Loading...
HomeMy WebLinkAbout1999-29040 • INDIAN RIVER COUNTY, FLORIDA CHANGE ORDER NO. 2 PROJECT NO: 9332 DATE OF ISSUANCE: PROJECT: CR 510 and US 1 Intersection Improvements CONTRACTOR: Ranger Construction Industries, Inc. P.O. Box 145979 Ft. Pierce, Florida 34979 ITEM NO. DESCRIPTION OF CHANGE QUAN UNIT UNIT PRICE PRICE PRICE I INCREASE DECREASE 1 Remove Traffic Head Assembly 3 2 EA EA ($21.00) ($535.00 ($63.00j ($1,070.00j 2 Remove Signal Poles 3 Excavation 50 CY $9.90 $495.001 $86.251 4 Flowabl® Fill 25 CY $3.45 5 Valve Box Adjustment 2 EA I ($432.10 ($864.20; 6 Fire Hydrant Relocation 1 EA ($1,490.00 ($1,490.00; 7 Turno ut Construction 69 SY $25.95 $1,790.55 8 1" Type "S" Asphalt 537 SY I $2.50 $1,342.50 9 1" FC -2 (C.O. #1, Item 5) 537 SY ($2.65 ($1,423.05 10 18" RCP 64 LF $128.40 $8,217.601 11 24" RCP 3 LF $117.25 $351.75, 12 14" x 23" ERCP 4 LF $119.75 $479.00 I 13 Type "F" Curb 138 LF ($7.00 ($966.00 14 4" Sidewalk 33 SY ($17.45 1 ($575.85 15 Grounding Electrode 150 LF ($3.60) ($540.00 ($377.00 1 6 Conduit Underground HeadAuxiallary 130 1 LF EA ($2.901 ($1,510.00 I ($1,510.00 17 Signal 1 EA ($185.00 ($185.0( 18 Remove Cable and Conduit 1 19 Grading Crew Delays due to Utility Conflicts 7.5 DAYS $1,500.00 $11,250.00 20 Pipe Crew Delays due to Conflicts 24.5 HRS $210.00 $5,145.00 21 Extra Rock due to Conflicts 690 TONS $7.25 $5,002.501 1 22 Modify Structures S-4 and 8-1 1 LS $275.00 $275.00 23 Reflective Pavement Markers 39 EA $5.30 $206.70 24 Directional Arrows, Thermo 1 EA $55.00 $55.00 25 Guidelines 46 LF $0.80 $36.80 26 6" Skip Thermo, White 294 LF $0.80 $235.20 27 6" Solid Thermo, White 991 LF ($0.75'($743.2 28 8" Solid Thermo, White 18, LF $1.05 $18.90; 29 12" Solid Thermo, White 46 LF I ($1.95 I ($89.7 30 18" Solid Thermo, White 67 LF($2.45 ($164.1 31 24" Solid Thermo. White 47 LF $3.70 $173.90 32 6" Solid Thermo, Yellow 1427 LF ($0.80 33 8" Solid Thermo, Yellow 12 LF ($1.20 ($14.4 34 18" Solid Thermo, Yellow 182 LF ($2.70 ($491.4 35 6' Solid Paint, White 756 LF $0.24 II $181.44 36 6" Solid Paint, Double Yellow 756 LF $0.50 $378.00 G INDIAN RIVER COUNTY, FLORIDA CHANGE ORDER NO. 2 PROJECT NO: 9332 DATE OF ISSUANCE: PROJECT: CR 510 and US 1 Intersection Improvements CONTRACTOR: Ranger Construction Industries, Inc. P.O. Box 145979 Ft. Pierce, Florida 34979 ITEM NO, DESCRIPTION OF CHANGE QUAN UNIT UNIT PRICE PRICE PRICE I 37 18" Solid Paint, White 3671 LF 1 $1.49 $546.83 38 18" Solid Paint, Yellow 1351 LF $1.54 $207.90 39 Sodding, Bahia__ 249 SY — $2.15 y-- $535,35L-1- '— n^ ORIGINAL CONTRACT PRICE $461,066.$.5 CURRENT CONTRACT PRICE $4-04,1-0-0,90 AS ADJUSTED BY PREVIOUS CHANGE ORDERS NET CHANGE IN CONTRACT PRICE $ 25,302 5 THIS DUE TO THIS CHANGE ORDER NEW CONTRACT PRICE INCLUDING $509,471.47 THIS CHANGE ORDER 12Q.IQayl 1.2Q .Q.oya LQ_P-I5ys 130 Days FtG.