AN AGREEMENT (DEVELOPER'S AGREEMENT)
BETWEEN
INDIAN RIVER COUNTY, FLORIDA
AND
JOHN LLOYD
FOR
WQ.QDM1IERE TRADE CENTER
FOR THE CONSTRUCTION OF OFF-SITE UTILITIES
THIS AGREEMENT made this 7th day of December, 1999 by and between INDIAN RIVER
COUNTY, a political subdivision of the State of Florida, the address of which is 1840 25th Street, Vero
Beach, Florida 32960 (hereinafter the COUNTY) and John Lloyd, the address of which is 9432 U.S.
Highway 41, Sebastian, Florida 32958 (hereinafter the DEVELOPER).
WITNESSETH.
WHEREAS, the DEVELOPER, in conjunction with the construction improvements at
f Woodmerc__�r?4 & n r is providing water and wastewater facilities to Serve the Subject property, and
WHEREAS, the COUNTY, has required the DEVELOPER to provide the utility improvements
to serve the regional area and has agreed to reimburse the DEVELOPER for the cost of providing these
off-site utilities,
NOW, THEREFORE:, for and in consideration of the premises and other good and valuable
considerable, the COUNTY and DEVELOPER agree to the special conditions (SC) as follows:
UTIL, TIES;
The DEVELOPER shall construct the necessary off-site utilities described herein, per the Indian
River County Utilities Department. The COUNTY shall reimburse the DEVELOPER for over -sizing of
the off-site utilities as outlined below:
A. 6 -inch Diameter-anitan� Forcc Main along High Street from 2'. Street to Woodmen Road and
along Woodmen: Road from High Street to Old Dixie High
The DEVELOPER shall furnish and install a 6 -inch PVC force main along the West Side of
High Street from CR -512 to 2"' Street to Woodmere Road and along the south side of Woodmere
Road from High Street to Old Dixie Highway. Make connection to a proposed 6 -inch force main
to be located on the west side of High Street and 2' Street, as per the Smith Warehouse
Developer' Agreement. The new force main shall extend south along High Street from 2" Street
to the intersection of Woodmere Road and travel eastward along Woodmere to the west right-of--
way line of Old Dixie Highway for a total of 983 +/- lineal feet.
The Developer is relying upon the construction of a sewer force main along High Street to be
installed by others (Smith Warehouse Development, Randy Mosby as Engineer -of -Record).
Devekpa1 Apeanaa
Wood—Trde Cotler
CSteven D4yk FlksTrolw- Woodmen Tnde CenwAlrearc-Devek,"n Apreanad, Wood.— Tnde Carta Nov 1999 doc
D
•
•
Smith Warehouse is currently under design and construction may not run concurrently with
Woodmere Trade Center. Therefore it is agreed that the DEVELOPER install a 6 -inch sewer
force main if the 6 -inch force main is not installed along High Street under the Smith Warehouse
Developers Agreement or its sequel. If the force main proposed by the Smith Warehouse
Developer's Agreement is not constructed, the DEVELOPER shall furnish and install a 6 -inch
PVC force main along the west side of High Street from CR -512 to 2' Street. The
DEVELOPER shall make connection to an existing 8 -inch force main located on CR -512. The
proposed force main shall extend along Higi Street to the intersection of 2" Street for a total of
300 +/- lineal feet.
