HomeMy WebLinkAbout2023-266WORK ORDER 6
This Work Order Number 6 is entered into as of this 12 day of December ,2023 ,
pursuant to that certain Continuing Contract Agreement, dated May 2, 2023 (referred to as the
"Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida
("COUNTY") and Kimley-Horn ("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The
professional services will be performed by the Consultant for the mutually agreed upon lump sum or
maximum amount not -to -exceed professional fee. Any additional costs must be approved in writing,
and at a rate not to exceed the prices set forth in Exhibit B (Rate Schedule) of the Agreement, made a
part hereof by this reference. The Consultant will perform the professional services within the
timeframe more particularly set forth in Exhibit A (Time Schedule), attached to this Work Order and
made a part hereof by this reference all in accordance with the terms and provisions set forth in the
Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall
conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be
incorporated in each individual Work Order as if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first
written above.
CONSULTANT:
By:
Print Name:
Title: j%L ti �urdr�
BOARD OF COUNTY COMMI
OF IINDtAM-RIVER COUNTY/
Susan Adams, Chairman
BCC Approval Date: December 12, 2023
Attest: Ryan L. Butler, Clerk of Court and Comptroller
By:
Deput Clerk
By:
ohn A. Yitkanich, Jr., County Administrator
d as`I;o fot m and legal sufficiency:
K. Keit'hr4tzdgj5q Assistant County Attorney
EXHIBIT #A
PROJECT ID 13.23.538
Indian River County Department of Utility Services
Gifford Elevated Water Tank Modification and Rehabilitation
PROJECT UNDERSTANDING
Indian River County Department of Utility Services (IRCDUS) owns and operates the
Gifford Elevated Water Tank located at 4690 28' Ct, Vero Beach, FL 32967.
The following information is currently provided on the existing tank structure:
• Beindorf and Associates / Sverdrup & Parcel and Associates mechanical drawings
dated 10/10/1977 .
• Kimley-Horn condition assessment report, Job #KHRAL- 173 3 8, dated 06/10/2022
• Kimley-Horn structural mapping report, Job #KHRAL-17339, dated 07/25/2022
• Kimley-Horn "As -Is" structural analysis report, Job #KHRAL- 173 4 1, dated 06/30/2022
IRCDUS is looking to evaluate the water tank structure in order to verify if it is
sufficient to support the proposed loading by multiple telecommunication carriers
(Verizon, T -Mobile, and Metro PCS). Refer to "Scope of Services" section for a
detailed list of services proposed.
SCOPE OF SERVICES
TASK 1— Structural Analysis Report
Kimley-Horn will perform a structural analysis of the water tank structure in general
accordance with Florida Building Code 7`h Edition (2020) and American Water Works
Association (AWWA) D100-21. The purpose of the structural analysis is to determine
the adequacy of the structure to support existing and proposed loading by multiple
telecommunication carriers (Verizon, T -Mobile, and Metro PCS).
Kimley-Horn will identify which components of the structure, if any, will require
reinforcements or modifications in order to support the proposed loading in
conformance with applicable codes.
The analysis report will only evaluate the primary latticed structural elements such as
the columns, sway rods, and horizontals. Evaluation of the tank shell, catwalk, and
carrier mounts will not be included.
KAWPB_Civil\General\King\Marketing\IRCDUS\Gifford Water Tank\2023.11.27 - Gifford Water Tank Modification - Scope
(MRD Edits).doc
Task 2 — Structural Analysis Report with Modifications
Based on the overstressed structural components identified per the analysis report per
Task 1, Kimley-Horn will perform a supplemental structural analysis of the water tank
structure in general accordance with Florida Building Code 7U' Edition (2020) and
American Water Works Association (AWWA) D100-21. The purpose of the structural
analysis is to determine the adequacy of the structure to support existing and proposed
loading by multiple telecommunication carriers (Verizon, T -Mobile, and Metro PCS),
includins7 proposed structural modifications required to meet referenced code
requirements.
The analysis report will only evaluate the primary latticed structural elements such as
the columns, sway rods, and horizontals. Evaluation of the tank shell, catwalk, and
carrier mounts will not be included.
Task 3 — Modification Design Drawings
Kimley-Horn will produce a structural modification drawing package detailing the
reinforcements and modifications required to bring the elevated water tank structure
into compliance with the Florida Building Code 7h Edition (2020) and American Water
Works Association (AWWA) D100-21.
In addition to modifications required to address overstressed structural components, the
drawings will also detail reinforcements required to address critically deficient
structural components identified in the Kimley-Horn condition assessment report dated
06/10/2022.
The modification drawings will only address modifications required for the primary
latticed structural elements such as the columns, sway rods, and horizontals. Evaluation
of the tank shell, catwalk, and carrier mounts will not be included.
Task 4 — Bidding Assistance
Consultant will attend one prebid meeting with the Owner.
Consultant will coordinate with IRCDUS staff and IRC purchasing department to assist
with project advertisement. Consultant will respond to up to two (2) addenda.
Consultant will review bids from Contractors and prepare a letter for IRCDUS that
identifies the lowest, most responsible, most responsive bidder.
Task 5 — Construction Phase Assistance
Consultant will attend pre -work meeting with Contractor. Consultant will prepare
meeting minutes and distribute to project team.
K:\WPB_Civil\General\King\Marketing\IRCDUS\Gifford Water Tank\2023.11.27 - Gifford Water Tank Modification - Scope
(MRD Edits).doc
Consultant will review Contractor furnished shop drawings. This scope assumes that up
to six (6) shop drawing submittals will be required as part of the proposed work.
Consultant will review Contractor Applications for Payment. Consultant will make
recommendations to Owner with respect to payment based on Consultant's observations
and overall progress of the work. Consultant assumes four (4) payment application
reviews will be required.