�IaFE� SCQMMEN�2BT19�1 I have examined the above changes. They are necessary to satisfactorily complete the Contract. Thep cA ch nges a able and I recommend that th cha es be made. ENGINE mw -DAT 1J �. CS2NI8gGI0RS APPRQ-VAL I agree that the abo h g s t'd Contract, in accord/,-:'�60 with Specifications for the price changes shown, e CONTR OR DA ACC-EEIE0 5 INDIAN WER C ON LORIDA H IftMANL nnet R Machu DATE U 10-%5V-00 H:06AM FR064- I!a Lj I^II ItIV "A %-%j Ulal !, ri utusiA APPLICATION FOR PAYMENT NO— .WI- PROJECT NO:_ --q332 AccOLM NO T-910 P.02/05 F-773 IPROJECT:,'CR SI0 & l Lii76RSGT.i�-N IM ROU MENS._, TS_.. IC ONTRACTORNAMFJADDRESS: -RANGER CONSTRUCTION INDUSTRIES INC. 145 GL ES CUT OFF ROAD PLICATION DATE: -1 L1QJAc FOR PERIOD ENDING–jQ/_8.1/.Qg_____ _____ STATEMENT OF WORT: Original Contract Price $ '461,066.65 Materials Stored ' S -Q Net Change Orders $ 7404.82 (Attach detailed schedule and paid invoices) Current Contract Price e __ Total Word/Materials to Date $ 509,471.47 Fork to Date; Less 10% Retainage S 0 Under Original Contract Under Change Order 5 4f21.4S3 82 Sub Total Less Prior Payments S_509,47 1, 47 S_399 , acj` '� 1c1, 2 1 'ercent of Work Completed to Date—'/- ate%BALANCE BALANCEDUE THIS PAYMENT S_ 109_:704.20_ {��. . C tom. rap . ctors_ e E19Ati n The undersigned CONTRACTOR hereby certifies that all items and amounts on the face of this application for payment are correct; that all work has bun performed and/or materials supplied in Rill accordance with the terms and conditions of the contract. The undersigned CONTRACTOR hereby swears under penalty of perjury that (1) all previous progress payments received from the OWNER on account of work perfonned under the contract referred to above have been applied by the undersigned to discharge in ftlll all obligations of the undersigned incurred in connection with work covered by prior Applications for Payment under said contract, being Applications for Payment numbered I through __ inclusive; and (2) all materials and equipment incorporated in said project or other% ise listed in or covered by this Application for Payment are free and clear of all liens, claims, security interests and encumbrances. Dated NOVEMBER 10 1999 WGER CONSTRUCTION INDUSTRIES, INC. (Contractor) e/T le) VICE PRESIDENT COUMY OF INDIAN RIVER STATE OF FLORIDA Before nne thisl TH day of NOVEMBER _`__, 19 99 , personally nppexed WGV l G. CORREA _ , known to me, y,ho beinS duly swom, deposes and saps that (s)he is theVlt C pf(p$�pEtIT of the CONTRACTOR above mentions: that ON executed the above Application for Payment and statement on behalf of said CONTRACTOR; and that alt i`II ements contained herein are tntc, correct and complete. Board g9,County'Qgmntission Nota ublic Approved for Payment My Commission Expil to At EA Maio a area ', MY Cantu &P. IVM2001 I No IC No. cc 705GT0 t1 -v- rtl fiat0 � nl7asm�li Wawn I IUMw tr). FOR PRYI MNT AP - 1 Ketxtijtt M I —ch T Chairman