Project:
Winter 2024 County -wide Onshore/Offshore Beach Profile Monitoring
Surveys
WORK ORDER NO. 5 (Hydrographic Surveying)
FOR
PROFESSIONAL SERVICES AGREEMENT
ANNUAL SURVEYING and MAPPING/GIS SERVICES
WITH
MORGAN AND EKLUND, INC
In accordance with Contract No. 2022064
This Work Order No. 4 is in accordance with the existing AGREEMENT dated October 4, 2022
between Morgan and Eklund, Inc., (SURVEYOR) and Indian River County (COUNTY); This Work
Order No. 5 amends the agreement as follows:
SECTION I — PROJECT LIMITS
This Work Order No. 5 is for the SURVEYOR to perform all related field and office Surveying and
Mapping services in connection with the Winter 2024 County -wide Onshore/Offshore Beach
Profile Monitoring Surveys; Florida Department of Environmental Protection Reference
Monuments R-20 — R-119.
SECTION II - SCOPE OF SERVICES
As agreed upon between SURVEYOR and COUNTY, the SURVEYOR shall provide Professional
Land Surveying services to complete all tasks as outlined in this Work Order No. 5; specifically
detailed in the attached proposal Exhibit A.
SECTION III — TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT
1. Project shall be completed as follows:
a. 100% "Paper' review submittal (final review prior to request for final deliverables) shall
be made within 90 calendar days of receipt of Notice to Proceed for review by County
Staff prior to preparing the final submittal package.
b. Time of FINAL project completion shall be within 10 calendar days of receipt of the
County's review comments from the 100% "Paper Submittal".
2. Deliverables -The SURVEYOR shall provide the COUNTY:
DocuSign Envelope ID: F2575A73-DBBO-4426-A266-4EB47D844205
Winter 2024 Beach Profile Surveying
BCC Agenda October 31, 2023
Page 2 of 3
a. 100% Phase Submittal for COUNTY review and comment. All submittals shall
include one (1) paper "hardcopy" along with AutoCad Files and an ASCII file for all
survey points. COUNTY shall strive to provide review comments within 10 calendar
days of the preliminary submittal.
b. FINAL Deliverables, one (1) paper "hardcopy" signed and sealed sets. Sheeted and
model space (as applicable) AutoCad drawing file in release 2009 through Civil 3D
2013, PDF formats and an ASCII file for all survey points, all electronic files to be on
CD.
c. Survey set/sheets shall include a cover sheet with location sketch, survey
certifications, related title and project number, survey notes, legend and
abbreviations and plan view sheets.
Work Product and digital versions are to be prepared and submitted so that the
COUNTY or other consultants can readily use it for the design and analysis of the
area, as defined. It shall contain all information necessary for third -party surveyor to
independently recreate and/or utilize the survey work. It is acknowledged all final
products become property of Indian River COUNTY and will be available for use by
the public at large.
e. The SURVEYOR'S work product shall meet or exceed the minimum standards as
defined by Sections II, III and IV or the COUNTY will not approve the SURVEYOR'S
request for payment.
SECTION IV — COMPENSATION
The COUNTY agrees to pay, and the SURVEYOR agrees to accept, for the above described
services rendered as identified in Sections I, II, III and IV of this Work Order No. 5, for a total lump
sum fee of $62,978.50.
All and/or any additional services not described hereon shall be pre -approved by the
COUNTY. Approved additional services shall be invoiced at the rates disclosed in the
approved fee schedule with the SURVEYOR for the contract year(s) of October 4, 2022
through October 3, 2024.
All invoicing shall include Work Order No. 5 (WO 5), Contract Number (2022064). Payments shall
be in accordance with the original Professional Surveying and Mapping Services Agreement,
Contract No: 2022064 with the COUNTY and as stated in Section II, III and IV hereon.
The AGREEMENT is hereby amended as specifically set forth herein. All remaining sections of
the AGREEMENT shall remain in full force and effect, and are incorporated herein.
