HomeMy WebLinkAbout1999-121•` INDIAN RIVER COUNTY, FLORIDA ' CHANGE ORDER NO. 3 PRQJECT NO: 8823 PROJECT 58th Avenue Improvements/ 12th Street to 26th Street CONTRACTOR: Dickerson Florida, Inc. P.O, Drawer 719 Stuart, Florida 34995 DATE OF ISSUANCE: ITEM DESCRIPTION OF CHANGE QUANT NO. A. Drainage (See Attached Summary) 1 Storm Sewer $1,800.001 a. 15" RCP $2,100.00; b. 115" RCP Side Drain 0 EA c. ,18" RCP 1 EA d. 24" RCP 1 EA e. 30" RCP $520.00' f. 136" RCP EA g. 148" RCP 1 h. ;54" RCP $825.00 i. 14" x 23" RCP LS j. 24" CAP 1 k. ;48" CAP 2 'Cross Drains i a. 118" RCP 1 b. 24" RCP $2,200.00,' C. ,36" RCP LS d. 124" CAP i e. 36" CAP 3 ',Inlets LS a. ;P-4(-S37A) b.'P-5 < 10' (-S70,-S75,-S76,-S86A) c. P-5 > 10' (+S75,+S76) d. P-6<10'(+S37A,-S86, - S88, -S103) e. J -5<10'(+870-678A) f. 'J-5 > 10' (+S78A) g. Type "C" DBI<10' (-S95B) 4 Manholes a. !J-7 < 10' (-S68A,+S91,+S92A) b. J-7 > 10' (+S68A,-S68D,-S78C,-S91) c. P-7 < 10' (-S82C) i d.: P-7 > 10' (+S78C) 5 Mitered End Sections a. ',15" MES b. '48" MES "6 S-37A,connect 14"x23" to 24" RCP (conflict 12" WM) "7 S-75, Add riser (conflict 20" WM) 8 'Relocate 8 modify S -77C 9 Hand digging at substation S -77C east 10 S -77C to Substation Swale: Replace 15" RCP with 10" DIP 11 S-78, modify box 12 S-78, install 4" backflow device i3 S -78D (S -78H) Modify box IRC UTILITIES UNIT -U P 91 LF -28' LF -733 LF -250 LF -245 LF 1021 LF -80 LF -21 LF 83' LF 40' LF 132 LF -130 LF 2 LF 95 LF 20: LF 10. LF NIT PRICE RICE I INCREASE $28.001 $252.00 $22.001 $33.00 $32.00 $37.00 $42.00 $4,284.00 $60.001 $75.001 $39,87' $3,309.21 $31.00 $1,240.00 $56.00 $7,392.00 $36.001 $36.00 $72.00 $48.00' $40.00 $800.00 $50.00 $500.00 -1 EA $3,100.00' 4 EA $1,800.001 2 EA $2,100.00; -2 EA $1,700.00, 0 EA $2,800.00; 1 EA $3,100.00; 1 EA $800.00. 1 EA $2,500.00 -2 EA $4,000.00 -1 EA $1,100.00 1 EA ! $1,500.00', -2.5 EA $520.00' -1 EA $1,400.00' 1 LS $825.00 1 LS i $275.00, 1 LS $1,510.30 1 LS $1,204.19,, 1 LS $2,200.00,' 1 LS $726.00 1 LS $495.00: 1 LS $1,050.50 PRICE DECREASE ($616.00 ($24,189.00) ($8,000.00) ($9,065.00) i ($4,800.00 ($1,575.00) ($4,680.00 j ($4,560.00 i ($3,100.001 ($7,200.00) $4,200.00 ($3,400.00 $0.00' $3,100.00 $800.00 $2,500.00 ($8,000.00) ($1,100.00) $1,500.00 ($1,300.00 ($1,400.00) $825.00 I $275.00'. $1,510.30 $1,204.19 $2,200.00 $726.00 $495.00 $1,050.50 04/27/99:ChangeOrder 3 1 40 e INDIAN RIVER COUNTY, FLORIDA CHANGE ORDER NO 3 PROJECT NO: 8823 PROJECT 58th Avenue Improvements/ 12th Street to 28th Street CONTRACTOR: Dickerson Florida, Inc. ' IRC UTILITIES 04/27/99:ChangeOrder 3 $695.75 ! $1,337.05 $1,868.50 $4,578.64 $2,258.99 $1,422.70 $1,760.00 $4,900.00 $2,200.00 $5,841.00 $13,573.00 $4,160.00 I $4,950.00 i $2,475.001 I ($320.00) $622.00 i $6,700.00 $385.00 $237.60 i $568.34 $565.55' ($940.00)1 I I ($762.50) ($1,244.00) 2 P.O, Drawer 719 Stuart, Florida 34995 DATE OF ISSUANCE: • 14 S -78G, Modify oox (conflict 20' WM) I 1 LS 1 $695.75 ! 