The Developer shall pay line extension fees in the amount of $15.77 per foot of property frontage
of the proposed wastewater line. The DEVELOPER'S fee for this portion is tabulated below:
Woodmere Rd, F%mage Total Frontage Cost per Front Footage (5/ft.) Developer Cost
L— —210 _ 210 _ - —515.77 i 53,311.70
$B K -inch Diameter Water Main along ►Hgh Street from CR-512to 2" Street:
The DEVELOPER shall furnish and install a 8 -inch PVC water main along the east Side of High
Street from CR -512 to 2`1 Street to Woodmere Road and along the north side of Woodmere Road
from High Street to Old Dixie Highway. Make connection to a proposed 8 -inch water main to be
located on the east side of High Street and 2' Street, as per the Smith Warehouse Developer'
Agreement. The new water main shall extend south along High Street from 2' Street to the
intersection of Woodmere Road and travel eastward along Woodmcre to the west right-of-way
line of Old Dixie Highway for a total of 947 +/- lineal feet
The Developer is relying upon the construction of a water main along High Street to be installed
by others (Smith Warehouse Development, Randy Mosby as Engineer -of -Record). Smith
Warehouse is currently under design and construction may not run concurrently with Woodmere
Trade Center. Therefore it is agreed that the DEVELOPER install an 8 -inch water main if the 6 -
inch force main is not installed along High Street under the Smith Warehouse Developer's
Agreement or its sequel. If the water main proposed by the Smith Warehouse Developer's
Agreement is not constructed, the DEVELOPER shall furnish and install a 6 -inch PVC water
main along the east side of High Street from CR -512 to 2"' Street. The DEVELOPER shall
make connection to an existing 16 -inch water main located on CR -512. The proposed water
main shall extend along High Street to the intersection of 2"' Street for a total of 300 +/- lineal
feet.
The Developer shall pay line extension fees in the amount of $11.25 per foot of property frontage
of the proposed water line. The DEVELOPER'S fee for this portion is tabulated below:
Woodmere Rd. Frontage Total Frontage Cost per Front Footage ($/ft.) Developer Cost
210 210 -1 511.25 - $2,362.50
.7ar.lopa,Apee -d
Woodmen Trade Cada
CAStel. NYW FdaT .J d-Wood—T.&C.WeArrarron-D.wlopae Areemad,Wmd-1 Trdo Creta Nov 1999 doe
D
•
•
Smith Warehouse is currently under design and construction may not run concurrently with
Woodmere Trade Center. Therefore it is agreed that the DEVELOPER install a 6 -inch sewer
force main if the 6 -inch force main is not installed along High Street under the Smith Warehouse
Developers Agreement or its sequel. If the force main proposed by the Smith Warehouse
Developer's Agreement is not constructed, the DEVELOPER shall furnish and install a 6 -inch
PVC force main along the west side of High Street from CR -512 to 2' Street. The
DEVELOPER shall make connection to an existing 8 -inch force main located on CR -512. The
proposed force main shall extend along Higi Street to the intersection of 2" Street for a total of
300 +/- lineal feet.
The Developer shall pay line extension fees in the amount of $15.77 per foot of property frontage
of the proposed wastewater line. The DEVELOPER'S fee for this portion is tabulated below:
Woodmere Rd, F%mage Total Frontage Cost per Front Footage (5/ft.) Developer Cost
L— —210 _ 210 _ - —515.77 i 53,311.70
$B K -inch Diameter Water Main along ►Hgh Street from CR-512to 2" Street:
The DEVELOPER shall furnish and install a 8 -inch PVC water main along the east Side of High
Street from CR -512 to 2`1 Street to Woodmere Road and along the north side of Woodmere Road
from High Street to Old Dixie Highway. Make connection to a proposed 8 -inch water main to be
located on the east side of High Street and 2' Street, as per the Smith Warehouse Developer'
Agreement. The new water main shall extend south along High Street from 2' Street to the
intersection of Woodmere Road and travel eastward along Woodmcre to the west right-of-way
line of Old Dixie Highway for a total of 947 +/- lineal feet
The Developer is relying upon the construction of a water main along High Street to be installed
by others (Smith Warehouse Development, Randy Mosby as Engineer -of -Record). Smith
Warehouse is currently under design and construction may not run concurrently with Woodmere
Trade Center. Therefore it is agreed that the DEVELOPER install an 8 -inch water main if the 6 -
inch force main is not installed along High Street under the Smith Warehouse Developer's
Agreement or its sequel. If the water main proposed by the Smith Warehouse Developer's
Agreement is not constructed, the DEVELOPER shall furnish and install a 6 -inch PVC water
main along the east side of High Street from CR -512 to 2"' Street. The DEVELOPER shall
make connection to an existing 16 -inch water main located on CR -512. The proposed water
main shall extend along High Street to the intersection of 2"' Street for a total of 300 +/- lineal
feet.