DocuSign Envelope ID: F2575A73-DBBO-4426-A266-4EB47D844205
Winter 2024 Beach Profile Surveying
BCC Agenda October 31, 2023
Page 3 of 3
IN WITNESS WHEREOF the parties hereto have executed these presents this 31st day
of October 2023.
OWNER
BOARD OF COUNTY COMMISSIONERS
INDIAN RIVER COUNTY, FLORIDA .........
(Sig -M)
Joseph Earman
Chairman
• ,SLR � E ... -.. • •':� �'
Approved by BCC October 31, 2.023
ATTEST:
Ryan L. Butler
Clerk
of Court and Comptroller
.n
(Se+l) Deouty Clerk
Appr ved:
ohn A. titkanich, Jr.
COUNTY Administrator
Approved as to Form and Legal Sufficiency:
V"- , Z92�u
William K. DeBraal
COUNTY Attorney
Morgan and Eklund, Inc.
FV
ousi9nw by:
ooAwl W. ('bov') psk
( ignature)
David W. Coggin, Vice President
(Printed name and title)
Witnessed by:
FD-uS19".dby:
t,Lbit, (,ar(,�sla,
( )gna ure)
r 990%
M&E
Morgan 6. Eklund, Inc.
4909 US Highway 1
Vero Beach, Florida 32967
October 4, 2023
(Rev. October 9, 2023)
Indian River County
Public Works Coastal Division
Attn: Eric Charest, Natural Resources Manager
1801 27th Street
Vero Beach, FL 32960
Phone: 772-3BB-5664
Fax: 772-388-31 65
RE: 2024 Winter Semi -Annual Indian River County Coastal Monitoring Survey;
Onshore/Offshore Profiles along FDEP Range Lines R-15 to R-119
Dear Eric:
Morgan & Eklund, Inc. (M&E) is pleased to provide you with the following proposal to furnish
professional land and hydrographic survey services for the above referenced project.
Beach profiles will include R-15 through R-119, a total of 105 beach profile lines. All data
collected will be in accordance with the FDEP-approved Physical Monitoring Plan. M&E will
provide the County with beach profile data in ASCII file format together with AutoCAD
drawings signed by the surveyor. We will also provide FDEP submittal package. The survey will
be performed in January/February 2024 with drawings and reports completed by the end of
March 2024.
In accordance with the scope of work as provided, our prices will be as follows:
I. Sector 3 (R-15 to R-60, 46 Onshore/Offshore Profile Lines)
Chief Surveyor
4 hours @ $171/hr........................................ $ 684.00
Senior Project Manager
9 hours @ $132/hr........................................$ 1,188.00
Assistant Project Manager
1.5 hours @$85/hr....................................... $ 127.50
Hydrographic Lead Surveyor
16 hours @ $107/hr...................................... $ 1,712.00
Survey Technician (Boat)
16 hours @$82/hr........................................$
1,312.00
Three Man Survey Crew
76 hours @ $180/hr...................................... $
13,680.00
26' Parker Survey Boat
2 days @ $600/day.......................................
$
1,200.00
Trimble MPS500 Inert System
2 days @ $500/day....................................... $
1,000.00
Single Beam Digital Fathometer
2 days @ $100/day.......................................$
200.00
Hypack Navigation Software & Computer
2 days @ $120/day.......................................
$
240.00
Trimble RTK
8 days @ $450/day.......................................
$
3,600.00
Beach UTV
8 days @ $100/day.......................................
$
800.00
Senior Survey Computer Technician
18 hours @ $103/hr.......................................
1,854.00
Total.........................................................5
27,597.50
H. Sector 4 (R-61 to R-64, 4 Onshore/Offshore Profile
Lines)
Chief Surveyor
1 hour @ $171 /hr .........................................
$
171.00
Senior Project Manager
1 hour @ $132/hr.........................................
$
132.00
Assistant Project Manager
.5 hour @$85/hr..........................................