15 S -78F and S-80, Modify structure 1 ! LS $1,337.05 openings to go above 54' RCP 16 'S426, Modify structure for exist inv. 1 LS $1,856.50 17 S-82 to S -82C, Remove 18" RCP & 1 LS i $4,578.64 plug opening S-62 18 S-83, Encase ductbank, reinstall 18" 1 LS $2,258.99 RCP & modify box 19 S-84, connect to 54" RCP 1 LS $1,422.701 20 Cut top off exist. MH at 288+40 1 LS $1,760.00' & install grate (S -WA) 21 S -W, Cut in Type B base, field 1 LS $4,900.00 !pourtop 22 S-88, Construct curb inlet top on 1 LS $2,200.00 ;existing box & plug aaist. RCP to south in box 23 S -95B Modification 1 LS $5,841.001 24 !Bellsouth conflicts, STA 300+00 It. to 1 i LS `: $13,573.00 STA 306+75 h. '25 Add conflict box between S -92A and 1 LS $4,180.00 S-94, STA 299+90 (conflict 10" WM) 26 Install Type "C" DBI (S -100F) at STA 11 LS I $4,950.00 271+30.58 (substation) 27 S-105 to S-106: Install 12"DIP & (2) 1 LS $2,475.001 vertical endwalls 28 Credit SS -33C -0.64! CY $500.00 '29 Decreased production (36' RCP) 1 LS $622.00 STA 275+20 to STA 278+17 (Conflict 20" WM) 30 Decreased production STA 272 to i; LS $6,700.00! STA 274 (conflict CVB duct not located) 31 S -1 00C, Saw cut htad•!;ali to ii LS $385.001 eliminate conflict with 16' `AMI 32 S-104 to S -104A, lower (2) 'Abc : 11 LS $237.60 optic cables 33 S-101 and S102, grade & pipe sae 1 LS $568.341 changes 34 S-376, S -37C, S -37D, S-104, S-92 5' EA 1 $113.11 cut box to finish grade 35 Credit for raised inverts -470 LF $2.00 S -98,S -98A & S -100A i ! 36 Credit for eliminating removal of 15" -1 LS $762.50 RCP STA 294+70 to STA 297+40 37 Credit for road closure STA 312+00 -0.5 Day $2,488.00. ' IRC UTILITIES 04/27/99:ChangeOrder 3 $695.75 ! $1,337.05 $1,868.50 $4,578.64 $2,258.99 $1,422.70 $1,760.00 $4,900.00 $2,200.00 $5,841.00 $13,573.00 $4,160.00 I $4,950.00 i $2,475.001 I ($320.00) $622.00 i $6,700.00 $385.00 $237.60 i $568.34 $565.55' ($940.00)1 I I ($762.50) ($1,244.00) 2 40 0 • INDIAN RIVER COUNTY, FLORIDA CHANGE ORDER NO. 3 PROJECT NO: 8823 PROJECT 58th Avenue Improvements/ 12th Street to 28th Street CONTRACTOR: Dickerson Florida, Inc. $1,320.00 P.O, Drawer 719 $2,820.00! $2.75 ; $352.00 b. STA 287+97.16 to STA324+00.50 Stuart, Florida 34995 SY $3,080.00 ($52,189.50) DATE OF ISSUANCE: ($4,000.00)1 i LF ($5,852.00), B. Utilities '1 jCut in 6" Gate Valves, STA 250+97 2 FFA $660.00 ` & 260+32 $1 430 00' -13288 TON •2 1,20" DIP WM Fittings_ 0.564 TON $5,000.00 '3 - Remove & Replace EAsWv o-, G.V. 1 LS I $352.00 ST A 250+99 L i 1, i •4 'Install (2) 6" G.V. in line while ! 1 LS $154.00; relocating hydrant I '5 ,6" G.V. on FM north & south side of 2 EA $1,540.00 16th Street ! I ! I •6 Delete 6 x 6 Tapping Sleeve & Valve -2 EA I $2,000.00 north and south side of 16th Street j '7 ;20" DIP WM above ground -38 j LF $154.00 •8 120" DIP WM below ground 371 LF $158.00 9 iFira hydrant extension STA 291+ 1 LS $1,163.03 150 LT (conflict with private FM) 10 Hydrant relocation -1 EA $900.00 11 1,4' Diameter Doghouse Manhole, FM 1 EA $1,430.00 Air Release Valve C. Misc. I j 1 Variable Message Sign 561 ED j $38.00 2 Gravity Retaining Wall 209 i LF $126.45 3 I1- torial Shelf Plantings 1 LS $1,270.56 4 2 Year Littorial Maintenance and 1 LS j $1,716.00 Monitoring Program 5 Pour by hand & dowel curb STA 277 1201 LF $5.201, + 20 to 278+40 (11.55-6.35=5.201 LF extra) 6 Cut ez;sting concrete pavement 120 i LF $2.86. 