The Developer shall pay line extension fees in the amount of $11.25 per foot of property frontage
of the proposed water line. The DEVELOPER'S fee for this portion is tabulated below:
Woodmere Rd. Frontage Total Frontage Cost per Front Footage ($/ft.) Developer Cost
210 210 -1 511.25 - $2,362.50
.7ar.lopa,Apee -d
Woodmen Trade Cada
CAStel. NYW FdaT .J d-Wood—T.&C.WeArrarron-D.wlopae Areemad,Wmd-1 Trdo Creta Nov 1999 doe
L
n.�
prior to submittal to the permitting agencies must approve all plans and specifications. The
DEVELOPER shall be responsible for all costs associated with the design, permitting and construction of
the offsite facilities (which includes but is not limited to transmission lines, valves, fittings, hydrants,
meters, and associated appurtenances) whether designed, permitted or constructed by the DEVELOPER
or the COUNTY.
The design, permitting, construction, operation and maintenance of all 99:0W water and wastewater
utilities which is on or solely dedicated to the DEVELOPER's property (including but not limited to
water meter, transmission lines, pumps, valves, storage facilities,) shall be the DEVELOPER's
responsibility and expense. Construction of on-site water and wastewater utilities shall be subject to
COUNTY review and approval.
'Ile DEVELOPER shall be deemed in possession of the potable water on the DEVELOPER's side of
the water meter, however the DEVELOPER shall not be deemed to own the water and the transfer or sale
of water is prohibited.
The DEVELOPER may not transfer or sell water or wastewater capacityto any pally for use offsite
of the property.
59--10— Easerocn
The DEVELOPER shall convey to the COUNTY an exclusive casement for the water and
wastewater utilities. In addition, the DEVELOPER shall grant to the COUNTY a non-exclusive ingress -
egress casement necessary for the COUNTY to install, maintain, operate and monitor the water and
wastewater utilities, within the public right-of-way including but not limited to water lines, services,
laterals, manholes, meters, lift station, sewer, remote monitoring
After the COUNTY'S final inspection of the off-site water and wastewater facilities for conformance
with the approved plans and specifications, the DEVELOPER shall convey all the offsite facilities to the
COUNTY. The conveyance shall include, but not be limited to the following documents, in a form
acceptable to the COUNTY:
a) Bill of Sale
b) Grants of Easements
c) Maintenance Bond
d) Record Drawings (hard copy and electronic format - AutoCAD rel. 14.0)
SC -11_ Entire Agreement:
This Agreement embodies the entire agreement between the parties relative to the subject matter
hereof, and there is no oral or written agreements between the parties, nor any representations made by
either party relative to the subject. matter hereof, which are not expressly set forth herein.
SC - l2 Governing Law & Jurisdiction:
This Agreement shall be governed by the laws of the State of Florida and the laws of the United
States pertaining to transactions in such State and all actions arising out of this Agreement shall be
brought in Indian River COUNTY. All of the parties to this agreement have participated freely in the
negotiation and preparation hereof, accordingly, this Agreement shall not be more strictly construed
against any one of the parties hereto.
SC - 13. Insurance:
DEVELOPER agrees to ensure that the selected Contractor for the project provides insurance
coverage in accordance with Indian River County Utilities Department requirements. In addition, Indian
Ne .kVa'e Ap—t
Woodmen Trade Cm
C:%9%e L,kFd.,,Njat- Woodmae Trade CentefA9-1-[krelopna Apern kW -1— T.& Cmta Nor 1999 doe
0
River County shall be named as an additional insured and the Developer shall provide an original
certificate of insurance to the COUNTY.
SC - 14 Main nange Bond
The DEVELOPER agrees to convey all right, title and interest in the aforementioned utility
improvements to Indian River County, Florida, and provide a Maintenance Bond for a period of one-year
after release of final payment by the COUNTY. The value of the Maintenance Bond shall be twenty-five
percent (25%) of the total construction value of the utility improvements.
