HomeMy WebLinkAbout1999-292•
Indian River County
Task 01 - Roseland Area Stormwater Improvements
WORK ORDER NO. S TO THE PROFESSIONAL
CIVIL SERVICES MASTER AGREEMENT
BETWEEN CARTER ASSOCIATES, INC.,
DATED AUGUST 4,1998 AND
INDIAN RIVER COUNTY, FLORIDA
Pursuant to the Professional Services Agreement dated August 4, 1998, by and between Indian River
B County, a political subdivision of the State of Florida, hereinafter referred to as the COUNTY, and CARTER
ASSOCIATES, INC., VERO BEACH, FLORIDA, hereinafter referred to as the ENGINEER, this Work Order
•
No. 5 is an extension of and hereby becomes a part of the MASTER AGREEMENT as follows:
SECTION 1- PROJECT LIMITS AND DESCRIPTION
The Roseland Area Stormwater Improvement Project will provide flood control and stormwater quality
treatment for a portion of Roseland lying primarily east of the FEC Railroad including tributary areas west of
the Railroad. The limits of the work are the east Roseland Watershed north of the City of Sebastian, east of the
Gibson Street, south of the St. Sebastian River, and west of US 1, including connecting tributaries.
SECTION II - COUNTY OBLIGATIONS
The COUNTY agrees to provide the ENGINEER with the following material, data or services as
required in connection with the work to be performed under this Agreement:
A. Currently available drainage studies, survey drawings, plans, calculations and other data
pertinent to the project.
B. Title information and title opinion relating to land necessary for the project.
C. Landowner authorizations to inspect the site(s) with jurisdictional agencies to determine existing
environmental conditions.
D. Landowner negotiations to acquire easements and/or right-of-way necessary for the project.
E. Property appraisal information for areas of potential acquisition.
F. Soils testing as required, under the direction of the ENGINEER.
SECTION III - SCOPE OF SERVICES
A. The ENGINEER will perform all necessary environmental investigation, engineering design,
surveying, drainage design, permitting, and incidental work for the drainage and related
improvements to the east Roseland Area Stormwater Improvement project. Detailed Plans and
Specifications shall be prepared so that the construction can be properly bid. The ENGINEER
will prepare complete permit applications to St. Johns River Water Management District
(SJRWMD), Florida Department of Environmental Protection (FDEP), US Army Corps of
Engineers (USACOE), and Environmental Protection Agency (EPA), for the COUNTY
signature.
B. After issuance of a work order and written authorization to proceed, the ENGINEER shall
consult with the COUNTY to clarify and define the COUNTY'S requirements and objective for
the project, and review all available data.
C. The ENGINEER will strive to complete his work on the PROJECT within the time allowed by
maintaining an adequate staff of registered engineers, biologists, draftsmen, and other
employees on the work at all times.
D. The ENGINEER shall report the status of this project to the Director of Public Works
Department upon request and hold all drawings, calculations and revised work open to the
inspection of the Director or his authorized agent at any time, upon reasonable request.
J:\CYN\ENGPROJ\IRCStormwtrMgmthnprove\IRC-WORK ORDER NO S-ROSELAND-Fnal.doc Page I of 4
Q E, Ii�MM----'D WORK
TASK 02- PROJECT DEFINIVON
The ENGINEER will provide it wetland boundary survey on three (a) parcels of land
which are currently under review for potential acquisition by the COUNTY. The stormwater
improvements associated with the project will be designed to minimize impacts to the existing
wetland system. This wetland information is required to complete the development of it
conceptual drainage design as authorized under the previously issued Work Order No. 2.
The ENGINEER and/or Environmental Consultant will meet with all regulatory agencies
having permit jurisdiction on the project, to determine the wetland boundaries. During this task,
a meeting will be held with COUNTY staff and the landowners of the subject parcels to review
and examine the existing wetland boundaries and select the desired design so that the
INGINEF,R may proceed with Work Order No. 2 tasks.
Engineering Services
A. Prepare Base Sheet
e Assimilate wetland survey information into the project's base sheet.
B. Preliminary Environmental Repots
• Written letter report and aerial map with jurisdictional wetltwd boundaries.
• Meet on-site with agencies, flag and survey wetland lines in the vicinity of the
proposed project which ruay be directly impacted by the proposed swale, lake
or pipe improvements.
C, Conceptual Design
• Prepare a conceptual design plan with the conveyance system and wetland
impacts depicted.
D. Review Meetings
• Indian River County Conceptual Design (3) meetings.
• St. Johns River Water Management District. (1)
• US Arany Corps of Engineers (1)
• Local representatives (1)
E. Reimbursables
• Mileage, mail printing, telephone.
SECTION IV - TIME FOR COMPLETION
A. After issuance of written authorization to proceed, ninety (90) working days will be allowed for
delivery of the plans, specifications and permit applications for COUNTY review and submittal.
