HomeMy WebLinkAbout2022-231AWork Order Signature Document
FZIQC Contract No.: FL-R10-GC11-111821-JLC
FNew Work Order a Modify an Existing Work Order
Work Order Number.: 108272.00 Work Order Date: 10/27/2022
Work Order Title: Indian River County - Archie Smith Fish House Pavilion / Demo
Owner Name: Indian River County Contractor Name: Johnson-Laux Construction, LLC
Contact: Beth Powell Contact: James Powell
Phone: 772.226.1873 Phone: 407-453-2261
Work to be Performed
Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of
EZIQC Contract No FL-R10-GC11-111821-JLC.
Brief Work Order Description:
Time of Performance Estimated Start Date:
Estimated Completion Date:
Liquidated Damages Will apply: El Will notapply: Y
Work Order Firm Fixed Price: $508,407.90
Owner Purchase Order Number:
Approvals
Digitally signed by: Jennifer Hyde
Jennifer H yd eD CN = Jennifer Hyde email =
Cie@ircgov.com C = US O = Indian River
unty, OU = Purchasing Manager
Date: 2023.06.16 10:02:55 -04'00'
Owner
Date
;Vm e& 05/18/2023
Contractor Date
Work Order Signature Document Page 1 of 1
1 OJ2712022
Sourcewell
Detailed Scope of Work
To: James Powell
From: Beth Powell
Johnson-Laux Construction, LLC
Indian River County
650 Garden Commerce Parkway
1801 27th St
Winter Garden, FL 34787
Vero Beach, FL 32960
407-453-2261
772.226.1873
Date Printed: October 27, 2022
Work Order Number: 108272.00
Work Order Title: Indian River County - Archie Smith Fish House Pavilion / Demo
Brief Scope:
Preliminary F� Revised ❑X Final
The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the
items set forth below shall be considered part of this scope of work.
Please see the attached Scope of Work.
Subject to the terms and conditions of JOC Contract FL-R10-GC11-111821-JLC.
Contractor
Owner
vale
wr-na
Scope of Work Page 1 of 1
10/27/2022
Contractor's Price Proposal - Summary
Date: October 27, 2022
Re: IQC Master Contract #: FL-RIO-GC11-111821-JLC
Work Order #: 108272.00
Owner PO #:
Title: Indian River County - Archie Smith Fish House Pavilion / Demo
Contractor: Johnson-Laux Construction, LLC
Proposal Value: $508,407.90
Alternate $47,796.24
Base Bid $460,611.66
Proposal Total $508,407.90
Thisl total represents the correct total for the proposal. Any discrepancy between line totals,
sub -totals and the proposal total is due to rounding.
Contractor's Price Proposal - Summary Page 1 of 1
10/27/2022
Contractor's Price Proposal - Detail
Date: October 27, 2022
Re: IQC Master Contract #:
FL-13I0-GC11-111821-JLC
Work Order #:
108272.00
Owner PO #:
Title:
Indian River County - Archie Smith Fish House Pavilion / Demo
Contractor:
Johnson-Laux Construction, LLC
Proposal Value:
$508,407.90
Sect. Item Mod.
UOM Description
Line Total
Labor Equip. Material (Excludes)
Alternate
1 01 22 23 00 0279
DAY 1,500 LB Capacity, 60" Wide, Skid -Steer Loader With Full -Time Operator
$1,905.11
Quantity Unit Price Factor
Total
Installation=
2.00 x 769.93 x 1.2372
1,905.11
material handling and fence pulling
2 01 22 23 00 0353
DAY 7/8 To 1 CY Hydraulic Excavator With Full -Time Operator
$2,376.78
Quantity Unit Price Factor
Total
Installation=
2.00 x 960.55 x 12372
2,376.78
excavation of the existing piers for the fish house
3 01 71 13 00 0002
EA Equipment Delivery, Pickup, Mobilization And Demobilization Using A Rollback
$292.56
Flatbed Trucklncludes loading, tie -down of equipment, delivery of equipment,
off loading on site, rigging, dismantling, loading for return and transporting
away. For equipment such as trenchers, skid -steer loaders (bobcats), industrial
warehouse forklifts, sweepers, scissor platform lifts, telescoping and
articulating boom man lifts with up to 40' boom lengths, etc.
Quantity Unit Price Factor
Total
Installation 100 x 236.47 x 1.2372
292.56
equipment delivery for the skid steer
4 01 71 13 00 0003
EA Equipment Delivery, Pickup, Mobilization And Demobilization Using A Tractor
$1,088.30
Trailer With Up To 53' Bedlncludes loading, tie -down of equipment, delivery of
equipment, off loading on site, rigging, dismantling, loading for return and
transporting away. For equipment such as bulldozers, motor scrapers,
hydraulic excavators, gradalls, road graders, loader-backhoes, heavy duty
construction loaders, tractors, pavers, rollers, bridge finishers, straight mast
construction forklifts, telescoping boom rough terrain construction forklifts,
telescoping and articulating boom man lifts with >40' boom lengths, etc.
