Loading...
HomeMy WebLinkAbout2023-201A TRUE COPY CERTIFICATION ON LAST PAGE RYAN L. SUTLER, CLERK Prepared by and return to: City Attorney P.O. Box 1389 Vero Beach; FL 32961-1389 TEMPORARY CONSTRUCTION EASEMENT (WATER LINE) #2023-EG-281(TCE) THIS INDENTURE made and entered into this ) a 07day of 2023, "Effective Date's by and between INDIAN RIVER COUNTY, a politial subdivision of the State of Florida: (hereinafter "GRANTOR" or "COUNTY'), whose mailing address is 1801 271h Street, Vero Reach, Florida 32960, and the CITY OF VERO BEACH, FLORIDA, a Municipal corporation (hereinafter "GRANTEE" or "CITY"), whose mailing address is P.O. Box 1389; Vero Beach, Florida 32961-1389.. GRANTOR and GRANTEE may also be referred to herein individually as a. "party" or collectively as the "parties." WHEREAS, GRANTOR is the fee simple owner of certain lands situated in Indian. River County, Florida, and more specifically described in Exhibit "A" attached hereto and made a part hereof, which is located at GIFFORD DOCK PARK; and, WHEREAS, GRANTOR HAS AGREED TO GRANT AND CONVEY TO GRANTEE, a temporary non-exclusive access easement over, on, under, upon, and across the entire property for the specific limited purposes set forth herein, NOW, THEREFORE, in consideration of the mutual covenants, promises, terms and conditions set forth herein, together with other good and. valuable consideration provided to GRANTOR, the adequacy and, receipt of which are hereby acknowledged, GRANTOR hereby voluntarily grants, creates, conveys, and establishes a temporary easement for and in favor of GRANTEE upon the Property described in Exhibit "A," which shall run with the Iand and be binding on the GRANTOR, and shall remain in full force and effect for the duration provided below. The scope, nature, and character of this Temporary Construction Easement shall -be: 1. For the construction of an underground pipeline containing. water for service to John's Island; including site work, preparation, maintenance; repair; access, and testing. 2. GRANTEE shall restore the Property to the condition that existed prior to any work being conducted and permitted hereunder, normal wear and tear excepted. 3. GRANTEE shall, at its own cost and expense, obtain all necessary permits and authorizations required by local, state, or federal authorities prior to the start of construction work at the Premises. 4. GRANTEE shall hold the GRANTOR harmless on and indemnify against any claims, causes of action, demands, or suits arising. out of its use of this temporary construction easement for the construction of the pipeline at or on the. Premises, for any and all negligent acts caused by Page 1 of 3 N\Departments\Water & Scwer\BASEMENTS\202311RC- Gifford Dock\2023.8.14 - Teinporary Construction. Easement 112023-E0•281(TCE),docx A TRUE COPY CERTIFICATION ON LAST PAGE RYAN L. BUTLER, CLERK its employees, agents, and contractors,. for any and all damages, attorney's fees and court costs incurred by any third party. By execution of this agreement, neither Party waives its sovereign immunity protections as provided under section 768.28, Fla. Stat. 5. GRANTEE shall maintain its current level of liability insurance during the- term of this easement for use and benefit of the Parties. fi. GRANTOR warrants that it has full authority to grant this temporary construction easement. 7. The Easement hereby created and granted includes the creation of all incidental rights reasonably necessary for the use and enjoyment. of .the easement area and Premises for its intended purposes, including, specifically, the right of entry for purposes of construction, installation, operation, maintenance and repair of the pipeline being installed hereunder. 8. Use of the easement Premises and entry upon the Premises will at all times conform to and comply with the terms of this easement and all applicable governmental regulations now in existence or hereafter created, 9. The easement hereby granted and conveyed to,, over, under, upon, across; and through the Premises shall be for the reasonable time necessary for the completion of the project, but not to exceed ninety (90) days from the date of commencement of construction activities at the Property. GRANTEE shall give GRANTOR written notice of completion of the construction of the project. 