SECTION V 4 COMPENSATION
l:1CYN %NGI RO1�iR("Sturnnvnh4gintlmtxov�ltn(: Wf)IZK
The COUNTY agrees to pay, and the ENGINEER agrees to accept fee for services rendered according
to the Scope of Services, Task 2, identified as Section III of this
work order with a maximum charge under this
I'I _t ' o
work order of $1,7-,290,00. This fee is itemized as follows:
LA Base Sheet
$ 2,910.00
I.B. Preliminary Environmental Report
$11,230,00
LC. Concept Design
$ 910.40
I.D. Review Meetings
$ 2,440.(X)
I R Reimbursables (not to exc+red)
300.(9
Tonal
$17,750.44
ORDER NO 5.110SMAND-11 tat.dix }1xp 2 of,t
SECTION VI - ADDITIONAL WORK
In the event changes are requested by the COUNTY or extra work
is imposed to the COUNTY by the
demands of certain regulatory agencies after the approval by the COUNTY
of this AGRE)IMENT, and upon the
issuance of a subsequent work order by the Director of Public Works
Department, said extra work may
commence in accordance with the following fee schedule:
ENGINEER L. .......... ...............................
$ 1 15.00/hr
ENGINEER 11 ...........................................................
$ 85.001fir
ENGINEER 111, .... .................. --- ........... — ...............
$ 60.00/lit.
ENGINEER TECHNICIAN ..........................................
$ 50.00/hr
SURVEYOR I (Principal)., ............... ............. -- ........
$ 115,00/1r
SURVEYOR 11 (Registered). ... ..... -- ..........................
$ 65.00/hr
SURVEYOR III . . ........................................ ..............
$ 55,00/hr
SURVEY CREW (3 -MAN) .... .............. ....... ... ---,
$ 90.00/hr
CADTFCHNICIAN... .... ... — .......... ..................... ....
$ 50D0/1117
DRAFTING. ................................................. ...........
$ 45.00/hr
SECRETARY/WORD PROCESSOR. ...... .................
$ 30.00/hr
RESIDENT PROJECT REP ...................... ..........
$ 35.M/hr
GRAPHICS ASSISTANT ................. ............ ..........
$ 25.00/hr
RECORDING AND PERMIT FEES ................................
Cost + 10%
MATERIALS ... ........ ...... ..................
Cost + 10%
TRAVEL ................. ....... .................. .......
$ 0.29/Mile or Cost
SUB -CONSULTANTS ................ .................... ..........
Cost + 10%
REIMBURSABLE EXPENSES:
Postage, Long Distance Calls
Federal express, mail, etc ....................................
Cost+ 10%
Blueprints ............. ................. ......... ........
$ 0.20/sf
Mylars..........................................................
$ 1.75/sf
Xerox. . ......................... .... -- ............ ..........
$ .15
SECTION VII - PARTIAL PAYMENTS
The COUNTY shall make monthly partial payments to the ENGINEER for all authorized work
pertaining directly to this project performed during the previous calendar month. Invoices will he submitted on
forms furnished for that purpose by the ENGINEER to the COUNTY monthly for services performed and
expenses incurred pursuant to this Agreement during the prior month.
The ENGINEER shall submit duly certified invoices in duplicate to the Director of the Public Works
Department. The amount of the invoices submitted shall be the prorated amount due for all work perfornied to
date under this phase, determined by applying the percentage of the work completed as certified by the
ENGINEER to the total due for this phaso of the work.
The amount of the partial payment due for the work performed to (late under these phases shatl be an
amount calculated in accordance with the percentage of work complete, less ten percent (10%) of the amount
thus determined which shall be withheld by the COUNTY, as retainage, and less previous payments.
The ten Percent (10%) retainage withheld with respect to the Task 2 phase shall be paid in full to the
ENGINEER upon award of a Design Phase Work Order, but in no case shall the amount be retained longer than
six (6) months after the ditto of final acceptance of the Task 2 phase by the Director of Public Works.
Fees are payable monthly base(] upon a percent complete of the lump sum elements. Billings will be
payable within 25 (lays. The contract is broken into deliverable units. No payment shall be made unless the
Public Works Director has received and approved work products require(] under the Scope of Services.
):%('YNIlF,'NGIIROJ\IRCStotillwtrNigiii(litil,t(,voU1,C.WORK ORDER NO 5-HOSELANDA'maklm
Lo.:
SECTION VIII - RELATIONSHIP TO MASTER AGREFMEN'r AND LAWS OF FLORIDA
All conditions set forth in the MASTER AGREEMENT shall control unless otherwise specified in this
WORK ORDER.
This WORK ORDER, regardless of where executed, shall be governed by and construed according to
the laws of the State of Florida.
IN WITNESS WHEREOF the parties hereto have executed these presents this 16th day of
November _ 1999.
CARTER ASSOCIATES, INC.
1708 21St STREET
VERO BEACH, FLORIDA 32960
BY:
Dean eth ent
Attest:
INDIAN RIVER COUNTY, FLORIDA
BOARD OF COUNTY COMMISSIONERS
INMRA
BC%prdved Novembe6, 1999
Public Works