Consultant will provide on-site construction observation services during the
construction phase. Consultant will periodically visit the site during the expected 12 -
week construction duration in order to observe the progress of the Work (up to 4 total
site visits). Such visits and observations by Consultant are not intended to be
exhaustive or to; extend to every aspect of Contractor's work in progress. Observations
are to be limited to spot checking, selective measurement, and similar methods of
general observation of the work based on Consultant's exercise of professional
judgment. Based on information obtained during such visits and such observations,
Consultant will evaluate whether Contractor's work is generally proceeding in
accordance with the Contract Documents, and Consultant will keep IRCDUS informed
of the general progress of the Work.
The purpose of our site visits will be to enable us to better carry out the duties and
responsibilities specifically assigned in this Agreement to Consultant, and to provide the
IRCDUS a greater degree of confidence that the completed work will conform in
general to the Contract Documents. Consultant shall not, during such visits or as a
result of such observations of Contractor's work in progress, supervise, direct, or have
control over Contractor's work, nor shall we have authority over or responsibility for the
means, methods, techniques, equipment choice and usage, sequences, schedules, or
procedures of construction selected by Contractor, for safety precautions and programs
incident to Contractor's work, nor for any failure of Contractor to comply with laws and
regulations applicable to Contractor's furnishing and performing the Work.
Accordingly, Consultant neither guarantees the performance of any Contractor nor
assumes responsibility for any Contractor's failure to furnish and perform its work in
accordance with the Contract Documents.
Once the Contractor considers the work to be substantially complete, Consultant will
attend one (1) punch list walk through with the Contractor and Owner. Consultant will
furnish "punch list" that identifies the remaining work to complete the project.
Upon completion of punch list, Consultant will perform a final site visit. Consultant
will review Contractor furnished closeout documentation and if applicable, make
recommendation for final payment and project closeout.
K:\WPB_Civil\Genera]\King\Marketing\IRCDUS\Gifford Water Tank\2023.11.27 - Gifford Water Tank Modification - Scope
(MRD Edits).doc
SCHEDULE
Consultant will complete these tasks in a timely manner and mutually agreed upon
schedule. The following schedule for each task is estimated below. Actual schedule may
vary based on coordination with the client.
Task 1:
2 weeks following NTP
Task 2:
2 — 3 weeks following Task 1
Task 3:
2 — 3 weeks (in conjunction with Task 2)
Task 4:
1-2 Months
Task 5:
4 Months
Total:
6 - 8 Months
FEESCHEDULE
We will provide these services in accordance with the Continuing Contract Agreement
for Consulting Engineering Services #2023015 dated May 2nd, 2023, by and between
INDIAN RIVER COUNTY, a political subdivision of the State of Florida
("COUNTY") and Kimley-Horn and Associates, Inc., ("Consultant").
The Consultant will provide professional services for a lump sum fee as follows:
Task 1: Structural Analysis Report
$ 8,703
Task 2: Structural Analysis Report w/ Modifications
$ 6,569
Task 3: Modification Design Drawings
$ 12,803
Task 4: Bidding Assistance
$ 6,977
Task 5: Construction Phase Assistance
$30,344
Total Tasks 1-5:
$ 65,396
ADDITIONAL SERVICES
The following services can be provided as additional services under separate future task
order:
• Carrier Mount Analysis Reports
• Corral Design Drawings
• Geotechnical Investigations
• Foundation Investigations
INFORMATION PROVIDED BY OWNER
• Record drawings
• Existing telecommunication equipment information
• Site access information
K:\WPB_Civi]\GeneraMing\Marketing\IRCDUS\Gifford Water Tank\2023.11.27 - Gifford Water Tank Modification - Scope
(MRD Edits).doc
ESTLMATE FOR £\GIIEERLNG SERCTCTS
DEStRIPrIC` :
adJF,TdIZY
PF2C
DtMT LAROR
SLN REG
PROF PROF
`hLi?wHCLRS}
rES CLK E%.'P w
F2 Fl SGB SLE
DiE:p
4.5°e
UNE
TOTAL
1O TASK
1 Structural Anahsis Report
StrxtxatA.tltsisEnELn-Oma
??
S4
__15
S7. L,5
S.L.rrrt
3:55
SL305
2 Structural -nal sis Re rt w lioditficatims
ht diti ts� 1 BimEmiR ri*=
15
5
32
Sx363
hlc�i^ik� RatSu?�asg-
4
=44
SL0C4
3 Modifimfion Desi= DravriLgs
hL�dufsts LLsi m I- simi3.
,
L
,
1<
a3333
SL''3
rr. i^$ QCR_tiie..
2
:,23
�
4 Biddir Awdstance
Prf_ yao cam lbid reviswf?:f2-��!L�cb�^
2
4
4
-s4i
`4UrA
Pr -'*t4 V---
2
{
5
5115
J2 575
F rx b Sidds: m--stixsIsm--- Addenda
2
4
4
LR4
SLB04
QA
2
�,23
*353
a Constructing Phase Assistance
Pr- ,cca', meeti7E
5
5
592
*2 102
S eaaUta�riaER=pier (Act
2
5
10
S159
S 3, 1519
P<k axe A4
4
s
511:
52332
Site VN `A
20
25
233
$52
514,832
P L-& t af;
5
5
w2
52,102
Pa�chIist2
2
591
3�J1
Fiat Bin tiiEit & Proj--t Cksamt
2
1 2
R
3
51-10
5 5-0
QA QC
2
S25
.5h5
TOT -AL HOU FS
5
112
103
5550 so
52
Q. S-5
Std 396
LkRCR /-5HOUR)
270
240
IRi
130 100 2.5