HomeMy WebLinkAbout1999-121•` INDIAN RIVER COUNTY, FLORIDA '
CHANGE ORDER NO. 3
PRQJECT NO: 8823
PROJECT 58th Avenue Improvements/ 12th Street to 26th Street
CONTRACTOR: Dickerson Florida, Inc.
P.O, Drawer 719
Stuart, Florida 34995
DATE OF ISSUANCE:
ITEM DESCRIPTION OF CHANGE QUANT
NO.
A. Drainage (See Attached Summary)
1
Storm Sewer
$1,800.001
a. 15" RCP
$2,100.00;
b.
115" RCP Side Drain
0 EA
c. ,18" RCP
1 EA
d. 24" RCP
1 EA
e. 30" RCP
$520.00'
f. 136" RCP
EA
g. 148" RCP
1
h. ;54" RCP
$825.00
i. 14" x 23" RCP
LS
j. 24" CAP
1
k. ;48" CAP
2
'Cross Drains
i
a. 118" RCP
1
b. 24" RCP
$2,200.00,'
C. ,36" RCP
LS
d. 124" CAP
i
e. 36" CAP
3
',Inlets
LS
a. ;P-4(-S37A)
b.'P-5 < 10' (-S70,-S75,-S76,-S86A)
c. P-5 > 10' (+S75,+S76)
d. P-6<10'(+S37A,-S86, - S88, -S103)
e. J -5<10'(+870-678A)
f. 'J-5 > 10' (+S78A)
g. Type "C" DBI<10' (-S95B)
4
Manholes
a. !J-7 < 10' (-S68A,+S91,+S92A)
b. J-7 > 10' (+S68A,-S68D,-S78C,-S91)
c. P-7 < 10' (-S82C)
i
d.: P-7 > 10' (+S78C)
5
Mitered End Sections
a. ',15" MES
b. '48" MES
"6
S-37A,connect 14"x23" to 24" RCP
(conflict 12" WM)
"7
S-75, Add riser (conflict 20" WM)
8
'Relocate 8 modify S -77C
9
Hand digging at substation S -77C east
10
S -77C to Substation Swale: Replace
15" RCP with 10" DIP
11
S-78, modify box
12
S-78, install 4" backflow device
i3
S -78D (S -78H) Modify box
IRC UTILITIES
UNIT -U
P
91 LF
-28' LF
-733 LF
-250 LF
-245 LF
1021 LF
-80 LF
-21 LF
83' LF
40' LF
132 LF
-130 LF
2 LF
95 LF
20: LF
10. LF
NIT PRICE
RICE I INCREASE
$28.001 $252.00
$22.001
$33.00
$32.00
$37.00
$42.00 $4,284.00
$60.001
$75.001
$39,87' $3,309.21
$31.00 $1,240.00
$56.00 $7,392.00
$36.001
$36.00 $72.00
$48.00'
$40.00 $800.00
$50.00 $500.00
-1 EA
$3,100.00'
4 EA
$1,800.001
2 EA
$2,100.00;
-2 EA
$1,700.00,
0 EA
$2,800.00;
1 EA
$3,100.00;
1 EA
$800.00.
1
EA
$2,500.00
-2
EA
$4,000.00
-1
EA
$1,100.00
1
EA
! $1,500.00',
-2.5
EA
$520.00'
-1
EA
$1,400.00'
1
LS
$825.00
1
LS
i
$275.00,
1
LS
$1,510.30
1
LS
$1,204.19,,
1
LS
$2,200.00,'
1
LS
$726.00
1
LS
$495.00:
1
LS
$1,050.50
PRICE
DECREASE
($616.00
($24,189.00)
($8,000.00)
($9,065.00)
i ($4,800.00
($1,575.00)
($4,680.00
j
($4,560.00
i
($3,100.001
($7,200.00)
$4,200.00
($3,400.00
$0.00'
$3,100.00
$800.00
$2,500.00
($8,000.00)
($1,100.00)
$1,500.00
($1,300.00
($1,400.00)
$825.00
I
$275.00'.
$1,510.30
$1,204.19
$2,200.00
$726.00
$495.00
$1,050.50
04/27/99:ChangeOrder 3 1
40
e
INDIAN RIVER COUNTY, FLORIDA
CHANGE ORDER NO 3
PROJECT NO: 8823
PROJECT 58th Avenue Improvements/ 12th Street to 28th Street
CONTRACTOR: Dickerson Florida, Inc.
' IRC UTILITIES
04/27/99:ChangeOrder 3
$695.75 !