7 Failing in place density tests a. Report 1 -41 EA $15.00' Report 2 -61 EA ! $15.00 Report 5 -11 EA j $15.00 :Report 8 -13 EA $15.001 :Report 9 -6 EA $15.00 i Report 10 -4 EA j $15.00 Report 11 -14' EA $15.00' Report 12 -101 EA $15.001 8 Inspectors overtime hours (see 1 LS ($3,208.64 attached summary) 9 5' sidewalk, south side SR60, west 98 SY $14.25 of 58th Avenue 10 Delete geogrid j $1,320.00 -25651 $2,820.00! $2.75 ; $352.00 b. STA 287+97.16 to STA324+00.50 $154.00 SY $3,080.00 ($52,189.50) 11 Temporary Concrete Barrier ($4,000.00)1 i LF ($5,852.00), $5,846.00 12 Relocate Concrete Barrier $1,163.03! LF $4.40' ($900.00) $1 430 00' -13288 $2,128.00 $26,428.05 $1,270.56 $1,716.00 $624.00 $343.20 $1,396.50 ($60.00) ($90.00) ($165.00 ($195.00) ($90.00) ($60.00) ($210.00) ($150.00) ($3,208.64 a. STA 258+90 to 267+00 -25651 SY $2.75 ; ($7,053.75) b. STA 287+97.16 to STA324+00.50 -18978' SY $2.75'. ($52,189.50) 11 Temporary Concrete Barrier -1000', LF $12.50 ($12,500.00) 12 Relocate Concrete Barrier 3048 LF $4.40' $13,411.20 13 Credit Off Site Base Material -13288 TON 0.385 ($5,115.88) thru April 'IRC UTILITIES 04/27/99:ChangeOrder 3 3 0 INDIAN RIVER COUNTY, FLORIDA CHANGE ORDER NO. 3 PROJECT NO: 8823 PROJECT 58th Avenue Improvements/ 12th Street to 26th Street CONTRACTOR: Dickerson Florida, Inc. P.O, Drawer 719 Stuart, Florida 34995 DATE OF ISSUANCE: 14 Additional Clearing at Kingswood 0.311 AC $2,870.00 $889.70 15 Subsoil Excavation, South of Main 971 CY $2.30 $2,233.30 Relief Canal 16 Select Fill (30% Shrinkage) South of 1,262 CY $3.82 $4,820.84 Main Relief Canal 17 Raise Kincsswood Berm Ona Fnnt 1 LS '3,000.00 $3,000.00 ; _ TOTAL INCREASE/DECREASE IN CONTRA_CT_PRICE____ _ $173,57a70_($178,091.27) NET CHANGE IN CONTRACT AMOUNT ($4,512.571 IRC UTILITIES ORIGINAL CONTRACT PRICE/TIME CURRENT CONTRACT PRICEITIME AS ADJUSTED BY PREVIOUS CHANGE ORDERS NET CHANGE IN CONTRACT PRICE/TIME DUE TO THIS CHANGE ORDER NEW CONTRACT PRICE/TIME INCLUDING THIS CHANGE ORDER NEW CONTRACT COMPLETION DATE ENGIN RI—PY-WgMMENDATION $5K7.966 93 546 DAYS "51A57-70 546 DAYS (M -MITI 65 DAYS November 30, 1999 I have examined the above changes. They are necessary to satisfactorily complete the Contract. The price changes are reasonable and I recommend that the changes be made. ENGINE R D� I agree that thea hanges in said Contract, in accordance with Specifications for the price changes shown, a e 'facto CONT CTOR DATE ACCEPTED BY INDIA . IVER COUNTY LORIDA C AIRMAN KENNE H N. MAGHT ----�"f�/-9� ---------------------- DATE 04127/99:ChangeOrder 3 intan River Ca I Approved I Dalp I Admin. Audge.l Dept Risk Mgr, 1-7(7 4