Sc - 15 Multiple Cvuntervarts;
This Agreement may be executed in a number of identical counterparts which, taken together, shall
constitute collectively one (1) agreement. but in making proof of this Agreement, it shall not be
necessary to produce or account for more than one such counterpart executed by the party to be charged.
SC - 16.Pgrmits:
The DEVELOPER shall be responsible for obtaining all construction and operating permits required
for the construction, delivery, use and monitoring of the water distributed and wastewater collected to the
subject property. If, through no fault of the parties involved, any federal, state or local government or
agency (excluding the COUNTY) fail to issue necessary permits, grant necessan approvals, or require a
material change in the system, then to the extent necessary and if possible, the parties agree to negotiate
an amendment to the Agreement to reflect the change in condition. If it becomes impossible or
impracticable to perform under the terms of this Agreement because of the above, then this Agreement
shall terminate and the parties shall have no further obligations to the other.
The DEVELOPER shall comply with reasonable request by the COUNTY concerning on-site
operations and maintenance including but not limited to all FDEP regulations relating to bacteriological
and hydrostatic testing, cross connection control, monitoring, color -coding of water and wastewater
equipment.
Rr�ingvt•Attretmcnt
The Agreement shall be recorded in the public records of Indian River County. The obligations
defined in this Agreement shall be a condition, which shall run with the land and shall bind subsequent
owners of the property for the term of this Agreement,
(- .....evcralrilily / Invalid Pruvision;
If any provision of the Agreement is held to be illegal, invalid or unenforceable under present or
future law's, such provision shall be fully severable. this Agreement shall be construed and enforced as if
such illegal, invalid or unenforceable provision had never comprised a part of this Agreement, and the
remaining provisions of this Agreement shall remain in full force and effect and shall not be affected by
such illegal, invalid, or unenforceable provision or by its severance from this Agreement.
Sc - 19. Term:
The term of this Agreement is five (5) Ncars. Unless otherwise authorized in writing this Agreement
shall be to be renewed automatically for successive terms at the expiration of any preceding term. The
Terns of this Agreement shall run concurrently with FDEP Permit to Construction and with the County's
Utility Construction Permit whichever is less but shall be not more than five 5 - •ears from the date of
issuance.
C.St,m Wyk Fdm'P,.J t -W --Ib erc Tnde CmtttUpt d-Nev kven Ar W -lb -I Tnda Cent -Nov 1999 da
N'o.d—T.& C -W
40
G
C
SC - 20 Time of Essence:
Time is of the essence of this Agreement; however, if the final date of any period which is set out in
any provision of this Agreement falls on a Saturday, Sunday or legal holiday under the laws of the United
States or the State of Florida, then, in such event, the time of such period shall be extended to the next
day which is not a Saturday, Sunday or legal holiday.
IN WITNESS WHEREOF, the COUNTY and DE`/ELOPER have accepted, made and executed this
Agreement upon the terms and conditions above stated on day and year first above written.
DEVELOPER: John Llovd
.� By:
�Wee(sigrt ature) (signature)
1, �yQ/VGS
Pnnte Name
1 ss ( ig ure)
STATE OF FLORIDA
COUNTY OF INDIAN RIVER
The foregoing instrument was acknowledged before me this \`t'_M_ day of g;�jq�k.__._. 1949, by who
is personally known to me or who has produced _ as identification and who did take
off.
Notary• Public
Name:
0AILSTRUBHAR
}4 r
4
Commission Number. Cs -_
Commission Expiration:
14ousr10rAny FlalDwysaawaeo warn
(Notary tamp
;,k •, /ynarvrt
Woodad�Tndt Cagy
C\Savar Doyk Fda',Proj- - W—dmm Trade Ca"I AF -1 • Drarelopm Apeemart Woo&e Tnh Cams Nor 1999 dm
40
•
•
•
STATE OF FLORIDA
COUNTY OF INDIAN RIVER
ATTEST. BOARD OF COUNTY COMMISSIONERS OF
INDIAN RIVER COUNTY, FLORIDA
B?AKe,4nthR
Jef�gyChainnan
f�,.-�
Before me personally appeared KennethR_Maeht�S , as Chairman of the Board of COUNTY
Commissioners, and''AiRILIA as Deputy Clerk, to me well known instrument, and they
acknowledge before me they executed same.
