HomeMy WebLinkAbout2023-143FIRST AMENDMENT TO WEST WABASSO SEPTIC
TO SEWER PHASE 3B AGREEMENT
THIS FIRST AMENDMENT TO WEST WABASSO SEPTIC TO SEWER PHASE 3B
AGREEMENT ("First Amendment") is entered into as of the AP4' day of July, 2023 by and between Indian
River County, a political subdivision of the State of Florida, hereinafter referred to as the "OWNER", and
Centerline, Inc., hereinafter referred to as "CONTRACTOR".
RECITALS
WHEREAS, on September 13, 2022, OWNER and CONTRACTOR entered into the West
Wabasso Septic to Sewer Phase 3B Agreement "Agreement" for constructing a new gravity sanitary sewer
system to serve the West Wabasso areas generally along 58th Court and 591h Avenue south of CR 510; and
WHEREAS, OWNER and CONTRACTOR, due to time restraints under existing grants, desire to
amend the Agreement to include construction of a new gravity sanitary sewer system to serve the West
Wabasso areas generally along 61" Drive, north of CR 510 under the same price schedule, excluding
mobilization, demobilization and MOT, and the same timeline as set forth in the Agreement.
NOW THEREFORE, in consideration of the mutual undertakings herein and other good and
valuable consideration, the receipt and adequacy of which is hereby acknowledged, the parties agree, as
follows:
1. Recitals. The above recitals are true and correct and are incorporated herein.
2. Article 1 WORK amended. Article 1 WORK of the Agreement is hereby amended to add the
following: Construction of a new gravity sanitary sewer system to serve the West Wabasso areas
generally along 61' Drive, north of CR 510. The project will include approximately 150 LF of
roadway extension, 1,134 LF of gravity sewer main, 1,260 LF of sanitary force main, five
manholes; a lift station and related valves, fittings, laterals, services, and restoration of trenches
and roadway. Owner has assigned West Wabasso Phase 3A — Project ID (PID) 21.21.512A.
3. CONTRACT TIMES. The Work described in Section 2 above, will be performed under the same
Contract Times terms as set forth in the Agreement, but based on a substantial completion date 390
days after the original substantial completion date (May 16, 2024) and 360 days after original final
completion date (June 15, 2024).
4. CONTRACT PRICE. The Contract Price for the work described in Section above will be in the
amount of $1,368,176.77.
5. All other provisions of the Agreement shall remain in full force and effect and those terms will
apply to the work described in Section 2 above.
IN WITNESS WHEREOF, OWNER and CONTRACTOR have executed this First Amendment
this rday of July, 2023.
Page 1 of 2
OWNER:
By:
JOseifi. EarmcW. Chairman
B
Y•
John A. Titkanich, Jr., County Administrator
APPROVED AS TO FORM AND LEGAL SUFFICIENCY:
By:
Dylan Reingold, County Attorney
Ryan L. Butler, Clerk of Court and Comptroller
Attest:
Clerk of CourUnd Comptroller
(SEAL)
Designated Representative:
Name: Robert Tobar
Title: Utilities Design Engineer
Contact Info: (772) 226-1801
rtobar@ircgov.com
Page 2 of 2
t li ilil..
CONTRACTOR:
CENTERLINE, Inc.
e
By: Randy Strin
(CORPORATE SEAL)
,
Attest: Spencer Weiner C
Address for giving notices:
2180 SW Poma Drive
Palm City, FL 34990
License No. CGCO11107
(Where applicable)
Agent for service of process: Young Foster
Designated Representative:
Name: Randy Stringer
Title: Vice President
Address: 2180 SW Poma Drive
Palm Citv. FL 34990
Phone: 561-689-3917
Facsimile: 561-689-0017
(If CONTRACTOR is a corporation or a partnership, attach evidence of
authority to sign.)