Loading...
HomeMy WebLinkAbout2022-169AWORK ORDER NUMBER 2018008-4 SHORELINE PERFORMANCE MODELING This Work Order Number 2018008-4 is entered into as of this 20th day of September , 2022 pursuant to the Continuing Contract Agreement for Continuing Engineering Services entered into as of April 17, 2018 ("Agreement"), and amended on May 18, 2021 for a 2 year extension on by and between Indian River County, a political subdivision of the State of Florida ("COUNTY") and Antim Environmental and Infrastructure, LLC. ("CONSULTANT"). The COUNTY has selected the CONSULTANT to perform the professional services set forth on Exhibit 1, attached to this Work Order and made part hereof by this reference. The professional services will be performed by the CONSULTANT for the fee schedule set forth in Exhibit 1. The CONSULTANT will perform the professional services within the timeframe more particularly set forth in Exhibit 1, all in accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.3 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first written above. CONSULTANT Aptim Environmental & Infrastructure, LLC. Nicole S. Sharp, P.E. BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY Lo Peter D. O'Bryan, Title: Coastal Market Lead Attest: Jeffrey R. Smith, Clerk of Court a Comptr er Date: 9/8/2022 By: T ala ( eal) Deputy Clerk oved: By: Jason=form , County dministrator Annroved and lural pie4: By: #A '-- . P�= Wil iam K. DeBraal, Deputy County A APTIM September 2, 2022 Eric Charest Coastal Division Indian River County Public Works 1801 27th Street Vero Beach, FL 32960 Aptim Environmental & Infrastructure, LLC 6401 Congress Avenue, Suite 140 Boca Raton, FL 33487 Tel: +1 561 391 8102 Fax: +1 561 391 9116 www.aptim.com Subject: Indian River County, FL Work Order 2018008-04 Sebastian Inlet Technical Advisory Committee Numerical Modeling Analysis Dear Eric: This proposal outlines a scope of work for Aptim Environmental & Infrastructure, LLC (APTIM) to provide numerical modeling assistance to the County for the final Technical Advisory Committee (TAC) meeting for the Sebastian Inlet. Scope of Work In order to better understand shoreline performance for historic and proposed bypassing amounts at Sebastian Inlet, APTIM will perform numerical modeling to analyze coastal processes in the vicinity of the inlet and propose beach management strategies to the TAC. APTIM will develop a numerical model for Indian River County that can model the complex interactions between offshore bathymetry, waves, tides, winds, currents, sediment transport, erosion, and deposition. The modeling effort will make best use of existing bathymetry and topography, LiDAR data, water levels, waves, winds and sediment data to simulate the physical processes that influence Indian River County and its surrounding areas. Beach profile data from of the annual monitoring surveys of Indian River County will be used for the beach portions of the study area. APTIM will model four (4) fill scenarios to evaluate the potential effects of various bypassing scenarios along the adjacent beaches. The model scenarios will be evaluated for short term (one year) and long term (five years) simulation periods. Each modeled alternative will be compared to a baseline condition in order to draw conclusions on the expected result of implementing each scenario. The model results will be reviewed and presented to the TAC. Deliverable A memorandum overviewing the results of numerical modeling analysis will be provided to the County for presentation to the TAC. Schedule & Assumptions APTIM will proceed with the task described herein upon receipt of a signed Work Order from Indian River County. It is estimated that the modeling efforts will require 2 months from receipt of the signed work order. ,* A P T I M September 22, 2021 Page 2 of 3 The total lump sum cost to perform the work described herein is $41,940.00. The scope and fee were developed following the provisions of the Continuing Services Contract Agreement for Continuing Engineering Services 2018008 (dated April 17, 2018 and amended May 18, 2021) between Indian River County and APTIM. Thank you for the opportunity to serve Indian River County. Please do not hesitate to call if you have any questions. Sincerely, Nicole S. Sharp, P.E. Coastal Restoration Modeling Program Manager Aptim Environmental & Infrastructure, LLC APTIM A APTIM EXHIBIT A Work Order 2018008-04 Numerical Modeling Analysis Indian River County, FL September 22, 2021 Page 3 of 3 Summary of Cost by Task Task Number Task NamSub- e Labor contractors MobilizationlTravel Totals Task 1 Technical Advisory Meetings $ 41,940.00 $ $ 295.00 $ 41,940.00 Totals = $ 41,940.00 $ - $ $ 41,940.00 Submitted By: Nicole Sharp _ Submitted To: Indian River County, FL Submission Date: 9/2/2022 A APTIM Work Order 2018008-04 Numerical Modeling Analysis Indian River County, FL Summary of Labor Hours and Cost Labor Title Labor Bill Rate Technical Advisory Meetings Task 1 Labor Hous Cost Principal Ergneer $ 295.00 $ - Program M3 $ 215.00 4 $ 860.00 Sr Coastal E/Pro' $ 195.00 $ - Coastal Engineer ID $ 165.00 $ - Coastal Erginow 1 $ 130.00 158 $ 20,540.00 Coastal Enginew I $ 105.00 $ - Coastal Modeler 1 $ 130.00 158 $ 20,540.00 Senor CAD Operalqr $ 165.00 $ CAD Operator $ 110.00 $ GIS Operator $ 120.00 $ Clerical $ 90.00 $ Technician $ 70.00 $ Mod6zatior✓rravel Sub -Contractors i TOTAL 320 $ 41,94000 aubmat.d By: 14cole Sharp submttted To: Indian River County, FL Submisslon Date: 9ar2022