Quantity Unit Price Factor
Total
Installation=
1.00 x 879.65 x 1.2372
1,088.30
excavator mobilization
5 01 74 19 00 0031
CY Traditional Building Construction Materials Landfill Dump Fee
$12,716.50
Quantity Unit Price Factor
Total
Installation 585.00 x 17.57 x 12372 =
12,716.50
landfill dump fees. 1052 SF building footprint x 15' Height = 15780 CF / 27 = 584.44 CY
6 01 74 19 00 0037
CYM Hauling On Paved Roads, First 15 Miles
$9,119.40
Quantity Unit Price Factor
Total
Installation 8,775.00 x 0.84 x 12372 =
9,119.40
hauling of debris from demolition. 585 CY x 15
7 01 74 19 00 0038
CYM Hauling On Paved Roads, Miles Over Initial 15 Miles
$2,062.72
Quantity Unit Price Factor
Total
Installation 2,925.00 x 0.57 x 12372 =
2,062.72
hauling of debris from demolition. 585 CY x 5
8 02 41 16 13 0018
CCF By Machine, Wood Frame Construction Building Demolition
$4,165.63
Quantity Unit Price Factor
Total
Installation 158.00 x 21.31 x 12372 =
4,165.63
demo of the fish house
Contractor's Price Proposal - Detail
Page 1 of 10
10/27/2022
Contractor's Price Proposal - Detail Continues..
Work Order Number:
108272.00
Work Order Title:
Indian River County - Archie Smith Fish House Pavilion / Demo
Alternate
9 02 41 16 13 0018
0004 MOD For Up To 500, Add
$1,164.35
Quantity Unit Price Factor
Total
Installation -
147.28 x 6.39 x 1.2372
1,164.35
10 02 41 16 13 0018
0010 MOD For Volume Of Area Within 15' To An Adjacent Building, Add
$1,281.84
Quantity Unit Price Factor
Total
Installation-
147.38 x 7.03 x 1.2372
1,281.84
11 02 41 16 13 0020
CCF Sorting Of Material Debris For Recycling Prior To Hauling Off
$903.11
Quantity Unit Price Factor
Total
Installation 158.00 x 4.62 x 1,2372 -
903.11
salvaged siding and signage for reuse
12 02 41 16 13 0020
0004 MOD For Up To 500, Add
$27171
Quantity Unit Price Factor
Total
Installation 158.00 x 1.39 x 1.2372
271.71
13 02 41 16 13 0061
CF Concrete Footing For Fence, Gate Or Playground Equipment Post, Etc.
$1,908.06
Demolitionlncludes excavation.
Quantity Unit Price Factor
Total
Installation 189.00 x 8.16 x 1.2372
1,908.06
removal of the existing piers for the fish house
14 02 41 16 13 0061
0080 MOD For >135 To 405, Deduct
-$166.02
Quantity Unit Price Factor
Total
Installation 189.00 x -0.71 x 1.2372 =
-166.02
15 02 41 19 13 0071
EA Saw Cut Minimum ChargeFor projects where the total saw cutting charge is
$771.34
less than the minimum charge, use this task exclusively. This task should not
be used in conjunction with any other tasks in this section.
Quantity Unit Price Factor
Total
Installation 100 x 623.46 x 12372 =
771.34
saw cut existing fence
16 02 41 19 13 0333
EA Core Drill Minimum ChargeFor projects where the total core drilling charge is
$613.53
less than the minimum charge, use task "Minimum Charge For Core Drilling"
exclusively. Task "Minimum Charge For Core Drilling" should not be used in
conjunction with any other tasks in this section. Does not apply to sections
"Drilling In Concrete Per Inch Of Depth" or "Drilling In Brick Or Block Per Inch
Of Depth".
Quantity Unit Price Factor
Total
Installation =
1.00 x 495.90 x 12372
613.53
core drilling for new fence posts
17 02 42 21 47 0005
SF Removal Of Wood Strip Flooring And Salvage
$1,991.76
Quantity Unit Price Factor
Total
Installation 1,563.00 x 1.03 x 12372 =
1,991.76
salvaged siding and signage for reuse
18 02 82 13 00 0002
HR Certified Asbestos Air Sampling Technician For Bulk Sampling Or Air
$1,480.78
Monitoring
Quantity Unit Price Factor
Total
Installation 24.00 x 49.87 x 12372 =
1,480.78
asbestos technician and reporting
19 02 82 13 00 0003
EA 48 Hours Or Longer Turnaround, (Bulk Point Counting) PLM Test, Asbestos
$335.23
Testing
Quantity Unit Price Factor
Total
Installation =
6.00 x 45.16 x 12372
335.23
asbestos sampling
Contractor's Price Proposal - Detail
Page 2 of 10
10/27/2022
Contractor's Price Proposal - Detail Continues..