$1,337.05
$1,868.50
$4,578.64
$2,258.99
$1,422.70
$1,760.00
$4,900.00
$2,200.00
$5,841.00
$13,573.00
$4,160.00
I
$4,950.00
i
$2,475.001
I
($320.00)
$622.00 i
$6,700.00
$385.00
$237.60
i
$568.34
$565.55'
($940.00)1
I I
($762.50)
($1,244.00)
2
P.O, Drawer 719
Stuart, Florida 34995
DATE OF ISSUANCE:
• 14
S -78G, Modify oox (conflict 20' WM) I
1
LS
1 $695.75 !
15
S -78F and S-80, Modify structure
1 !
LS
$1,337.05
openings to go above 54' RCP
16
'S426, Modify structure for exist inv.
1
LS
$1,856.50
17
S-82 to S -82C, Remove 18" RCP &
1
LS
i $4,578.64
plug opening S-62
18
S-83, Encase ductbank, reinstall 18"
1
LS
$2,258.99
RCP & modify box
19
S-84, connect to 54" RCP
1
LS
$1,422.701
20
Cut top off exist. MH at 288+40
1
LS
$1,760.00'
& install grate (S -WA)
21
S -W, Cut in Type B base, field
1
LS
$4,900.00
!pourtop
22
S-88, Construct curb inlet top on
1
LS
$2,200.00
;existing box & plug aaist. RCP to
south in box
23
S -95B Modification
1
LS
$5,841.001
24
!Bellsouth conflicts, STA 300+00 It. to
1 i
LS
`: $13,573.00
STA 306+75 h.
'25
Add conflict box between S -92A and 1
LS
$4,180.00
S-94, STA 299+90 (conflict
10" WM)
26
Install Type "C" DBI (S -100F) at STA
11
LS
I $4,950.00
271+30.58 (substation)
27
S-105 to S-106: Install 12"DIP & (2)
1
LS
$2,475.001
vertical endwalls
28
Credit SS -33C
-0.64!
CY
$500.00
'29
Decreased production (36' RCP)
1
LS
$622.00
STA 275+20 to STA 278+17
(Conflict 20" WM)
30
Decreased production STA 272 to
i;
LS
$6,700.00!
STA 274 (conflict CVB duct not
located)
31
S -1 00C, Saw cut htad•!;ali to
ii
LS
$385.001
eliminate conflict with 16' `AMI
32
S-104 to S -104A, lower (2) 'Abc :
11
LS
$237.60
optic cables
33
S-101 and S102, grade & pipe sae
1
LS
$568.341
changes
34
S-376, S -37C, S -37D, S-104, S-92
5'
EA
1 $113.11
cut box to finish grade
35
Credit for raised inverts
-470
LF
$2.00
S -98,S -98A & S -100A
i
!
36
Credit for eliminating removal of 15"
-1
LS
$762.50
RCP STA 294+70 to STA 297+40
37
Credit for road closure STA 312+00
-0.5
Day
$2,488.00.
' IRC UTILITIES
04/27/99:ChangeOrder 3
$695.75 !
$1,337.05
$1,868.50
$4,578.64
$2,258.99
$1,422.70
$1,760.00
$4,900.00
$2,200.00
$5,841.00
$13,573.00
$4,160.00
I
$4,950.00
i
$2,475.001
I
($320.00)
$622.00 i
$6,700.00
$385.00
$237.60
i
$568.34
$565.55'
($940.00)1
I I
($762.50)
($1,244.00)
2
40
0
•
INDIAN RIVER COUNTY, FLORIDA
CHANGE ORDER NO. 3
PROJECT NO: 8823
PROJECT 58th Avenue Improvements/ 12th Street to 28th Street
CONTRACTOR: Dickerson Florida, Inc.
$1,320.00
P.O, Drawer 719
$2,820.00!
$2.75 ;
$352.00
b. STA 287+97.16 to STA324+00.50
Stuart, Florida 34995
SY
$3,080.00
($52,189.50)
DATE OF ISSUANCE:
($4,000.00)1
i
LF
($5,852.00),
B. Utilities
'1 jCut in 6" Gate Valves, STA 250+97
2
FFA
$660.00
`
& 260+32
$1 430 00'
-13288
TON
•2
1,20" DIP WM Fittings_
0.564
TON
$5,000.00
'3
-
Remove & Replace EAsWv o-, G.V.
1
LS I
$352.00
ST A 250+99 L i
1,
i •4
'Install (2) 6" G.V. in line while !
1
LS
$154.00;
relocating hydrant
I
'5
,6" G.V. on FM north & south side of
2
EA
$1,540.00
16th Street
!
I
!
