Loading...
HomeMy WebLinkAbout1999-31140 • EXHIBIT B Change Order No. 4 Dated November 12, 1999 C.,Stevm Doyle FJa)WW!F-San}R.M.T,Agwl&-Swnh RegwmulWWTF-Fuel Reco tL.b Co.0.Tumn Snuth-Nov 161999A« C • (Instructions on reverse side) No. Four (4 ) South County WWTP-Phase II PROJECT; Expansion to 2.0 mgd. DATE OF ISSUANCE: ll —')WNER: Indian River County, Department of Utilities Services 1840 25th Street (Name, Vero Beach, Florida 32960 Address) CONTRACTOR: Wharton -Smith, Inc. 750 County Road 15 Lake Monroe, FL 32747 OWNER's Project No 7039 ENGINEER: Camp Dresser & McKee, Inc. 1701 State Road A -1-A, Ste. 301 South Count WWTP-Phase II Vero Beach, FL 32963 CONTRACT FOR: Y Expansion to 2.0 mgd. ENGINEER's Project No. 6706-13883-052 You are directed to make the following changes in the Contract Documents. '' Indian n. Dale Description: Final Reconciliation Change Order Adm,,� Q l-oyal t3udget Purpose of Change Order.. See Exhibits A and B u 11 ` Flick Mgr. Attachments: (List documents supporting change) Exhibit A- Final Reconcilla Exhibit B -South County Purchase Orders CHANGE IN CONTRACT PRICE: CI ANGE IN CONTRACT TIME: Original Contract Price Original Contract Time Substantial Completion -October 4, S 8,527,000.00 Final Completion - necember 1. 199 oars or aam Previous Change Orders No. 1 to No. 3 Net change from previous Change Orders S_ (2.811,�38n.47) 0 aars Contract Price prior to this Change Order Contract Time Prior to this Change Order Substantial Completion -October 4, S 5,713,619.53 Final Completion -December 3, 1998 cars or ave Net7(r)0=x (decrease) of this Change Order Net Increase (ftM# 00 of this Change Order 'Substantial Completion -41.5 days S (151,401.87) Final completion — In days days Contract Price with all Approved Change Orders Contract Time with all approved Change Orders Substantial Completion -November le_ S 5,562,21.7.66 Final Completion -January 24, 1999 aara or ave 1998 3 1998 RECOMMENDED: APPRO \ APPROVED: ( J ' � oy _^ — by by — E neth R. ht, Chairm n EJCDC No. 1910.8-8 (1983 Edition) B Approved 12-7-99 Prepared by the Eagtneen' Joint Contract Documents Committee and endorsed by The Associated General Con—clon of Amen - 00800 -25 1998 40 • EXHIBIT °A" FINAL RECONCILIATION ITEM DESCRIPTIONS Indian River County South County Wastewater Treatment Plant Phase II - Expansion to 2.0 MGD CDM Project No. 6706-13883-052 Change Order No. 4 Item No. 1 Description: Sales tax reconciliation. Purpose: County's purchasing of equipment resulted in overall project savings in excess of $150,000 associated with sales tax. Estimated equipment costs were conservative (high). County, Contractor, and CDM negotiated better prices. Cost: $114,325.18 �+ Time: None j 2 Description: Credit for extra costs incurred by Owner as a result of project completion delay from the City of Vero Beach. Purpose: Delayed project completion resulted in extended diversion of wastewater to City of Vero Beach facilities. Cost: ($58,000.00) Time: None 3 Description: Credit for extended engineering/inspection services incurred by County. Purpose: Delayed project completion resulted in extra costs to County from Camp Dresser & McKee, Inc. Contractor to pay full costs. Cost: ($71,600.00) Time: None rb2)02 go s 4 Description: Unsuitable soil excavation/replacement in chlorine contact basin area. Purpose: Unsuitable soil removed and replaced to structurally stabilize the basin. Cost: $14,612.74 Time: 7.5 days (SC) Description: Credit for topsoil not used on project. Purpose: Topsoil from excavation efforts used in lieu of off-site purchase. Cost: ($7,306.37) Time: None 6 Description: Bubbler control panels with air compressors. Purpose: Air compressors added to control panels for bubbler level systems in lieu of additional air piping. Cost: $4,266.74 Time: None 7 Description: Submersible pump base modifications. Purpose: Existing pumps identified to be used in onsite lift station required modification to facilitate rail -mounted seating in wet well. Cost: $3,025.51 Time: None 8 Description: Rotary drum thickener elevated slab revision. Purpose: Elevated slab enlarged to facilitate access to rotary drum thickener and control panel to meet electrical codes. Cost: $2,883.10 Time: 2 days (SC) rnnoz 40 �7 9 Description: Purpose: Cost: Time: 10 Description: Purpose: Cost: Time: 11 Description: Purpose: Cost: Time: 12 Description: Purpose: Cost: Time: 13 Description: i i Purpose: I Cost: Time: o� Rain delays. Extension in contract time as a result of excessive rainfall at the project site for the duration of the project. $0.00 32 days (SC) HVAC modifications in blower and generator buildings. Modifications necessary as a result of roof and electrical design conflicts. $2,700.00 None Additional electrical modifications. Modifications required for inclusion of sump pumps in meter pits and additional receptacles in existing plant administration building. $5,880.00 10 days (FC) Rubber mats for electrical room floors. Code requirement. Not specified in contract. $2,901.00 None Credit for Tera Systems maintenance contract. To facilitate close out of contract. County staff to contract directly with Tera Systems. ($143,862.27) None D 14 Description: Credit for money not used as part of administration office roof repair allowance. Purpose: Credit Owner for remainder of bid form allowance. Cost: ($6,538.00) Time: None 15 Description: Credit for money not used as part of laboratory testing allowance. Purpose: Credit Owner for remainder of bid form allowance. Cost: ($8,479.50) Time: None 16 Description: Credit for money not used as part of extra wiring/electrical allowance. Purpose: Credit Owner for bid form allowance item not used. Cost: ($5,000.00) Time: None 17 Description: Credit for shortening of main access roadway at turnaround. Purpose: Roadway shortened to avoid underlying muck pockets. Extra turnaround area to odor control equipment included. Cost: ($1,210.00) Time: None • O EXHIBIT "A" (cont.) FINAL RECONCILIATION CHANGE ORDER COST SUMMARY Indian River County South County Wastewater Treatment Plant Phase II — Expansion to 2.0 MGD CDM Project No. 6706-13883-052 Change Order No. 4 Item No. Cost/(Credit) Time (days) S.C. F.C. 1 $114,325.18 0 0 2 (58,000.00) 0 0 3 (71,600.00) 0 0 4 14,612.74 7.5 0 5 (7,306.37) 0 0 6 4,266.74 0 0 7 3,025.51 0 0 8 2,883.10 2 0 9 0.00 32 0 10 2,700.00 0 0 11 5,880.00 0 10 12 2,901.00 0 0 13 (143,862.27) 0 0 14 (6,538.00) 0 0 15 (8,479.50) 0 0 16 (5,000.00) 0 0 17 (1,210.00) 0 0 Total Change this C.O. No. 4 ($151,401.87) 41.5 t0 This Change Order includes not only all direct costs of Contractor such as labor, material, job overhead, and profit markup, but also includes any costs for modifications or changes in sequence of work to be performed, delays, rescheduling, disruptions, extended direct overhead or general overhead acceleration, material or other escalation which includes wages, and other impact costs. rb2702