Work Order Number:
108272.00
Work Order Title:
Indian River County - Archie Smith Fish House Pavilion / Demo
Alternate
20 02 82 13 00 0006
EA 48 Hours Or Longer Turnaround, (Bulk) TEM Test, Asbestos Testing
$1,074.95
Quantity Unit Price Factor
Total
Installation 6.00 x 144.81 x 12372 =
1,074.95
asbestos sampling
21 32 31 13 13 0023
VLF 4" Diameter, Concrete Fill For Post Hole
$139.41
Quantity Unit Price Factor
Total
Installation 18.00 x 6.26 x 1.2372 =
139.41
concrete fill for new posts
22 32 31 13 13 0083
LF 2-1/2" Outside Diameter Galvanized Steel Post, 7' To 10' In Length
$525.12
Quantity Unit Price Factor
Total
Installation 36.00 x 11.79 x 12372 =
525.12
new intermediate and end posts. 4 posts @ 9'
23 32 31 13 13 0083
0134 MOD For Each Top Rail Fitting, Add
$60.13
Quantity Unit Price Factor
Total
Installation 36.00 x 1.35 x 1.2372
60.13
24 32 31 13 13 0083
0150 MOD For Vinyl Coated, Add
$248.97
Quantity Unit Price Factor
Total
Installation 36.00 x 5.59 x 1.2372
248.97
25 32 31 13 13 0090
LF 3" Outside Diameter Galvanized Steel Post, 7' To 10' In Length
$370.79
Quantity Unit Price Factor
Total
Installation 18.00 x 16.65 x 1.2372
370.79
new terminal gate posts. 2 @ 9'
26 32 31 13 13 0090
0137 MOD For Each Top Rail Fitting, Add
$4.58
Quantity Unit Price Factor
Total
Installation 2.00 x 1.85 x 11372 =
4.58
27 32 31 13 13 0090
0150 MOD For Vinyl Coated, Add
$20.66
Quantity Unit Price Factor
Total
Installation 2.00 x 8.35 x 1,2372 =
20.66
28 32 31 13 13 0167
LF 1-5/8" Vinyl Coated Rail, 0.085" Wall Thickness, Tie Wires And Fittings
$354.83
Quantity Unit Price Factor
Total
Installation 40.00 x 717 x 12372 =
354.83
new top rail
29 32 31 13 13 0186
LF 6' Full Height Vinyl Coated Fabric Chain Link #9 Gauge Fused, 2" Mesh
$714,11
Quantity Unit Price Factor
Total
Installation=
40.00 x 14.43 x 1.2372
714.11
new fence fabric
Subtotal for Alternate
$47,796.24
Base Bid
30 01 22 16 00 0002
EA Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible
$5,610.00
costs as directed by Owner. Insert the appropriate quantity to adjust the base
cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees,
list each one separately and add a comment in the "note" block to identify the
Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended
warranty, expedited shipping costs, etc.). A copy of each receipt shall be
submitted with the Price Proposal.
Quantity Unit Price Factor
Total
Installation 5,100.00 x 1.00 x 1.1000
5,610.00
permit fee allowance
Contractor's Price Proposal - Detail
Page 3 of 10
10/27/2022
Contractor's Price Proposal - Detail Continues..
Work Order Number:
108272.00
Work Order Title:
Indian River County - Archie Smith Fish House Pavilion / Demo
Base Bid
31 01 22 16 00 0002
EA Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible
$5,500.00
costs as directed by Owner. Insert the appropriate quantity to adjust the base
cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees,
list each one separately and add a comment in the "note" block to identify the
Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended
warranty, expedited shipping costs, etc.). A copy of each receipt shall be
submitted with the Price Proposal.
Quantity Unit Price Factor
Total
Installation=
5,000.00 x 1.00 x 1.1000
5,500.00
longshoreman's insurance allowance as requested by owner.
32 01 22 16 00 0002
EA Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible
$2,750.00
costs as directed by Owner. Insert the appropriate quantity to adjust the base
cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees,
list each one separately and add a comment in the "note" block to identify the
Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended
warranty, expedited shipping costs, etc.). A copy of each receipt shall be
submitted with the Price Proposal.
Quantity Unit Price Factor
Total
Installation 2,500.00 x 1.00 x 1.1000
2,750.00
builders risk insurance allowance as requested by owner
33 01 22 16 00 0002
EA Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible
$3,960.00
costs as directed by Owner. Insert the appropriate quantity to adjust the base
cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees,
list each one separately and add a comment in the "note" block to identify the
Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended
warranty, expedited shipping costs, etc.). A copy of each receipt shall be
submitted with the Price Proposal.