$
42.50
Hydrographic Lead Surveyor
2 hours @ $107/hr........................................
$
214.00
Survey Technician (Boat)
2 hours @ $82/hr.........................................
$
164.00
Three Man Survey Crew
5 hours @ $180/hr........................................
$
900.00
26' Parker Survey Boat
.25 day @ $600/day.....................................
$
150.00
Indian River County 10/9/2023
Trimble MPS500 Inert System
.25 day @ $500/day2 "
..................................... $ _x 1 .00
Single Beam Digital Fathometer
.25 day @ $100/day..................................... $ 25.00
Hypack Navigation Software & Computer
.25 day @ $120/day..................................... $ 30.00
Trimble RTK
.5 day @ $450/day....................................... $ 225.00
Beach UTV
.5 day @ $100/day....................................... $ 50.00
Senior Survey Computer Technician
2 hours @ $103/hr........................................ $ 206.00
Total II ........................................................ S 2,434.50
III. Sector 5 (R-65 to R-91, 27 Onshore/Offshore Lines)
Chief Surveyor
2 hours @ $171/hr........................................$ 342.00
Senior Project Manager
6 hours @ $132/hr........................................ $ 792.00
Assistant Project Manager
1 hour @$85/hr...........................................
Hydrographic Lead Surveyor
9 hours @ $107/hr........................................ $
Survey Technician (Boat)
9 hours @ $82/hr......................................... $
Three Man Survey Crew
45 hours @ $180/hr...................................... $
26' Parker Survey Boat
1.25 days @ $600/day...................................
Trimble WS500 Inert System
1.25 days @ $500/day.................................. $
Single Beam Digital Fathometer
1.25 days @ $100/day.................................. $
85.00
963.00
738.00
750.00
625.00
125.00
Indian River County 3 10/9/2023
Hypack Navigation Software & Computer
1.25 days @ $120/day..................................$
150.00
Trimble RTK
4.5 days @ $450/day....................................
$ 2,025.00
Beach UTV
4.5 days @ $100/day....................................
$ 450.00
Senior Survey Computer Technician
12 hours @ $103/hr......................................$
1,236.00
TotalIII ......................................................
$ 16,381.00
IV. Countywide (R-92 to R-119, 28 Onshore/Offshore Lines)
Chief Surveyor
2 hours @ $171/hr........................................
$ 342.00
Senior Project Manager
6 hours @ $132/hr........................................
$ 792.00
Assistant Project Manager
1 hour @$85/hr...........................................
$ 85.00
Hydrographic Lead Surveyor
9.5 hours @ $107/hr.....................................$
1,016.50
Survey Technician (Boat)
9.5 hours @$82/hr.......................................
$ 779.00
Three Man Survey Crew
45.5 hours @ $180/hr...................................
$ 8,190.00
26' Parker Survey Boat
1.25 days @ $600/day..................................
$ 750.00
Trimble MPS500 Inert System
1.25 days @ $500/day...................................
625.00
Single Beam Digital Fathometer
1.25 days @ $100/day...................................
125.00
Hypack Navigation Software & Computer
1.25 days @ $120/day..................................$
150.00
Trimble RTK
4.5 days @ $450/day....................................
$ 2,025.00
Indian River County 4 101912023
Beach UTV
4.5 days @ $100/day.................................... $ 450.00
Senior Survey Computer Technician
12 hours @ $103/hr...................................... $ 1.236.00
TotalIV ...................................................... $ 16,565.50
TOTAL FIXED PRICE FEE I-IV .................. $ 62,978.50
As always. Morgan & Eklund, Inc. is looking forward to working with you and Indian River
County on this project.
Sincerely,
Digitally signed by DANE W. Coggin
DN: —David W. Coggin,
David W. Co in organ and Sound lnc au,
99 emalladcagglnamorganaklund—
aU5
Dal.: 1151 M -01100'
David W. Coggin, PSM
Vice President
DWC:dmc
Billing: project will be invoiced monthly based on percentage completed