IT FURTHER RESOLVED that the intent of the Board
of County Commissioners is to revise the schedule of fees and
charges to produce sufficient revenues that will allow the
department after considering all expenses and administrative
costs to break even; and to promote this goal, the County shall
review the financial status of the department each year during the
budget workshop sessions to determine whether further rate
modifications are necessary.
4. BE IT FURTHER RESOLVED that this resolution shall be
incorporated into the Code of Laws and Ordinances of Indian River
County, Florida, and for this purpose section heads may be
renumbered or relettered.
The foregoing resolution was offered by Commissioner
Wodtke who moved its adoption. The motion was seconded by
Commissioner Bird and, upon being put to a vote, the vote
was as follows:
Chairman Don C. Scurlock, Jr. Aye
Vice -Chairman A. Grover Fletcher Nay
Commissioner Patrick B. Lyons Absent
Commissioner William C. Wodtke, Jr. Aye
Commissioner Dick Bird Aye
The Chairman thereupon declared the resolution duly
passed and adopted this 15th day of December , 1982.
BOARD OF COUNTY COMMISSIONERS
OF INDIAN RIVER COUNTY, FLORIDA
Attest:j-By—
FREDA WRIGHT, (gl erk DON C. SCUR OCK, JR.
Chairman
APPROVE AS92z
AND L S
By
GA._ � BRAND_F.NRfTR,G;, rn��nty Attorney
/`�✓/J -8-