Quantity Unit Price Factor
Total
Installation 3,600.00 x 1.00 x 1.1000
3,960.00
2% bond fee based upon contract value
34 01 22 20 00 0047
HR Senior Surveyor (Party Chief)
$3,289.96
Quantity Unit Price Factor
Total
Installation 64.00 x 41.55 x 12372 -
3,289.96
topographic survey for the new dock and pavilion
35 01 22 20 00 0048
HR Surveyor (Instrument person)
$2,768.95
Quantity Unit Price Factor
Total
Installation 64.00 x 34.97 x 12372 -
2,768.95
topographic survey for the new dock and pavilion
36 01 22 20 00 0049
HR Surveyor (Rod Person)
$1,975.56
Quantity Unit Price Factor
Total
Installation=
64.00 x 24.95 x 1.2372
1,975.56
topographic survey for the new dock and pavilion
37 01 22 20 00 0055
HR Principal Architect
$2,103.44
Quantity Unit Price Factor
Total
Installation 8.00 x 212.52 x 1.2372 =
2,103.44
stamped and sealed architectural drawings
38 01 22 20 000056
HR Senior Architect
$3,706.06
Quantity Unit Price Factor
Total
Installation 16.00 x 187.22 x 12372 -
3,706.06
design of new dock and pavilion
39 01 22 20 00 0057
HR Architect
$4,244.29
Quantity Unit Price Factor
Total
Installation=
24.00 x 142.94 x 1.2372
4,244.29
design of new dock and pavilion
Contractor's Price Proposal - Detail
Page 4 of 10
10/27/2022
Contractor's Price Proposal - Detail Continues..
Work
Order
Number:
108272.00
Work Order Title:
Indian River County - Archie Smith Fish House Pavilion / Demo
Base Bid
40
01 22
20 000058
HR Principal Engineer
$2,103.44
Quantity Unit Price
Factor
Total
Installation 8.00 x 212.52 x
1,2372 =
2,103.44
stamped and sealed engineered structural drawings
41
01 22
20 00 0059
HR Senior Engineer
$9,615.72
Quantity Unit Price
Factor
Total
Installation 48.00 x 161.92 x
1.2372
9,615.72
engineering for new dock and pavilion
42
01 22
20 00 0059
HR Senior Engineer
$1,602.62
Quantity Unit Price
Factor
Total
Installation 8.00 x 161.92 x
1.2372 =
1,602.62
geotechnical evaluation
43
01 22
20 00 0061
HR Draft Person
$4,544.78
Quantity Unit Price
Factor
Total
Installation 48.00 x 76.53 x
12372 =
4,544.78
drafting of new design drawings for teh dock and pavilion
44
01 22
23 00 0909
DAY 50' Deck Cargo Barge
$1,059.55
Quantity Unit Price
Factor
Total
Installation 1.00 x 856.41 x
1.2372
1,059.55
barge to collect geotechnical sample
45
01 22
23 00 0910
DAY 90' Deck Cargo Barge
$30,083.51
Quantity Unit Price
Factor
Total
Installation 20.00 x 1,215.79 x
12372 =
30,083.51
material cargo barge for the logistics of construction materials to the construction site
46
01 22
23 00 0913
DAY Barge Rental With Mounted Crane And Full-time Operatorincluding barge.
$133,242.11
Quantity Unit Price
Factor
Total
Installation x x
50.00 2,153.93
=
1.2372
133,242.11
constructing the new dock and pavilion from water. platform with equipment for material handling
47
01 45
23 00 0065
EA Standard Penetration With Split Spoon
$51.27
Quantity Unit Price
Factor
Total
Installation 2.00 x 20.72 x
1.2372 =
51.27
geotechnical sampling
48
01 45
23 00 0066
EA Split Spoon (Tripod)
$95.69
Quantity Unit Price
Factor
Total
Installation=
2.00 x 38.67 x
1.2372
95.69
geotechnical sampling
49
01 45
23 00 0188
HR Pile Driving Inspection4 hour minimum.
$2,078.50
Quantity Unit Price
Factor
Total
Installation 48.00 x 35.00 x
1.2372
2,078.50
pile inspection
50
01 45
29 00 0019
EA Soil Bearing Ratio, ASTM D1883
$910.21
Quantity Unit Price
Factor
Total
Installation 2.00 x 367.85 x
1.2372
910.21
geotechnical sampling
51
01 45
29 00 0029
EA Permeability, ASTM D2434, Soil Borings Laboratory Test
$805.89
Quantity Unit Price
Factor
Total
Installation=
2.00 x 325.69 x
1.2372
805.89
geotechnical sampling
Contractor's Price Proposal - Detail Page 5 of 10
10/27/2022
Contractor's Price Proposal - Detail Continues..
Work Order Number:
108272.00
Work Order Title:
Indian River County - Archie Smith Fish House Pavilion / Demo
Base Bid
52 01 45 29 00 0035
EA Classification Of Soil, ASTM D2487, Soil Borings Laboratory Test
$214.90
Quantity Unit Price
Factor
Total
Installation=
2.00 x 86.85 x
1.2372
214.90
geotechnical sampling
53 01 74 19 00 0014
EA 20 CY Dumpster (3 Ton) "Construction Debris" Includes delivery of dumpster,
$3,304.21
rental cost, pick-up cost, hauling, and disposal fee. Non -hazardous material.
