Loading...
HomeMy WebLinkAbout2000-009CHANGE ORDER M rkx r,ment (33,101 PROJECT: EMS/Fire Station N8 -- 1115 Barber Street Sebastian, Fir;rida 329513 Distribution to: OwNEsr- 1Q ARcmrTEcT CONTRACTOR IJ FIELD I J OTHER I1 TO: (Cordran-) 1 Hill Bryant & Aasoclates, Inc. j 1550 Old Dixie Highway Vero Beach, Florida 32%0 L You tars dirsctad to make Nr roaowbv aIapes in at's c eantrsCC SEE ATTACHMEN r CHANGE ORDER: Two (2) INITIATION DATE: December 15, 1899 ARCHITECT'S PROJECT NO:050798VB CONTRACT FOR: Renovations CONTRACT DATE: July 28, 1899 Not valid until signed by both Architect and Owner Signature of the Contractor Indicates his agreement herewith, including any adjustment in the Contract_$um-of Contract Time $275,290.00 The original (Contract Sum) was.............................................................. 1,004.03 Net change by previously authorized Change Orders ...................................$ The (Contract Srnn) prior to this Change Order was.....................................$276,284.03 The (Contract Su111) will be increased by this Change Order ......................... S 2,328.60 The new (Contract SUM) including this Change Order will he........................$278,622.63 The Contract Timc will he (increased) (4)days The Date of Substantial Completion as of the date of this Change Order therefore is Authorized: AkVHITECT CONTRACTOR OWNER Edlund & Dritenbas Architects Bill Bryant & Associates c Indian River County EMS Dep -t_ fi5 Rn al alm_Ron;rward 1550 Old �{ixiet}iighwa.y . _11340 7-- _SSfrrPr.____.... .... Suite D o 1-132860 Vero orida 3" Ve o t a h F rr� 32 60 B By - DATE z DATE DATE t!' f APPR0VED nuary 40 /'�?0 T CHAIRMAN ' i Fran B. Adams FS #8 Change Order #2 STATE CERTIFIED GENERAL CONTRACTOR CGC 017811 ATTACHMENT 1. Delete (2) desks in dispatch credit ($702.00) 2. Gut (2.) Concrete lintels for clearance of doors 3 & 4 200.00 3. Supply (3) emergency lights to electrician 111.87 4. Install aluminum plates to hurricane braces @ garage doors per field report 1113 790.00 5. Paint existing garage floor with epoxy paint 625.00 6. Supply/install a 3 locker unit 1000.00 Subtotal $2024.87 Contractor's overhead fe-e 303.73 Total :2328.60 1550 OLD DIXIE I-IWY. 4' VERO BEACH, F1.32960.3655 • (561) 567-0045 FAX (561) 770-1460