Witness my hand and official seals this 7th day of 1999.
Notarn Public i
Name: Kimberly E MdiiWU
Commission Number:
Commission Expiration:
Moberly E Mossung
> A My COMMI "I cc&54U t)"Es
>utY iS 2003
•x¢.�•' raaonauroorFwrwA+ctW-
1`1— "
A dmi n
Utilities
Fltck M
C'Star. ale FaaTmixt • Wuod.. Trde CmdeM1Al*w-d - D—kVm App aT� W00&—T.& Cm[a dor 1999 dm
alt
n.�twa•..+�-,tee
W..do,e,. Thee Cad.
[i?ITTiLl
LEGAL D9KR TWM AMD PLAT
Al L OF LOTS 3 - 5, BLOCK 1, SEBASTIAN GROVES ESTATES ACCORDING TO TFIE PLAT
T MF: R.F,OF AS RF CORDF.I) IN PLAT BOOK 5, PAGE 85 OF THE PUBLIC RECORDS OF INDIAN
RIVER COUNTY, FLORIDA. SAID LANDS LYING IN INDIAN RIVER COUNTY, FLORIDA.
k,<I.•�rr t Apm.,,n,t
��,..�,•.,�r[$ 14 cr„�
s
EXHIBIT B
PROJECT COST ESTLNtATE
ESTQL4TED COST OF DIPROVEhiENTS:
Item
Description
Estimated
Unit of Measure
----Unit Price
Total Price
Quantity
Dia PVC Force
943
Ft.
S11.50
$10,844.50
Main
a
2.
4" Dia. PVC Force
40
Ft.
58.50
$340.00
3.
Main
4" Restrainers
2
Each
540.00
580.00
4,
6" Restrainers
10
Each _
550.00
5500.00
5.
6" Tee
1 ,--
Each
5221.00
$221.00
6.
6" 22.5 Degrce Fittin
I
Each
_ S110.00
$110.00
7.
6" x 4" Reducer
1
Each
S120.00
S120.00
8.
2" Air Release Valve
_
1
Each
S1,100.00
_S1,100.00
Gate Valve
1
Each
S575.00
_ 5575.00
10.
4" Gate Valve
1
_
Each
5100.00 _
5400.00
11.
_
Jute erConnrction
1
_
Each
_ 51,200.00
S1,200.00
12.
1 ''/i' Water Service
1
_
Each_S257.00
_5257.00
13.
Fire Hydrant & 6" Gate
2
_ _
Each
52,050.00
S4,100.00
Valve
--
14.
2" Blowoff
2
_ Each
_ _ $1,100.00
$2,200.00
_
1
Each
$302.00
15.
16.
8" Tee
8" Restrainers
14
Each
_$302.00
i $83.57
S1,169.98
17.
8" 22.5 Degree Fitting
1
Each
5257.00
5257.00
18.
19.
8" Gate Valve
8" Dia. PVC Water
2
947
Each
Ft.
5810.00
514.00
$1,620.00
$13,258.00
_
20.
Main _
Pavement Restoration
634SF
--
--
____S4,25
$2,694.50
------
_
Subtotal
-_. $41,348.98.
- - -- Contingeac (4710%
S4 134.90
_
Engineering, Surveying &
$3,000.00
Administration
Total Improvement Cost_
_ $48,483.88
_
Estimated County Share
542,809.68
- ._ ---
cc fle In
Developer s Agreement
W°odmem bade Center
Page 9 of 10
40
•
•
EXHIBIT C
PROJECT SKETCH OF I,MPORVENIENTS
uram ua a.om�n
\ as DISI u O