Quantity Unit Price
Factor
Total
Installation 4.00 x 667.68 x
1.2372 -
3,304.21
dumpster for construction waste
54 02 32 13 00 0002
EA Mobilization Of Drilling Crew
$822.76
Quantity Unit Price
Factor
Total
Installation 100 x 665.02 x
1.2372
822.76
geotechnical sampling
55 02 32 13 00 0004
LF Standard Auger Hole With Split Spoon Sample At 5' Intervals
$743.43
Quantity Unit Price
Factor
Total
Installation 30.00 x 20.03 x
12372 -
743.43
geotechnical sampling
56 02 41 13 15 0005
SF >6" To 8" Depth, Hydro Demolition, Using 40,000 PSI Water Jet
$11,489.63
Quantity Unit Price
Factor
Total
Installation 710.00 x 13.08 x
1.2372
11,489.63
jet pumping piles
57 05 05 23 00 1185
EA #10 Diameter x 2" Length, 304/18-8 Stainless Steel, Security Screw
$7,514.51
Quantity Unit Price
Factor
Total
Installation 2,292.00 x 2.65 x
1.2372 -
7,514.51
stainless steel screws for composite deck
58 05 05 23 001185
0197 MOD For >100, Deduct
-$879.06
Quantity Unit Price
Factor
Total
Installation 2,292.00 x -0.31 x
1.2372 -
-879.06
59 05 05 23 00 1361
EA 3/4" Diameter, 304 Stainless Steel Hex Nut
$384.62
Quantity Unit Price
Factor
Total
Installation 116.00 x 2,68 x
12372 -
384.62
nuts
60 05 05 23 00 1442
EA 3/4" Inside Diameter, 304/18-8 Stainless Steel Flat Washer
$238.24
Quantity Unit Price
Factor
Total
Installation=
116.00 x 1.66 x
1.2372
238.24
washers
61 06 01 20 91 0002
SF Restoration Of Existing Decorative Woodworklncludes stripping to bare wood,
$2,094.41
filling or patching, stain or paint to match existing.
Quantity Unit Price
Factor
Total
Installation
442.00 x 3.83 x
1.2372
2,094.41
reconfiguration of existing dock and railing
62 06 05 23 00 0007
EA 1-7/16" x 2-1/2" Galvanized Framing Angle Anchor (Simpson A34)
$203.10
Quantity Unit Price
Factor
Total
Installation 48.00 x 3.42 x
12372 -
203.10
angle anchors
63 06 05 23 00 0007
0103 MOD For >10 To 50, Deduct
-$7.72
Quantity Unit Price
Factor
Total
Installation 48.00 x -0.13 x
1.2372
-7.72
Contractor's Price Proposal - Detail
Page 6 of 10
10/27/2022
Contractor's Price Proposal - Detail Continues..
Work Order Number: 108272.00
Work Order Title: Indian River County - Archie Smith Fish House Pavilion / Demo
Base Bid
64
06 05
23
00 0029
EA 18 Gauge Stainless Steel Hurricane Clips (Simpson Strong Tie® H2.5SS)
$617.83
Quantity Unit Price
Factor
Total
Installation 82.00 x 6.09 x
1.2372 =
617.83
hurricane clips
65
06 05
23
00 0036
EA 1-1/2" Wide x 10-3/4" Long, 18 Gauge Rafter Anchor
$161.95
Quantity Unit Price
Factor
Total
Installation=
34.00 x 3.85 x
1.2372
161.95
rafter anchor
66
06 05
23
00 0036
0103
MOD For >10 To 50, Deduct
-$6.73
Quantity Unit Price
Factor
Total
Installation 34.00 x -0.16 x
1.2372
-6.73
67
06 05
23
00 0105
EA 3/4" Diameter x 8" Length, 304/18-8 Stainless Steel, Carriage Bolt
$3,289.42
Quantity Unit Price
Factor
Total
Installation 26.00 x 102.26 x
11372 =
3,289.42
bolts for balustrade
68
06 05
23
00 0105
0103
MOD For >10 To 50, Deduct
-$16.73
Quantity Unit Price
Factor
Total
Installation=
26.00 x -0.52 x
1.2372
-16.73
69
06 05
23
00 0107
EA 3/4" Diameter x 12" Length, 304/18-8 Stainless Steel, Carriage Bolt
$18,494.90
Quantity Unit Price
Factor
Total
Installation=
90.00 x 166.10 x
12372
18,494,90
timber pile fasteners and bracing fasteners
70
06 05
23
00 0107
0104
MOD For >50 To 100, Deduct
-$561.19
Quantity Unit Price
Factor
Total
Installation 90.00 x -5.04 x
1.2372
-561.19
71
06 05
23
00 0212
EA 1-1/4" Wide x 24" Long, 20 Gauge, Strap Tie (Simpson Strong Tie(& LSTA24)
$261.30
Quantity Unit Price
Factor
Total
Installation 66.00 x 3.20 x
12372 =
261.30
straps
72
06 05
23
00 0212
0121
MOD For >50 To 100, Deduct
-$8.98
Quantity Unit Price
Factor
Total
Installation 66.00 x -0.11 x
1.2372
-8.98
73
06 05
73
33 0002
MBF Preservative Treatment For Marine And Fresh Water Lumber
$3,108.34
Quantity Unit Price
Factor
Total
Installation 16.57 x 151.66 x
1.2372
3,108.34
marine grade lumber
74
06 11
16
00 0010
LF 2" x 10" Pressure Treated Wood Rafter
$2,331.48
Quantity Unit Price
Factor
Total
Installation=
624.00 x 3.02 x
1.2372
2,331.48
roof rafters, ridge board and fascia
75
06 11
16
00 0021
LF 2" x 12" Pressure Treated Wood Floor Joist
$4,320.10
Quantity Unit Price
Factor
Total
Installation=
1,024.00 x 3.41 x
12372
4,320.10
beams and joists
76
06 11
16
00 0029
LF 2" x 8" Pressure Treated Wood Purlin
$1,030.93
Quantity Unit Price
Factor
Total
Installation=
384.00 x 217 x
12372
1,030.93
collar ties
Contractor's Price Proposal - Detail
Page 7 of 10
10/27/2022
Contractor's Price Proposal - Detail Continues..