10. The easement shall be governed by and, construed in accordance with the laws of the State offlofida. IN WITNESS WHEREOF, the GRANTOR has duly authorized and caused this Indenture to be executed in its name as of the day and year first herein written. ATTEST: By: ,(yam 4LW� Deputy Cleric (Official Seal) Approved as to form and legal suqlciency: 014 Bill DeBraa , County Attorney GRANTOR: INDIAN RIVER, CO.VNTY, By its Board of County�Comm IM Joe .G�ti1MI..... >it�rie R C"N' . °+ BOCC approved: knfb�L�103 I Page 2 of 3 NADepartmentsMater & Sewcr\EASEMENTS\2023VFtC- Gifrord Dock\ 023.S.I4 .Temporary Construction Easement #2023-E0-28t(TCE).dacx A TRUE COPY CERTIFICATION ON LAST PAGE RYAN L. BUTLER, CLERK ACCEPTANCE OF CONVEYANCE The foregoing conveyance is hereby accepted by the City of Aero Beach, Florida, as evidenced by the signature- of the undersigned, who is authorized to accept this conveyance. ATTEST: Tammy K. ick City Clerk {:SFAs.) CITY OF VERO BEACH, FLORIDA By: --,A j l<-- At. Monte K. Falls, P.E, City Manager Date: !!Ll? 3. ADMINISTRATIVE REVIEW (For Internal Use Only—Sec. 2-77 COVB. Code) Approved as to form and. legal sufficiency I or CO onl/y: John Sl. Turner City Attorney Approved.q to technical req a ents: Robert J. 9afton, P.E. Director, Water & Sewer Approved as to technical requirements: 44--ZgE -- - Matthew T. Mitts, P.ff Director, Public Works Page 3 of 3 N:\Departments\Water & SewdT\EAS EMENTM202311RC- Gifford Dock -\2023,8.14 - Temporary Consiniction Easement #1023-EG-2$1CME).docx TRUE COPY CERTIFICATION ON LAST PA RY." h L. SUTLER, CLE y • .QOFtP��'( Qds P�0 a O / I G5, PoppZ� • Cyt($ / \ — � AFF �O�' 41 p\F- c. , DATE DRAWN BY: CITY OF VERO BEACH //�� 2/23/23 AW WATER AND SEWER DEPARTMENT EXHIBIT -fes APPR_ DWG. NO. ENGINEERING DIVISION REV. X 1 #2023— EG— 281 — TCE X PAGE -OF 3r.'AWMAJ W.) V w�yJ _ � J m f I C. PP.T. WUDD IRUIIbC3 04 0,, Ty, 13 LU I yo TRUSS U J. Q • '/ + 1 .n Rp R! I Y ' C,VV�i*. I LCAN 1' �� • SM 5i ?37 TDR [R 3CNlDUIL RR 3N[ET L/PM 7 ` ,(? / + PO13dSDllE C'dNECTADN OITA� Cg1NECTgNDETAt ...•M1/ PER 3CR8tRAl .•CONC.TMIE\DrNCN[3 I ! P.R. 3 A WI A RFLAR FA WAY` NAR TYP ��E{�N f � � \O ODDEPn1 !. vi ClMIIA.RTYI• ; � I PERIOFDUl6i'\ ! i :. CaIVMN I I ' RCEM T Mn6rJKDIRC 7D j eeNULTE3w \� �EA�j I ` { WAFFVF.R _ �-/�� PEII PL.♦Y r� „ � REWI I 1 T�L•t'WYfALLTOP OF SLAB ""t" !♦ rtnruteuTco r. 41, y, - _.. AIII1�'II j i coN[.n IKIO'NeD \ HCDW[l3\. MONDImrC Y U3rpn D: NC RAN """D u RbCJIFD.fDRRFMn POP 3r.NC rz3 CONCRLTF FOOTFR ` _, L --a lAl c _VtLMRwiv] %b• G EDLIR FOUNDAT NOCTA10I. ✓- nIRUCttU1W --_ - PER FDUMATON PCTAt; _ _ R[YDNp LEL 31!8731 v.3; Ct • -N 1 � , 1 I BENCH ' i b 6 b rr�TM, . ADI[ '� {I� I A ♦ i I f UNCII , C -1 i i 3=PPORT3 T I r- 0OR PLAN APPROVED REVISION DWG ND. – CITY OF VERO BEACH X UFFORD DOCK PARK GIFFORD DOCK PARK 1 WATER AND SEWER DRAWN BY AW 45TH STREET PK:NK: SHELTER EXHIBIT DEPARTMENT DAT[ _ -- --- —_- — "AlvLit, c�o Indian River County Florida 4 " t z Efi F�0WO Master File ID: 23-0802 Version: 1 Subject: File Number: 23-0802 Type: Department Staff Report Project Number: Title: Stormwater Pipeline Easement Request, Gifford Dock Park Internal Notes: Gifford Dock Park Stormwater Pipeline Easement Request Sponsors: Attachments: Staff Report, Temporary Construction Easement, Draft Permanent Easement, COVB Stormwater Pipeline Route, Shelter Exhibit Bid Number: Entered by: rscpyrka@ircgov.com History of Legislative File Indian River County Administration Complex 1801 27th Street, Building A Vero Beach, Florida, 32960-3388 www.indianriver.gov Status: Agenda Ready in Control: Public Works File Created: 08/30/2023 Final Action: 09/12/2023 Enactment Date: Enactment Number: Hearing Date: Effective Date: Ver- Acting Body: Date: Action: Sent To: Due Date: Return Result: sion: Date: 1 Board of County 09/12/2023 Approved Pass Commissioners Action Text: A motion was made by Commissioner Moss, seconded by Chairman Earman, to approve staffs recommendation. The motion carried by the following vote: Aye: 5 Chairman Earman, Vice Chairman Adams, Commissioner Flescher, Commissioner Loar, and Commissioner Moss Indian River County Florida Page 1 Printed on 9/29/2023