I •6
Delete 6 x 6 Tapping Sleeve & Valve
-2
EA I
$2,000.00
north and south side of 16th Street j
'7
;20" DIP WM above ground
-38 j
LF
$154.00
•8
120"
DIP WM below ground
371
LF
$158.00
9
iFira hydrant extension STA 291+
1
LS
$1,163.03
150 LT (conflict with private FM)
10
Hydrant relocation
-1
EA
$900.00
11
1,4' Diameter Doghouse Manhole, FM
1
EA
$1,430.00
Air Release Valve
C. Misc.
I
j
1
Variable Message Sign
561
ED j
$38.00
2
Gravity Retaining Wall
209 i
LF
$126.45
3
I1- torial Shelf Plantings
1
LS
$1,270.56
4
2 Year Littorial Maintenance and
1
LS j
$1,716.00
Monitoring Program
5
Pour by hand & dowel curb STA 277
1201
LF
$5.201,
+ 20 to 278+40 (11.55-6.35=5.201
LF extra)
6
Cut ez;sting concrete pavement
120 i
LF
$2.86.
7
Failing in place density tests
a. Report 1
-41
EA
$15.00'
Report 2
-61
EA !
$15.00
Report 5
-11
EA j
$15.00
:Report 8
-13
EA
$15.001
:Report 9
-6
EA
$15.00 i
Report 10
-4
EA j
$15.00
Report 11
-14'
EA
$15.00'
Report 12
-101
EA
$15.001
8
Inspectors overtime hours (see
1
LS
($3,208.64
attached summary)
9
5' sidewalk, south side SR60, west
98
SY
$14.25
of 58th Avenue
10
Delete geogrid
j
$1,320.00
-25651
$2,820.00!
$2.75 ;
$352.00
b. STA 287+97.16 to STA324+00.50
$154.00
SY
$3,080.00
($52,189.50)
11 Temporary Concrete Barrier
($4,000.00)1
i
LF
($5,852.00),
$5,846.00
12 Relocate Concrete Barrier
$1,163.03!
LF
$4.40'
($900.00)
$1 430 00'
-13288
$2,128.00
$26,428.05
$1,270.56
$1,716.00
$624.00
$343.20
$1,396.50
($60.00)
($90.00)
($165.00
($195.00)
($90.00)
($60.00)
($210.00)
($150.00)
($3,208.64
a. STA 258+90 to 267+00
-25651
SY
$2.75 ;
($7,053.75)
b. STA 287+97.16 to STA324+00.50
-18978'
SY
$2.75'.
($52,189.50)
11 Temporary Concrete Barrier
-1000',
LF
$12.50
($12,500.00)
12 Relocate Concrete Barrier
3048
LF
$4.40'
$13,411.20
13 Credit Off Site Base Material
-13288
TON
0.385
($5,115.88)
thru April
'IRC UTILITIES
04/27/99:ChangeOrder 3
3
0
INDIAN RIVER COUNTY, FLORIDA
CHANGE ORDER NO. 3
PROJECT NO: 8823
PROJECT 58th Avenue Improvements/ 12th Street to 26th Street
CONTRACTOR: Dickerson Florida, Inc.
P.O, Drawer 719
Stuart, Florida 34995
DATE OF ISSUANCE:
14 Additional Clearing at Kingswood 0.311
AC
$2,870.00
$889.70
15 Subsoil Excavation, South of Main 971
CY
$2.30
$2,233.30
Relief Canal
16 Select Fill (30% Shrinkage) South of 1,262 CY
$3.82
$4,820.84
Main Relief Canal
17 Raise Kincsswood Berm Ona Fnnt 1 LS
'3,000.00
$3,000.00 ;
_ TOTAL INCREASE/DECREASE IN CONTRA_CT_PRICE____ _
$173,57a70_($178,091.27)
NET CHANGE IN CONTRACT AMOUNT
($4,512.571
IRC UTILITIES
ORIGINAL CONTRACT PRICE/TIME
CURRENT CONTRACT PRICEITIME
AS ADJUSTED BY PREVIOUS
CHANGE ORDERS
NET CHANGE IN CONTRACT PRICE/TIME
DUE TO THIS CHANGE ORDER
NEW CONTRACT PRICE/TIME INCLUDING
THIS CHANGE ORDER
NEW CONTRACT COMPLETION DATE
ENGIN RI—PY-WgMMENDATION
$5K7.966 93 546 DAYS
"51A57-70 546 DAYS
(M -MITI 65 DAYS
November 30, 1999
I have examined the above changes. They are necessary to satisfactorily complete the Contract. The
price changes are reasonable and I recommend that the changes be made.
ENGINE R D�
I agree that thea hanges in said Contract, in accordance with Specifications for the price
changes shown, a e 'facto
CONT CTOR DATE
ACCEPTED BY INDIA . IVER COUNTY LORIDA
C AIRMAN KENNE H N. MAGHT
----�"f�/-9� ----------------------
DATE
04127/99:ChangeOrder 3
intan River Ca I Approved I Dalp I
Admin.
Audge.l
Dept
Risk Mgr,
1-7(7
4