Work Order Number: 108272.00
Work Order Title: Indian River County - Archie Smith Fish House Pavilion / Demo
Base Bid
77 06 11 16 00 0080 LF 2" x 4" Pressure Treated Wood Plate $117.09
Quantity Unit Price Factor Total
Installation 56.00 x 1.69 x 12372 = 117.09
balustrade
78
06 11
16
00 0081
LF 2" x 6" Pressure Treated Wood Plate
$353.15
Quantity Unit Price
Factor
Total
Installation 128.00 x 2.23 x
1.2372 =
353.15
balustrade
79
06 11
16
00 0082
LF 2" x 8" Pressure Treated Wood Plate
$2,438.77
Quantity Unit Price
Factor
Total
Installation=
704.00 x 2.80 x
1.2372
2,438.77
bracing
80
06 11
16
00 0100
LF 4" x 4" Pressure Treated Wood Post
$257,21
Quantity Unit Price
Factor
Total
Installation 70.00 x 2.97 x
1.2372 =
257.21
balustrade
81
06 11
16
00 0131
LF 2" x 4" Pressure Treated Wood Blocking To Wood
$389,72
Quantity Unit Price
Factor
Total
Installation 100.00 x 3.15 x
12372 =
389,72
blocking for deck joists
82
06 16
33
00 0005
SF 5/8" Thick CDX Plywood Roof DeckingApplied to wood rafters.
$1,432.48
Quantity Unit Price
Factor
Total
Installation 706.00 x 1.64 x
12372 =
1,432.48
roof sheathing
83
06 16
33
00 0005 0006
MOD For Exterior CC Grade Plywood, Add
$131.02
Quantity Unit Price
Factor
Total
Installation 706.00 x 0.15 x
1.2372
131.02
84
06 51
13
00 0002
LF 2" x 6", Beam Or Girder, Recycled Plastic Lumber
$16,498.06
Quantity Unit Price
Factor
Total
Installation 1,524.00 x 8.75 x
1.2372 =
16,498.06
composite deck boards. typical length per board: 16'. Top accent piece for balustrade
85
06 51
13
00 0002 0102
MOD For All Other Colors (Except Black, Brown Or White), Add
$5,222.82
Quantity Unit Price
Factor
Total
Installation 1,524.00 x 2.77 x
1.2372 =
5,222.82
86
07 34
00
00 0018
SQ 30 Mil, Fire Rated, High Temperature, Fire Rated, Embossed Surface, Butyl
$3,311.47
Rubber Based Adhesive, High Density Cross Laminated Polyethylene
Reinforcement, Roofing Underlayment, Self -Adhering (Grace Ultra)
Quantity Unit Price
Factor
Total
Installation 7,06 x 379.12 x
1,2372 -
3,311.47
roofing underlayment
87
07 41
13
00 0032
SF Architectural 24 Gauge Galvanized Steel Standing Seam Concealed Fastener
$7,293.42
Roofing
Quantity Unit Price
Factor
Total
Installation 706.00 x 8.35 x
1.2372
7,293.42
metal roof for pavilion
88
07 41
13
00 0032 0008
MOD For 140 MPH Wind Load, Add
$314.45
Quantity Unit Price
Factor
Total
Installation=
706.00 x 0.36 x
12372
314.45
Contractor's Price Proposal - Detail
Page 8 of 10
10/27/2022
Contractor's Price Proposal - Detail Continues..
Work Order
Number:
108272.00
Work Order Title:
Indian River County - Archie Smith Fish House Pavilion / Demo
Base Bid
89 07 41
13 00 0032
0010 MOD For Up To 1,500, Add
$1,825.54
Quantity Unit Price
Factor
Total
Installation 706.00 x 2.09 x
1.2372
1,825.54
90 07 41
13 00 0039
LF Ridge Flashing For Galvanized Steel Standing Seam Concealed Fastener
$560.93
Roofing
Quantity Unit Price
Factor
Total
Installation 2100 x 2159 x
12372 =
560.93
ridge flashing
91 07 41
13 00 0039
0008 MOD For 140 MPH Wind Load, Add
$26.50
Quantity Unit Price
Factor
Total
Installation 2100 x 102 x
12372 =
26.50
92 07 41
13 00 0040
LF Eave Flashing For Galvanized Steel Standing Seam Concealed Fastener
$2,031.68
Roofing
Quantity Unit Price
Factor
Total
Installation=
104.00 x 15.79 x
1.2372
2,031.68
eave flashing
93 07 41
13 00 0040
0008 MOD For 140 MPH Wind Load, Add
$115.80
Quantity Unit Price
Factor
Total
Installation 104.00 x 0.90 x
1.2372 =
115.80
94 07 41
13 00 0042
LF Hip Flashing For Galvanized Steel Standing Seam Concealed Fastener
$2,296.74
Roofing
Quantity Unit Price
Factor
Total
Installation 84.00 x 22.10 x
12372 =
2,296.74
hip flashing
95 07 41
13 00 0042
0008 MOD For 140 MPH Wind Load, Add
$107.04
Quantity Unit Price
Factor
Total
Installation 84.00 x 1.03 x
12372 =
107.04
96 07 62
19 00 0159
LF >5" To 7" Girth, 24 Gauge, Galvanized Steel Drip Edge
$822,49
Quantity Unit Price
Factor
Total
Installation=
120.00 x 5.54 x
12372
822.49
drip edge
97 31 08
13 00 0002
EA Pile Load Test, 50 To 100 Ton Design Load
$37,167.89
Quantity Unit Price
Factor
Total
Installation 1.00 x 30,041.94 x
12372 =
37,167.89
pile load testing
98 31 08
13 00 0002
0095 MOD For Barge Mounted Testing, Add
$14,867.16
Quantity Unit Price
Factor
Total
Installation 1.00 x 12,016.78 x
12372 =
14,867.16
99 31 08
13 00 0002
0096 MOD For Testing In Wet/Soft Soil Condition, Add
$11,150.36
Quantity Unit Price
Factor
Total
Installation 100 x 9,012.58 x
12372 =
11,150.36
100 31 25
14 23 0015
LF 4' High, 18 Oz PVC Coated Polyester, Type 2 DOT Turbidity Curtain
$5,559.98
Quantity Unit Price
Factor
Total
Installation=
200.00 x 22.47 x
1.2372
5,559.98
turbidity curtain
101 31 25
14 23 0033
EA 25 LB, Turbidity Curtain Anchor Systemincludes anchor, anchor chain, and
$5,364.99
marker buoy and rope.
Quantity Unit Price
Factor
Total
Installation 5.00 x 867.28 x
1.2372
5,364.99
turbidity anchor system. anchor every 6'
Contractor's Price Proposal - Detail
Page 9 of 10
10/27/2022
Contractor's Price Proposal - Detail Continues..
Work Order Number: 108272.00
Work Order Title: Indian River County - Archie Smith Fish House Pavilion / Demo
Base Bid
102 31 48 33 00 0002 EA Micro -Pile Mobilization Per Job $1,855.92
Quantity Unit Price Factor Total
Installation 100 x 1,500.10 x 12372 - 1,855.92
pile crew mobilization
103 31 48 33 00 0003
EA Relocate And Set-up Micro -Pile Equipment At New Pile Cap Location
$11,599.68
Quantity Unit Price Factor
Total
Installation 25.00 x 375.03 x 12372 -
11,599.68
relocation of pile equipment for each pile
104 31 62 19 00 0003
LF >30' To 39', 12" Butt x 8" Tip, Friction Or End Bearing, Driven Treated Wood
$33,172.43
Pile
Quantity Unit Price Factor
Total
Installation 975.00 x 27.50 x 12372 -
33,172.43
SYP Timber piles
105 31 62 19 00 0003 0108
MOD For Piles Driven In Water, Add
$12,460.77
Quantity Unit Price Factor
Total
Installation 975.00 x 10.33 x 12372 -
12,460.77
106 32 31 13 13 0184
LF 4' Full Height Vinyl Coated Fabric Chain Link #9 Gauge Fused, 2" Mesh
$618.90
Quantity Unit Price Factor
Total
Installation 52.00 x 9.62 x 12372 -
618.90
fence fabric for balustrade
Subtotal for Base Bid
$460,611.66
Proposal Total
$508,407.90
This total represents the correct total for the proposal. Any discrepancy between line totals,
sub -totals and the proposal total is due to rounding.
Contractor's Price Proposal - Detail Page 10 of 10
10/27/2022
Subcontractor Listing
Date: October 27, 2022
Re: IQC Master Contract #:
Work Order #:
Owner PO #:
Title:
Contractor:
Proposal Value:
FL -R1 O-GC11-111821-JLC
108272.00
Indian River County - Archie Smith Fish House Pavilion / Demo
Johnson-Laux Construction, LLC
$508,407.90
Name of Contractor
Duties
Amcuit
%
No Subcontractors have been
selected for this Work Order
$000
000
Subcontractor Listing Page 1 of 1
10/27/2022
650 GARDEN COb1AiERCE PARKWAY, SUITE 100
TOHN (SON idh LA V Y`11
WINTER GARDEN, 34787
J v U PHONE 407.77 70.2180
CON STRUCTION FAx 407.770.2181
09/01/2022
PROJECT: Indian River County: Archie Smith Fish House Pavilion
SUBJ: Scope of Work
Summary Scope:
This project consists of new decking and a pavilion at the Archie Smith Fish House located at 1740 North Indian River Drive Sebastian, FL
32958.
Detailed Scone of Work:
Provide labor, material, and equipment in accordance with the site walk performed on 7/28/2022 and the reference drawings by Atelier
Architecture, Engineering, Construction Incorporated dated 7/28/2014.
Base Bid:
Design and engineering for new deck, foundation, and pavilion
- New deck and pavilion to go in footprint of where the existing Ice House was located (approximately 21' x 31')
o Light fixtures in the pavilion and light poles on the walkway are excluded
o Painting is not included
- New wood railing to match the existing railing
Alternate:
- Demo of the existing Fish House
Reconfigure and provide new chain link fencing to match existing
- Salvage signage and shiplap for repurpose
o Salvage materials to be turned over to the county after removal
o Contractor not responsible for storage or transporting salvage material
- Asbestos testing of the existing of Fish House. Any abatement to be addressed in a supplemental proposal pending initial test
results
Clarifications:
Work to be performed during normal/regular business hours as defined: Monday through Friday, 7:00am to 3:30pm with holidays
excluded
Price proposal subject to change upon review of the engineered design drawings and details
Owner is responsible for all power, water, HVAC, and wastewater safe -off and disconnection for the existing Fish House
Building permit fee allowance included
Any special or environmental permits/notices such as FDEP, Corps of Engineers, etc. to be done by others
SWPPP management plan and water quality monitoring not included
Dumpster to be provided by GC
Davis -bacon wages / Certified payroll are not included
Liability insurance included
Builder's risk insurance included
Long Shoreman's Insurance included
Bond included
As-Builts are included
No Liquidated Damages
Any unforeseen conditions are excluded
- Johnson-Laux Construction is not responsible for delays to the schedule caused by others
www.johnson-laux.com
C(3C1519701
Archie Smith fish Nouse Pavilion - Preliminary Schedule
Ir•.,r.rams Isa.w aa• .•rasy
NOTE: Add/Alts Including the Demo of Existing House, Reconfiguration of
Chain Link Fence, Sign and Siding Salvage, and Asbestos Testing Not
Considered in This Preliminary Schedule (Reference Proposal and Scoped.
i
Work)
s Receive Purtllase Order from Owner
1 day
a bb setup and Subcontracts to Professional Service Vendors
5 days
aaaa�t
s Procure Design and Engineering Docu mt for Pemmbng
30 days
) s a
a Review of Dmg, D ngs lComments and RevisbrssdNeeded)
lOdays
a�
T RFls to A/E T needd Q tions and! Responses
10 days
xaaaawa
F Provide Design Documents [, Pawl:on S,bwntractor for Revieyv
5 days
1 AaINIet
_
s Suomi[ Documents for Permitting/Issuance of Permit llLC to provide
30 days
....._!
i
Building Permit Only)
e Any Special or Envirorvnental Permits or Notices By Owner (TBD)
_
ss Product Submittals to Owner for Revisor and Acceptance _
Sdeso
.__..! xaaaaaet
..
a Material Procuremem
Sdays
....
u Rrlcahe HotiQ to Proceed (tom Otmer
ss ketag Pedestrian Barricades and Logistics
I day
ra Geotechnical Evaluation and Sal Borings(Fkdd and leb Work)
10 days
^ Isstall Piles for New Structure _
15 days
..
;.
u Nle Inspectron... _ ......
2 days_
........ .. .j ra
rs Construction of Deck, Pavilion, and lfanldrefN
45daysm-
i
as Inspecisom
5days
n Substantial Completron �
lday
Avner Walk/Punch List
Iday
i
ias
v Final Acceptance and Closeout
..... ..`
zs Wip Revise Schedule Rased on Acual Dates and Lead Times after Issuance
!
j of PO
_rs
_...............�
t' Upc,ming Holidays to be Incorporated Into Const—ion Schedule
es jThanksgiving Holiday- No Work
1 day
Thu 11/75/21
Thu 11/25/21 I
n Christmas Holiday No Work
2 days
Fn 12/24/21
Mon 12/27/21
._.....
sa New Year Haiday- No Work
3 tlays
fn 12/31/23
Mon 1/3/22
ar Memorial Day Holiday. No Work
IT
as
ai
M
... ............... ....... ... .. e
O... ....... ....................... .......
A
Iday
....... .......
.....
Mon 5/29/23
.................
.........
Mon 5/29/23 sa
f
..
t
1
!
................. !'
.....�
(
10��
rr rem
•
retrsv�l
•ebtr
r—'—r wrarrrpn ryyrr er�,yrra p�4�
.: aeYaWYaal trwsmM'W SN'w C a W,yeyr
.... aser�w r`" """""'t prraM 'a■Maaaale) u...is•+w r� n:•+e, wraw • s+•..
3
sg2T/A2a
Pgat